NO JENIS TENAGA / BAHAN KODE JEKAN RAYA BUKIT BATU KASONGAN SAMPIT
1 2 3 4
0 1 2 3 4 5 6
A. TENAGA
1 Mandor L.01 265,700.00 265,700.00 265,700.00 265,700.00
2 Kepala tukang batu L.02 215,000.00 215,000.00 215,000.00 215,000.00
3 Kepala tukang kayu L.03 196,100.00 196,100.00 196,100.00 196,100.00
4 Kepala tukang besi L.04 189,800.00 189,800.00 189,800.00 189,800.00
5 Kepala Tukang Cat L.05 189,800.00 189,800.00 189,800.00 189,800.00
6 Tukang batu L.06 151,800.00 151,800.00 151,800.00 151,800.00
7 Tukang kayu L.07 151,800.00 151,800.00 151,800.00 151,800.00
8 Tukang Cat L.08 115,500.00 115,500.00 115,500.00 115,500.00
9 Tukang besi L.09 126,500.00 126,500.00 126,500.00 126,500.00
10 Tukang Khusus Alumunium L.10 139,200.00 139,200.00 139,200.00 139,200.00
11 Tukang Allumunium/Kaca L.11 139,200.00 139,200.00 139,200.00 139,200.00
12 Pembantu tukang batu L.12 107,500.00 107,500.00 107,500.00 107,500.00
13 Pembantu tukang kayu L.13 107,500.00 107,500.00 107,500.00 107,500.00
14 Pembantu tukang besi L.14 107,500.00 107,500.00 107,500.00 107,500.00
15 Pembantu tukang cat L.15 107,500.00 107,500.00 107,500.00 107,500.00
B BAHAN
- BAHAN AIR
1 Air A.1 3.75 3.75 3.75 3.75
- BAHAN GALIAN
1 Batu belah B-1 700,000.00 700,000.00 700,000.00 700,000.00
2 Batu pecah 2-3 cm B-4 552,500.00 552,500.00 552,500.00 552,500.00
3 Pasir beton B-9 168,000.00 168,000.00 168,000.00 168,000.00
4 Pasir Pasang B-10 168,000.00 168,000.00 168,000.00 168,000.00
5 Pasir Urug B-11 108,000.00 108,000.00 108,000.00 108,000.00
- BAHAN CETAKAN DAN SEMEN
1 Asbes semen plafond C-3 21,100.00 21,100.00 21,100.00 21,100.00
2 Batu bata merah C-7 1,150.00 1,150.00 1,150.00 1,150.00
3 Genteng metal C-14 63,300.00 63,300.00 63,300.00 63,300.00
4 Gypsum board C-16 91,400.00 91,400.00 91,400.00 91,400.00
5 Tepung gipsum C-17 8,125.00 8,125.00 8,125.00 8,125.00
6 keramik uk. 20x20 cm ( Roman ) C-22 146,250.00 146,250.00 146,250.00 146,250.00
7 Keramik 20x25 cm ( Roman ) C-23 124,500.00 124,500.00 124,500.00 124,500.00
8 Keramik 40x40 cm kasar ( Roman ) C-24 165,082.50 165,082.50 165,082.50 165,082.50
9 Keramik 10x40cm C-25 22,500.00 22,500.00 22,500.00 22,500.00
10 Keramik 40x40 cm ( Roman ) C-26 150,075.00 150,075.00 150,075.00 150,075.00
11 Semen portland C-46 1,970.00 1,970.00 1,970.00 1,970.00
12 Semen warna C-47 16,500.00 16,500.00 16,500.00 16,500.00
1 Pintu kaca tempered tebal 12 mm lengkap + stiker sandblast J-3 8,450,000.00 8,450,000.00 8,450,000.00 8,450,000.00
2 Kaca tempered 12 mm J-4 1,562,500.00 1,562,500.00 1,562,500.00 1,562,500.00
3 Memasang kaca - tebal 5 mm + stiker sandblast J-7 270,000.00 270,000.00 270,000.00 270,000.00
4 Kaca tebal 5 mm J-13 157,500.00 157,500.00 157,500.00 157,500.00
5 Profil kaca J-16 157,500.00 157,500.00 157,500.00 157,500.00
6 Sealant J-17 30,000.00 30,000.00 30,000.00 30,000.00
265,700.00
215,000.00
196,100.00
189,800.00
189,800.00
151,800.00
151,800.00
115,500.00
126,500.00
139,200.00
139,200.00
107,500.00
107,500.00
107,500.00
107,500.00
3.75
700,000.00
552,500.00
168,000.00
168,000.00
108,000.00
21,100.00
1,150.00
63,300.00
91,400.00
8,125.00
146,250.00
124,500.00
165,082.50
22,500.00
150,075.00
1,970.00
16,500.00
207,000.00
207,000.00
467,500.00
225,000.00
15,750.00
31,500.00
8,868.75
8,868.75
64,965.00
64,965.00
90,585.00
90,585.00
5,000.00
561,494.40
125,000.00
6,839,000.00
105,000.00
50,000.00
18,500.00
13,000.00
175.00
20,256.00
12,000.00
27,756.00
36,000.00
17,100.00
5,500.00
34,500.00
150,000.00
50,000.00
11,600.00
46,800.00
156.00
1,000.00
35,000.00
93,750.00
30,000.00
20,000.00
28,350.00
18,900.00
17,750.00
133,875.00
7,500.00
41,700.00
49,500.00
33,320.00
15,000.00
25,500.00
12,600.00
12,600.00
3,593,750.00
2,400,000.00
16,500.00
24,000.00
7,600.00
3,200,000.00
5,376,300.00
210,000.00
8,450,000.00
1,562,500.00
270,000.00
157,500.00
157,500.00
30,000.00
1,798,940.00
212,625.00
450,000.00
30,000.00
67,300.00
228,375.00
750,000.00
0%
PULANG PISAU SPESIFIKASI TEKNIS SATUAN
5 12
10 11 12
Lokal Orang/hari
Lokal Orang/hari
Lokal Orang/hari
Lokal Orang/hari
Lokal Orang/hari
Lokal Orang/hari
Lokal Orang/hari
Lokal Orang/hari
Lokal Orang/hari
Lokal Orang/hari
Lokal Orang/hari
Lokal Orang/hari
Lokal Orang/hari
Lokal Orang/hari
Lokal Orang/hari
Liter
M3
M3
M3
M3
M3
M2
Buah
Lembar
Lbr
Kg
M2
M2
M2
Buah
M2
Kg
Kg
Unit
Unit
Unit
Unit
Unit
M1
M1
Ls
M1
Ls
M1
Ls
Bh
Unit
Buah
Unit
M1
Ls
M1
M1
Buah
Kg
Buah
Kg
Bh
Kg
Kg
Kg
M1
M1
M1
Lbr
Bh
Ls
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Lbr
Kg
Kg
Kg
Bh
Ltr
Kg
Ltr
M3
M3
Batang
Batang
M1
M3
M3
Lbr
Buah
M2
M2
M2
M1
Tube
Unit
Titik
Titik
Buah
Buah
Titik
Buah
LAMPIRAN A
NOMOR : ...........................................
