3-1 Planning
/ Planning is an art, and the art of planning exist only amon
human beings. This power to be able to plan distinguishes man —
from the other members of the animal kingdom.
The environmental development through planning is a natu-
ral field for Architects as they are in a better position because of
their training and experience. However, for a good planning,
intelligence and are necessary. And for a plan to be
successful, it rv i:
fied.
s of any construction project. Unfortunately, it
seems that some engineers and constructors have not given the
pre-planning special emphasis despite their one direction of go-
ing there.
Past experience have proven that there is no short cuts to
sound construction pre-planning. There is no new procedure to
replace the following four basic rules for any job.
1. The construction superintendent should be included in the
consultation at the very start of the planning stage.
just present him later the finished plan and say:
the plan for you to implement. ; %Rie
philosophy. Locking ahead isa way of think~
m about the future eects of today’s action. Plan
S 8 sate ofthe mind that recognizes the n2ed for
{the value of direction,
Both long and short range plans
No give purpose to the organiza-
“The central figure i
bears the ultimate
projet. His role inthe ea
person who i xpable of wo
the objectives of the projet
"hej of project manage an
ing, However, the reward of the jb
from:
|. The benefits of being assoiated
2. The personal satisfhction ofn projects have some clments in
of planing and coordinating project
ble for large projects, which typi-
‘even thousands of activities, that must
ied and monitored ifthe project is to proceed
schedule ata reasonable cos.
be established and priorities are set
must be identified and time estima’
‘The fist sep in constuction
‘raph and poting the anticipated dt
uipment atthe sit, The optimum tin
ctvites could be anayand. Sever
‘cal use of equipment will appear on
oul then be adjust to preven
can probably be traced to
: Similarly, people at every ter no ating
‘ssenially the same manage- we experienced projoet ADAGE
ate
Yowards the accomplish- stating date for any of theActivites, which are related to
‘ill serve as a running list of ind
nt and materials, which are in the
pressed acoring to their importance
project. The design and dating effort
ce those drawings that are necessary
‘3
5-5 Project Engineer's Review peA Gist hand review ofthe pra
ral status ofthe work is
iscassed withthe key field
ome ofice assistance i of
Suggestions are made and disuse a
‘ganizations as to how its progress canbe
Discussions and review of
assures a clearer understanding of the we
lowing actions .
1 Altemate solutions may be reviewed
2. Exchanging ideas fora ete solution
5, To implement results as agreed int
‘sucessful rescue operation ‘The site review, gives every an
Cy ni liscussions of ideas and techniques on
work, The best presplanning
tion toa construction projet.‘withthe plans and specifcarions
‘mistake and delay on this ecount.
Othe work. Large construction w
he oxtractor must be selective in Pj undergoes srs of
ity and qualifcatio to start the
ater by selected personnel Pen BF
xewuton of major actives
Project phase ot
Project construction fife. cele
suchas:
‘The site must be foundes of organizing a con-
iceses and building permits
site temporary roadway
feces, and temporary shed
field offices for the sat
é ater and letrc supply
es
Hef storage space for use of
employer = the owner. Most of
sponsbiltes were stipulated
will be beter exercised if ach
sponsibility ofthe other, The
1. Proving and making
‘he comvenicne of constuction.
Eretion of site office i‘The rate of which they must bee
‘The owner's staff and thethe effect of the contingency. I,
‘and to make the necessary ad-
back into line
many horizontal spaces as are re
(ofthe job, The vertical columns
date
the
the next step isto complete th
the same order as
‘of work which should
fine when they pil be
site, also giving the present
ated time of completion and alps f a
3-9 Planning and Scheduling:
‘The Gantt char isa tool used for
‘ope projects With he chart, the pret
chau projet activites, and to monitor
comparing planned progress actual
To prepare the char, the project
major activities that would be required
tity are made and the sequence wns.
sed, the chart indicates which
[As the project progresses, the projet
to sce which activities were ahead ofEB
_
"Wenastacsst
FORCONSTRUCTION
Pts simpy, ming i
so eal enn
an be crucial to effective pro-
‘tne of the carly activitics
they could not start until
ate acs ny e
i
rd
3-10 Materi
The busing of
struction works. The
‘requirements and
‘Ther are tems which
davings and fabrication befor i
‘material requirements from the bill of ¢
thot dey *
‘The contractor should refer the :
arth tine of preparing his i or the jo
th basi of petites wath the supplies A
Gotan may be obtained fom the
dhs nals, a comparative statement
‘classification of the quotations received, listing
fie any condition by which may be
A. purchasing program for construction
prepared according to its priority. nthe
‘hasing program, the materials are likely £0
ther t00 soon with eonsequence of pF
sible deterioration or too late deliveries which ¥
dla of the work. .
