DAFTAR HARGA BAHAN DAN UPAH

NO JENIS TENAGA / BAHAN KODE JEKAN RAYA BUKIT BATU KASONGAN SAMPIT
1 2 3 4
0 1 2 3 4 5 6
A. TENAGA
1 Mandor L.01 265,700.00 265,700.00 265,700.00 265,700.00
2 Kepala tukang batu L.02 215,000.00 215,000.00 215,000.00 215,000.00
3 Kepala tukang kayu L.03 196,100.00 196,100.00 196,100.00 196,100.00
4 Kepala tukang besi L.04 189,800.00 189,800.00 189,800.00 189,800.00
5 Kepala Tukang Cat L.05 189,800.00 189,800.00 189,800.00 189,800.00
6 Tukang batu L.06 151,800.00 151,800.00 151,800.00 151,800.00
7 Tukang kayu L.07 151,800.00 151,800.00 151,800.00 151,800.00
8 Tukang Cat L.08 115,500.00 115,500.00 115,500.00 115,500.00
9 Tukang besi L.09 126,500.00 126,500.00 126,500.00 126,500.00
10 Tukang Khusus Alumunium L.10 139,200.00 139,200.00 139,200.00 139,200.00
11 Tukang Allumunium/Kaca L.11 139,200.00 139,200.00 139,200.00 139,200.00
12 Pembantu tukang batu L.12 107,500.00 107,500.00 107,500.00 107,500.00
13 Pembantu tukang kayu L.13 107,500.00 107,500.00 107,500.00 107,500.00
14 Pembantu tukang besi L.14 107,500.00 107,500.00 107,500.00 107,500.00
15 Pembantu tukang cat L.15 107,500.00 107,500.00 107,500.00 107,500.00

B BAHAN
- BAHAN AIR
1 Air A.1 3.75 3.75 3.75 3.75

- BAHAN GALIAN
1 Batu belah B-1 700,000.00 700,000.00 700,000.00 700,000.00
2 Batu pecah 2-3 cm B-4 552,500.00 552,500.00 552,500.00 552,500.00
3 Pasir beton B-9 168,000.00 168,000.00 168,000.00 168,000.00
4 Pasir Pasang B-10 168,000.00 168,000.00 168,000.00 168,000.00
5 Pasir Urug B-11 108,000.00 108,000.00 108,000.00 108,000.00
- BAHAN CETAKAN DAN SEMEN
1 Asbes semen plafond C-3 21,100.00 21,100.00 21,100.00 21,100.00
2 Batu bata merah C-7 1,150.00 1,150.00 1,150.00 1,150.00
3 Genteng metal C-14 63,300.00 63,300.00 63,300.00 63,300.00
4 Gypsum board C-16 91,400.00 91,400.00 91,400.00 91,400.00
5 Tepung gipsum C-17 8,125.00 8,125.00 8,125.00 8,125.00
6 keramik uk. 20x20 cm ( Roman ) C-22 146,250.00 146,250.00 146,250.00 146,250.00
7 Keramik 20x25 cm ( Roman ) C-23 124,500.00 124,500.00 124,500.00 124,500.00
8 Keramik 40x40 cm kasar ( Roman ) C-24 165,082.50 165,082.50 165,082.50 165,082.50
9 Keramik 10x40cm C-25 22,500.00 22,500.00 22,500.00 22,500.00
10 Keramik 40x40 cm ( Roman ) C-26 150,075.00 150,075.00 150,075.00 150,075.00
11 Semen portland C-46 1,970.00 1,970.00 1,970.00 1,970.00
12 Semen warna C-47 16,500.00 16,500.00 16,500.00 16,500.00

- BAHAN PIPA DAN SANITARI


1 Bak fibreglass D-2 207,000.00 207,000.00 207,000.00 207,000.00
2 Bak fibreglass perlengkapan D-3 207,000.00 207,000.00 207,000.00 207,000.00
3 Wastafel (perlengkapan) D-7 467,500.00 467,500.00 467,500.00 467,500.00
4 Closet jongkok D-8 225,000.00 225,000.00 225,000.00 225,000.00
5 Floor drain D-9 15,750.00 15,750.00 15,750.00 15,750.00
6 Kran air D-10 31,500.00 31,500.00 31,500.00 31,500.00
7 Pipa PVC 3/4” D-108 8,868.75 8,868.75 8,868.75 8,868.75
8 Pipa PVC 3/4” (perlengkapan) D-109 8,868.75 8,868.75 8,868.75 8,868.75
9 Pipa PVC 3” D-110 64,965.00 64,965.00 64,965.00 64,965.00
10 Pipa PVC 3” (perlengkapan) D-111 64,965.00 64,965.00 64,965.00 64,965.00
11 Pipa PVC 4” D-112 90,585.00 90,585.00 90,585.00 90,585.00
12 Pipa PVC 4” (perlengkapan) D-113 90,585.00 90,585.00 90,585.00 90,585.00
13 Sealtape D-131 5,000.00 5,000.00 5,000.00 5,000.00
14 Wastafel D-162 467,500.00 561,494.40 561,494.40 561,494.40
15 valve 3/4" PVC D-164 125,000.00 125,000.00 125,000.00 125,000.00
16 septictank + resapan D-165 6,839,000.00 6,839,000.00 6,839,000.00 6,839,000.00

1 Alluminium strip E-1 105,000.00 105,000.00 105,000.00 105,000.00


2 Assesoris rangka hollow (perkuatan, las dll) E-4 50,000.00 50,000.00 50,000.00 50,000.00
3 Batang C-75 tebal 0,80 mm E-5 18,500.00 18,500.00 18,500.00 18,500.00
4 Batang C-75 tebal 0,60 mm E-6 13,000.00 13,000.00 13,000.00 13,000.00
5 Baut screw driver E-7 175.00 175.00 175.00 175.00
6 Besi beton polos E-11 20,256.00 20,256.00 20,256.00 20,256.00
7 Dinabolt dia 12mm (10-15cm) E-20 12,000.00 12,000.00 12,000.00 12,000.00
8 Kawat bindrat E-22 27,756.00 27,756.00 27,756.00 27,756.00
9 Nok genteng metal E-29 36,000.00 36,000.00 36,000.00 36,000.00
10 Paku kayu E-32 17,100.00 17,100.00 17,100.00 17,100.00
11 Paku skrup Gypsum board E-38 5,500.00 5,500.00 5,500.00 5,500.00
12 Paku tripleks E-39 34,500.00 34,500.00 34,500.00 34,500.00
13 Profil alluminium E-44 150,000.00 150,000.00 150,000.00 150,000.00
14 Rangka metal hollow 40.40.2 mm E-46 50,000.00 50,000.00 50,000.00 50,000.00
15 Roof batten reng T=0,60 mm E-48 11,600.00 11,600.00 11,600.00 11,600.00
16 Seng plat E-51 46,800.00 46,800.00 46,800.00 46,800.00
17 Skrup fixer E-54 156.00 156.00 156.00 156.00
18 Tools E-56 1,000.00 1,000.00 1,000.00 1,000.00

1 Door closer F-1 35,000.00 35,000.00 35,000.00 35,000.00


2 Door holder F-2 93,750.00 93,750.00 93,750.00 93,750.00
3 Door stop F-3 30,000.00 30,000.00 30,000.00 30,000.00
4 Engsel kupu-kupu F-5 20,000.00 30,000.00 20,000.00 20,000.00
5 Engsel pintu F-6 28,350.00 28,350.00 28,350.00 28,350.00
6 Kait angin F-7 18,900.00 18,900.00 18,900.00 18,900.00
7 Kunci slot F-10 17,750.00 17,750.00 17,750.00 17,750.00
8 Kunci tanam biasa F-12 133,875.00 133,875.00 133,875.00 133,875.00

1 Ampelas G-1 8,500.00 7,500.00 7,500.00 7,500.00


2 Cat dasar G-4 41,700.00 41,700.00 41,700.00 41,700.00
3 Cat menie kayu G-5 49,500.00 49,500.00 49,500.00 49,500.00
4 Cat penutup G-6 33,320.00 33,320.00 33,320.00 33,320.00
5 Kuas G-12 15,000.00 15,000.00 15,000.00 15,000.00
6 Minyak bekisting G-20 25,500.00 25,500.00 25,500.00 25,500.00
7 Plamir G-24 12,600.00 12,600.00 12,600.00 12,600.00
8 Thinner G-32 12,600.00 12,600.00 12,600.00 12,600.00

9 Balok kayu kelas II H-3 3,593,750.00 3,593,750.00 3,593,750.00 3,593,750.00


10 Balok kayu kelas III H-5 2,400,000.00 2,400,000.00 2,400,000.00 2,400,000.00
Dolken kayu φ 8-10/400 cm
11 H-8 16,500.00 16,500.00 16,500.00 16,500.00
8-10/400 cm
12 Kayu galam dia 10-12 Cm p.4 m H-11 24,000.00 24,000.00 24,000.00 24,000.00
13 List kayu profil H-12 7,600.00 7,600.00 7,600.00 7,600.00
14 Papan bakesting H-13 3,200,000.00 3,200,000.00 3,200,000.00 3,200,000.00
15 Papan kayu kelas II H-14 5,376,300.00 5,376,300.00 5,376,300.00 5,376,300.00
16 Plywood tebal 9 mm H-19 210,000.00 210,000.00 210,000.00 210,000.00

1 Pintu kaca tempered tebal 12 mm lengkap + stiker sandblast J-3 8,450,000.00 8,450,000.00 8,450,000.00 8,450,000.00
2 Kaca tempered 12 mm J-4 1,562,500.00 1,562,500.00 1,562,500.00 1,562,500.00
3 Memasang kaca - tebal 5 mm + stiker sandblast J-7 270,000.00 270,000.00 270,000.00 270,000.00
4 Kaca tebal 5 mm J-13 157,500.00 157,500.00 157,500.00 157,500.00
5 Profil kaca J-16 157,500.00 157,500.00 157,500.00 157,500.00
6 Sealant J-17 30,000.00 30,000.00 30,000.00 30,000.00

1 Box Panel uk. 60x80x20 EL-019 1,798,940.00 1,798,940.00 1,798,940.00 1,798,940.00


2 Stop kontak + instalasi beton EL-041 212,625.00 212,625.00 212,625.00 212,625.00
3 Stop kontak AC + instalasi beton EL-042 450,000.00 450,000.00 450,000.00 450,000.00
4 Schakelar (standar) EL-045 30,000.00 30,000.00 30,000.00 30,000.00
5 Lampu PL 20 watt + armatur plafond EL-047 67,300.00 67,300.00 67,300.00 67,300.00
6 Titik lampu + instalasi beton EL-049 212,625.00 228,375.00 228,375.00 228,375.00
7 Exhaustfan EL-050 750,000.00 750,000.00 750,000.00 750,000.00

C OVERHEAD DAN KEUNTUNGAN


1 OVERHEAD + KEUNTUNGAN J-1 0% 0% 0% 0%
PULANG PISAU PULANG PISAU PULANG PISAU
5 5 5
7 8 9

265,700.00
215,000.00
196,100.00
189,800.00
189,800.00
151,800.00
151,800.00
115,500.00
126,500.00
139,200.00
139,200.00
107,500.00
107,500.00
107,500.00
107,500.00

3.75

700,000.00
552,500.00
168,000.00
168,000.00
108,000.00
21,100.00
1,150.00
63,300.00
91,400.00
8,125.00
146,250.00
124,500.00
165,082.50
22,500.00
150,075.00
1,970.00
16,500.00

207,000.00
207,000.00
467,500.00
225,000.00
15,750.00
31,500.00
8,868.75
8,868.75
64,965.00
64,965.00
90,585.00
90,585.00
5,000.00
561,494.40
125,000.00
6,839,000.00

105,000.00
50,000.00
18,500.00
13,000.00
175.00
20,256.00
12,000.00
27,756.00
36,000.00
17,100.00
5,500.00
34,500.00
150,000.00
50,000.00
11,600.00
46,800.00
156.00
1,000.00

35,000.00
93,750.00
30,000.00
20,000.00
28,350.00
18,900.00
17,750.00
133,875.00

7,500.00
41,700.00
49,500.00
33,320.00
15,000.00
25,500.00
12,600.00
12,600.00

3,593,750.00
2,400,000.00
16,500.00
24,000.00
7,600.00
3,200,000.00
5,376,300.00
210,000.00

8,450,000.00
1,562,500.00
270,000.00
157,500.00
157,500.00
30,000.00

1,798,940.00
212,625.00
450,000.00
30,000.00
67,300.00
228,375.00
750,000.00

0%
PULANG PISAU SPESIFIKASI TEKNIS SATUAN
5 12
10 11 12

Lokal Orang/hari
Lokal Orang/hari
Lokal Orang/hari
Lokal Orang/hari
Lokal Orang/hari
Lokal Orang/hari
Lokal Orang/hari
Lokal Orang/hari
Lokal Orang/hari
Lokal Orang/hari
Lokal Orang/hari
Lokal Orang/hari
Lokal Orang/hari
Lokal Orang/hari
Lokal Orang/hari

Liter

M3
M3
M3
M3
M3
M2
Buah
Lembar
Lbr
Kg
M2
M2
M2
Buah
M2
Kg
Kg

Unit
Unit
Unit
Unit
Unit
M1
M1
Ls
M1
Ls
M1
Ls
Bh
Unit
Buah
Unit

M1
Ls
M1
M1
Buah
Kg
Buah
Kg
Bh
Kg
Kg
Kg
M1
M1
M1
Lbr
Bh
Ls

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

Lbr
Kg
Kg
Kg
Bh
Ltr
Kg
Ltr

M3
M3
Batang
Batang
M1
M3
M3
Lbr

Buah
M2
M2
M2
M1
Tube

Unit
Titik
Titik
Buah
Buah
Titik
Buah
LAMPIRAN A
NOMOR : ...........................................