PROGRAM : 0
KEGIATAN : 0
PEKERJAAN : 0
LOKASI : 0
TAHUN : 0
KONTRAK AWAL
NO. URAIAN PEKERJAAN
ANALISA VOLUME SATUAN HARGA SATUAN (RP)
JMLH HARGA (RP) ANALISA VOLUME SATUAN HARGA SATUAN (RP) JMLH HARGA (RP) TAMBAH KURANG
TETAP
TETAP
TETAP
DIHILANGKAN
BERTAMBAH
BERTAMBAH
ITEM BARU
BERTAMBAH
BERTAMBAH
BERKURANG
BERKURANG
BERKURANG
BERKURANG
BERKURANG
BERKURANG
TETAP
TETAP
TETAP
BERKURANG
BERKURANG
BERKURANG
REKAPITULASI
RENCANA ANGGARAN BIAYA
(RAB)
PROGRAM :
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN :
NO. PEKERJAAN
A PEKERJAAN PERSIAPAN
B PEKERJAAN TANAH
C PEKERJAAN STRUKTUR
D PEKERJAAN PASANGAN DINDING
E PEKERJAAN PINTU JENDELA
F PEKERJAAN LANTAI
G PEKERJAAN ATAP
H PEKERJAAN PLAFOND
I PEKERJAAN PENGECETAN DAN LAIN-LAIN
J PEKERJAAN INSTALASI LISTRIK
K PEKERJAAN SANITASI
TOTAL KESELUR
PEMBUL
TERBILANG : " SERATUS TUJUH PULUH SATU JUTA RUPIAH "
HARGA
1,500,000.00
616,600.00
40,698,691.19
39,485,542.40
9,647,986.80
9,552,518.98
22,626,879.05
13,534,052.35
9,214,520.39
675,970.00
7,922,260.80
TOTAL 155,475,021.96
PPN 10% 15,547,502.20
ESELURUHAN 171,022,524.16
PEMBULATAN 171,000,000.00
RENCANA ANGGARAN BIAYA
(RAB)
PROGRAM :
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN :
A PEKERJAAN PERSIAPAN
1 Pengukuran dan pembersihan lokasi Ls
2 Plang nama proyek Ls
B PEKERJAAN TANAH
1 Penggalian tanah biasa sedalam 1 m A.2.3.1.1
2 Pengurugan kembali galian tanah A.2.3.1.9
C PEKERJAAN STRUKTUR
1 Pengadaan cerucuk dia. 8-10 cm Ls
2 Memancang kayu kedalam tanah E.13
3 Cor beton lantai kerja pondasi mutu f’c = 21,7 MPa (K 100) Footplate A.4.1.1.4
4 Pekerjaan Pondasi Footplate
- Pek. Beton mutu f’c = 21,7 MPa (K 175) Footplate A.4.1.1.5
- Pek. Bekesting Footplate A.4.1.1.20
- Pek. Penulangan Footplate A.4.1.1.17
5 Pekerjaan Pedistal Pondasi Footplate
- Pek. Beton mutu f’c = 21,7 MPa (K 175) Pedistal A.4.1.1.5
- Pek. Bekesting Pedistal A.4.1.1.22
- Pek. Penulangan Pedistal A.4.1.1.17
6 Pekerjaan Sloof 15/20 cm
- Pek. Beton mutu f’c = 21,7 MPa (K 175) Sloof A.4.1.1.5
- Pek. Bekesting Sloof A.4.1.1.21
- Pek. Penulangan Sloof A.4.1.1.17
7 Pekerjaan Sloof 15/15 cm ( teras )
- Pek. Beton mutu f’c = 21,7 MPa (K 175) Sloof A.4.1.1.5
- Pek. Bekesting Sloof A.4.1.1.21
- Pek. Penulangan Sloof A.4.1.1.17
8 Pekerjaan Kolom 20/20
- Pek. Beton mutu f’c = 21,7 MPa (K 175) Kolom A.4.1.1.5
- Pek. Bekesting Kolom A.4.1.1.22
- Pek. Penulangan Kolom A.4.1.1.17
9 Pekerjaan Ring Balk 15/20
- Pek. Beton mutu f’c = 21,7 MPa (K 175) Ring Balk A.4.1.1.5
- Pek. Bekesting Ring Balk A.4.1.1.22
- Pek. Penulangan Ring Balk A.4.1.1.17
10 Pekerjaan Plat Beton (kanopi)
- Pek. Beton mutu f’c = 21,7 MPa (K 175) kanopi A.4.1.1.5
- Pek. Bekesting Plat Beton kanopi A.4.1.1.24
- Pek. Penulangan Plat Beton kanopi A.4.1.1.17
G PEKERJAAN ATAP
1 Pasangan Rangka Atap Baja Ringan LS- baja ringan
2 Pasangan atap multi roof A.4.5.2.32
3 Pasangan bubungan A.4.5.2.36
4 Pasangan Listplang Nusa Plank Ls. Nusaplank
H PEKERJAAN PLAFOND
1 Pasangan rangka plafond A.4.6.1.19
2 Pasangan plafond A.4.5.1.7
3 Pasangan list plafond gifsum A.4.5.1.8
K PEKERJAAN SANITASI
1 Pembuatan Septiktank Ls
2 Pasangan Closed jongkok A.5.1.1.2
3 Pasangan kran air A.5.1.1.35
4 Pasangan floordrain A.5.1.1.36
5 Pasangan Pipa Air Kotor Ls
6 Pasangan Pipa Air Bekas Ls
7 Pasangan Pipa Air Bersih Ls
RAN BIAYA
#REF!
A.4.1.1.6 Membuat beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang batu L.11 Orang/hari 1.6500
Tukang batu L.06 Orang/hari 0.2750
Kepala tukang batu L.02 Orang/hari 0.0280
Mandor L.01 Orang/hari 0.0830
.........................................................................................
Jumlah- 1
2 BAHAN
Semen portland C-3 Kg 352.0000
Pasir beton C-4 M3 0.5221
Batu pecah 2-3 cm C-10 M3 0.7637
Air C-15 Liter 215.0000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
A.4.4.1.9 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang batu L.11 Orang/hari 0.3000
Tukang batu L.06 Orang/hari 0.1000
Kepala tukang batu L.02 Orang/hari 0.0100
Mandor L.01 Orang/hari 0.0150
.........................................................................................
Jumlah- 1
2 BAHAN
Batu bata merah C-12 Bh 70.0000
Semen portland C-3 Kg 11.5000
Pasir beton C-4 M3 0.0430
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
A.4.6.1.1 Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas I
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 7.00
Tukang kayu L.07 Orang/hari 21.00
Kepala tukang kayu L.03 Orang/hari 2.10
Mandor L.01 Orang/hari 0.35
.........................................................................................
Jumlah- 1
2 BAHAN
Balok kayu kelas I H-1 M3 1.10
Paku kayu E-7 Kg 1.25
Lem kayu G-8 Kg 1.00
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
A.4.6.1.5 Pembuatan dan pemasangan daun pintu panel, kayu kelas I atau II
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 1.0000
Tukang kayu L.07 Orang/hari 3.0000
Kepala tukang kayu L.03 Orang/hari 0.3000
Mandor L.01 Orang/hari 0.0500
.........................................................................................
Jumlah- 1
2 BAHAN
Papan kayu kelas II H-5 M3 0.0400
Lem kayu G-8 Kg 0.5000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
A.4.6.2.6 Pemasangan engsel jendela
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 0.0100
Tukang kayu L.07 Orang/hari 0.1000
Kepala tukang kayu L.03 Orang/hari 0.0100
Mandor L.01 Orang/hari 0.0005
.........................................................................................
