Installation Guide
Issue: 04
Date:2010-03-05
TIP Indicates a tip that may help you solve a problem or save time.
Safety of Personnel
• The high voltage power supply provides power for running the system. Direct contact with the high voltage
power supply or contact through damp objects may result in fatal danger.
• Non-standard and improper high voltage operations may result in fire and electric shock.
• In a thunderstorm, do not perform operations on high voltage and AC power supply facilities or on a steel
tower and mast.
• Ground the device before powering on the device. Otherwise, the personnel and device are in danger.
• Power off the device before performing operations on the power supply equipment.
• High power radio-frequency signals are harmful to human body. Before installing or maintaining an antenna
on a steel tower or mast with a large number of transmitter antennas, the operator should coordinate with all
parties to ensure that the transmitter antennas are shut down.
• When handling optical fibers, do not stand close to, or look into the optical fiber outlet with unaided eyes.
• Protect yourself when drilling holes. Flying dust may hurt your eyes or you may inhale the dust.
• Power off the batteries before connecting the cables to the batteries. Otherwise, casualties may occur.
• When working at a height, be cautious about falling objects.
Device Safety
• Check the electrical connection of the device before operation and ensure that the device is reliably grounded.
• The static electricity generated by the human body may damage the electrostatic sensitive components on
the circuit board, such as the large-scale integrated circuit (LIC). Wear an electrostatic discharge (ESD) wrist
strap or ESD gloves when performing the operation.
• When working on batteries, take measures to prevent short circuits in the batteries and electrolyte spill/loss.
The electrolyte may erode metal and boards, or even cause rust of the equipment or short circuits in the boards.
• When the equipment is unpacked, it must be powered on in 24 hours. The maximum duration of the power-
off state of the equipment is 24 hours during maintenance.
2
Installation Tools
Knife
Adjustable wrench
Power cable crimping pliers Wire cutter (with the diameter of at laest 32 mm)
Torque wrench
Combination wrench
Marking pen
(with the diameter of no more
Multimeter Measuring tape
than 10 mm)
3
Installation Options
The following figure describes the specifications for the metal pole, angle steel, and U-steel where the RRU is
installed.
30 mm to 50 mm
60 mm to 114 mm
63 mm to 75 mm
m
0
8
m
3
6
50 mm to 100 mm
63 mm to 75 mm
Metal pole Angle steel U-steel
RRU
z A maximum of two RRUs can be installed on a metal pole with a diameter of 60 mm to 75 mm, and the
installation mode must be standard mode. Three or more RRUs must be installed on a metal pole with a
diameter of 76 mm to 114 mm in a centralized way.
z It is recommended that only one RRU be installed on a U-steel or an angle steel.
z When installed on a tower, one RRU can be installed only in standard mode or reverse mode rather than
side-mounted. Two RRUs cannot be installed in back-to-back mode.
4
Dimensions and Installation Clearance
a Dimensions of the RRU
285 mm 170 mm
485 mm
≥300 mm 200 mm
≥ 10
30 0m
0m m
m
m m
00
m 0m
≥6 60 40
≥8 00 0m
mm m
≥500 mm 300 mm
d e
Recommended Clearance for Minimum Clearance for Multiple
Multiple Centralized RRUs Centralized RRUs
200 mm
≥300 mm
m m m
00 0m
≥5 30
≥ 60
80 0m
mm 0m mm
500 m 300 m
≥
≥500 mm 300 mm
5
Dimensions and Installation Clearance
f Recommended Horizontal Spacing for
Two RRUs Installed in Parallel
g Minimum Horizontal Spacing for Two
RRUs Installed in Parallel
h
Recommended Vertical Spacing for
Two RRUs Installed in Parallel i Minimum Vertical Spacing for Two
RRUs Installed in Parallel
≥300 mm 200 mm
≥500 mm 300 mm
≥500 mm 300 mm
6
Installation Procedure
Dual-nut bolt
Main bracket
7
Installing the RRU on a Metal Pole
a Installing a Single RRU on a Metal Pole
1200 mm~1600 mm
Contact piece
You may fit one end of the auxiliary bracket on one dual-nut bolt assembly and then the other end on the
other dual-nut bolt assembly during the installation.