PROGRAM : 0
KEGIATAN : 0
PEKERJAAN : 0
LOKASI : 0
TAHUN : 0

KONTRAK AWAL
NO. URAIAN PEKERJAAN
ANALISA VOLUME SATUAN HARGA SATUAN (RP)

A.1 PEKERJAAN PERSIAPAN


1 Pengukuran dan pembersihan lokasi Ls 1.00 - 1,494,300.00
2 Plang nama proyek Ls 1.00 - 498,100.00
3 Pekerjaan bongkaran Ls 1.00 Err:509 1,394,680.00
4 Kesehatan dan Keselamatan Kerja (K3) Ls 1.00 Err:509 871,675.00
JUMLAH A.1

A.2 PEKERJAAN TANAH


1 Pekerjaan Galian Tanah A.2.3.1.1 60.88 M3 78,201.00
2 Pengurugan kembali galian tanah A.2.3.1.9 18.26 M3 65,300.00
3 Pengurugan dengan pasir urug A.2.3.1.11 Err:509 Err:509 147,614.00
JUMLAH A.2
A.3 PEKERJAAN PONDASI, STRUKTUR DAN DINDING
1 Cor beton lantai kerja pondasi mutu f’c = 21,7 MPa (K 100) Footplate A.4.1.1.4 4.84 - 1,023,123.26
2 Pasangan pondasi batu belah A.3.2.1.2 11.43 Err:509 1,207,884.10
3 Pekerjaa Pondasi Footplat
- Pek. Beton mutu f’c = 21,7 MPa (K 175) Footplate A.4.1.1.5 13.25 M3 1,220,153.48
- Pek. Bekesting Footplate A.4.1.1.20 44.16 M2 204,527.50
- Pek. Penulangan Footplate A.4.1.1.17 1,045.71 Kg 15,607.80
4 Pekerjaa Pedestal Pondasi Footplate
- Pek. Beton mutu f’c = 21,7 MPa (K 175) Pedestal A.4.1.1.5 2.69 M3 1,220,153.48
- Pek. Bekesting Pedestal A.4.1.1.22 35.88 M2 288,132.50
- Pek. Penulangan Pedestal A.4.1.1.17 253.79 Kg 15,607.80
5 Pekerjaa Sloof 25/40 cm
- Pek. Beton mutu f’c = 21,7 MPa (K 175) Sloof A.4.1.1.5 4.58 M3 1,220,153.48
- Pek. Bekesting Sloof A.4.1.1.21 36.60 M2 216,027.50
- Pek. Penulangan Sloof A.4.1.1.17 400.37 Kg 15,607.80
6 Pekerjaan Kolom 30/30
- Pek. Beton mutu f’c = 21,7 MPa (K 175) Kolom A.4.1.1.5 12.42 M3 1,220,153.48
- Pek. Bekesting Kolom A.4.1.1.22 165.60 M2 288,132.50
- Pek. Penulangan Kolom A.4.1.1.17 1,416.43 Kg 15,607.80
JUMLAH A.3
TOTAL = A1+A2+A3
PEMBULATAN
LAMPIRAN ADDENDUM - 01
................................, TANGGAL : .........................................

KONTRAK ADDENDUM - 01 DEVIASI

JMLH HARGA (RP) ANALISA VOLUME SATUAN HARGA SATUAN (RP) JMLH HARGA (RP) TAMBAH KURANG

1,494,300.00 Ls 1.00 Ls 1,494,300.00 1,494,300.00


498,100.00 Ls 1.00 Ls 498,100.00 498,100.00
1,394,680.00 Ls Err:509 Err:509 1,394,680.00 Err:509
871,675.00 Ls
4,258,755.00 JUMLAH A.1 Err:509

4,760,876.88 A.2.3.1.1 5.12 M3 78,201.00 400,389.12 (4,360,487.76)


1,192,378.00 A.2.3.1.9 Err:509 Err:509 65,300.00 Err:509 Err:509
A.2.3.1.11 5.10 Err:509 147,614.00 752,831.40 752,831.40
5,953,254.88 JUMLAH A.2 Err:509
4,951,916.58 A.4.1.1.4 - - 1,023,123.26 - (4,951,916.58)
13,806,115.26 A.3.2.1.2 Err:509 Err:509 1,207,884.10 Err:509 Err:509

16,167,033.67 A.4.1.1.5 1.60 M3 1,220,153.48 1,952,245.58 14,214,788.09


9,031,934.40 A.4.1.1.20 8.00 M2 204,527.50 1,636,220.00 7,395,714.40
16,321,232.54 A.4.1.1.17 223.83 Kg 15,607.80 3,493,524.43 12,827,708.10

3,282,212.87 A.4.1.1.5 0.20 M3 1,220,153.48 244,030.70 3,038,182.18


10,338,194.10 A.4.1.1.22 4.00 M2 288,132.50 1,152,530.00 9,185,664.10
3,961,103.56 A.4.1.1.17 28.29 Kg 15,607.80 441,596.69 3,519,506.87

5,588,302.96 A.4.1.1.5 0.99 M3 1,220,153.48 1,207,951.95


7,906,606.50 A.4.1.1.21 13.20 M2 216,027.50 2,851,563.00
6,248,894.89 A.4.1.1.17 178.05 Kg 15,607.80 2,778,906.36

15,154,306.28 A.4.1.1.5 1.32 M3 1,220,153.48 1,610,602.60 13,543,703.68


47,714,742.00 A.4.1.1.22 26.40 M2 288,132.50 7,606,698.00 40,108,044.00
22,107,356.15 A.4.1.1.17 186.74 Kg 15,607.80 2,914,538.14 19,192,818.01
182,579,951.76 JUMLAH A.3 Err:509
192,791,961.64 TOTAL = A1+A2+A3 Err:509 Err:509 123,026,129.44
192,791,000.00 PEMBULATAN Err:509
KETERANGAN

TETAP
TETAP
TETAP
DIHILANGKAN

BERTAMBAH
BERTAMBAH
ITEM BARU
BERTAMBAH
BERTAMBAH

BERKURANG
BERKURANG
BERKURANG

BERKURANG
BERKURANG
BERKURANG

TETAP
TETAP
TETAP

BERKURANG
BERKURANG
BERKURANG
REKAPITULASI
RENCANA ANGGARAN BIAYA
(RAB)

PROGRAM :
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN :

NO. PEKERJAAN

A PEKERJAAN PERSIAPAN
B PEKERJAAN TANAH
C PEKERJAAN STRUKTUR
D PEKERJAAN PASANGAN DINDING
E PEKERJAAN PINTU JENDELA
F PEKERJAAN LANTAI
G PEKERJAAN ATAP
H PEKERJAAN PLAFOND
I PEKERJAAN PENGECETAN DAN LAIN-LAIN
J PEKERJAAN INSTALASI LISTRIK
K PEKERJAAN SANITASI

TOTAL KESELUR
PEMBUL
TERBILANG : " SERATUS TUJUH PULUH SATU JUTA RUPIAH "
HARGA

1,500,000.00
616,600.00
40,698,691.19
39,485,542.40
9,647,986.80
9,552,518.98
22,626,879.05
13,534,052.35
9,214,520.39
675,970.00
7,922,260.80

TOTAL 155,475,021.96
PPN 10% 15,547,502.20
ESELURUHAN 171,022,524.16
PEMBULATAN 171,000,000.00
RENCANA ANGGARAN BIAYA
(RAB)

PROGRAM :
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN :

NO. URAIAN PEKERJAAN ANALISA

A PEKERJAAN PERSIAPAN
1 Pengukuran dan pembersihan lokasi Ls
2 Plang nama proyek Ls

B PEKERJAAN TANAH
1 Penggalian tanah biasa sedalam 1 m A.2.3.1.1
2 Pengurugan kembali galian tanah A.2.3.1.9

C PEKERJAAN STRUKTUR
1 Pengadaan cerucuk dia. 8-10 cm Ls
2 Memancang kayu kedalam tanah E.13
3 Cor beton lantai kerja pondasi mutu f’c = 21,7 MPa (K 100) Footplate A.4.1.1.4
4 Pekerjaan Pondasi Footplate
- Pek. Beton mutu f’c = 21,7 MPa (K 175) Footplate A.4.1.1.5
- Pek. Bekesting Footplate A.4.1.1.20
- Pek. Penulangan Footplate A.4.1.1.17
5 Pekerjaan Pedistal Pondasi Footplate
- Pek. Beton mutu f’c = 21,7 MPa (K 175) Pedistal A.4.1.1.5
- Pek. Bekesting Pedistal A.4.1.1.22
- Pek. Penulangan Pedistal A.4.1.1.17
6 Pekerjaan Sloof 15/20 cm
- Pek. Beton mutu f’c = 21,7 MPa (K 175) Sloof A.4.1.1.5
- Pek. Bekesting Sloof A.4.1.1.21
- Pek. Penulangan Sloof A.4.1.1.17
7 Pekerjaan Sloof 15/15 cm ( teras )
- Pek. Beton mutu f’c = 21,7 MPa (K 175) Sloof A.4.1.1.5
- Pek. Bekesting Sloof A.4.1.1.21
- Pek. Penulangan Sloof A.4.1.1.17
8 Pekerjaan Kolom 20/20
- Pek. Beton mutu f’c = 21,7 MPa (K 175) Kolom A.4.1.1.5
- Pek. Bekesting Kolom A.4.1.1.22
- Pek. Penulangan Kolom A.4.1.1.17
9 Pekerjaan Ring Balk 15/20
- Pek. Beton mutu f’c = 21,7 MPa (K 175) Ring Balk A.4.1.1.5
- Pek. Bekesting Ring Balk A.4.1.1.22
- Pek. Penulangan Ring Balk A.4.1.1.17
10 Pekerjaan Plat Beton (kanopi)
- Pek. Beton mutu f’c = 21,7 MPa (K 175) kanopi A.4.1.1.5
- Pek. Bekesting Plat Beton kanopi A.4.1.1.24
- Pek. Penulangan Plat Beton kanopi A.4.1.1.17

D PEKERJAAN PASANGAN DINDING


1 Pasangan dinding 1/2 bata A.4.4.1.9
2 Plestarant A.4.4.2.6
3 Acian A.4.4.2.27
4 Pasangan roster Ls
5 Pasangan rangka dinding partisi A.4.6.1.20.a
6 Pasangan dinding partisi Plywood A.4.5.1.7.b

E PEKERJAAN PINTU JENDELA


1 Memasang kusen pintu kayu klas I (P-1) A.4.6.1.1
2 Memasang kusen pintu kayu klas I (P-2) A.4.6.1.1
3 Memasang kusen jendela kayu klas I (J-1) A.4.6.1.1
4 Pasangan daun pintu A.4.6.1.5
5 Pasangan daun jendela A.4.6.1.6
6 Pasangan Kaca bening A.4.6.2.17
7 Engsel jendela A.4.6.2.6
8 Kait angin A.4.6.2.9
9 Grendel A.4.6.2.11
10 Engsel pintu A.4.6.2.5
11 Handle pintu A.4.6.2.2
F PEKERJAAN LANTAI
1 Pekerjaan cor beton tumbuk lantai A.4.1.1.1
2 Pekerjaan pasangan lantai keramik lantai 40x40 cm A.4.4.3.34.a
3 Pekerjaan pasangan lantai keramik lantai 25x25 cm (WC) A.4.4.3.54

G PEKERJAAN ATAP
1 Pasangan Rangka Atap Baja Ringan LS- baja ringan
2 Pasangan atap multi roof A.4.5.2.32
3 Pasangan bubungan A.4.5.2.36
4 Pasangan Listplang Nusa Plank Ls. Nusaplank

H PEKERJAAN PLAFOND
1 Pasangan rangka plafond A.4.6.1.19
2 Pasangan plafond A.4.5.1.7
3 Pasangan list plafond gifsum A.4.5.1.8

I PEKERJAAN PENGECETAN DAN LAIN-LAIN


1 Pekerjaan pengecetan dinding A.4.7.1.10
2 Pekerjaan pengecetan Plafond A.4.7.1.11
3 Pekerjaan pengecetan kayu A.4.7.1.4

J PEKERJAAN INSTALASI LISTRIK


1 Saklar Tunggal M.005
2 Saklar Ganda M.006
3 Stop Kontak + Instalasi Kabel M.001
4 Titik Lampu M.009
5 Lampu SL 20 watt M.007

K PEKERJAAN SANITASI
1 Pembuatan Septiktank Ls
2 Pasangan Closed jongkok A.5.1.1.2
3 Pasangan kran air A.5.1.1.35
4 Pasangan floordrain A.5.1.1.36
5 Pasangan Pipa Air Kotor Ls
6 Pasangan Pipa Air Bekas Ls
7 Pasangan Pipa Air Bersih Ls
RAN BIAYA

#REF!