Jumlah- 1
2 BAHAN
Engsel G-9 Buah 1.0000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
A.4.6.1.19 Pemasangan rangka langit-langit (50 x 100) cm, kayu kelas II atau III
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 0.1500
Tukang kayu L.07 Orang/hari 0.3000
Kepala tukang kayu L.03 Orang/hari 0.0300
Mandor L.01 Orang/hari 0.0750
.........................................................................................
Jumlah- 1
2 BAHAN
Balok kayu kelas II H-2 M3 0.0154
Paku kayu E-7 Kg 0.2000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
A.4.6.1.21 Pemasangan lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 0.1000
Tukang kayu L.07 Orang/hari 0.2000
Kepala tukang kayu L.03 Orang/hari 0.0200
Mandor L.01 Orang/hari 0.0050
.........................................................................................
Jumlah- 1
2 BAHAN
Papan kayu kelas II H-5 M3 0.0108
Paku kayu E-7 Kg 0.1000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
A.5.1.1.6 Pemasangan bak mandi teraso vol 0,30 m3
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang batu L.11 Orang/hari 3.0000
Tukang batu L.06 Orang/hari 4.5000
Kepala tukang batu L.02 Orang/hari 0.0500
Mandor L.01 Orang/hari 0.9000
.........................................................................................
Jumlah- 1
2 BAHAN
Bak fibreglass G-12 Buah 1.0000
Bak fibreglass Perlengkapan #N/A #N/A 12%
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
PEKERJAAN KAYU
6.1.20.a A.4.6.1.20.a Pemasangan Rangka Dinding Partisi
.6.1.20. No. Uraian Kode Satuan Koef
6.1.20.a 1 TENAGA
6.1.20.a Pembantu tukang kayu L.12 Orang/hari 0.2000
6.1.20.a Tukang kayu L.07 Orang/hari 0.3000
6.1.20.a Kepala tukang kayu L.03 Orang/hari 0.0300
6.1.20.a Mandor L.01 Orang/hari 0.0100
6.1.20.a .........................................................................................
Jumlah- 1
6.1.20.a 2 BAHAN
6.1.20.a Balok kayu kelas II H-2 M3 0.0100
6.1.20.a Paku kayu E-7 Kg 0.1500
6.1.20.a .........................................................................................
Jumlah- 2
6.1.20.a 3 PERALATAN
6.1.20.a .........................................................................................
Jumlah- 3
6.1.20.a 4 JUMLAH (1+2+3)
6.1.20.a 5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6.1.20.a 6 HARGA SATUAN PEKERJAAN (4+5)
A.4.6.1.7 Pembuatan dan pemasangan pintu dan jendela jalusi kayu kelas I atau II
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang kayu L.12 Orang/hari 1.0000
Tukang kayu L.07 Orang/hari 3.0000
Kepala tukang kayu L.03 Orang/hari 0.3000
Mandor L.01 Orang/hari 0.0500
.........................................................................................
Jumlah- 1
2 BAHAN
Papan kayu kelas II H-5 M3 0.0640
Paku kayu E-7 Kg 0.5000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
PEKERJAAN PENGECATAN
A.4.7.1.4 Pengecatan bidang kayu baru (1 lapis plamuur,
1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang cat L.14 Orang/hari 0.0700
Tukang Cat L.08 Orang/hari 0.0090
Kepala Tukang Cat L.05 Orang/hari 0.0060
Mandor L.01 Orang/hari 0.0030
.........................................................................................
Jumlah- 1
2 BAHAN
Cat menie kayu G-3 Kg 0.2000
Plamir G-6 Kg 0.1500
Cat dasar G-2 Kg 0.1700
Cat penutup G-4 Kg 0.2600
Kuas G-5 Bh 0.0100
Thinner G-7 Ltr 0.0300
Ampelas G-1 Lbr 0.2000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
Pengecatan tembok baru ( 1lapis plamuur, 1
A.4.7.1.10 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koef
1 TENAGA
Pembantu tukang cat L.14 Orang/hari 0.0200
Tukang Cat L.08 Orang/hari 0.0630
Kepala Tukang Cat L.05 Orang/hari 0.0063
Mandor L.01 Orang/hari 0.0030
.........................................................................................
Jumlah- 1
2 BAHAN
Plamir G-6 Kg 0.1000
Cat dasar G-2 Kg 0.1000
Cat penutup G-4 Kg 0.2600
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
PEKERJAAN MEKANIKAL
M.001 Stop kontak + instalasi beton
No. Uraian Kode Satuan Koef
1 TENAGA
.........................................................................................
Jumlah- 1
2 BAHAN
Stop kontak + instalasi beton H-1 Buah 1.0000
.........................................................................................
Jumlah- 2
3 PERALATAN
.........................................................................................
Jumlah- 3
4 JUMLAH (1+2+3)
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4
6 HARGA SATUAN PEKERJAAN (4+5)
100,000.00 75,000.00
200,000.00 5,000.00
.................. 80,000.00
.................. -
.................. -
80,000.00
80,000.00
Satuan M3
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 50,000.00
200,000.00 10,000.00
.................. 60,000.00
.................. -
.................. -
60,000.00
9,000.00
69,000.00
Satuan M3
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 30,000.00
200,000.00 2,000.00
.................. 32,000.00
80,300.00 96,360.00
.................. 96,360.00
.................. -
128,360.00
19,254.00
147,614.00
Satuan M1
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 10,000.00
120,000.00 2,400.00
150,000.00 600.00
200,000.00 400.00
.................. 13,400.00
5,000.00 1,250.00
.................. 1,250.00
.................. -
14,650.00
2,197.50
16,847.50
Satuan M3
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 150,000.00
120,000.00 90,000.00
150,000.00 11,250.00
200,000.00 15,000.00
.................. 266,250.00
410,000.00 492,000.00
1,300.00 211,900.00
154,200.00 80,184.00
.................. 784,084.00
.................. -
1,050,334.00
157,550.10
1,207,884.10
Satuan M3
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 120,000.00
120,000.00 24,000.00
150,000.00 3,000.00
200,000.00 12,000.00
.................. 159,000.00
1,300.00 299,000.00
154,200.00 98,357.58
425,000.00 323,314.82
50.00 10,000.00
.................. 730,672.40
.................. -
889,672.40
133,450.86
1,023,123.26
Satuan M3
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 165,000.00