2. Use an adjustable wrench to tighten the nut until the fastening torque is 40 N·m. In
this way, the main and auxiliary brackets are secured on the pole.
3. Install the RRU on the main bracket. When you hear click sound, you can infer that
the RRU is in position.
8
Installing the RRU on a Metal Pole
b Installing Two RRUs Back-To-Back on a Metal Pole
1. Install an RRU. For details, see page 8 2. Install the main fixture for another RRU.
Installing a Single RRU on a Metal Pole.
3. Reinstall the attachment plate and cover plate on the second RRU by interchanging
their positions.
M6X16
4.8N•m
Cabling cavity
9
Installing the RRU on a Metal Pole
c Installing Multiple RRUs in Centralized Mode
1. Install the main fixture and the auxiliary fixture. For details, see page 8
Installing a Single RRU in Ordinary Mode.
M6X16
4.8N•m
3. Fit the tabs on the attachment plate of the 4. Install the second main fixture.
RRU into the anchor slots on the main fixture.
5. Fit the tabs on the attachment plate of 6. Install the third RRU.
the second RRU into the anchor slots on
the second main fixture.
10
Installing the RRU on a Metal Pole
c Installing Multiple RRUs in Centralized Mode
7. Install the fourth main fixture. 8. Fit the tabs on the attachment plate of
the fourth RRU into the anchor slots on
the fourth main fixture.
9. Four RRUs installed in centralized mode. 10. Six RRUs installed in centralized mode.
11
Installing the RRU on a U-Steel
Plan view
U-steel
z The procedure for installing the RRU on a U-steel is the same as that for installing the RRU on a metal pole.
z It is recommended that only one RRU be installed on a U-steel.
Angle steel
zThe procedure for installing the RRU on an angle steel is the same as that for installing the RRU on a metal
pole.
z It is recommended that only one RRU be installed on an angle steel.
12
Installing the RRU on a Wall
1. Place the auxiliary bracket at the installation position. Use a level to check that the
auxiliary bracket is placed horizontally. Then, mark the anchor points by using a
marking pen.
≥600 mm ≥600 mm
128 mm
Level
79 mm 79 mm
z It is recommended that the auxiliary bracket be 1,200 mm to 1,600 mm above the ground.
z The RRUs cannot installed on a wall in centralized mode. Therefore, expansion bolt assemblies should be
prepared for each RRU.
2. Drill holes at the anchor points and then install the expansion bolt assemblies.
M10x65 bolt
Spring washer 10
Ø14 Plastic tube
Flat washer 10
Expansion tube
90°
55 mm to 60mm
20 mmto 30 mm
13
Installing the RRU on a Wall
3. Fit the auxiliary bracket on the expansion 4. Install the main bracket.
bolts downward, and then tighten the bolts
by using a combination wrench 17 mm.
M10
30N•m
14
Installing the RRU on a Wall
6. Install multiple RRUs.
Recommended Clearance :
≥760 mm ≥760 mm ≥70 mm ≥70 mm
Minimum Clearance:
560 mm 560 mm
RRU RF jumper DIN male connector Ports labeled ANT_TX/RXA and ANT_TX/RXB on the RRU
(Only the ANT_TX/RXA port supports the OOK signal).
DC RRU power cable Two OT terminals The blue OT terminal is connected to socket labeled NEG(-)0 in
(North American standard: 3.3 mm 2 (M4) the RRU cabling cavity. And the black OT terminal is connected
European standard: to socket labeled RTN(+)0.
