KEMENTERIAN PEKERJAAN UMUM
DIREKTORAT JENDERAL SUMBER DAYA AIR
BALAI BESAR WILAYAH SUNGAI PEMALI JUANA
‘SATUAN KERJA BALAI BESAR WILAYAH SUNGAI PEMALI JUANA
‘Alamat : Jalan Brigiend S. Soediarto No, 375, Telp /Fax (62) (24) 6731758 Email: snvjatbarang@yahoo oid
TO WHOM JT MY CONCER®
Ref. No.
‘The undersigned
Name Abdul Haris Subarda, ST
NIP 198610312005021000
Position Commitment Maker of Sungai / Banjir Kanal
Pemali Juana River Basin Management Unit Semarang,
Clarifies that
Name ‘Agus Supurwo
Company WASKITA-BAP-WIKA, JO
Position Supervisor
Has performed his/her job very well for the construction of the followings
Project Component A » West Flood Way / Garang River Improvement Works
Contract Package A-1(1). West Flood Way / Garang River Improvement
Contract Ne. KUO702A06 13/A0.5.301 dated October 15th, 2009
Contract Amount (Original) IDR 317.763.468.673,20 (Include VAT 10%)
Contract Amount (Addendum 03) : IDR 349.499,853.078,63 (Include VAT 16%)
Construction Period November 12, 2009 - November 10, 2013
Consultant CTI Engineering Intemational, Co.Ltd
The scope of work as follows
TNo. Description Quantity Unit
1 [Channel and Dike Works 7.988.925,22 | _m3
2. Raising the Existing Floodwall m
3 [Protection Works for Riverbank and Riverbed 5.857,00 | m
Precast Concrete Block (1.5/piece), Concrete Type-D and Placin 5.661,00 } nos
|Gabion Mattress =500mm (Galvanized), Type-A 49.197.94 | m3
Furnishing PC Sheet Pile (K-500, t=220mm, w=S00mm) 15,027.00 | m
4 [Drainage Outlet Works 32,00 | unit
5. |River Amenity and Maintenance Facilities 5.25300] m
6 |Watertevel Gauging Station 4,00} anit
7. |River Crossing Facilities 1,00} Ls
8 Inspection Road 500,00 m
Embankm 31.508,37 | m3
Riprap Mound (Dia.250 to 400mm) 7.441,28 | m3
Tetrapod Concrete Type C1 ( w = 1-2 ton ) (Cement Type PPC) 5.355,00| nos
9 |PC (Prestressed Concrete) Sheet Pile Wall Type Revetment (2) 3.708,00] om
10_|Revetment (2) 1.65.00 | __m
With the results : Good
This statement is made for any use required by the law.