VOLUME SATUAN HARGA SATUAN (RP) JMLH HARGA (RP)

1.00 Ls 1,000,000.00 1,000,000.00


1.00 Ls 500,000.00 500,000.00
JUMLAH A 1,500,000.00

5.12 M3 80,000.00 409,600.00


3.00 M3 69,000.00 207,000.00
JUMLAH B 616,600.00

100.00 M' 5,000.00 500,000.00


100.00 M' 20,000.00 2,000,000.00
0.32 M3 1,023,123.26 327,399.44

1.60 M3 1,220,153.48 1,952,245.58


8.00 M2 204,527.50 1,636,220.00
223.83 Kg 15,607.80 3,493,524.43

0.20 M3 1,220,153.48 244,030.70


4.00 M2 288,132.50 1,152,530.00
28.29 Kg 15,607.80 441,596.69

0.99 M3 1,220,153.48 1,207,951.95


13.20 M2 216,027.50 2,851,563.00
178.05 Kg 15,607.80 2,778,906.36

0.09 M3 1,220,153.48 109,813.81


1.20 M2 216,027.50 259,233.00
20.53 Kg 15,607.80 320,396.92

1.32 M3 1,220,153.48 1,610,602.60


26.40 M2 288,132.50 7,606,698.00
186.74 Kg 15,607.80 2,914,538.14

0.99 M3 1,220,153.48 1,207,951.95


13.20 M2 288,132.50 3,803,349.00
178.05 Kg 15,607.80 2,778,906.36

0.15 M3 1,220,153.48 178,142.41


3.51 M2 336,892.50 1,182,492.68
9.01 Kg 15,607.80 140,598.18
JUMLAH C 40,698,691.19

95.99 M2 142,692.69 13,697,071.31


191.98 M2 72,627.33 13,942,994.81
191.98 M2 45,683.75 8,770,366.33
25.00 Buah 10,000.00 250,000.00
13.11 M2 102,666.25 1,345,954.54
26.22 M2 56,413.25 1,479,155.42
JUMLAH D 39,485,542.40

0.05 M3 12,572,978.75 641,221.92


0.02 M3 12,572,978.75 282,892.02
0.14 M3 12,572,978.75 1,709,925.11
4.39 M2 717,255.00 3,148,749.45
0.35 M2 549,182.50 193,312.24
1.44 M3 143,474.00 206,602.56
16.00 Buah 45,540.00 728,640.00
16.00 Buah 66,527.50 1,064,440.00
8.00 Buah 61,525.00 492,200.00
9.00 Buah 89,711.50 807,403.50
3.00 Set 124,200.00 372,600.00
JUMLAH E 9,647,986.80
4.20 M3 119,306.98 501,089.32
39.00 M2 210,462.65 8,208,043.35
3.00 M2 281,128.77 843,386.31
JUMLAH F 9,552,518.98

69.56 M2 157,262.50 10,939,179.50


69.56 M2 119,255.00 8,295,377.80
19.00 M1 82,909.25 1,575,275.75
30.80 M1 58,995.00 1,817,046.00
JUMLAH G 22,626,879.05

55.62 M2 127,834.00 7,110,127.08


55.62 M2 43,850.19 2,438,947.57
96.80 M1 41,167.13 3,984,977.70
JUMLAH H 13,534,052.35

218.20 M2 34,232.05 7,469,433.31


55.62 M2 22,737.80 1,264,676.44
9.80 M2 49,030.25 480,410.65
JUMLAH I 9,214,520.39

2.00 Buah 13,915.00 27,830.00


1.00 Buah 18,860.00 18,860.00
3.00 Buah 39,100.00 117,300.00
4.00 Titik 86,250.00 345,000.00
4.00 Buah 41,745.00 166,980.00
JUMLAH J 675,970.00

1.00 Pkt 7,000,000.00 7,000,000.00


1.00 Buah 567,918.30 567,918.30
2.00 Buah 81,218.75 162,437.50
1.00 Buah 39,905.00 39,905.00
4.00 M1 10,000.00 40,000.00
4.00 M1 9,250.00 37,000.00
10.00 M1 7,500.00 75,000.00
JUMLAH K 7,922,260.80
DAFTAR ANALISA SNI

A.2.3.1.1 Penggalian tanah biasa sedalam 1 m


No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang batu L.11 Orang/hari 0.7500
Mandor L.01 Orang/hari 0.0250
.........................................................................................
Jumlah- 1
2 BAHAN
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.2.3.1.9 Pengurugan kembali galian tanah


No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang batu L.11 Orang/hari 0.5000
Mandor L.01 Orang/hari 0.0500
.........................................................................................
Jumlah- 1
2 BAHAN
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.2.3.1.11 Pengurugan dengan pasir urug


No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang batu L.11 Orang/hari 0.3000
Mandor L.01 Orang/hari 0.0100
.........................................................................................
Jumlah- 1
2 BAHAN
Tanah urug biasa/granit M3 1.2000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
LS.galam Kayu galam dia 10-12 Cm p.4 m
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 0.1000
Tukang kayu L.07 Orang/hari 0.0200
Kepala tukang kayu L.03 Orang/hari 0.0040
Mandor L.01 Orang/hari 0.0020
.........................................................................................
Jumlah- 1
2 BAHAN
Kayu galam dia 10-12 Cm p.4 m H-10 batang 0.2500
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.3.2.1.2 Pemasangan pondasi batu belah campuran 1SP : 4PP


No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang batu L.11 Orang/hari 1.5000
Tukang batu L.06 Orang/hari 0.7500
Kepala tukang batu L.02 Orang/hari 0.0750
Mandor L.01 Orang/hari 0.0750
.........................................................................................
Jumlah- 1
2 BAHAN
Batu belah C-11 M3 1.2000
Semen portland C-3 Kg 163.0000
Pasir beton C-4 M3 0.5200
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100),


A.4.1.1.4 slump (3-6) cm, w/c = 0,87
n bakestin No. Uraian Kode Satuan Koef
n bakesting 1 TENAGA
n bakesting Pembantu tukang batu L.11 Orang/hari 1.2000
n bakesting Tukang batu L.06 Orang/hari 0.2000
n bakesting Kepala tukang batu L.02 Orang/hari 0.0200
n bakesting Mandor L.01 Orang/hari 0.0600
n bakesting .........................................................................................
Jumlah- 1
n bakesting 2 BAHAN
n bakesting Semen portland C-3 Kg 230.0000
n bakesting Pasir beton C-4 M3 0.6379
n bakesting Batu pecah 2-3 cm C-10 M3 0.7607
n bakesting Air C-15 Liter 200.0000
n bakesting .........................................................................................
Jumlah- 2
n bakesting 3 PERALATAN
n bakesting .........................................................................................
Jumlah- 3
n bakesting 4 JUMLAH (1+2+3)
n bakesting 5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
n bakesting 6 HARGA SATUAN PEKERJAAN (4+5)
A.4.1.1.5 Membuatbeton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang batu L.11 Orang/hari 1.6500
Tukang batu L.06 Orang/hari 0.2750
Kepala tukang batu L.02 Orang/hari 0.0280
Mandor L.01 Orang/hari 0.0830
.........................................................................................
Jumlah- 1
2 BAHAN
Semen portland C-3 Kg 326.0000
Pasir beton C-4 M3 0.5429
Batu pecah 2-3 cm C-10 M3 0.7622
Air C-15 Liter 215.0000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.4.1.1.6 Membuat beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang batu L.11 Orang/hari 1.6500
Tukang batu L.06 Orang/hari 0.2750
Kepala tukang batu L.02 Orang/hari 0.0280
Mandor L.01 Orang/hari 0.0830
.........................................................................................
Jumlah- 1
2 BAHAN
Semen portland C-3 Kg 352.0000
Pasir beton C-4 M3 0.5221
Batu pecah 2-3 cm C-10 M3 0.7637
Air C-15 Liter 215.0000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.4.1.1.20 Pemasangan bekisting untuk pondasi


No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 0.5200
Tukang kayu L.07 Orang/hari 0.2600
Kepala tukang kayu L.03 Orang/hari 0.0260
Mandor L.01 Orang/hari 0.0260
.........................................................................................
Jumlah- 1
2 BAHAN
Papan bakesting H-4 M3 0.0400
Paku kayu E-7 Kg 0.3000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
A.4.1.1.21 Pemasangan bekisting untuk sloof
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 0.5200
Tukang kayu L.07 Orang/hari 0.2600
Kepala tukang batu L.02 Orang/hari 0.0260
Mandor L.01 Orang/hari 0.0260
.........................................................................................
Jumlah- 1
2 BAHAN
Papan bakesting H-4 M3 0.0450
Paku kayu E-7 Kg 0.3000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.4.1.1.17 Pembesian dengan besi polos atau besi ulir


No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang besi L.13 Orang/hari 0.0070
Tukang besi L.09 Orang/hari 0.0070
Kepala tukang besi L.04 Orang/hari 0.0007
Mandor L.01 Orang/hari 0.0004
.........................................................................................
Jumlah- 1
2 BAHAN
Besi beton polos E-2 kg 1.0500
Kawat bindrat E-3 kg 0.0150
.........................................................................................
Jumlah- 2
3 PERALATAN
PERALATAN .........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.4.1.1.22 Pemasangan bekisting untuk kolom


No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 0.6600
Tukang kayu L.07 Orang/hari 0.3300
Kepala tukang batu L.02 Orang/hari 0.0330
Mandor L.01 Orang/hari 0.0330
.........................................................................................
Jumlah- 1
2 BAHAN
Papan bakesting H-4 M3 0.0400
Paku kayu E-7 Kg 0.4000
Balok kayu kelas II H-2 M3 0.0150
Dolken kayu φ 8-10/400 cm 8-10/400 cm H-7 batang 2.0000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
A.4.1.1.23 Pemasangan bekisting untuk balok
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 0.6600
Tukang kayu L.07 Orang/hari 0.3300
Kepala tukang batu L.02 Orang/hari 0.0330
Mandor L.01 Orang/hari 0.0330
.........................................................................................
Jumlah- 1
2 BAHAN
Papan bakesting H-4 M3 0.0400
Paku kayu E-7 Kg 0.4000
Balok kayu kelas II H-2 M3 0.0180
Plywood tebal 4 mm H-6 Lembar 0.3500
Dolken kayu φ 8-10/400 cm 8-10/400 cm H-7 batang 2.0000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.4.1.1.24 Pemasangan bekisting untuk lantai


No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 0.6600
Tukang kayu L.07 Orang/hari 0.3300
Kepala tukang batu L.02 Orang/hari 0.0330
Mandor L.01 Orang/hari 0.0330
.........................................................................................
Jumlah- 1
2 BAHAN
Papan bakesting H-4 M3 0.0400
Paku kayu E-7 Kg 0.4000
Balok kayu kelas II H-2 M3 0.0150
Plywood tebal 4 mm H-6 Lembar 0.3500
Dolken kayu φ 8-10/400 cm 8-10/400 cm H-7 batang 6.0000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.4.4.1.9 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang batu L.11 Orang/hari 0.3000
Tukang batu L.06 Orang/hari 0.1000
Kepala tukang batu L.02 Orang/hari 0.0100
Mandor L.01 Orang/hari 0.0150
.........................................................................................
Jumlah- 1
2 BAHAN
Batu bata merah C-12 Bh 70.0000
Semen portland C-3 Kg 11.5000
Pasir beton C-4 M3 0.0430
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.4.6.1.1 Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas I
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 7.00
Tukang kayu L.07 Orang/hari 21.00
Kepala tukang kayu L.03 Orang/hari 2.10
Mandor L.01 Orang/hari 0.35
.........................................................................................
Jumlah- 1
2 BAHAN
Balok kayu kelas I H-1 M3 1.10
Paku kayu E-7 Kg 1.25
Lem kayu G-8 Kg 1.00
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.4.4.3.35 Pemasangan lantai keramik ukuran 40cm x 40cm


No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang batu L.11 Orang/hari 0.7000
Tukang batu L.06 Orang/hari 0.3500
Kepala tukang batu L.02 Orang/hari 0.0350
Mandor L.01 Orang/hari 0.0350
.........................................................................................
Jumlah- 1
2 BAHAN
Keramik 40x40 cm C-7 Bh 6.2500
Semen portland C-3 Kg 10.0000
Pasir beton C-4 M3 0.0450
Semen warna C-6 Kg 1.5000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.4.5.2.32 Pemasangan genteng metal


No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang batu L.11 Orang/hari 0.2000
Tukang kayu L.07 Orang/hari 0.1000
Kepala tukang batu L.02 Orang/hari 0.0100
Mandor L.01 Orang/hari 0.0010
.........................................................................................
Jumlah- 1
2 BAHAN
Genteng metal C-2 Lembar 1.0200
Paku kayu E-7 Kg 0.2000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
A.4.1.1.1 Membuat beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang batu L.12 Orang/hari 0.1800
Tukang batu L.06 Orang/hari 0.0200
Tukang kayu L.06 Orang/hari 0.0200
Tukang besi L.06 Orang/hari 0.0200
Kepala tukang batu L.02 Orang/hari 0.0060
Mandor L.01 Orang/hari 0.0090
.........................................................................................
Jumlah- 1
2 BAHAN
Papan bakesting C-40 Kg 0.0020
Paku kayu A.1 Kg 0.0100
minyak bekisting A.1 Liter 1.2000
besi beton polos A.1 Kg 3.0000
kawat bindrat A.1 Kg 0.4500
semen portland A.1 Zak 4.0000
pasir beton A.1 M3 0.0060
batu pecah 2-3 cm A.1 M3 0.0090
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
PEKERJAAN PLESTERAN
A.4.4.2.6 Pemasangan plesteran 1SP : 6PP tebal 15 mm.
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang batu L.12 Orang/hari 0.3000
Tukang batu L.06 Orang/hari 0.1500
Kepala tukang batu L.02 Orang/hari 0.0150
Mandor L.01 Orang/hari 0.0150
.........................................................................................
Jumlah- 1
2 BAHAN
Semen portland C-40 Kg 4.4160
Pasir beton B-10 M3 0.0270
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.4.4.2.27 Pemasangan acian.