CPRI optical cable DLC connector The connectors labeled 1A and 1B are connected to the optical
module on the port labeled CPRI_W on the RRU
DLC connector The connectors labeled 2A and 2B are connected to port labeled
CPRI0, CPRI1 or CPRI2 on the LBBP board of the BBU.
AISG multi-wire cable between Waterproof DB9 connector Port labeled RET/MON on the RRU
the RRU and the RCU
Standard AISG female Standard AISG male connector of the AISG extension cable or
connector RCU
AISG extended cable between Standard AISG male Standard AISG female connector of the AISG multi-wire cable
the RRU and the RCU connector
15
Installing the RRU Cables
a RRU Cable Connections
Single RRU
Antenna
the OOK signals are required. Therefore, the RET
control signal cable needs to be connected to the
ANT_TX/RXA port.
External power
system
Multiple RRUs
Antenna
Antenna
Antenna
PGND cable
RRU RF jumper
DC RRU power cable
CPRI optical cable
AISG multi-wire cable
between the RRU and
the RCU
AISG extended cable
between the RRU and
the RCU
External power
system
For detail information of the cable, see Cable List on Page 15.
16
Installing the RRU Cables
b Opening the Cover Plate
of the RRU Cabling Cavity
c Cabling Cavity of the RRU
Cable troughs for
power cables
M4
Cable troughs for
optical cables
Cable troughs for
power cables
17
Installing the RRU Cables
e Closing the Cover Plate of the RRU Cabling Cavity
M4
z The screws on the cover plate should be
tightened until the fastening torque is 1.4 N·m.
z Tighten the screws on the cover plate of the
cabling cavity in the sequence shown in the figure.
1.4N•m
f RRU+APM30/APM30H (Ver.A)
Grounding the shielding layer
of the power cable:
DC RRU power cable Metal Shielding layer (25 mm) PGND cable
LOAD4
z The DC RRU power cable is connected to one of the LOAD4 to LOAD9 terminals of the PDU.
z Strip the jacket of the DC RRU power cable for a small part, press the exposed shielding layer on the
strap, and then connect the PGND cable on the strap to the nearest grounding bolt on the side in the
APM30/APM30H(Ver.A).
18
Installing the RRU Cables
g RRU+APM30(+24V) / APM30H(Ver.B, +24V)
LOAD0
z Strip the jacket of the DC RRU power cable for a small part, press the exposed shielding layer on the
strap, and then connect the PGND cable on the strap to the nearest grounding bolt on the side in the
APM30.
z The DC RRU power cable is connected to one of the LOAD0 to LOAD5 terminals of the DCDU-03B.
19
Installing the RRU Cables
h RRU+APM30H (Ver.B)
RRU0
z The DC RRU power cable is connected to one of the RRU0 to RRU5 terminals of the PDU.
z Strip the jacket of the DC RRU power cable for a small part, press the exposed shielding layer on the
strap, and then connect the PGND cable on the strap to the nearest grounding bolt on the side in the
APM30H(Ver.B).
20
Installing the RRU Cables
i RRU+TMC
LOAD0
The DC RRU power cable is connected to one of the LOAD0 to LOAD5 terminals of the DCDU-03B.
21
Installing the RRU Cables
j RRU+TMC11H(Ver.A) / TMC11H(Ver.B)
LOAD0
The DC RRU power cable is connected to one of the LOAD0 to LOAD5 terminals of the DCDU-03B.
22
Installing the RRU Cables
k RRU+BBU Installed Against the Wall
LOAD0
shielding layer
z When connecting the DC RRU power cable to the DCDU-03B you must add an OT terminal to the shielding
layer. Then, fix the OT terminal to the corresponding GND terminal of the DCDU-03B. For details on how to
add an OT terminal, see page 27 Adding OT Terminals to the Shielding Layer of the DC RRU Power Cable.
z The DC RRU power cable is connected to one of the LOAD0 to LOAD5 terminals of the DCDU-03B.