120,000.00 33,000.00
150,000.00 4,200.00
200,000.00 16,600.00
.................. 218,800.00
1,300.00 423,800.00
154,200.00 83,708.58
425,000.00 323,944.45
50.00 10,750.00
.................. 842,203.03
.................. -
1,061,003.03
159,150.45
1,220,153.48
Satuan M3
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 165,000.00
120,000.00 33,000.00
150,000.00 4,200.00
200,000.00 16,600.00
.................. 218,800.00
1,300.00 457,600.00
154,200.00 80,514.43
425,000.00 324,574.08
50.00 10,750.00
.................. 873,438.51
.................. -
1,092,238.51
163,835.78
1,256,074.29
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 52,000.00
120,000.00 31,200.00
150,000.00 3,900.00
200,000.00 5,200.00
.................. 92,300.00
2,000,000.00 80,000.00
18,500.00 5,550.00
.................. 85,550.00
.................. -
177,850.00
26,677.50
204,527.50
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 52,000.00
120,000.00 31,200.00
150,000.00 3,900.00
200,000.00 5,200.00
.................. 92,300.00
2,000,000.00 90,000.00
18,500.00 5,550.00
.................. 95,550.00
.................. -
187,850.00
28,177.50
216,027.50
Satuan Kg
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 700.00
120,000.00 840.00
150,000.00 105.00
200,000.00 80.00
.................. 1,725.00
11,000.00 11,550.00
19,800.00 297.00
.................. 11,847.00
.................. -
13,572.00
2,035.80
15,607.80
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 66,000.00
120,000.00 39,600.00
150,000.00 4,950.00
200,000.00 6,600.00
.................. 117,150.00
2,000,000.00 80,000.00
18,500.00 7,400.00
2,400,000.00 36,000.00
5,000.00 10,000.00
.................. 133,400.00
.................. -
250,550.00
37,582.50
288,132.50
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 66,000.00
120,000.00 39,600.00
150,000.00 4,950.00
200,000.00 6,600.00
.................. 117,150.00
2,000,000.00 80,000.00
18,500.00 7,400.00
2,400,000.00 43,200.00
64,000.00 22,400.00
5,000.00 10,000.00
.................. 163,000.00
.................. -
280,150.00
42,022.50
322,172.50
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 66,000.00
120,000.00 39,600.00
150,000.00 4,950.00
200,000.00 6,600.00
.................. 117,150.00
2,000,000.00 80,000.00
18,500.00 7,400.00
2,400,000.00 36,000.00
64,000.00 22,400.00
5,000.00 30,000.00
.................. 175,800.00
.................. -
292,950.00
43,942.50
336,892.50
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 30,000.00
120,000.00 12,000.00
150,000.00 1,500.00
200,000.00 3,000.00
.................. 46,500.00
800.00 56,000.00
1,300.00 14,950.00
154,200.00 6,630.60
.................. 77,580.60
.................. -
124,080.60
18,612.09
142,692.69
Satuan M3
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 700,000.00
120,000.00 2,520,000.00
150,000.00 315,000.00
200,000.00 70,000.00
....................... 3,605,000.00
6,625,000.00 7,287,500.00
18,500.00 23,125.00
17,400.00 17,400.00
....................... 7,328,025.00
....................... -
10,933,025.00
1,639,953.75
12,572,978.75
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 70,000.00
120,000.00 42,000.00
150,000.00 5,250.00
200,000.00 7,000.00
.................. 124,250.00
32,500.00 203,125.00
1,300.00 13,000.00
154,200.00 6,939.00
14,100.00 21,150.00
.................. 244,214.00
.................. -
368,464.00
55,269.60
423,733.60
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 20,000.00
120,000.00 12,000.00
150,000.00 1,500.00
200,000.00 200.00
.................. 33,700.00
65,000.00 66,300.00
18,500.00 3,700.00
.................. 70,000.00
.................. -
103,700.00
15,555.00
119,255.00
Satuan M3
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 18,000.00
120,000.00 2,400.00
120,000.00 2,400.00
120,000.00 2,400.00
150,000.00 900.00
200,000.00 1,800.00
.................. 27,900.00
2,000,000.00 4,000.00
18,500.00 185.00
16,500.00 19,800.00
11,000.00 33,000.00
19,800.00 8,910.00
1,300.00 5,200.00
154,200.00 925.20
425,000.00 3,825.00
.................. 75,845.20
.................. -
103,745.20
15,561.78
119,306.98
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 30,000.00
120,000.00 18,000.00
150,000.00 2,250.00
200,000.00 3,000.00
.................. 53,250.00
1,300.00 5,740.80
154,200.00 4,163.40
.................. 9,904.20
.................. -
63,154.20
9,473.13
72,627.33
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 20,000.00
120,000.00 12,000.00
150,000.00 1,500.00
200,000.00 2,000.00
.................. 35,500.00
1,300.00 4,225.00
.................. 4,225.00
.................. -
39,725.00
5,958.75
45,683.75
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 26,000.00
120,000.00 15,600.00
150,000.00 1,950.00
200,000.00 2,600.00
.................. 46,150.00
#N/A #N/A
1,300.00 13,000.00
14,100.00 21,150.00
154,200.00 6,939.00
.................. #N/A
.................. -
#N/A
#N/A
#N/A
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 70,000.00
120,000.00 42,000.00
150,000.00 5,250.00
200,000.00 7,000.00
.................. 124,250.00
32,500.00 34,125.00
1,300.00 10,647.00
154,200.00 6,939.00
14,100.00 7,050.00
.................. 58,761.00
.................. -
183,011.00
27,451.65
210,462.65
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 90,000.00
120,000.00 54,000.00
150,000.00 6,750.00
200,000.00 9,000.00
.................. 159,750.00
2,400.00 63,600.00
1,300.00 12,090.00
154,200.00 2,775.60
14,100.00 27,354.00
.................. 63,600.00
.................. -
244,459.80
36,668.97
281,128.77
Satuan M1
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 9,000.00
120,000.00 10,800.00
150,000.00 5,250.00
200,000.00 1,000.00
.................. 26,050.00
19,380.00 102,714.00
1,300.00 741.00
154,200.00 231.30
14,100.00 183.30
.................. 102,714.00
.................. -
129,341.80
19,401.27
148,743.07
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 90,000.00
120,000.00 54,000.00
150,000.00 6,750.00
200,000.00 9,000.00
.................. 159,750.00
5,125.00 5,381.25