‘Confasion usually results from delay
als of day to day requirements if they
hour. The purchasing. program willwith the storekeeper at the
‘where suppliers fail to
1
‘budget should be a consenatve aid
thin the organization toward their
nately, this purpose is frequently co
Impression and meaning tothe budget as;
1. A control of expenditures
subordinates. An attitude thFoudget depends upon the ability
ta reasonable degre of accuracy
for expenditures with a fixed
tions in volume where changes in e
tional shifts, building and supervisory
Variable rate cost is caleulated as
‘wo points of minimum and maximum
3-12. Budget Preparation
‘The preparation of budget estimate in €
vumittee proposition, This is under the
ration of a budget serves to familiarize
problems involved.
With their knowledge ofthe p
ing part in seting the goal and im
personel give more effectiveplies tothe son tina
tem of low value mateial at
the constriction activites, pat
oot Fo tan ae
period and make allowance ane ae
eo “yt ea
‘owing major procurement factors:
ality of th materials
(Quantity of the materials
“Time oflvery
Pe ofthe mails
1
a
3
4
‘Te procurement departeat and hi
Know and maintain reonds
their possible substitute, sources of
«quantities availablenumber, description or by its
simple but because of specifi.
ars from a purchase requisition. It
nd when is to be deliversl, Por
Sey mand san aid in fling and
reply, a traveling requisition is
[eanying the usual information on the put~
ih pace forthe word repeat order. This
Tr
er
boueht under contiming contract or those purr
jot require quotations from the supplier
on is already available to both
order, the purchase order form might
‘furnished on our PO No. __
unt expected will likewise be shown as
and that ofthe original requis
The immediate supervisor's
the working place is properly
‘the equipment, scaffoldings and the lke
conditions. He should stly see to
low the safe working hai.
Reyandless of the exact percentage Fela
human motivation to work safely isan impo
of the foreman and supervisors. Safety
cirassing beard. In the original design of
place of tools, acident hazards may bel
Safety minded project engineer will
for safety measures to:
| Minimize manual handling
2. Will loeate control and
reached safely‘of the plant and construction equip
efficient operation and uninterrupted
‘While deterioration of building cannot
Tikewise, are subject to wear and A number of engineers feel that in
tend to got out of adjustment not only as regular inspections of equipment 1
also because of temperature chanves ‘hat are hereby prevented, They pointed
fmachine parts and a host of other causes downs oceur suddenly and without wae
the proach of such failures i tise
factor as corrosion forms in b
ofthe machine, Dirt gradually finds How docs one foresee fractured dive
eS of quipment. Moisture seeps into ce raulie val, amit switch that
BM tation To cortcrsc \cansfrmer that blows up? These are
‘M equipment, the or bicakdown headache which are dificult iF
pFssrbed is proper penidic mainte cure by the inspection medicine. Ths,
maintenance inspection must be weighed
of cost. Te question is: does an ounce
fect a pound of eure, oF does @ pound
only an ounce of cure?
‘Where machine and equipmentits i to the continuity
ility or item being checked, its importance
pee ee to een of the plant and workers and the ;
a fi Pin from the first indication of trouble to the actual
file General inspection of machinery can be scheduled at
intervals of perhaps 3 to 4 months depending upon the volume
of service or Operations.
Equipment Rental
The trend in construction business is to have equipment
ted. In very recent years, there has been a Significant g1
‘quipment as opposed to outright purchase.
Tn rental plans for con-
struction equipmei materials handling trucks,
ant, delivery trucks,
and office equipment.
Renting equipment offers the advantag
lay, no maintenance
OF Servicing worries f:
Cost fully deductible on income tax ¢|
Ness expense,
eS of no capital out.
or the user, and rental
‘assified as current busi-
Whether the long FANE cost of such rentals compared with
Ownership is lower
: 1s a debatable Point which each Company
Tust decide on the Metits of its own Case,