CONFIRMATION LETTER

SITE DONOR SITE ACCEPTOR


Subcon
NO PO No. PO Description Material Type Material Qty Material Unit Delivery Date Material Origin REMARK
DU ID DU Name Project Code DU ID DU Name Project Code Installation

PT Xerindo
1 GSK022_GSK040 Panceng _Sedayu Panceng - D5_BJN016_D5_BJN005_MW_N_S100B D5_BJN016_D5_BJN005 56A034R 1091298777-305 IRO_Telkom_Fix_Network_2018 Antena MW link 1 HOP 7/1+0/1.2 17-Jul-19 Re-Use Done Delivery + Re Use
Teknologi

Acknowledge By,

Huawei Engineer Huawei RPM


Date : Date :