1,300.00 12,090.00
154,200.00 2,775.60
14,100.00 27,354.00
.................. 47,600.85
.................. -
207,350.85
31,102.63
238,453.48
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 10,000.00
120,000.00 6,000.00
150,000.00 750.00
200,000.00 1,000.00
.................. 17,750.00
50,400.00 18,345.60
18,500.00 2,035.00
.................. 20,380.60
.................. -
38,130.60
5,719.59
43,850.19
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 100,000.00
120,000.00 360,000.00
150,000.00 45,000.00
200,000.00 10,000.00
.................. 515,000.00
2,500,000.00 100,000.00
17,400.00 8,700.00
.................. 108,700.00
.................. -
623,700.00
93,555.00
717,255.00
Satuan Buah
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 1,000.00
120,000.00 12,000.00
150,000.00 1,500.00
200,000.00 100.00
.................. 14,600.00
25,000.00 25,000.00
.................. 25,000.00
.................. -
39,600.00
5,940.00
45,540.00
Satuan Buah
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 1,500.00
120,000.00 18,000.00
150,000.00 2,250.00
200,000.00 1,600.00
.................. 23,350.00
34,500.00 34,500.00
.................. 34,500.00
.................. -
57,850.00
8,677.50
66,527.50
Satuan Buah
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 2,000.00
120,000.00 24,000.00
150,000.00 3,000.00
200,000.00 200.00
....................... 29,200.00
24,300.00 24,300.00
....................... 24,300.00
....................... -
53,500.00
8,025.00
61,525.00
Satuan M1
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 18,000.00
120,000.00 2,400.00
120,000.00 2,400.00
120,000.00 2,400.00
150,000.00 900.00
200,000.00 1,800.00
.................. 27,900.00
2,000,000.00 4,000.00
18,500.00 185.00
11,000.00 33,000.00
19,800.00 8,910.00
1,300.00 5,200.00
154,200.00 925.20
425,000.00 3,825.00
.................. 56,045.20
.................. -
83,945.20
12,591.78
96,536.98
Satuan M3
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 400,000.00
120,000.00 1,440,000.00
150,000.00 180,000.00
200,000.00 40,000.00
.................. 2,060,000.00
2,400,000.00 2,640,000.00
27,800.00 417,000.00
18,500.00 103,600.00
.................. 3,160,600.00
.................. -
5,220,600.00
783,090.00
6,003,690.00
Satuan M3
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 670,000.00
120,000.00 2,412,000.00
150,000.00 301,500.00
200,000.00 67,000.00
.................. 3,450,500.00
2,400,000.00 2,640,000.00
27,800.00 417,000.00
18,500.00 55,500.00
.................. 3,112,500.00
.................. -
6,563,000.00
984,450.00
7,547,450.00
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 10,000.00
120,000.00 12,000.00
150,000.00 1,500.00
200,000.00 1,000.00
.................. 24,500.00
2,400,000.00 33,600.00
2,400,000.00 136,800.00
18,500.00 4,625.00
.................. 175,025.00
.................. -
199,525.00
29,928.75
229,453.75
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 10,000.00
120,000.00 27,000.00
150,000.00 750.00
200,000.00 5,000.00
.................. 42,750.00
2,000.00 30,000.00
10,000.00 54,000.00
10,000.00 10,000.00
.................. 94,000.00
.................. -
136,750.00
20,512.50
157,262.50
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 20,000.00
120,000.00 12,000.00
150,000.00 1,500.00
200,000.00 200.00
.................. 33,700.00
65,000.00 66,300.00
18,500.00 3,700.00
.................. 70,000.00
.................. -
103,700.00
15,555.00
119,255.00
Satuan M1
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 25,000.00
120,000.00 18,000.00
150,000.00 2,250.00
200,000.00 2,600.00
.................. 47,850.00
21,200.00 23,320.00
18,500.00 925.00
.................. 24,245.00
.................. -
72,095.00
10,814.25
82,909.25
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 15,000.00
120,000.00 36,000.00
150,000.00 4,500.00
200,000.00 15,000.00
.................. 70,500.00
2,400,000.00 36,960.00
18,500.00 3,700.00
.................. 40,660.00
.................. -
111,160.00
16,674.00
127,834.00
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 10,000.00
120,000.00 6,000.00
150,000.00 750.00
200,000.00 1,000.00
.................. 17,750.00
50,400.00 18,345.60
18,500.00 2,035.00
.................. 20,380.60
.................. -
38,130.60
5,719.59
43,850.19
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 6,000.00
120,000.00 720.00
150,000.00 900.00
200,000.00 600.00
.................. 8,220.00
24,250.00 25,462.50
14,100.00 2,115.00
.................. 27,577.50
.................. -
35,797.50
5,369.63
41,167.13
Satuan M1
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 10,000.00
120,000.00 24,000.00
150,000.00 3,000.00
200,000.00 1,000.00
.................. 38,000.00
56,000.00 26,600.00
18,500.00 1,850.00
.................. 51,300.00
7,695.00
58,995.00
Satuan M1
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 10,000.00
120,000.00 24,000.00
150,000.00 3,000.00
200,000.00 1,000.00
.................. 38,000.00
2,500,000.00 27,000.00
18,500.00 1,850.00
.................. 28,850.00
.................. -
66,850.00
10,027.50
76,877.50
Satuan Buah
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 300,000.00
120,000.00 540,000.00
150,000.00 7,500.00
200,000.00 180,000.00
.................. 1,027,500.00
470,000.00 470,000.00
50,000.00 6,000.00
.................. 476,000.00
.................. -
1,503,500.00
225,525.00
1,729,025.00
Satuan Buah
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 100,000.00
120,000.00 180,000.00
150,000.00 22,500.00
200,000.00 32,000.00
.................. 334,500.00
150,000.00 150,000.00
1,300.00 7,800.00
154,200.00 1,542.00
.................. 159,342.00
.................. -
493,842.00
74,076.30
567,918.30
Satuan Buah
100,000.00 1,000.00
120,000.00 48,000.00
150,000.00 6,000.00
200,000.00 1,000.00
.................. 56,000.00
14,500.00 14,500.00
5,000.00 125.00
.................. 14,625.00
.................. -
70,625.00
10,593.75
81,218.75
Satuan Buah
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 1,000.00
