OIL & DEVELOPMENT, COMPA! LIMITED
AEA
NTOREIGN SECTION
venue's
se sem noncoson has aM
a : scneputs oF RpguiRe
GHEE Re swore estar]
ae HES ie SS Tro Two eRrm tA caravan malwgarilae
eee cmcasaccr en
7S OS ER remnants -
[RESEROR YING SE omearmeses mae ——1
2
ees |
HERA rr arom ce came 7 1
fA eo aoe 1 |
Eee eita at een aaa ve Daw
7 SLEEVE. OIL SEAL 20VENG VTTON PIN CSDADISIVE TYCO cone T e oS
Tae onesastia ea
, =e
ia :
eeOLS SA RENELOBMENT COME LiTED
FOREIGN SECTION C
|ANNEXURE'A”
ERR CT A
Sib SEIS EA rr,
7 — Hae einai eran mate
Tee ee ee eae eater
To ao ee oe
a
YOM SL Sc SURE COMPRESSOR Oe UV ALENT. a)»
2»
3)
a
PAYMENT TERMS: e e
PRYMENTTTO THE CONTRACTOR BIDDER IN FOREIGN CURRENCY SHAUL BE MADE Y ESTABLISHING IN FAVOR OF THE CONTRACTOR AN IRREVOCABLE
LETTER OF CREDIT (HEREINAFTER CALLED THE YC). 70% PAYMENT (S] UNDER THE L/C WILL BE MADE FOR THE FOB) CER / CPT AS THE CASE MAY BE)
PRICE OF MATERIAL OF EACH SHIPMENT UPON SUBNISSION OF THE SHIPPING DOCUMENTS. BALANCE 20% PAYMENT WILL BE RELEASED AFTER
IECEIPT, NSPECTION AND ACCEPTANCE OF MATERIAL. FURTHERMORE BALANCE 20% SHALL BE PAID UPON PRESENTATION OF VERIFIED INVOICES
[ALONG WITH DELIVERY COMPLETION CERTIFICATE
PURSUANT TO TENDER CLAUSE #22, 1.4, 13 8 26.32, D BOND AMOUNTING TO EURO 920/-OR EQUIVALENT TO PAK RUPEES MUST BE SUBMITTED
\WITH THE TECHNICAL BID AND VALID FOR 350 DAYS FROM THE DATE OF OPENING OF THE 8D.
EVALUATION CRITERIA: FULL CONSIGNMENT WISE ON CF BY SEA KARACHI BASS,
DESIRED DELIVERY PERIOD: 120-150 DAYS
TERMS AND CONDITIONS: BIDDER IS ADVISED TO CAREFUL READ ALL THE TERMS AND CONDITIONS OF THE TENDER DOCUMENT AVAILABLE AT
(OGOCL WEBSITE INTHE MASTER TENDER DOCUMENT (PROPRIETARY)
TEGINICAL TERMS & conomONS
1. PARTS MUST BEIN ORIGINAL OEM PACKING
2 PARTS MUST BE NEW & FREE FROM ANY DEFECT.
3 IFBIODER FOUND ANY AMBIGUITY IN PART NOS, IT SHOULD BE CLERRED PRIOR TO 810 SUBMISSION.
4. PARTS MUST HAVE STANDARD OEM WARRANTY/GUARANTEE AS PER TENOER REQUIREMENT.
5 INCASE OF EQUIVALENTITEMS OR SUPERSEDED PART NUMBER, 100% REPLACEMENT WITH SAME FITS & TOLERANCES 5 REQUIRED. BIDDER MUST
PROVIDE THE UTERATURE,
RELEVANT DOCUMENTS TO PROVE THAT SUPPLIED ITEM IS EXACT REPLACEMENT OF PART MENTIONED IN SOR.
6: IN CASE BIDDER OFFERED EQUIVALENT PARTS, LETTER FROM OEM M4/S MAYEKAWA [MYCOM) MUST BE PROVIDED ALONG WrTH
Tear EQUIVALENT
TEMS ARE EXACT REPLACEMENT OF ITEMS MENTIONED INTHE SOR
6, DELIVERY PERIOD MUST NOT EXCEED 320.250 DAYS,
SERIAL NO.OF MYCOM SCREW COMPRESSOR (MODEL: 2520 C5 15 2521416.