No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang batu L.12 Orang/hari 0.2000
Tukang batu L.06 Orang/hari 0.1000
Kepala tukang batu L.02 Orang/hari 0.0100
Mandor L.01 Orang/hari 0.0100
.........................................................................................
Jumlah- 1
2 BAHAN
Semen portland C-40 Kg 3.2500
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.4.4.3.5 Pemasangan lantai ubin warna ukuran 30cm x30cm


No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang batu L.12 Orang/hari 0.2600
Tukang batu L.06 Orang/hari 0.1300
Kepala tukang batu L.02 Orang/hari 0.0130
Mandor L.01 Orang/hari 0.0130
.........................................................................................
Jumlah- 1
2 BAHAN
Keramik 30 x 30 cm C-50 Bh 11.8700
Semen portland C-40 Kg 10.0000
Semen warna C-41 Kg 1.5000
Pasir beton B-10 M3 0.0450
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
A.4.4.3.34.a Pemasangan lantai ukuran 40cm x40cm
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang batu L.11 Orang/hari 0.7000
Tukang batu L.06 Orang/hari 0.3500
Kepala tukang batu L.02 Orang/hari 0.0350
Mandor L.01 Orang/hari 0.0350
.........................................................................................
Jumlah- 1
2 BAHAN
Keramik 40x40 cm C-7 Bh 1.0500
Semen portland C-3 Kg 8.1900
Pasir beton C-4 M3 0.0450
Semen warna C-6 Kg 0.5000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.4.4.3.54 Pemasangan dinding keramik 20cm x 20cm


No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang batu L.12 Orang/hari 0.9000
Tukang batu L.06 Orang/hari 0.4500
Kepala tukang batu L.02 Orang/hari 0.0450
Mandor L.01 Orang/hari 0.0450
.........................................................................................
Jumlah- 1
2 BAHAN
Keramik 20 x 20 cm C-20 Bh 26.5000
Semen portland C-40 Kg 9.3000
Pasir beton B-10 M3 0.0180
Semen warna C-41 Kg 1.9400
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.4.4.3.41 Pemasangan plint keramik ukuran 5cm x 20cm


No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang batu L.12 Orang/hari 0.0900
Tukang batu L.06 Orang/hari 0.0900
Kepala tukang batu L.02 Orang/hari 0.0350
Mandor L.01 Orang/hari 0.0050
.........................................................................................
Jumlah- 1
2 BAHAN
Plint keramik C-28 Bh 5.3000
Semen portland C-40 Kg 0.5700
Pasir beton B-10 M3 0.0015
Semen warna C-41 Kg 0.0130
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
A.4.4.3.50 Pemasangan dinding porslen 25cm x 40cm
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang batu L.11 Orang/hari 0.9000
Tukang batu L.06 Orang/hari 0.4500
Kepala tukang batu L.02 Orang/hari 0.0450
Mandor L.01 Orang/hari 0.0450
.........................................................................................
Jumlah- 1
2 BAHAN
keramik dinding 25cmx40cm G-17 Dus 1.0500
Semen portland C-3 Kg 9.3000
Pasir beton C-4 M3 0.0180
Semen warna C-6 Kg 1.9400
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.4.5.1.7 Pemasangan langit-langit nusaboard ukuran (120x240x6) mm, tebal 6 mm


No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 0.1000
Tukang kayu L.07 Orang/hari 0.0500
Kepala tukang kayu L.03 Orang/hari 0.0050
Mandor L.01 Orang/hari 0.0050
.........................................................................................
Jumlah- 1
2 BAHAN
Nusa board C-13 Lembar 0.3640
Paku skrup Nusa board C-14 Kg 0.1100
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.4.6.1.5 Pembuatan dan pemasangan daun pintu panel, kayu kelas I atau II
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 1.0000
Tukang kayu L.07 Orang/hari 3.0000
Kepala tukang kayu L.03 Orang/hari 0.3000
Mandor L.01 Orang/hari 0.0500
.........................................................................................
Jumlah- 1
2 BAHAN
Papan kayu kelas II H-5 M3 0.0400
Lem kayu G-8 Kg 0.5000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
A.4.6.2.6 Pemasangan engsel jendela
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 0.0100
Tukang kayu L.07 Orang/hari 0.1000
Kepala tukang kayu L.03 Orang/hari 0.0100
Mandor L.01 Orang/hari 0.0005
.........................................................................................
Jumlah- 1
2 BAHAN
Engsel G-9 Buah 1.0000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.4.6.2.9 Pemasangan kait angin


No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 0.0150
Tukang kayu L.07 Orang/hari 0.1500
Kepala tukang kayu L.03 Orang/hari 0.0150
Mandor L.01 Orang/hari 0.0080
.........................................................................................
Jumlah- 1
2 BAHAN
Kait angin G-10 Buah 1.0000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.4.6.2.11 Pemasangan kunci slot


No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 0.0200
Tukang kayu L.07 Orang/hari 0.2000
Kepala tukang kayu L.03 Orang/hari 0.0200
Mandor L.01 Orang/hari 0.0010
.........................................................................................
Jumlah- 1
2 BAHAN
Kunci slot E-13 Buah 1.0000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.4.1.1.35 Membuat kolom praktis beton bertulang (11 x 11) cm


No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang batu L.11 Orang/hari 0.1800
Tukang batu L.06 Orang/hari 0.0200
Tukang kayu L.07 Orang/hari 0.0200
Tukang besi L.09 Orang/hari 0.0200
Kepala tukang batu L.02 Orang/hari 0.0060
Mandor L.01 Orang/hari 0.0090
.........................................................................................
Jumlah- 1
2 BAHAN
Papan bakesting H-4 M3 0.0020
Paku kayu E-7 Kg 0.0100
Besi beton polos E-2 kg 3.0000
Kawat bindrat E-3 kg 0.4500
Semen portland C-3 Kg 4.0000
Pasir beton C-4 M3 0.0060
Batu pecah 2-3 cm C-10 M3 0.0090
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.4.6.1.13 Pemasangan konstruksi kuda-kuda konvensional, kayu kelas II


No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 4.0000
Tukang kayu L.07 Orang/hari 12.0000
Kepala tukang kayu L.03 Orang/hari 1.2000
Mandor L.01 Orang/hari 0.2000
.........................................................................................
Jumlah- 1
2 BAHAN
Balok kayu kelas II H-2 M3 1.1000
Besi Beugel / baut kuda-kuda E-4 Kg 15.0000
Paku kayu E-7 Kg 5.6000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.4.6.1.15 Pemasangan konstruksi gordeng, kayu kelas II


No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 6.7000
Tukang kayu L.07 Orang/hari 20.1000
Kepala tukang kayu L.03 Orang/hari 2.0100
Mandor L.01 Orang/hari 0.3350
.........................................................................................
Jumlah- 1
2 BAHAN
Balok kayu kelas II H-2 M3 1.1000
Besi Beugel / baut kuda-kuda E-4 Kg 15.0000
Paku kayu E-7 Kg 3.0000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
A.4.6.1.17 Pemasangan rangka atap genteng beton, kayu kelas II
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 0.1000
Tukang kayu L.07 Orang/hari 0.1000
Kepala tukang kayu L.03 Orang/hari 0.0100
Mandor L.01 Orang/hari 0.0050
.........................................................................................
Jumlah- 1
2 BAHAN
Balok kayu kelas II H-2 M3 0.0140
Balok kayu kelas II H-2 M3 0.0570
Paku kayu E-7 Kg 0.2500
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

PEKERJAAN PENUTUP ATAP


aja ringan LS- baja ringan Memasang rangka baja ringan untuk atap metal/
genteng biasa
aja ringan No. Uraian Kode Satuan Koef
aja ringan 1 TENAGA
aja ringan Pembantu tukang besi L.13 Orang/hari 0.1000
aja ringan Tukang besi L.09 Orang/hari 0.2250
aja ringan Kepala tukang besi L.04 Orang/hari 0.0050
aja ringan Mandor L.01 Orang/hari 0.0250
aja ringan .........................................................................................
Jumlah- 1
aja ringan 2 BAHAN
aja ringan Baut screw driver E-5 Buah 15.0000
aja ringan Roof batten reng T=0,60 mm E-10 M1 5.4000
aja ringan Tools E-12 Ls 1.0000
aja ringan .........................................................................................
Jumlah- 2
aja ringan 3 PERALATAN
aja ringan .........................................................................................
Jumlah- 3
aja ringan 4 JUMLAH (1+2+3)
aja ringan 5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
aja ringan 6 HARGA SATUAN PEKERJAAN (4+5)

A.4.5.2.32 Pemasangan genteng metal


No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang batu L.11 Orang/hari 0.2000
Tukang kayu L.07 Orang/hari 0.1000
Kepala tukang batu L.02 Orang/hari 0.0100
Mandor L.01 Orang/hari 0.0010
.........................................................................................
Jumlah- 1
2 BAHAN
Genteng metal C-2 Lembar 1.0200
Paku kayu E-7 Kg 0.2000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
A.4.5.2.36 Pemasangan nok genteng metal
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang batu L.11 Orang/hari 0.2500
Tukang kayu L.07 Orang/hari 0.1500
Kepala tukang batu L.02 Orang/hari 0.0150
Mandor L.01 Orang/hari 0.0130
.........................................................................................
Jumlah- 1
2 BAHAN
Nok genteng metal E-6 Bh 1.1000
Paku kayu E-7 Kg 0.0500
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.4.6.1.19 Pemasangan rangka langit-langit (50 x 100) cm, kayu kelas II atau III
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 0.1500
Tukang kayu L.07 Orang/hari 0.3000
Kepala tukang kayu L.03 Orang/hari 0.0300
Mandor L.01 Orang/hari 0.0750
.........................................................................................
Jumlah- 1
2 BAHAN
Balok kayu kelas II H-2 M3 0.0154
Paku kayu E-7 Kg 0.2000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.4.5.1.7 Pemasangan langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm


No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 0.1000
Tukang kayu L.07 Orang/hari 0.0500
Kepala tukang kayu L.03 Orang/hari 0.0050
Mandor L.01 Orang/hari 0.0050
.........................................................................................
Jumlah- 1
2 BAHAN
Nusaboard Uk. 240 cm x 120 cm x 6,0 mm H-8 Lembar 0.3640
Paku skrup G-11 Buah 0.1100
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
A.4.5.1.8 Pemasangan list langit-langit gypsum
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 0.0600
Tukang kayu L.07 Orang/hari 0.0060
Kepala tukang kayu L.03 Orang/hari 0.0060
Mandor L.01 Orang/hari 0.0030
.........................................................................................
Jumlah- 1
2 BAHAN
List gipsum profil C-16 M1 1.0500
Semen gipsum C-17 Kg 0.1500
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

Ls. Nusaplank List Plang Nusaplank (30/240)


No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 0.1000
Tukang kayu L.07 Orang/hari 0.2000
Kepala tukang kayu L.03 Orang/hari 0.0200
Mandor L.01 Orang/hari 0.0050
.........................................................................................
Jumlah- 1
2 BAHAN
Papan nusaboard tbl 8mm C-18 M1 0.4750
Paku kayu E-7 Kg 0.1000
.........................................................................................
Jumlah- 1
3 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
4 HARGA SATUAN PEKERJAAN (4+5)

A.4.6.1.21 Pemasangan lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 0.1000
Tukang kayu L.07 Orang/hari 0.2000
Kepala tukang kayu L.03 Orang/hari 0.0200
Mandor L.01 Orang/hari 0.0050
.........................................................................................
Jumlah- 1
2 BAHAN
Papan kayu kelas II H-5 M3 0.0108
Paku kayu E-7 Kg 0.1000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
A.5.1.1.6 Pemasangan bak mandi teraso vol 0,30 m3
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang batu L.11 Orang/hari 3.0000
Tukang batu L.06 Orang/hari 4.5000
Kepala tukang batu L.02 Orang/hari 0.0500
Mandor L.01 Orang/hari 0.9000
.........................................................................................
Jumlah- 1
2 BAHAN
Bak fibreglass G-12 Buah 1.0000
Bak fibreglass Perlengkapan #N/A #N/A 12%
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.5.1.1.2 Pemasangan closet jongkok porslen


No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang batu L.11 Orang/hari 1.0000
Tukang batu L.06 Orang/hari 1.5000
Kepala tukang batu L.02 Orang/hari 0.1500
Mandor L.01 Orang/hari 0.1600
.........................................................................................
Jumlah- 1
2 BAHAN
Closet jongkok G-13 Buah 1.0000
Semen portland C-3 Kg 6.0000
Pasir Beton C-4 M3 0.0100
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

Pemasangan 1 buah kran diameter ½” atau 3/4”


A.5.1.1.35

No. Uraian Kode Satuan Koef


1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 0.0100
Tukang kayu L.07 Orang/hari 0.4000
Kepala tukang kayu L.03 Orang/hari 0.0400
Mandor L.01 Orang/hari 0.0050
.........................................................................................
Jumlah- 1
2 BAHAN
Kran air G-14 Buah 1.0000
Sealtape G-15 Buah 0.0250
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
A.5.1.1.36 Pemasangan floordrain
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang batu L.11 Orang/hari 0.0100
Tukang batu L.06 Orang/hari 0.1000
Kepala tukang batu L.02 Orang/hari 0.0100
Mandor L.01 Orang/hari 0.0050
.........................................................................................
Jumlah- 1
2 BAHAN
Floor drain G-16 Buah 1.0000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

PEKERJAAN KAYU
6.1.20.a A.4.6.1.20.a Pemasangan Rangka Dinding Partisi
.6.1.20. No. Uraian Kode Satuan Koef
6.1.20.a 1 TENAGA
6.1.20.a Pembantu tukang kayu L.12 Orang/hari 0.2000
6.1.20.a Tukang kayu L.07 Orang/hari 0.3000
6.1.20.a Kepala tukang kayu L.03 Orang/hari 0.0300
6.1.20.a Mandor L.01 Orang/hari 0.0100
6.1.20.a .........................................................................................
Jumlah- 1
6.1.20.a 2 BAHAN
6.1.20.a Balok kayu kelas II H-2 M3 0.0100
6.1.20.a Paku kayu E-7 Kg 0.1500
6.1.20.a .........................................................................................
Jumlah- 2
6.1.20.a 3 PERALATAN
6.1.20.a .........................................................................................
Jumlah- 3
6.1.20.a 4 JUMLAH (1+2+3)
6.1.20.a 5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6.1.20.a 6 HARGA SATUAN PEKERJAAN (4+5)

A.4.5.1.7.b Pemasangan dinding partisi plywood, tebal 4 mm


5.1.7.b No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 0.1000
Tukang kayu L.07 Orang/hari 0.1000
Kepala tukang kayu L.03 Orang/hari 0.0100
Mandor L.01 Orang/hari 0.0050
.........................................................................................
Jumlah- 1
2 BAHAN
Plywood tebal 4 mm H-6 Lembar 0.3750
Paku kayu E-7 Kg 0.0300
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
A.4.6.1.6 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kelas I atau II
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 0.8000
Tukang kayu L.07 Orang/hari 2.4000
Kepala tukang kayu L.03 Orang/hari 0.2400
Mandor L.01 Orang/hari 0.0400
.........................................................................................
Jumlah- 1
2 BAHAN
Papan kayu kelas II H-5 M3 0.0240
Paku kayu E-7 Kg 0.3000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.4.6.1.7 Pembuatan dan pemasangan pintu dan jendela jalusi kayu kelas I atau II
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 1.0000
Tukang kayu L.07 Orang/hari 3.0000
Kepala tukang kayu L.03 Orang/hari 0.3000
Mandor L.01 Orang/hari 0.0500
.........................................................................................
Jumlah- 1
2 BAHAN
Papan kayu kelas II H-5 M3 0.0640
Paku kayu E-7 Kg 0.5000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

