PROYEK : RUMAH TINGGAL BAPAK JERRY HERMAWAN LO - BSD

SUBYEK : KALKULASI DAYA LISTRIK


BAGIAN : LISTRIK
TANGGAL : JANUARI 2019

UNIT DAYA DAYA DAYA FAKTOR KEBUTUHAN FAKTOR KEBUTUHAN


NO URAIAN TERPASANG TERPASANG TERPASANG KEBUTUHAN DAYA EMERGENCY DAYA
EMERGENCY
(W)/UNIT (VA)/UNIT (VA) (VA) (VA)

I PUTR-1
1 - PD-D
Penerangan - 15,356.1 19,195 19,195 0.80 15,356 1.00 15,356
Stopkontak - 10,000 0.50 5,000 1.00 5,000
Water heater 1 1400 1400 0.30 420 1.00 420
2 - PD-D1
Penerangan - 3,849.7 4,812 4,812 0.80 3,850 1.00 3,850
Stopkontak - 5,400 0.50 2,700 1.00 2,700
Water heater 1 1400 1400 0.30 420 1.00 420

3 - PD-1
Penerangan - 19,085.4 23,857 23,857 0.80 19,085 1.00 19,085
Stopkontak - 15,200 0.50 7,600 1.00 7,600
Water heater 3 1400 4200 0.30 1,260 1.00 1,260
4 - PD-2
Penerangan - 14,484.8 18,106 18,106 0.80 14,485 1.00 14,485
Stopkontak - 11,400 0.50 5,700 1.00 5,700
Water heater 3 1400 4200 0.30 1,260 1.00 1,260
5 Pompa
- SUMMERSIBLE/DEEPWELL 1 3000 3000 1.00 3,000 1.00 3,000
- SIRAM TAMAN 1 1500 1500 1.00 1,500 1.00 1,500
- FILTER 1 6000 6000 1.00 6,000 1.00 6,000
- BOOSTER 1 7500 7500 1.00 7,500 1.00 7,500
- KOLAM RENANG 1 9450 9450 1.00 9,450 1.00 9,450
- LIFT 1 8,600 10750 10750 1.00 10,750 1.00 10,750
6 DAPUR / PANTRY 15,000 15,000 1.00 15,000 1.00 15,000
7 LAIN LAIN
- Hot Pool 31,000 38,750 38,750 1.00 38,750 1.00 38,750
- Cool Pool 10,000 12,500 12,500 1.00 12,500 1.00 12,500
- Sauna 17,000 21,250 21,250 1.00 21,250 1.00 21,250
- Steam 17,000 21,250 21,250 1.00 21,250 1.00 21,250
- Koi Pond
1 Rdf 100 watt 100 125 125 1.00 125 1.00 125
2 Pompa rdf 1500 watt 1,500 1,875 1,875 1.00 1,875 1.00 1,875
3 UV 5 x 100 watt = 500 watt 500 625 625 1.00 625 1.00 625
4 Aerator 2x 200 watt= 400 watt 400 500 500 1.00 500 1.00 500
5 Pompa 50 ton = 600 watt 600 750 750 1.00 750 1.00 750
6 Pompa 16.8 ton x 5= 600 watt = 3000 watt 3,000 3,750 3,750 1.00 3,750 1.00 3,750

III PUTR-3
1 - PD-B
Penerangan - 3,944.0 4,930 4,930 0.80 3,944 1.00 3,944
Stopkontak - 2,800 0.50 1,400 1.00 1,400
Water heater 1 1400 1400 0.30 420 1.00 420
2 PAC-1 - 17,114 21,393 21,393 1.00 21,393 0.50 10,696

TOTAL PUTR-1 & PUTR-3 304,268 258,868 248,171

FAKTOR KESEREMPAKAN 1.30 1.30 1.30

TOTAL PUTR-1 & PUTR-3 234,052 199,129 190,901

II PUTR-2
1 PAC-A - 89,770 112,213 112,213 1.00 112,213 0.50 56,106

TOTAL PUTR-2 112,213 112,213 56,106

FAKTOR KESEREMPAKAN 1.10 1.10 1.10

TOTAL PUTR-2 102,011 102,011 51,006

REKAPITULASI :
1. DAYA TERSAMBUNG : 336,063 VA

2. KEBUTUHAN DAYA : 301,140 VA


3. KEBUTUHAN DAYA EMERGENCY :

AC : 100 % 301,140 VA
AC : 50 % 241,907 VA

4. KAPASITAS PERALATAN UTAMA

- DIESEL GENERATING SET AC 100% : 360 KVA

- DIESEL GENERATING SET AC 50% : 280 KVA