23
RRU Hardware Installation Checklist
No. Items
1 The position for each equipment conforms to the engineering design and meets the space requirement. Sufficient
space is reserved for equipment maintenance.
4 Waterproof check: The empty cable troughs in the cabling cavity of the RRU are waterproofed. The cover plate is
tightly buckled on the cabling cavity of the RRU. The RF ports that are not connected with RF cables are capped and
waterproofed. The waterproof caps are fastened.
5 No joint lies in the middle of the power cable or the PGND cable.
6 The lugs at both ends of the power cable or the PGND cable are securely soldered or crimped.
7 The power cable and PGND cable are not short-circuited or reversely connected and are not damaged or broken.
8 The power cable, PGND cable and other cables need to be bound separately.
9 The working grounding and protection grounding of the base station and the lightning protection grounding of the
building share one group of grounding conductors.
10 The connectors of signal cables are intact and securely linked. And the signal cables are not damaged or broken.
11 All labels, tags, and nameplates are correct, legible, and complete. All the labels at both ends of the cables, jumpers
and feeders are legible.
Check
whether the input No
voltage of the RRU is a
Normal input voltage of the
normal?
Rectify the fault RRU:
If the BBU is supplied with
Yes -48 V DC power, the
external input power
voltage ranges from -57 V
Power on the RRU Rectify the fault DC to -36 V DC.
b b
Normal status of the
Power off the RRU LEDs on the RRU:
Check RUN LED: ON for 1s
whether the status of and OFF for 1s
the LEDs on the RRU ALM LED: OFF
No
is normal?
Yes
When the RRU is unpacked, it must be powered on within 24
End hours. Each time the RRU is maintained after being put into use,
the power-off duration cannot exceed 24 hours.
24
Appendix
a Binding the RRU and Installation Components
1. Bind the RRU by leading the lifting rope along the lower part of the adapting piece and
through the handle, bind the main and auxiliary brackets with the lifting rope, and then
bind the steering rope with the handle of the RRU, as shown in the following figures.
Lifting rope
Steering rope
z When lifting the RRU and installation components to the tower, Do not bind the lifting rope
prevent the RRU from colliding with the tower. only on the handle when
z Lift the RRU to the tower before it is installed on the metal pole, lifting the RRU.
angle steel, or U-steel.
Pulley
25
Appendix
b Adding OT Terminals by Using a Wire Stripper (Recommended)
Adding the OT terminals to the power cable involves adding OT terminals to the DC
RRU power cable and adding OT terminals to the shielding layer of the DC RRU power
cable.
Label for preparing
the power cable
-48V DC power cable -48V DC power wire
OT terminals
8mm
Remove the jacket from each wire.
15mm
The OT terminals must be added to the power cable before the RRU is installed on a metal pole.
26
Appendix
c Adding OT Terminals to the Shielding Layer of the DC RRU Power Cable
WARNING
Do not damage the shielding layer of the power cable when cutting around the jacket.
27
Appendix
d Waterproofing Outdoor Cables
tie
28
Appendix
f Pin Assignment of the RRU AISG Extension cable
Pin of the AISG Pin of the AISG Wire Color Wire Type Instruction
male connector female connector
X1.1 X2.1 White/blue Twisted pair +12V
Blue
Orange
Brown
29
Change History
z04(2010-03-05)
This is the fourth commercial release.
Compared with issue 03 (2009-12-10) of V200, the description on the cross-section area of the
RRU power cable is added.
z03(2009-12-10)
This is the third commercial release.
Compared with issue 02 (2009-09-25) of V200, the installation scenarios of APM30H(Ver.B),
APM30H(Ver.B, +24V), TMC11H(Ver.B) are added.
z02 (2009-09-25)
This is the second commercial release.
Compared with issue 01 (2009-08-04) of V200, the requirements for installation support
structure are modified.
z01 (2009-08-04)
This is the initial commercial release.