120,000.00 12,000.00
150,000.00 1,500.00
200,000.00 1,000.00
.................. 15,500.00
19,200.00 19,200.00
.................. 19,200.00
.................. -
34,700.00
5,205.00
39,905.00
Satuan M2
Hrg Sat (Rp)Jmlh Hrg (Rp)
100,000.00 20,000.00
120,000.00 36,000.00
150,000.00 4,500.00
200,000.00 2,000.00
.......................... 62,500.00
### 24,000.00
18,500.00 2,775.00
.......................... 26,775.00
.......................... -
89,275.00
13,391.25
###
Satuan M2
Hrg Sat (Rp)Jmlh Hrg (Rp)
100,000.00 10,000.00
120,000.00 12,000.00
150,000.00 1,500.00
200,000.00 1,000.00
.......................... 24,500.00
64,000.00 24,000.00
18,500.00 555.00
.......................... 24,555.00
.......................... -
49,055.00
7,358.25
56,413.25
Satuan M1
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 80,000.00
120,000.00 288,000.00
150,000.00 36,000.00
200,000.00 8,000.00
.................. 412,000.00
2,500,000.00 60,000.00
18,500.00 5,550.00
.................. 65,550.00
.................. -
477,550.00
71,632.50
549,182.50
Satuan M1
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 100,000.00
120,000.00 360,000.00
150,000.00 45,000.00
200,000.00 10,000.00
.................. 515,000.00
2,500,000.00 160,000.00
18,500.00 9,250.00
.................. 169,250.00
.................. -
684,250.00
102,637.50
786,887.50
Satuan M1
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 1,000.00
120,000.00 60,000.00
150,000.00 7,500.00
200,000.00 1,000.00
.................. 69,500.00
38,500.00 38,500.00
.................. 38,500.00
.................. -
108,000.00
16,200.00
124,200.00
Satuan M1
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 1,500.00
120,000.00 18,000.00
150,000.00 2,250.00
200,000.00 160.00
.................. 21,910.00
56,100.00 56,100.00
.................. 56,100.00
.................. -
78,010.00
11,701.50
89,711.50
Satuan M1
Hrg Sat (Rp) Jmlh Hrg (Rp)
100,000.00 1,500.00
120,000.00 18,000.00
150,000.00 2,250.00
200,000.00 160.00
.................. 21,910.00
93,500.00 102,850.00
- -
.................. 102,850.00
.................. -
124,760.00
18,714.00
143,474.00
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)
80,000.00 5,600.00
120,000.00 1,080.00
150,000.00 900.00
200,000.00 600.00
.................. 8,180.00
38,200.00 7,640.00
56,400.00 8,460.00
38,800.00 6,596.00
36,700.00 9,542.00
18,200.00 182.00
16,500.00 495.00
7,700.00 1,540.00
.................. 34,455.00
.................. -
42,635.00
6,395.25
49,030.25
Satuan M2
80,000.00 1,600.00
120,000.00 7,560.00
150,000.00 945.00
200,000.00 600.00
.................. 10,705.00
56,400.00 5,640.00
38,800.00 3,880.00
36,700.00 9,542.00
.................. 19,062.00
.................. -
29,767.00
4,465.05
34,232.05
Satuan M2
Hrg Sat (Rp) Jmlh Hrg (Rp)
80,000.00 2,240.00
120,000.00 5,040.00
150,000.00 630.00
200,000.00 600.00
.................. 8,510.00
38,800.00 4,656.00
36,700.00 6,606.00
.................. 11,262.00
.................. -
19,772.00
2,965.80
22,737.80
Satuan Titik
Hrg Sat (Rp) Jmlh Hrg (Rp)
....................... -
34,000.00 34,000.00
....................... 34,000.00
....................... -
34,000.00
5,100.00
39,100.00
Satuan Buah
Hrg Sat (Rp) Jmlh Hrg (Rp)
....................... -
12,100.00 12,100.00
....................... 12,100.00
....................... -
12,100.00
1,815.00
13,915.00
Satuan Buah
Hrg Sat (Rp) Jmlh Hrg (Rp)
....................... -
16,400.00 16,400.00
....................... 16,400.00
....................... -
16,400.00
2,460.00
18,860.00
Satuan Buah
Hrg Sat (Rp) Jmlh Hrg (Rp)
....................... -
36,300.00 36,300.00
....................... 36,300.00
....................... -
36,300.00
5,445.00
41,745.00
Satuan Buah
Hrg Sat (Rp) Jmlh Hrg (Rp)
....................... -
75,000.00 75,000.00
....................... 75,000.00
....................... -
75,000.00
11,250.00
86,250.00
DAFTAR HARGA BAHAN DAN UPAH
BUKIT BATU
0 1 2 3
A. TENAGA
1 Mandor L.01 200,000.00
2 Kepala tukang batu L.02 150,000.00
3 Kepala tukang kayu L.03 150,000.00
4 Kepala tukang besi L.04 150,000.00
5 Kepala Tukang Cat L.05 150,000.00
6 Tukang batu L.06 120,000.00
7 Tukang kayu L.07 120,000.00
8 Tukang Cat L.08 120,000.00
9 Tukang besi L.09 120,000.00
10 Tukang Khusus Alumunium L.10 120,000.00
11 Pembantu tukang batu L.11 100,000.00
12 Pembantu tukang kayu L.12 100,000.00
13 Pembantu tukang besi L.13 100,000.00
14 Pembantu tukang cat L.14 80,000.00
- BAHAN BESI
1 Alluminium strip E-1 68,400.00
2 Besi beton polos E-2 11,000.00
3 Kawat bindrat E-3 19,800.00
4 Besi Beugel / baut kuda-kuda E-4 27,800.00
5 Baut screw driver E-5 2,000.00
6 Nok genteng metal E-6 21,200.00
7 Paku kayu E-7 18,500.00
8 Paku tripleks E-8 18,000.00
9 Profil alluminium E-9 19,000.00
10 Roof batten reng T=0,60 mm E-10 10,000.00
11 Seng plat E-11 37,000.00
12 Tools E-12 10,000.00
13 Kunci slot E-13 24,300.00
- BAHAN CAT, FINISHING LANTAI DAN DINDING
14 Ampelas G-1 7,700.00
15 Cat dasar G-2 38,800.00
16 Cat menie kayu G-3 38,200.00
17 Cat penutup G-4 36,700.00
18 Kuas G-5 18,200.00
19 Plamir G-6 56,400.00
20 Thinner G-7 16,500.00
21 Lem kayu G-8 17,400.00
22 Engsel G-9 25,000.00
23 Kait angin G-10 34,500.00
24 Paku skrup G-11 18,500.00
25 Bak fibreglass G-12 470,000.00
26 Closet jongkok G-13 150,000.00
27 Kran air G-14 14,500.00
28 Sealtape G-15 5,000.00
29 Floor drain G-16 19,200.00
30 keramik dinding 25cmx40cm G-17 5,125.00
31 keramik 25x25 cm G-18 2,400.00
32 minyak bekisting G-18 16,500.00
- BAHAN KAYU
1 Balok kayu kelas I H-1 6,625,000.00
2 Balok kayu kelas II H-2 2,400,000.00
3 List kayu profil H-3 5,475.00
4 Papan bakesting H-4 2,000,000.00
5 Papan kayu kelas II H-5 2,500,000.00
6 Plywood tebal 4 mm H-6 64,000.00
7 Dolken kayu φ 8-10/400 cm 8-10/400 cm H-7 5,000.00
8 Nusaboard Uk. 240 cm x 120 cm x 6,0 mm H-8 50,400.00
9 Kayu galam dia 10-12 Cm p.4 m H-10 5,000.00
- BAHAN MEKANIKAL
1 Stop kontak + instalasi beton H-1 34,000.00
2 Lampu PL 14 watt + armatur plafond H-2 36,300.00
3 Titik lampu + instalasi beton H-3 75,000.00
4 Sakelar Tunggal H-4 12,100.00