PEKERJAAN KUNCI & KACA


A.4.6.2.2 Pemasangan kunci tanam biasa
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 0.0100
Tukang kayu L.07 Orang/hari 0.5000
Kepala tukang kayu L.03 Orang/hari 0.0500
Mandor L.01 Orang/hari 0.0050
.........................................................................................
Jumlah- 1
2 BAHAN
Kunci tanam biasa F - 12 Bh 1.0000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
A.4.6.2.5 Pemasangan engsel pintu
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 0.0150
Tukang kayu L.07 Orang/hari 0.1500
Kepala tukang kayu L.03 Orang/hari 0.0150
Mandor L.01 Orang/hari 0.0008
.........................................................................................
Jumlah- 1
2 BAHAN
Engsel pintu F-6 Bh 1.0000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.4.6.2.17 Pemasangan kaca tebal 5 mm


No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 0.0150
Tukang kayu L.07 Orang/hari 0.1500
Kepala tukang kayu L.03 Orang/hari 0.0150
Mandor L.01 Orang/hari 0.0008
.........................................................................................
Jumlah- 1
2 BAHAN
Kaca tebal 5 mm J-10 M2 1.1000
Sealant J-14 Tube 0.0500
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

PEKERJAAN PENGECATAN
A.4.7.1.4 Pengecatan bidang kayu baru (1 lapis plamuur,
1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang cat L.14 Orang/hari 0.0700
Tukang Cat L.08 Orang/hari 0.0090
Kepala Tukang Cat L.05 Orang/hari 0.0060
Mandor L.01 Orang/hari 0.0030
.........................................................................................
Jumlah- 1
2 BAHAN
Cat menie kayu G-3 Kg 0.2000
Plamir G-6 Kg 0.1500
Cat dasar G-2 Kg 0.1700
Cat penutup G-4 Kg 0.2600
Kuas G-5 Bh 0.0100
Thinner G-7 Ltr 0.0300
Ampelas G-1 Lbr 0.2000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
Pengecatan tembok baru ( 1lapis plamuur, 1
A.4.7.1.10 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang cat L.14 Orang/hari 0.0200
Tukang Cat L.08 Orang/hari 0.0630
Kepala Tukang Cat L.05 Orang/hari 0.0063
Mandor L.01 Orang/hari 0.0030
.........................................................................................
Jumlah- 1
2 BAHAN
Plamir G-6 Kg 0.1000
Cat dasar G-2 Kg 0.1000
Cat penutup G-4 Kg 0.2600
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

A.4.7.1.11 Pengecatan tembok lama ( 1 lapis cat dasar, 2


lapis cat penutup)
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang cat L.14 Orang/hari 0.0280
Tukang Cat L.08 Orang/hari 0.0420
Kepala Tukang Cat L.05 Orang/hari 0.0042
Mandor L.01 Orang/hari 0.0030
.........................................................................................
Jumlah- 1
2 BAHAN
Cat dasar G-2 Kg 0.1200
Cat penutup G-4 Kg 0.1800
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

PEKERJAAN MEKANIKAL
M.001 Stop kontak + instalasi beton
No. Uraian Kode Satuan Koef
1 TENAGA
.........................................................................................
Jumlah- 1
2 BAHAN
Stop kontak + instalasi beton H-1 Buah 1.0000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

M.005 Sakelar tunggal


No. Uraian Kode Satuan Koef
1 TENAGA
.........................................................................................
Jumlah- 1
2 BAHAN
Sakelar tunggal H-4 Buah 1.0000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

M.006 Sakelar ganda


No. Uraian Kode Satuan Koef
1 TENAGA
.........................................................................................
Jumlah- 1
2 BAHAN
Sakelar ganda H-5 Buah 1.0000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

M.007 Lampu PL 14 watt + armatur plafond


No. Uraian Kode Satuan Koef
1 TENAGA
.........................................................................................
Jumlah- 1
2 BAHAN
Lampu PL 14 watt + armatur plafond H-2 Buah 1.0000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)

M.009 Titik lampu + instalasi beton


No. Uraian Kode Satuan Koef
1 TENAGA
.........................................................................................
Jumlah- 1
2 BAHAN
Titik lampu + instalasi beton H-3 Titik 1.0000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
Satuan M3
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 75,000.00
200,000.00 5,000.00
.................. 80,000.00

.................. -

.................. -
80,000.00

80,000.00

Satuan M3
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 50,000.00
200,000.00 10,000.00
.................. 60,000.00

.................. -

.................. -
60,000.00
9,000.00
69,000.00

Satuan M3
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 30,000.00
200,000.00 2,000.00
.................. 32,000.00

80,300.00 96,360.00
.................. 96,360.00

.................. -
128,360.00
19,254.00
147,614.00
Satuan M1
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 10,000.00
120,000.00 2,400.00
150,000.00 600.00
200,000.00 400.00
.................. 13,400.00

5,000.00 1,250.00
.................. 1,250.00

.................. -
14,650.00
2,197.50
16,847.50

Satuan M3
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 150,000.00
120,000.00 90,000.00
150,000.00 11,250.00
200,000.00 15,000.00
.................. 266,250.00

410,000.00 492,000.00
1,300.00 211,900.00
154,200.00 80,184.00
.................. 784,084.00

.................. -
1,050,334.00
157,550.10
1,207,884.10

Satuan M3
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 120,000.00
120,000.00 24,000.00
150,000.00 3,000.00
200,000.00 12,000.00
.................. 159,000.00
1,300.00 299,000.00
154,200.00 98,357.58
425,000.00 323,314.82
50.00 10,000.00
.................. 730,672.40

.................. -
889,672.40
133,450.86
1,023,123.26
Satuan M3
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 165,000.00
120,000.00 33,000.00
150,000.00 4,200.00
200,000.00 16,600.00
.................. 218,800.00

1,300.00 423,800.00
154,200.00 83,708.58
425,000.00 323,944.45
50.00 10,750.00
.................. 842,203.03

.................. -
1,061,003.03
159,150.45
1,220,153.48

Satuan M3
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 165,000.00
120,000.00 33,000.00
150,000.00 4,200.00
200,000.00 16,600.00
.................. 218,800.00

1,300.00 457,600.00
154,200.00 80,514.43
425,000.00 324,574.08
50.00 10,750.00
.................. 873,438.51

.................. -
1,092,238.51
163,835.78
1,256,074.29

Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 52,000.00
120,000.00 31,200.00
150,000.00 3,900.00
200,000.00 5,200.00
.................. 92,300.00

2,000,000.00 80,000.00
18,500.00 5,550.00
.................. 85,550.00

.................. -
177,850.00
26,677.50
204,527.50
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 52,000.00
120,000.00 31,200.00
150,000.00 3,900.00
200,000.00 5,200.00
.................. 92,300.00

2,000,000.00 90,000.00
18,500.00 5,550.00
.................. 95,550.00

.................. -
187,850.00
28,177.50
216,027.50

Satuan Kg
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 700.00
120,000.00 840.00
150,000.00 105.00
200,000.00 80.00
.................. 1,725.00

11,000.00 11,550.00
19,800.00 297.00
.................. 11,847.00

.................. -
13,572.00
2,035.80
15,607.80

Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 66,000.00
120,000.00 39,600.00
150,000.00 4,950.00
200,000.00 6,600.00
.................. 117,150.00
2,000,000.00 80,000.00
18,500.00 7,400.00
2,400,000.00 36,000.00
5,000.00 10,000.00
.................. 133,400.00

.................. -
250,550.00
37,582.50
288,132.50
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 66,000.00
120,000.00 39,600.00
150,000.00 4,950.00
200,000.00 6,600.00
.................. 117,150.00

2,000,000.00 80,000.00
18,500.00 7,400.00
2,400,000.00 43,200.00
64,000.00 22,400.00
5,000.00 10,000.00
.................. 163,000.00

.................. -
280,150.00
42,022.50
322,172.50

Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 66,000.00
120,000.00 39,600.00
150,000.00 4,950.00
200,000.00 6,600.00
.................. 117,150.00

2,000,000.00 80,000.00
18,500.00 7,400.00
2,400,000.00 36,000.00
64,000.00 22,400.00
5,000.00 30,000.00
.................. 175,800.00

.................. -
292,950.00
43,942.50
336,892.50

Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 30,000.00
120,000.00 12,000.00
150,000.00 1,500.00
200,000.00 3,000.00
.................. 46,500.00

800.00 56,000.00
1,300.00 14,950.00
154,200.00 6,630.60
.................. 77,580.60

.................. -
124,080.60
18,612.09
142,692.69

Satuan M3
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 700,000.00
120,000.00 2,520,000.00
150,000.00 315,000.00
200,000.00 70,000.00
....................... 3,605,000.00

6,625,000.00 7,287,500.00
18,500.00 23,125.00
17,400.00 17,400.00
....................... 7,328,025.00

....................... -
10,933,025.00
1,639,953.75
12,572,978.75

Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 70,000.00
120,000.00 42,000.00
150,000.00 5,250.00
200,000.00 7,000.00
.................. 124,250.00
32,500.00 203,125.00
1,300.00 13,000.00
154,200.00 6,939.00
14,100.00 21,150.00
.................. 244,214.00

.................. -
368,464.00
55,269.60
423,733.60

Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 20,000.00
120,000.00 12,000.00
150,000.00 1,500.00
200,000.00 200.00
.................. 33,700.00

65,000.00 66,300.00
18,500.00 3,700.00
.................. 70,000.00

.................. -
103,700.00
15,555.00
119,255.00
Satuan M3
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 18,000.00
120,000.00 2,400.00
120,000.00 2,400.00
120,000.00 2,400.00
150,000.00 900.00
200,000.00 1,800.00
.................. 27,900.00

2,000,000.00 4,000.00
18,500.00 185.00
16,500.00 19,800.00
11,000.00 33,000.00
19,800.00 8,910.00
1,300.00 5,200.00
154,200.00 925.20
425,000.00 3,825.00
.................. 75,845.20

.................. -
103,745.20
15,561.78
119,306.98
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 30,000.00
120,000.00 18,000.00
150,000.00 2,250.00
200,000.00 3,000.00
.................. 53,250.00

1,300.00 5,740.80
154,200.00 4,163.40
.................. 9,904.20

.................. -
63,154.20
9,473.13
72,627.33

Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 20,000.00
120,000.00 12,000.00
150,000.00 1,500.00
200,000.00 2,000.00
.................. 35,500.00

1,300.00 4,225.00
.................. 4,225.00

.................. -
39,725.00
5,958.75
45,683.75

Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 26,000.00
120,000.00 15,600.00
150,000.00 1,950.00
200,000.00 2,600.00
.................. 46,150.00
#N/A #N/A
1,300.00 13,000.00
14,100.00 21,150.00
154,200.00 6,939.00
.................. #N/A

.................. -
#N/A
#N/A
#N/A
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 70,000.00
120,000.00 42,000.00
150,000.00 5,250.00
200,000.00 7,000.00
.................. 124,250.00

32,500.00 34,125.00
1,300.00 10,647.00
154,200.00 6,939.00
14,100.00 7,050.00
.................. 58,761.00

.................. -
183,011.00
27,451.65
210,462.65

Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 90,000.00
120,000.00 54,000.00
150,000.00 6,750.00
200,000.00 9,000.00
.................. 159,750.00

2,400.00 63,600.00
1,300.00 12,090.00
154,200.00 2,775.60
14,100.00 27,354.00
.................. 63,600.00

.................. -
244,459.80
36,668.97
281,128.77

Satuan M1
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 9,000.00
120,000.00 10,800.00
150,000.00 5,250.00
200,000.00 1,000.00
.................. 26,050.00

19,380.00 102,714.00
1,300.00 741.00
154,200.00 231.30
14,100.00 183.30
.................. 102,714.00

.................. -
129,341.80
19,401.27
148,743.07
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 90,000.00
120,000.00 54,000.00
150,000.00 6,750.00
200,000.00 9,000.00
.................. 159,750.00

5,125.00 5,381.25
1,300.00 12,090.00
154,200.00 2,775.60
14,100.00 27,354.00
.................. 47,600.85

.................. -
207,350.85
31,102.63
238,453.48

Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 10,000.00
120,000.00 6,000.00
150,000.00 750.00
200,000.00 1,000.00
.................. 17,750.00

50,400.00 18,345.60
18,500.00 2,035.00
.................. 20,380.60

.................. -
38,130.60
5,719.59
43,850.19

Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 100,000.00
120,000.00 360,000.00
150,000.00 45,000.00
200,000.00 10,000.00
.................. 515,000.00

2,500,000.00 100,000.00
17,400.00 8,700.00
.................. 108,700.00

.................. -
623,700.00
93,555.00
717,255.00
Satuan Buah
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 1,000.00
120,000.00 12,000.00
150,000.00 1,500.00
200,000.00 100.00
.................. 14,600.00

25,000.00 25,000.00
.................. 25,000.00

.................. -
39,600.00
5,940.00
45,540.00

Satuan Buah
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 1,500.00
120,000.00 18,000.00
150,000.00 2,250.00
200,000.00 1,600.00
.................. 23,350.00

34,500.00 34,500.00
.................. 34,500.00

.................. -
57,850.00
8,677.50
66,527.50

Satuan Buah
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 2,000.00
120,000.00 24,000.00
150,000.00 3,000.00
200,000.00 200.00
....................... 29,200.00

24,300.00 24,300.00
....................... 24,300.00

....................... -
53,500.00
8,025.00
61,525.00

Satuan M1
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 18,000.00
120,000.00 2,400.00
120,000.00 2,400.00
120,000.00 2,400.00
150,000.00 900.00
200,000.00 1,800.00
.................. 27,900.00

2,000,000.00 4,000.00
18,500.00 185.00
11,000.00 33,000.00
19,800.00 8,910.00
1,300.00 5,200.00
154,200.00 925.20
425,000.00 3,825.00
.................. 56,045.20

.................. -
83,945.20
12,591.78
96,536.98

Satuan M3
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 400,000.00
120,000.00 1,440,000.00
150,000.00 180,000.00
200,000.00 40,000.00
.................. 2,060,000.00

2,400,000.00 2,640,000.00
27,800.00 417,000.00
18,500.00 103,600.00
.................. 3,160,600.00

.................. -
5,220,600.00
783,090.00
6,003,690.00

Satuan M3
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 670,000.00
120,000.00 2,412,000.00
150,000.00 301,500.00
200,000.00 67,000.00
.................. 3,450,500.00

2,400,000.00 2,640,000.00
27,800.00 417,000.00
18,500.00 55,500.00
.................. 3,112,500.00

.................. -
6,563,000.00
984,450.00
7,547,450.00
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 10,000.00
120,000.00 12,000.00
150,000.00 1,500.00
200,000.00 1,000.00
.................. 24,500.00

2,400,000.00 33,600.00
2,400,000.00 136,800.00
18,500.00 4,625.00
.................. 175,025.00

.................. -
199,525.00
29,928.75
229,453.75

Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 10,000.00
120,000.00 27,000.00
150,000.00 750.00
200,000.00 5,000.00
.................. 42,750.00

2,000.00 30,000.00
10,000.00 54,000.00
10,000.00 10,000.00
.................. 94,000.00

.................. -
136,750.00
20,512.50
157,262.50

Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 20,000.00
120,000.00 12,000.00
150,000.00 1,500.00
200,000.00 200.00
.................. 33,700.00

65,000.00 66,300.00
18,500.00 3,700.00
.................. 70,000.00

.................. -
103,700.00
15,555.00
119,255.00
Satuan M1
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 25,000.00
120,000.00 18,000.00
150,000.00 2,250.00
200,000.00 2,600.00
.................. 47,850.00

21,200.00 23,320.00
18,500.00 925.00
.................. 24,245.00

.................. -
72,095.00
10,814.25
82,909.25

Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 15,000.00
120,000.00 36,000.00
150,000.00 4,500.00
200,000.00 15,000.00
.................. 70,500.00

2,400,000.00 36,960.00
18,500.00 3,700.00
.................. 40,660.00

.................. -
111,160.00
16,674.00
127,834.00

Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 10,000.00
120,000.00 6,000.00
150,000.00 750.00
200,000.00 1,000.00
.................. 17,750.00
50,400.00 18,345.60
18,500.00 2,035.00
.................. 20,380.60

.................. -
38,130.60
5,719.59
43,850.19
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 6,000.00
120,000.00 720.00
150,000.00 900.00
200,000.00 600.00
.................. 8,220.00

24,250.00 25,462.50
14,100.00 2,115.00
.................. 27,577.50

.................. -
35,797.50
5,369.63
41,167.13

Satuan M1
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 10,000.00
120,000.00 24,000.00
150,000.00 3,000.00
200,000.00 1,000.00
.................. 38,000.00

56,000.00 26,600.00
18,500.00 1,850.00
.................. 51,300.00
7,695.00
58,995.00

Satuan M1
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 10,000.00
120,000.00 24,000.00
150,000.00 3,000.00
200,000.00 1,000.00
.................. 38,000.00

2,500,000.00 27,000.00
18,500.00 1,850.00
.................. 28,850.00
.................. -
66,850.00
10,027.50
76,877.50
Satuan Buah
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 300,000.00
120,000.00 540,000.00
150,000.00 7,500.00
200,000.00 180,000.00
.................. 1,027,500.00

470,000.00 470,000.00
50,000.00 6,000.00
.................. 476,000.00

.................. -
1,503,500.00
225,525.00
1,729,025.00

Satuan Buah
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 100,000.00
120,000.00 180,000.00
150,000.00 22,500.00
200,000.00 32,000.00
.................. 334,500.00

150,000.00 150,000.00
1,300.00 7,800.00
154,200.00 1,542.00
.................. 159,342.00

.................. -
493,842.00
74,076.30
567,918.30

Satuan Buah

Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 1,000.00
120,000.00 48,000.00
150,000.00 6,000.00
200,000.00 1,000.00
.................. 56,000.00
14,500.00 14,500.00
5,000.00 125.00
.................. 14,625.00

.................. -
70,625.00
10,593.75
81,218.75
Satuan Buah
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 1,000.00
120,000.00 12,000.00
150,000.00 1,500.00
200,000.00 1,000.00
.................. 15,500.00

19,200.00 19,200.00
.................. 19,200.00

.................. -
34,700.00
5,205.00
39,905.00

Satuan M2
Hrg Sat (Rp)Jmlh Hrg (Rp)

100,000.00 20,000.00
120,000.00 36,000.00
150,000.00 4,500.00
200,000.00 2,000.00
.......................... 62,500.00

### 24,000.00
18,500.00 2,775.00
.......................... 26,775.00

.......................... -
89,275.00
13,391.25
###

Satuan M2
Hrg Sat (Rp)Jmlh Hrg (Rp)

100,000.00 10,000.00
120,000.00 12,000.00
150,000.00 1,500.00
200,000.00 1,000.00
.......................... 24,500.00

64,000.00 24,000.00
18,500.00 555.00
.......................... 24,555.00
.......................... -
49,055.00
7,358.25
56,413.25
Satuan M1
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 80,000.00
120,000.00 288,000.00
150,000.00 36,000.00
200,000.00 8,000.00
.................. 412,000.00

2,500,000.00 60,000.00
18,500.00 5,550.00
.................. 65,550.00

.................. -
477,550.00
71,632.50
549,182.50

Satuan M1
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 100,000.00
120,000.00 360,000.00
150,000.00 45,000.00
200,000.00 10,000.00
.................. 515,000.00

2,500,000.00 160,000.00
18,500.00 9,250.00
.................. 169,250.00

.................. -
684,250.00
102,637.50
786,887.50

Satuan M1
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 1,000.00
120,000.00 60,000.00
150,000.00 7,500.00
200,000.00 1,000.00
.................. 69,500.00
38,500.00 38,500.00
.................. 38,500.00

.................. -
108,000.00
16,200.00
124,200.00
Satuan M1
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 1,500.00
120,000.00 18,000.00
150,000.00 2,250.00
200,000.00 160.00
.................. 21,910.00

56,100.00 56,100.00
.................. 56,100.00

.................. -
78,010.00
11,701.50
89,711.50

Satuan M1
Hrg Sat (Rp) Jmlh Hrg (Rp)

100,000.00 1,500.00
120,000.00 18,000.00
150,000.00 2,250.00
200,000.00 160.00
.................. 21,910.00

93,500.00 102,850.00
- -
.................. 102,850.00

.................. -
124,760.00
18,714.00
143,474.00

Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)

80,000.00 5,600.00
120,000.00 1,080.00
150,000.00 900.00
200,000.00 600.00
.................. 8,180.00
38,200.00 7,640.00
56,400.00 8,460.00
38,800.00 6,596.00
36,700.00 9,542.00
18,200.00 182.00
16,500.00 495.00
7,700.00 1,540.00
.................. 34,455.00

.................. -
42,635.00
6,395.25
49,030.25
Satuan M2

Hrg Sat (Rp) Jmlh Hrg (Rp)

80,000.00 1,600.00
120,000.00 7,560.00
150,000.00 945.00
200,000.00 600.00
.................. 10,705.00

56,400.00 5,640.00
38,800.00 3,880.00
36,700.00 9,542.00
.................. 19,062.00

.................. -
29,767.00
4,465.05
34,232.05

Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)

80,000.00 2,240.00
120,000.00 5,040.00
150,000.00 630.00
200,000.00 600.00
.................. 8,510.00

38,800.00 4,656.00
36,700.00 6,606.00
.................. 11,262.00

.................. -
19,772.00
2,965.80
22,737.80

Satuan Titik
Hrg Sat (Rp) Jmlh Hrg (Rp)

....................... -

34,000.00 34,000.00
....................... 34,000.00
....................... -
34,000.00
5,100.00
39,100.00

Satuan Buah
Hrg Sat (Rp) Jmlh Hrg (Rp)

....................... -

12,100.00 12,100.00
....................... 12,100.00

....................... -
12,100.00
1,815.00
13,915.00

Satuan Buah
Hrg Sat (Rp) Jmlh Hrg (Rp)

....................... -

16,400.00 16,400.00
....................... 16,400.00

....................... -
16,400.00
2,460.00
18,860.00

Satuan Buah
Hrg Sat (Rp) Jmlh Hrg (Rp)

....................... -

36,300.00 36,300.00
....................... 36,300.00

....................... -
36,300.00
5,445.00
41,745.00

Satuan Buah
Hrg Sat (Rp) Jmlh Hrg (Rp)

....................... -
75,000.00 75,000.00
....................... 75,000.00

....................... -
75,000.00
11,250.00
86,250.00
DAFTAR HARGA BAHAN DAN UPAH

NO JENIS TENAGA / BAHAN KODE HARGA

BUKIT BATU
0 1 2 3
A. TENAGA
1 Mandor L.01 200,000.00
2 Kepala tukang batu L.02 150,000.00
3 Kepala tukang kayu L.03 150,000.00
4 Kepala tukang besi L.04 150,000.00
5 Kepala Tukang Cat L.05 150,000.00
6 Tukang batu L.06 120,000.00
7 Tukang kayu L.07 120,000.00
8 Tukang Cat L.08 120,000.00
9 Tukang besi L.09 120,000.00
10 Tukang Khusus Alumunium L.10 120,000.00
11 Pembantu tukang batu L.11 100,000.00
12 Pembantu tukang kayu L.12 100,000.00
13 Pembantu tukang besi L.13 100,000.00
14 Pembantu tukang cat L.14 80,000.00

- BAHAN CETAKAN DAN SEMEN


1 Asbes semen plafond C-1 -
2 Genteng metal C-2 65,000.00
3 Semen portland C-3 1,300.00
4 Pasir beton C-4 154,200.00
5 Tanah urug biasa/granit C-5 80,300.00
6 Semen warna C-6 14,100.00
7 Keramik 40x40 cm C-7 32,500.00
8 Keramik 20 x 20 cm C-8 2,400.00
9 Plint keramik C-9 19,380.00
10 Batu pecah 2-3 cm C-10 425,000.00
11 Batu belah C-11 410,000.00
12 Batu bata merah C-12 800.00
13 Nusa board C-13 50,400.00
14 Paku skrup Nusa board C-14 18,500.00
15 Air C-15 50.00
16 List gipsum profil C-16 24,250.00
17 Semen gipsum C-17 14,100.00
18 Papan nusaboard tbl 8mm C-18 56,000.00

- BAHAN BESI
1 Alluminium strip E-1 68,400.00
2 Besi beton polos E-2 11,000.00
3 Kawat bindrat E-3 19,800.00
4 Besi Beugel / baut kuda-kuda E-4 27,800.00
5 Baut screw driver E-5 2,000.00
6 Nok genteng metal E-6 21,200.00
7 Paku kayu E-7 18,500.00
8 Paku tripleks E-8 18,000.00
9 Profil alluminium E-9 19,000.00
10 Roof batten reng T=0,60 mm E-10 10,000.00
11 Seng plat E-11 37,000.00
12 Tools E-12 10,000.00
13 Kunci slot E-13 24,300.00
- BAHAN CAT, FINISHING LANTAI DAN DINDING
14 Ampelas G-1 7,700.00
15 Cat dasar G-2 38,800.00
16 Cat menie kayu G-3 38,200.00
17 Cat penutup G-4 36,700.00
18 Kuas G-5 18,200.00
19 Plamir G-6 56,400.00
20 Thinner G-7 16,500.00
21 Lem kayu G-8 17,400.00
22 Engsel G-9 25,000.00
23 Kait angin G-10 34,500.00
24 Paku skrup G-11 18,500.00
25 Bak fibreglass G-12 470,000.00
26 Closet jongkok G-13 150,000.00
27 Kran air G-14 14,500.00
28 Sealtape G-15 5,000.00
29 Floor drain G-16 19,200.00
30 keramik dinding 25cmx40cm G-17 5,125.00
31 keramik 25x25 cm G-18 2,400.00
32 minyak bekisting G-18 16,500.00

- BAHAN KAYU
1 Balok kayu kelas I H-1 6,625,000.00
2 Balok kayu kelas II H-2 2,400,000.00
3 List kayu profil H-3 5,475.00
4 Papan bakesting H-4 2,000,000.00
5 Papan kayu kelas II H-5 2,500,000.00
6 Plywood tebal 4 mm H-6 64,000.00
7 Dolken kayu φ 8-10/400 cm 8-10/400 cm H-7 5,000.00
8 Nusaboard Uk. 240 cm x 120 cm x 6,0 mm H-8 50,400.00
9 Kayu galam dia 10-12 Cm p.4 m H-10 5,000.00

- BAHAN MEKANIKAL
1 Stop kontak + instalasi beton H-1 34,000.00
2 Lampu PL 14 watt + armatur plafond H-2 36,300.00
3 Titik lampu + instalasi beton H-3 75,000.00
4 Sakelar Tunggal H-4 12,100.00
5 Sakelar ganda H-5 16,400.00

C OVERHEAD DAN KEUNTUNGAN


1 OVERHEAD + KEUNTUNGAN J-1 15%
SATUAN

12
4

Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari

M2
Lembar
Kg
M3
M3
Kg
Bh
Bh
Bh
M3
M3
Bh
Lembar
Kg
Liter
M1
Kg
M1

M1
kg
kg
Kg
Buah
Bh
Kg
Kg
Kg
M1
Lbr
Ls
Buah
Lbr
Kg
Kg
Kg
Bh
Kg
Ltr
Kg
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Dus
Dus
Ltr

M3
M3
M1
M3
M3
Lembar
batang
Lembar
batang

Buah
Buah
Titik
Buah
Buah
DAFTAR HARGA SATUAN UPAH & BAHAN
PEKERJAAN PEMBANGUNAN KANTOR DINAS KOPERASI DAN UKM
KOTA PALANGKA RAYA
TAHUN ANGGARAN 2019

UPAH TENAGA KERJA

NO. TENAGA KERJA

A UPAH
1 Mandor
2 Kepala tukang
3 Tukang Kayu
4 Tukang Besi Beton
5 Tukang Besi / IWF
6 Tukang Batu
7 Tukang Cat
8 Tukang Pipa
9 Tukang Listrik
10 Pekerja