5 Sakelar ganda H-5 16,400.00
12
4
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
M2
Lembar
Kg
M3
M3
Kg
Bh
Bh
Bh
M3
M3
Bh
Lembar
Kg
Liter
M1
Kg
M1
M1
kg
kg
Kg
Buah
Bh
Kg
Kg
Kg
M1
Lbr
Ls
Buah
Lbr
Kg
Kg
Kg
Bh
Kg
Ltr
Kg
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Dus
Dus
Ltr
M3
M3
M1
M3
M3
Lembar
batang
Lembar
batang
Buah
Buah
Titik
Buah
Buah
DAFTAR HARGA SATUAN UPAH & BAHAN
PEKERJAAN PEMBANGUNAN KANTOR DINAS KOPERASI DAN UKM
KOTA PALANGKA RAYA
TAHUN ANGGARAN 2019
A UPAH
1 Mandor
2 Kepala tukang
3 Tukang Kayu
4 Tukang Besi Beton
5 Tukang Besi / IWF
6 Tukang Batu
7 Tukang Cat
8 Tukang Pipa
9 Tukang Listrik
10 Pekerja
NO. MATERIAL
B BAHAN PENGISI
1 Batu pecah 3-5 cm
2 Batu pecah 2-3 cm
3 Batu pecah 1-2 cm
4 Batu pecah 1-1 cm
5 Batu belah
6 Abu batu
7 Pasir urug
8 Pasir pasang
9 Pasir beton
10 Semen PC / 40 kg
11 Semen PC
12 Semen Mortar
13 Semen warna
14 Tanah urug
15 Paving block t = 6 cm, fullpave
16 Paving block t = 8 cm, fullpave
17 Bata ringan t = 75 x 160 x 600 mm
18 Bata ringan t = 10 x 20 x 60 cm
19 perekat bata ringan (mortar) MU-380
20 plesteran (MU-200)-premium plester
21 acian (MU-250)-fine coat
NO. TENAGA KERJA
C BAHAN KAYU
1 Kayu balok Kelas III
2 Kayu papan kelas III
3 Kayu Papan Kelas I
4 Kayu Balok Kelas I
5 Kayu Balok Kelas II
6 Kayu Papan Kelas II
7 Dolken dia. 5 s/d 7 cm
8 Dolken dia. 8 s/d 10 cm
9 Kayu galam p = 4 m
10 Triplek 3 mm, uk. 1,2 x 2,4
11 Triplek 4 mm, uk. 1,2 x 2,4
12 Multiplek 6 mm, uk. 1,2 x 2,4
13 Multiplek 9 mm, uk. 1,2 x 2,5
14 Multiplek 12 mm, uk. 1,2 x 2,4
15 Multiplek 15 mm, uk. 1,2 x 2,4
NO. TENAGA KERJA
D BAHAN CAT
1 Amplas
2 Minyak Cat
3 Cat kilat
4 Plamur
5 Cat dasar
6 Cat tembok
9 Cat tembok interior, warna Stand
10 Cat tembok eksterior, warna Stand
11 Cat besi/kayu
12 Meni
13 Oker
14 Lem kayu
15 Lem kuning
16 Sealent
17 Rol Cat
18 Kuas
19 Road line paint (cat marka)
20 Water Proofing coating liquid setara SIKA
21 Wallpaper
22 Sealent GE / Dow Coming Non Asan
E BAHAN PENGGANTUNG
1 Pintu pvc untuk wc uk.2.2 x 80 cm
2 Partisi cubical lengkap dengan assesories berikut pintu dan kaki
3 Kait angin
4 Casement
5 Handle pintu Biasa
6 Handle Casement
7 Handle pintu stainless
8 Engsel jendela
9 Engsel pintu
10 Engsel angin
11 Slot pintu
12 Spring knip
13 Kunci tanam 2 slag
14 Kunci tanam 1 slag
15 Kunci tanam antik
16 Kunci tanam biasa
17 Kunci silinder
18 Grendel tanam
19 Door closer
20 Door Stoper
NO. TENAGA KERJA
21 Paku seng
22 Paku campuran 1" - 5"
23 Paku beton
24 Paku triplek
25 Paku GRC
26 Sekrup gypsum
27 Sekrup
28 Sekrup fixer
29 Sekrup steel sheet
30 Sekrup zincalume
31 Jalusi alumunium
F BAHAN ATAP
1 Seng gelombang Bjls 20
2 Atap Genteng Metal
3 Rangka atap baja ringan profil Z lengkap dengan accesories
G BAHAN KACA
1 Kaca polos, t = 3 mm
2 Kaca polos, t = 5 mm
3 Kaca polos, t = 8 mm
4 Kaca polos, t = 12 mm
5 Kaca rayben, t = 5 mm
6 Kaca rayben, t = 8 mm
7 Kaca cermin, t = 5 mm
8 Kaca repsol, t = 5 mm
9 Kaca tempered, t = 6 mm
10 Kaca tempered, t = 8 mm
11 Kaca tempered, t = 12 mm
12 Kaca tempered, t = 15 mm
13 Kaca stopsol t = 6 mm
14 Kaca Stopsol t = 8 mm
15 Kaca es
16 Karet list kaca
17 Lapisan Sandblast
18 Kaca rayben, t = 8 mm
H BAHAN SANITASI
1 Wastafel Meja Oval
2 Wastafel gantung bulat
3 Kloset duduk monoblok
4 Kloset jongkok
5 Jet Washer
6 Urinoir
7 Sekat urinoir
NO. TENAGA KERJA
I BAHAN MINYAK
1 Alat - alat bantu
2 Minyak bekisting
3 Waterproofing membrane bakar
4 Waterproofing Integral
5 Pengelasan Besi
J ALAT BERAT
1 Welding set
2 Water tanker 3000-4500 L
3 Concrete pump
A SATUAN UPAH & BAHAN
AN KANTOR DINAS KOPERASI DAN UKM
A PALANGKA RAYA
UN ANGGARAN 2019
HARGA SATUAN
SATUAN
(Rp.)
org/hr 200,000.00
org/hr 170,000.00
org/hr 100,000.00
org/hr 100,000.00
org/hr 100,000.00
org/hr 120,000.00
org/hr 120,000.00
org/hr 100,000.00
org/hr 175,000.00
org/hr 90,000.00
HARGA SATUAN
SATUAN
(Rp.)
m3 362,500.00
m3 362,500.00
m3 362,500.00
m3 362,500.00
m3 380,000.00
m3 450,000.00
m3 82,000.00
m3 113,000.00
m3 155,000.00
zak 53,000.00
kg 1,300.00
kg 7,500.00
kg 15,000.00
m3 83,000.00
bh 5,900.00
bh 7,500.00
m3 1,863,000.00
bh 13,500.00
sak 140,000.00
kg 3,500.00
kg 3,200.00
HARGA SATUAN
SATUAN
(Rp.)
bh 770.00
bh 3,100.00
bh 4,540.00
bh 8,500.00
m2 61,000.00
m2 155,000.00
m2 75,000.00
m2 63,000.00
m2 61,500.00
kotak 124,602.00
kotak 270,016.56
kotak 170,000.00
kotak 343,400.00
bh 25,000.00
bh 10,944.00
bh 68,970.00
bh 19,380.00
bh 25,080.00
kg 11,500.00
m3 848,673.00
m3 884,262.00
m3 1,050,000.00
m3 1,075,000.00
m3 1,150,000.00
m3 1,225,000.00
m3 1,150,000.00
m3 1,315,000.00
liter 50,160.00
ltr 250.00
m3 1,570,000.00
m3 1,830,000.00
m3 9,000,000.00
m3 6,000,000.00
m3 3,000,000.00
m3 2,500,000.00
btg 23,100.00
btg 30,800.00
btg 20,000.00
lbr 61,600.00
lbr 82,500.00
lbr 83,840.00
lbr 165,000.00
lbr 242,000.00
lbr 295,900.00
HARGA SATUAN
SATUAN
(Rp.)
lbr 341,000.00
lbr 71,500.00
lbr 176,000.00
lbr 104,500.00
lbr 96,900.00
lbr 96,900.00
lbr 93,480.00
lbr 108,300.00
lbr 108,300.00
lbr 78,500.00
lbr 75,600.00
lbr 68,000.00
bh 2,500.00
m' 28,000.00
lbr 256,500.00
cm 17,500.00
lbr 16,700.00
kg 17,600.00
kg 67,100.00
kg 15,400.00
kg 35,000.00
kg 42,000.00
kg 46,800.00
kg 116,700.00
kg 54,000.00
kg 127,200.00
kg 72,000.00
kg 35,000.00
kg 45,600.00
tube 87,193.00
bh 21,660.00
bh 25,600.00
kg 95,760.00
m2 45,000.00
m2 85,000.00
tube 51,300.00
kg 12,000.00
kg 12,500.00
kg 17,784.00
kg 21,000.00
kg 13,110.00
kg 14,250.00
HARGA SATUAN
SATUAN
(Rp.)
kg 17,500.00
kg 14,575.00
m' 15,000.00
btg 6,954.00
kg 31,800.00
m2 25,300.00
m2 15,400.00
m 42,693.00
m 11,492.00
m 124,602.00
unit 1,966,500.00
Btg 262,200.00
Btg 524,000.00
Btg 410,400.00
Btg 647,264.00
m2 387,600.00
m' 285,600.00
m' 145,800.00
m' 452,000.00
m' 168,000.00
bh 35,000.00
btg 84,000.00
m' 14,000.00
m' 20,000.00
bh 865,000.00
m2 2,650,000.00
bh 35,000.00
bh 45,000.00
bh 82,500.00
bh 20,000.00
set 120,000.00
bh 37,200.00
bh 48,500.00
bh 10,699.00
bh 32,832.00
bh 26,500.00
bh 150,000.00
bh 99,000.00
bh 108,300.00
bh 81,220.00
bh 81,220.00
bh 100,000.00
bh 219,000.00
bh 152,000.00
HARGA SATUAN
SATUAN
(Rp.)