HARGA BAHAN BANGUNAN

NO. MATERIAL

B BAHAN PENGISI
1 Batu pecah 3-5 cm
2 Batu pecah 2-3 cm
3 Batu pecah 1-2 cm
4 Batu pecah 1-1 cm
5 Batu belah
6 Abu batu
7 Pasir urug
8 Pasir pasang
9 Pasir beton
10 Semen PC / 40 kg
11 Semen PC
12 Semen Mortar
13 Semen warna
14 Tanah urug
15 Paving block t = 6 cm, fullpave
16 Paving block t = 8 cm, fullpave
17 Bata ringan t = 75 x 160 x 600 mm
18 Bata ringan t = 10 x 20 x 60 cm
19 perekat bata ringan (mortar) MU-380
20 plesteran (MU-200)-premium plester
21 acian (MU-250)-fine coat
NO. TENAGA KERJA

22 Batu bata 5x11x22 cm


23 Batako 15x30x7 cm
24 Batako 20x40x9 cm (press)
25 Batako (roster) R -06 uk. 30 x 14 x 15,5
26 Keramik 25x20 cm polos
27 Keramik 30x60 cm warna, Polished
28 Keramik 20x20 cm polos/corak, Unpolished
29 Keramik 30x30 cm putih polos, Polished
30 Keramik 30x30 cm Unpolshed
31 Keramik 40x40 cm
32 Lantai Homogenous Tile 80 x 80 cm, Polished
33 Lantai Keramik 60 x 60 cm, Polished
34 Lantai keramik 60x60 cm, Unpolished
37 Step nosing 10 x 60 cm, Polos
38 List keramik WC. 8x20 cm
39 Plint kayu uk. 2x10 cm
40 Plint keramik uk. 10x30 cm
41 Plint keramik uk. 10x60 cm
42 Drymix Floor hardener
43 Beton mutu f'c = 8.30 Mpa (K-100)
44 Beton mutu f'c = 10.38 Mpa (K-125)
45 Beton mutu f'c = 12.35 Mpa (K-150)
46 Beton mutu f'c = 14.53 Mpa (K-175)
47 Beton mutu f'c = 16.60 Mpa (K-200)
48 Beton mutu f'c = 18.68 Mpa (K-225)
49 Beton mutu f'c = 20.75 Mpa (K-250)
50 Beton mutu f'c = 22.83 Mpa (K-275)
51 Additive ready mix
65 Air

C BAHAN KAYU
1 Kayu balok Kelas III
2 Kayu papan kelas III
3 Kayu Papan Kelas I
4 Kayu Balok Kelas I
5 Kayu Balok Kelas II
6 Kayu Papan Kelas II
7 Dolken dia. 5 s/d 7 cm
8 Dolken dia. 8 s/d 10 cm
9 Kayu galam p = 4 m
10 Triplek 3 mm, uk. 1,2 x 2,4
11 Triplek 4 mm, uk. 1,2 x 2,4
12 Multiplek 6 mm, uk. 1,2 x 2,4
13 Multiplek 9 mm, uk. 1,2 x 2,5
14 Multiplek 12 mm, uk. 1,2 x 2,4
15 Multiplek 15 mm, uk. 1,2 x 2,4
NO. TENAGA KERJA

16 Multiplek 18 mm, uk. 1,2 x 2,4


17 Plywood 4 mm
18 Plywood 9 mm
19 Teakwood 4 mm, uk. 1,2 x 2,4
20 Megateak 4 mm, uk. 1,2 x 2,4
21 Melamin 4 mm, uk. 1,2 x 2,4
22 Formika putih polos, uk. 1,2 x 2,4
23 Formika motif, uk. 1,2 x 2,4
23 Calci board, 1,2 x 2,4
24 Gypsum jayaboard, uk. 1,2 x 2,4
25 Gypsum knauf, uk. 1,2 x 2,4
26 GRC, uk. 1,2 x 2,4
27 Screw
28 Shadowline
29 HPL
30 3D Text Stainless

D BAHAN CAT
1 Amplas
2 Minyak Cat
3 Cat kilat
4 Plamur
5 Cat dasar
6 Cat tembok
9 Cat tembok interior, warna Stand
10 Cat tembok eksterior, warna Stand
11 Cat besi/kayu
12 Meni
13 Oker
14 Lem kayu
15 Lem kuning
16 Sealent
17 Rol Cat
18 Kuas
19 Road line paint (cat marka)
20 Water Proofing coating liquid setara SIKA
21 Wallpaper
22 Sealent GE / Dow Coming Non Asan

D BAHAN BESI DAN ALUMINIUM


1 Besi tulangan U-24 polos
2 Besi tulangan U-39 ulir
3 Besi wire mesh
4 Kawat baja/bendarat
5 Besi konstruksi (I, H)
6 Besi konstruksi (C)
NO. TENAGA KERJA

7 Besi konstruksi Siku


8 Besi strip
9 Besi hollow 40/40 mm
10 Kawat las
11 Kawat las
12 Kawat harmonika
13 Kawat kasa
14 Kawat BC
15 Rangka aluminium 1 1/2"x 3"
16 Rangka Alumunium 1 3/4"x 4"
17 Pintu alumunium std IKP, lengkap 4"
18 Kusen aluminium 3" natural
19 Kusen aluminium 3" warna
20 Kusen aluminium 4" natural
21 Kusen aluminium 4" warna
22 Aluminium profil pintu
23 Besi stainles 2"
24 Besi stainles 1,5"
25 Handrail Stainless Steel
26 Stainless steel flat bar
27 Fitting karet untuk kaca
28 Metal stud 34x75x10 tebal 0.4mm
29 metal track 25 X 42
30 metal track 25 x 78

E BAHAN PENGGANTUNG
1 Pintu pvc untuk wc uk.2.2 x 80 cm
2 Partisi cubical lengkap dengan assesories berikut pintu dan kaki
3 Kait angin
4 Casement
5 Handle pintu Biasa
6 Handle Casement
7 Handle pintu stainless
8 Engsel jendela
9 Engsel pintu
10 Engsel angin
11 Slot pintu
12 Spring knip
13 Kunci tanam 2 slag
14 Kunci tanam 1 slag
15 Kunci tanam antik
16 Kunci tanam biasa
17 Kunci silinder
18 Grendel tanam
19 Door closer
20 Door Stoper
NO. TENAGA KERJA

21 Paku seng
22 Paku campuran 1" - 5"
23 Paku beton
24 Paku triplek
25 Paku GRC
26 Sekrup gypsum
27 Sekrup
28 Sekrup fixer
29 Sekrup steel sheet
30 Sekrup zincalume
31 Jalusi alumunium

F BAHAN ATAP
1 Seng gelombang Bjls 20
2 Atap Genteng Metal
3 Rangka atap baja ringan profil Z lengkap dengan accesories

G BAHAN KACA
1 Kaca polos, t = 3 mm
2 Kaca polos, t = 5 mm
3 Kaca polos, t = 8 mm
4 Kaca polos, t = 12 mm
5 Kaca rayben, t = 5 mm
6 Kaca rayben, t = 8 mm
7 Kaca cermin, t = 5 mm
8 Kaca repsol, t = 5 mm
9 Kaca tempered, t = 6 mm
10 Kaca tempered, t = 8 mm
11 Kaca tempered, t = 12 mm
12 Kaca tempered, t = 15 mm
13 Kaca stopsol t = 6 mm
14 Kaca Stopsol t = 8 mm
15 Kaca es
16 Karet list kaca
17 Lapisan Sandblast
18 Kaca rayben, t = 8 mm

H BAHAN SANITASI
1 Wastafel Meja Oval
2 Wastafel gantung bulat
3 Kloset duduk monoblok
4 Kloset jongkok
5 Jet Washer
6 Urinoir
7 Sekat urinoir
NO. TENAGA KERJA

8 Bak fiberglass uk. 55x55x60 cm


9 Shower kran
10 Kran air Panas,Dingin setara SunAi
11 Sliding rail
12 Floordrain
13 Roofdrain dia 4
14 Tempat sabun tanam
15 Tisue holder
16 Kran Wastafel
17 Kitchensink stailess 1 lubang
18 Kran dinding
19 Kaca cermin
20 Kran air uk. 1/2"
21 Elbow 1"
22 Elbow 1,5"
23 Seal tape

I BAHAN MINYAK
1 Alat - alat bantu
2 Minyak bekisting
3 Waterproofing membrane bakar
4 Waterproofing Integral
5 Pengelasan Besi
J ALAT BERAT
1 Welding set
2 Water tanker 3000-4500 L
3 Concrete pump
A SATUAN UPAH & BAHAN
AN KANTOR DINAS KOPERASI DAN UKM
A PALANGKA RAYA
UN ANGGARAN 2019

HARGA SATUAN
SATUAN
(Rp.)

org/hr 200,000.00
org/hr 170,000.00
org/hr 100,000.00
org/hr 100,000.00
org/hr 100,000.00
org/hr 120,000.00
org/hr 120,000.00
org/hr 100,000.00
org/hr 175,000.00
org/hr 90,000.00

HARGA SATUAN
SATUAN
(Rp.)

m3 362,500.00
m3 362,500.00
m3 362,500.00
m3 362,500.00
m3 380,000.00
m3 450,000.00
m3 82,000.00
m3 113,000.00
m3 155,000.00
zak 53,000.00
kg 1,300.00
kg 7,500.00
kg 15,000.00
m3 83,000.00
bh 5,900.00
bh 7,500.00
m3 1,863,000.00
bh 13,500.00
sak 140,000.00
kg 3,500.00
kg 3,200.00
HARGA SATUAN
SATUAN
(Rp.)
bh 770.00
bh 3,100.00
bh 4,540.00
bh 8,500.00
m2 61,000.00
m2 155,000.00
m2 75,000.00
m2 63,000.00
m2 61,500.00
kotak 124,602.00
kotak 270,016.56
kotak 170,000.00
kotak 343,400.00
bh 25,000.00
bh 10,944.00
bh 68,970.00
bh 19,380.00
bh 25,080.00
kg 11,500.00
m3 848,673.00
m3 884,262.00
m3 1,050,000.00
m3 1,075,000.00
m3 1,150,000.00
m3 1,225,000.00
m3 1,150,000.00
m3 1,315,000.00
liter 50,160.00
ltr 250.00

m3 1,570,000.00
m3 1,830,000.00
m3 9,000,000.00
m3 6,000,000.00
m3 3,000,000.00
m3 2,500,000.00
btg 23,100.00
btg 30,800.00
btg 20,000.00
lbr 61,600.00
lbr 82,500.00
lbr 83,840.00
lbr 165,000.00
lbr 242,000.00
lbr 295,900.00
HARGA SATUAN
SATUAN
(Rp.)
lbr 341,000.00
lbr 71,500.00
lbr 176,000.00
lbr 104,500.00
lbr 96,900.00
lbr 96,900.00
lbr 93,480.00
lbr 108,300.00
lbr 108,300.00
lbr 78,500.00
lbr 75,600.00
lbr 68,000.00
bh 2,500.00
m' 28,000.00
lbr 256,500.00
cm 17,500.00

lbr 16,700.00
kg 17,600.00
kg 67,100.00
kg 15,400.00
kg 35,000.00
kg 42,000.00
kg 46,800.00
kg 116,700.00
kg 54,000.00
kg 127,200.00
kg 72,000.00
kg 35,000.00
kg 45,600.00
tube 87,193.00
bh 21,660.00
bh 25,600.00
kg 95,760.00
m2 45,000.00
m2 85,000.00
tube 51,300.00

kg 12,000.00
kg 12,500.00
kg 17,784.00
kg 21,000.00
kg 13,110.00
kg 14,250.00
HARGA SATUAN
SATUAN
(Rp.)
kg 17,500.00
kg 14,575.00
m' 15,000.00
btg 6,954.00
kg 31,800.00
m2 25,300.00
m2 15,400.00
m 42,693.00
m 11,492.00
m 124,602.00
unit 1,966,500.00
Btg 262,200.00
Btg 524,000.00
Btg 410,400.00
Btg 647,264.00
m2 387,600.00
m' 285,600.00
m' 145,800.00
m' 452,000.00
m' 168,000.00
bh 35,000.00
btg 84,000.00
m' 14,000.00
m' 20,000.00

bh 865,000.00
m2 2,650,000.00
bh 35,000.00
bh 45,000.00
bh 82,500.00
bh 20,000.00
set 120,000.00
bh 37,200.00
bh 48,500.00
bh 10,699.00
bh 32,832.00
bh 26,500.00
bh 150,000.00
bh 99,000.00
bh 108,300.00
bh 81,220.00
bh 81,220.00
bh 100,000.00
bh 219,000.00
bh 152,000.00
HARGA SATUAN
SATUAN
(Rp.)
kg 18,865.00
kg 15,500.00
kg 25,000.00
kg 24,208.00
kg 28,500.00
kg 33,620.00
bh 500.00
bh 300.00
bh 600.00
bh 400.00
m2 750,000.00

lbr 56,100.00
m2 75,000.00
m2 162,000.00

m2 80,000.00
m2 90,000.00
m2 93,500.00
m2 207,900.00
m2 90,200.00
m2 101,000.00
m2 341,000.00
m2 589,950.00
m2 325,299.00
m2 375,000.00
m2 596,220.00
m2 1,300,000.00
m2 479,000.00
m2 673,000.00
m2 122,000.00
m 12,000.00
m2 47,500.00
m2 160,000.00

bh 398,400.00
bh 330,000.00
bh 2,553,400.00
bh 187,500.00
bh 328,000.00
unit 1,470,000.00
unit 224,078.00
HARGA SATUAN
SATUAN
(Rp.)
bh 542,235.00
bh 625,000.00
bh 210,900.00
unit 430,920.00
bh 37,400.00
bh 195,000.00
bh 38,500.00
bh 357,960.00
bh 450,000.00
unit 593,300.00
bh 54,100.00
m2 393,300.00
bh 27,500.00
bh 5,000.00
bh 8,500.00
bh 3,500.00

ls 68,400.00
ltr 11,000.00
m2 135,600.00
ltr 39,900.00
ls 35,000.00

jam 138,331.00
jam 300,741.00
jam 300,705.00
PERHITUNGAN VOLUME

KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN :

No. Uraian Pekerjaan Panjang Lebar Tinggi Jmlh-1 Jmlh-2

A PEKERJAAN PERSIAPAN
1 Pengukuran dan pembersihan lokasi
2 Plang nama proyek

B PEKERJAAN TANAH
1 Penggalian tanah biasa sedalam 1 m 0.80 x 0.80 x 0.80 x 10.00
2 Pengurugan kembali galian tanah (