kg 18,865.00
kg 15,500.00
kg 25,000.00
kg 24,208.00
kg 28,500.00
kg 33,620.00
bh 500.00
bh 300.00
bh 600.00
bh 400.00
m2 750,000.00
lbr 56,100.00
m2 75,000.00
m2 162,000.00
m2 80,000.00
m2 90,000.00
m2 93,500.00
m2 207,900.00
m2 90,200.00
m2 101,000.00
m2 341,000.00
m2 589,950.00
m2 325,299.00
m2 375,000.00
m2 596,220.00
m2 1,300,000.00
m2 479,000.00
m2 673,000.00
m2 122,000.00
m 12,000.00
m2 47,500.00
m2 160,000.00
bh 398,400.00
bh 330,000.00
bh 2,553,400.00
bh 187,500.00
bh 328,000.00
unit 1,470,000.00
unit 224,078.00
HARGA SATUAN
SATUAN
(Rp.)
bh 542,235.00
bh 625,000.00
bh 210,900.00
unit 430,920.00
bh 37,400.00
bh 195,000.00
bh 38,500.00
bh 357,960.00
bh 450,000.00
unit 593,300.00
bh 54,100.00
m2 393,300.00
bh 27,500.00
bh 5,000.00
bh 8,500.00
bh 3,500.00
ls 68,400.00
ltr 11,000.00
m2 135,600.00
ltr 39,900.00
ls 35,000.00
jam 138,331.00
jam 300,741.00
jam 300,705.00
PERHITUNGAN VOLUME
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN :
A PEKERJAAN PERSIAPAN
1 Pengukuran dan pembersihan lokasi
2 Plang nama proyek
B PEKERJAAN TANAH
1 Penggalian tanah biasa sedalam 1 m 0.80 x 0.80 x 0.80 x 10.00
2 Pengurugan kembali galian tanah (
C PEKERJAAN STRUKTUR
1 Pengadaan cerucuk dia. 8-10 cm 2.00 x 5.00 x 10.00
2 Memancang kayu kedalam tanah 2.00 x 5.00 x 10.00
3 Cor beton lantai kerja pondasi mutu f’c = 21,7 MPa (K 100) Footplate
pondasi footplate 0.80 x 0.80 x 0.05 x 10.00
2 Plestarant 2.00 x
3 Acian 2.00 x
4 Pasangan roster 25.00
5 Pasangan rangka dinding partisi 5.00 x 3.00 ( -
6 Pasangan dinding partisi Plywood 2.00 x
F PEKERJAAN LANTAI
1 Pekerjaan cor beton tumbuk lantai
Bagian teras 1.00 x 2.00 x 0.10
Ruang Tunggu 2.00 x 5.00 x 0.10
Ruang Istirahat 4.00 x 5.00 x 0.10
Dapur 2.00 x 3.50 x 0.10
KM / WV 2.00 x 1.50 x 0.10
2 Pekerjaan pasangan lantai keramik lantai 40x40 cm
Bagian teras 1.00 x 2.00
Ruang Tunggu 2.00 x 5.00
Ruang Istirahat 4.00 x 5.00
Dapur 2.00 x 3.50
3 Pekerjaan pasangan lantai keramik lantai 25x25 cm (WC) 2.00 x 1.50
G PEKERJAAN ATAP
1 Pasangan Rangka Atap Baja Ringan 10.20 x 6.20 / COS 30^
Melintang X 3.20 x 3.70 x 2.00
Melintang Y 6.20 x 3.70 x 2.00
H PEKERJAAN PLAFOND
1 Pasangan rangka plafond
Ruang Tunggu 2.00 x 5.00
Ruang Istirahat 4.00 x 5.00
Dapur 2.00 x 3.50
KM / WV 2.00 x 1.50
Bagian luar 28.40 x 0.55
2 Pasangan plafond
3 Pasangan list plafond gifsum
Ruang Tunggu + Ruang Istirahat 22.00
Dapur 11.00
KM / WV 7.00
Bagian luar 56.80
K PEKERJAAN SANITASI
1 Pembuatan Septiktank 1.00
2 Pasangan Closed jongkok 1.00
3 Pasangan kran air 2.00
4 Pasangan floordrain 1.00
5 Pasangan Pipa Air Kotor 4.00
6 Pasangan Pipa Air Bekas 4.00
7 Pasangan Pipa Air Bersih 10.00
NGAN VOLUME
1.00 Ls
1.00 Ls
5.12 5.12 M3
5.12 - 2.12 ) 3.00 3.00 M3
0.32 0.32 M3
1.60 1.60 M3
8.00 8.00 M2
223.83 223.83 Kg
0.89 111.92
0.89 111.92
0.20 0.20 M3
4.00 4.00 M2
28.29 28.29 Kg
x 0.89 17.76
x 0.40 10.53
0.09 0.09 M3
0.30 1.20 1.20 M2
20.53 20.53 Kg
x 0.89 14.21
x 0.40 6.32
Luas - 1 Luas - 2 Berat Total Vol Sat Ket
1.32 1.32 M3
0.80 26.40 26.40 M2
186.74 186.74 Kg
x 0.89 117.22
x 0.40 69.52
0.99 0.99 M3
0.40 13.20 13.20 M2
178.05 178.05 Kg
x 0.89 117.22
x 0.40 60.83
0.15 0.15 M3
3.51 3.51 M2
9.01 9.01 Kg
x 0.62 9.01
0.05 0.05 M3
0.02 0.02 M3
0.14 0.14 M3
4.39 4.39 M2
3.28
1.11
0.35 0.35 M2
1.44 1.44 M3
16.00 16.00 Buah
16.00 16.00 Buah
8.00 8.00 Buah
9.00 9.00 Buah
3.00 3.00 Set
Luas - 1 Luas - 2 Berat Total Vol Sat Ket
4.20 4.20 M3
0.20
1.00
2.00
0.70
0.30
39.00 39.00 M2
2.00
10.00
20.00
7.00
3.00 3.00 M2
69.56 69.56 M2
23.68
45.88
55.62 55.62 M2
10.00
20.00
7.00
3.00
15.62
55.62 sama dengan luasan rangka plafond 55.62 55.62 M2
96.80 96.80 M1
22.00
11.00
7.00
56.80
LOKASI
SAMPIT – KAB. KOTAWARINGIN TIMUR
TAHUN ANGGARAN
2016
PROGRAM
PENINGKATAN SARANA DAN PRASARANA APARATU
KONSULTAN PERENCANA
CV.BAGASNUSA KONSULTAN
I KALIMANTAN TENGAH
ANUS PALANGKA RAYA
: 0536 3221717,0536 3229194,0536 3237353
GGARAN BIAYA
AN PRASARANA APARATUR
DINAS
ALAMAT
PROGRAM :
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
TANGGAL :
KONSULTAN PERENCANA :
DIREKTUR :
DIPERIKSA :
DIPERIKSA :
DISETUJUI :
DATA PEKERJAAN
PEMERINTAH PROVINSI KALIMANTAN TENGAH
Jl. Tambun Bungai 4 Palangka Pahandut. Telp : 0536 3221717,0536 3229194,0536 3237353
PENINGKATAN SARANA DAN PRASARANA APARATUR
PENGEMBANGAN FASILITAS SARANA RS
PERENCANAAN PEMBANGUNAN GEDUNG / RUANG POLI JIWA
2016
29/4/2016
CV.BAGASNUSA KONSULTAN
EDWARIANSYAH, ST
Pengelola Teknis
Dinas PU Bidang Cipta Karya
Provinsi Kalimantan Tengah
M A R N O