C PEKERJAAN STRUKTUR
1 Pengadaan cerucuk dia. 8-10 cm 2.00 x 5.00 x 10.00
2 Memancang kayu kedalam tanah 2.00 x 5.00 x 10.00
3 Cor beton lantai kerja pondasi mutu f’c = 21,7 MPa (K 100) Footplate
pondasi footplate 0.80 x 0.80 x 0.05 x 10.00

4 Pekerjaan Pondasi Footplate


- Pek. Beton mutu f’c = 21,7 MPa (K 175) Footplate 0.80 x 0.80 x 0.25 x 10.00
- Pek. Bekesting Footplate 3.20 x 0.25 x 10.00
- Pek. Penulangan Footplate
Tulangan Besi 12 Y 2.10 x 6.00 x 10.00 x
Tulangan Besi 12 X 2.10 x 6.00 x 10.00 x

5 Pekerjaan Pedistal Pondasi Footplate


- Pek. Beton mutu f’c = 21,7 MPa (K 175) Pedistal 0.20 x 0.20 x 0.50 x 10.00
- Pek. Bekesting Pedistal 0.80 x 0.50 x 10.00
- Pek. Penulangan Pedistal
Tulangan Besi 12 0.50 x 10.00 x 4.00
Beugel Besi 8 0.80 x 3.33 x 10.00

6 Pekerjaan Sloof 15/20 cm


- Pek. Beton mutu f’c = 21,7 MPa (K 175) Sloof 33.00 x 0.15 x 0.20
- Pek. Bekesting Sloof 33.00 x
- Pek. Penulangan Sloof
Tulangan Besi 12 33.00 x 4.00
Beugel Besi 8 0.70 x 220.00
7 Pekerjaan Sloof 15/15 cm ( teras )
- Pek. Beton mutu f’c = 21,7 MPa (K 175) Sloof 4.00 x 0.15 x 0.15
- Pek. Bekesting Sloof 4.00 x
- Pek. Penulangan Sloof
Tulangan Besi 12 4.00 x 4.00
Beugel Besi 8 0.60 x 26.67
No. Uraian Pekerjaan Panjang Lebar Tinggi Jmlh-1 Jmlh-2
8 Pekerjaan Kolom 20/20
- Pek. Beton mutu f’c = 21,7 MPa (K 175) Kolom 0.20 x 0.20 x 3.30 x 10.00
- Pek. Bekesting Kolom 3.30 x 10.00 x
- Pek. Penulangan Kolom
Tulangan Besi 12 3.30 x 4.00 x 10.00
Beugel Besi 8 0.80 x 22.00 x 10.00
9 Pekerjaan Ring Balk 15/20
- Pek. Beton mutu f’c = 21,7 MPa (K 175) Ring Balk 33.00 x 0.15 x 0.20
- Pek. Bekesting Ring Balk 33.00 x
- Pek. Penulangan Ring Balk
Tulangan Besi 12 33.00 x 4.00
Beugel Besi 8 0.70 x 220.00
10 Pekerjaan Plat Beton (kanopi)
- Pek. Beton mutu f’c = 21,7 MPa (K 175) kanopi 7.30 x 0.40 x 0.05
- Pek. Bekesting Plat Beton kanopi 7.80 x 0.45
- Pek. Penulangan Plat Beton kanopi
Tulangan Besi 10 0.40 x x 36.50

D PEKERJAAN PASANGAN DINDING


1 Pasangan dinding 1/2 bata 33.00 x 3.30 ( -
Dikurangi luasan pintu P - 1 0.90 x 2.10 x 2.00
Dikurangi luasan pintu P - 2 0.70 x 1.90 x 1.00
Dikurangi luasan jendela J - 1 0.50 x 1.20 x 8.00
Dikurangi luasan pintu dinding 1.00 x 2.00 x 1.00
Dikurangi luasan roster 0.20 x 0.20 x 25.00

2 Plestarant 2.00 x
3 Acian 2.00 x
4 Pasangan roster 25.00
5 Pasangan rangka dinding partisi 5.00 x 3.00 ( -
6 Pasangan dinding partisi Plywood 2.00 x

E PEKERJAAN PINTU JENDELA


1 Memasang kusen pintu kayu klas I (P-1) 5.10 x 0.05 x 0.10 x 2.00
2 Memasang kusen pintu kayu klas I (P-2) 4.50 x 0.05 x 0.10 x 1.00
3 Memasang kusen jendela kayu klas I (J-1) 3.40 x 0.05 x 0.10 x 8.00
4 Pasangan daun pintu
P-1 2.05 x 0.80 x 2.00
P-2 1.85 x 0.60 x 1.00
5 Pasangan daun jendela 1.10 x 0.04 x 8.00
6 Pasangan Kaca bening 0.90 x 0.20 x 8.00
7 Engsel jendela 2.00 x 8.00
8 Kait angin 2.00 x 8.00
9 Grendel 1.00 x 8.00
10 Engsel pintu 3.00 x 3.00
11 Handle pintu 1.00 x 3.00
No. Uraian Pekerjaan Panjang Lebar Tinggi Jmlh-1 Jmlh-2

F PEKERJAAN LANTAI
1 Pekerjaan cor beton tumbuk lantai
Bagian teras 1.00 x 2.00 x 0.10
Ruang Tunggu 2.00 x 5.00 x 0.10
Ruang Istirahat 4.00 x 5.00 x 0.10
Dapur 2.00 x 3.50 x 0.10
KM / WV 2.00 x 1.50 x 0.10
2 Pekerjaan pasangan lantai keramik lantai 40x40 cm
Bagian teras 1.00 x 2.00
Ruang Tunggu 2.00 x 5.00
Ruang Istirahat 4.00 x 5.00
Dapur 2.00 x 3.50
3 Pekerjaan pasangan lantai keramik lantai 25x25 cm (WC) 2.00 x 1.50

G PEKERJAAN ATAP
1 Pasangan Rangka Atap Baja Ringan 10.20 x 6.20 / COS 30^
Melintang X 3.20 x 3.70 x 2.00
Melintang Y 6.20 x 3.70 x 2.00

2 Pasangan atap multi roof


3 Pasangan bubungan 19.00
4 Pasangan Listplang Nusa Plank 30.80

H PEKERJAAN PLAFOND
1 Pasangan rangka plafond
Ruang Tunggu 2.00 x 5.00
Ruang Istirahat 4.00 x 5.00
Dapur 2.00 x 3.50
KM / WV 2.00 x 1.50
Bagian luar 28.40 x 0.55
2 Pasangan plafond
3 Pasangan list plafond gifsum
Ruang Tunggu + Ruang Istirahat 22.00
Dapur 11.00
KM / WV 7.00
Bagian luar 56.80

I PEKERJAAN PENGECETAN DAN LAIN-LAIN


1 Pekerjaan pengecetan dinding sama dengan luasan pasangan dinding partisi 26.22 +
2 Pekerjaan pengecetan Plafond
3 Pekerjaan pengecetan kayu sama dengan luasan kusen pintu jendela x 1,5=
luar dalam

J PEKERJAAN INSTALASI LISTRIK


1 Saklar Tunggal 2.00
2 Saklar Ganda 1.00
3 Stop Kontak + Instalasi Kabel 3.00
4 Titik Lampu 4.00
5 Lampu SL 20 watt 4.00
No. Uraian Pekerjaan Panjang Lebar Tinggi Jmlh-1 Jmlh-2

K PEKERJAAN SANITASI
1 Pembuatan Septiktank 1.00
2 Pasangan Closed jongkok 1.00
3 Pasangan kran air 2.00
4 Pasangan floordrain 1.00
5 Pasangan Pipa Air Kotor 4.00
6 Pasangan Pipa Air Bekas 4.00
7 Pasangan Pipa Air Bersih 10.00
NGAN VOLUME

Luas - 1 Luas - 2 Berat Total Vol Sat Ket

1.00 Ls
1.00 Ls

5.12 5.12 M3
5.12 - 2.12 ) 3.00 3.00 M3

100.00 100.00 M'


100.00 100.00 M'

0.32 0.32 M3

1.60 1.60 M3
8.00 8.00 M2
223.83 223.83 Kg
0.89 111.92
0.89 111.92

0.20 0.20 M3
4.00 4.00 M2
28.29 28.29 Kg
x 0.89 17.76
x 0.40 10.53

0.99 0.99 M3 4.58


0.40 13.20 13.20 M2 36.6
178.05 178.05 Kg 400.37
x 0.89 117.22
x 0.40 60.83

0.09 0.09 M3
0.30 1.20 1.20 M2
20.53 20.53 Kg
x 0.89 14.21
x 0.40 6.32
Luas - 1 Luas - 2 Berat Total Vol Sat Ket

1.32 1.32 M3
0.80 26.40 26.40 M2
186.74 186.74 Kg
x 0.89 117.22
x 0.40 69.52

0.99 0.99 M3
0.40 13.20 13.20 M2
178.05 178.05 Kg
x 0.89 117.22
x 0.40 60.83

0.15 0.15 M3
3.51 3.51 M2
9.01 9.01 Kg
x 0.62 9.01

12.91 ) dikurangi luasan pintu jendela 108.90 95.99 M2


3.78
1.33
4.80
2.00
1.00
12.91
95.99 sama dengan luasan pasangan dinding x 2 191.98 191.98 M2
95.99 sama dengan luasan pasangan dinding x 2 191.98 191.98 M2
25.00 25.00 Buah
1.89 ) dikurangi luasan pintu P1 13.11 13.11 M2
13.11 sama dengan luasan rangka dinding partisi x 2 26.22 26.22 M2

0.05 0.05 M3
0.02 0.02 M3
0.14 0.14 M3
4.39 4.39 M2
3.28
1.11
0.35 0.35 M2
1.44 1.44 M3
16.00 16.00 Buah
16.00 16.00 Buah
8.00 8.00 Buah
9.00 9.00 Buah
3.00 3.00 Set
Luas - 1 Luas - 2 Berat Total Vol Sat Ket

4.20 4.20 M3
0.20
1.00
2.00
0.70
0.30
39.00 39.00 M2
2.00
10.00
20.00
7.00
3.00 3.00 M2

69.56 69.56 M2
23.68
45.88

69.56 sama dengan luasan Rangka atap 69.56 69.56 M2


19.00 19.00 M1
30.80 30.80 M1

55.62 55.62 M2
10.00
20.00
7.00
3.00
15.62
55.62 sama dengan luasan rangka plafond 55.62 55.62 M2
96.80 96.80 M1
22.00
11.00
7.00
56.80

191.98 = sama dengan luasan acian dinding 218.20 218.20 M2


55.62 = sama dengan luasan pasangan plafond 55.62 55.62 M2
0.31 + 9.48 = sama dengan luasan daun 9.80 9.80 M2
pintu jendela x 2

2.00 2.00 Buah


1.00 1.00 Buah
3.00 3.00 Buah
4.00 4.00 Titik
4.00 4.00 Buah
Luas - 1 Luas - 2 Berat Total Vol Sat Ket

1.00 1.00 Pkt


1.00 1.00 Buah
2.00 2.00 Buah
1.00 1.00 Buah
4.00 4.00 M1
4.00 4.00 M1
10.00 10.00 M1
PEMERINTAH PROVINSI KALIMANTAN T
RSUD dr. DORIS SYLVANUS PALANGK
Jl. Tambun Bungai 4 Palangka Pahandut. Telp : 0536 3221717,0536 3229194

RENCANA ANGGARAN BIA


[RAB]
PROGRAM
PENINGKATAN SARANA DAN PRASARANA APARATU
KEGIATAN
PENGEMBANGAN FASILITAS SARANA RS
PEKERJAAN
PERENCANAAN PEMBANGUNAN GEDUNG / RUANG POL

LOKASI
SAMPIT – KAB. KOTAWARINGIN TIMUR
TAHUN ANGGARAN
2016
PROGRAM
PENINGKATAN SARANA DAN PRASARANA APARATU

KONSULTAN PERENCANA

CV.BAGASNUSA KONSULTAN
I KALIMANTAN TENGAH
ANUS PALANGKA RAYA
: 0536 3221717,0536 3229194,0536 3237353

GGARAN BIAYA

AN PRASARANA APARATUR

AN GEDUNG / RUANG POLI JIWA


DATA PEKERJAAN
PEMERINTAH

DINAS

ALAMAT
PROGRAM :
KEGIATAN :
PEKERJAAN :

LOKASI :

TAHUN ANGGARAN :

TANGGAL :

KONSULTAN PERENCANA :
DIREKTUR :

DIPERIKSA :

DIPERIKSA :

DISETUJUI :
DATA PEKERJAAN
PEMERINTAH PROVINSI KALIMANTAN TENGAH

RSUD dr. DORIS SYLVANUS PALANGKA RAYA

Jl. Tambun Bungai 4 Palangka Pahandut. Telp : 0536 3221717,0536 3229194,0536 3237353
PENINGKATAN SARANA DAN PRASARANA APARATUR
PENGEMBANGAN FASILITAS SARANA RS
PERENCANAAN PEMBANGUNAN GEDUNG / RUANG POLI JIWA

SAMPIT – KAB. KOTAWARINGIN TIMUR

2016

29/4/2016

CV.BAGASNUSA KONSULTAN
EDWARIANSYAH, ST

Pengelola Teknis
Dinas PU Bidang Cipta Karya
Provinsi Kalimantan Tengah
M A R N O
NIP. 19600602 199103 1 005

Pejabat Pelaksana Teknis Kegiatan


(PPTK)
KRISPION, ST.MSi
NIP. 19720129 199203 1 001

Kuasa Pengguna Anggaran


RSUD dr. DORIS SYLVANUS PALANGKA RAYA

YUNA KORNELIS, SKM, MSi


NIP. 19641219 198412 1 001
SEMEN Rp 10,500,000 150 SAK
BESI 12 Rp 16,500,000 150 BATANG
BESI 8 Rp 3,500,000 50 BATANG
BATA Rp 3,000,000 1500 BATANG
TUKANG Rp 23,400,000
PASIR Rp 7,000,000
TAKTIS Rp 10,000,000
KONTARAK 2000000 156000000
BENDAHARA 2000000
PAJAK 3120000
CV 3900000
Rp 84,920,000 Rp 71,080,000