WALL FORMWORK SYSTEM

FORMWORK FOR HIGH RISE STRUCTURES DOKA FORMWORK  Components


–H – Beam
•Its a leading European company for concrete form- –CT Prop
TYPES OF FORMWORK work.  –H-Beam Splice 
•Doka formwork technology makes a major contri- –Foot Adapter 
bution towards getting concrete in to the desired  –Steel waler 
‘form’ - in an economical way.  –Connecting Pin 
•EUR 394 Million Doka Group is spreaded in more –Wing Nut  • deal for speedy construction.
than 35countries of world . –Tie rod • Minimizes the number sheeting
joints.
H-BEAM SYSTEM COLUMN SYSTEM

The flanges are


Timber formwork Engineered Formwork Components
made of sea-
soned chem-  –H – Beam
ically treated  –CT Prop
timber  .The  –H-Beam Splice 
Formwork is the term used for the process of cre-
web is made of –Foot Adapter 
ating a temporary mould into which concrete is
boiling point,  –Steel waler 
poured and formed. Traditional formwork is fabri-
waterproof ply-  –Connecting Pin 
cated using timber, but it can also be constructed
wood and joined  –Anchor Plate –Wing Nut 
from steel, glass fibre reinforced plastics and other H–beams are light, dimensionally
with the flange  –Lifting Bracket –Tie rod
materials. stable and retain their structural
Re-usable plastic framework Permanent Insulated formwork
by unique finger  –Angle Plate   –Head Adapter 
properties over a period of time
PROCESS OF FORMWORK even after repeated usage. joint.
1.Traditional timber formwork: The formwork is built ACCESS SYSTEM
on site out of timber and plywood or moisture-resis- FLEX SYSTEM
tant particleboard.  Components
Components
2.Engineered Formwork System. This formwork is –Scaffold frame –
 –H-Beam  0.9m, 1.2m, 1.8m.
built out of prefabricated modules with a metal frame
–Floor Form   – Spring locked con-
(usually steel or aluminium) and covered on the appli-
–Plywood  nected pin
cation (concrete) side with material having the want-
–Collapsible Tele-  – Foot plate 
ed surface structure (steel, aluminum, timber, etc.).
scopic Prop
Installing the rebar structure in Rebar beams in the foundation 3.Re-usable plastic formwork. These interlocking – Coupler
the foundation trenches –Four-way head   – Scaffold coupler
and modular systems are used to build widely variable,
–Removable fold-  –Scaffold spindle  --Scaffold spindle 
but relatively simple, concrete structures. • Effective for slab and beam form-
ing tripod 
4.Permanent Insulated Formwork. This formwork is work up to floor heights of 4.4 m. – 2H-225 bracing – 2H-225 bracing
–Supporting head –Scaffold Board –Scaffold Board
assembled on site, usually out of insulating concrete • Removable folding tripods make
 –Assembly
forms (ICF). The formwork stays in place after the selected individual prop self
wedge clamp
concrete has cured, and may provide advantages in STAIR TOWER SYSTEM
terms of speed, strength, superior thermal and acous-
Components
tic insulation, space to run utilities within the EPS Components
Rebar structure joint Formwork for foundation layer, and integrated furring strip for cladding finishes. –Basic Frame  –Basic Frame – 1.2 m 
5.Stay-In-Place structural formwork systems. This – size of 0.9 m, 1.2 –Foot Plate
formwork is assembled on site, usually out of prefabri- m, 1.8 m  –Tower spindle with
cated fiber-reinforced plastic forms.  –Horizontal Brace lever nut
6.Flexible formwork. In contrast to the rigid moulds  –Diagonal Brace  –Coupler 
described above, flexible formwork is a system that  –Foot Plate
uses lightweight, high strength sheets of fabric to  –U-Head
HEAVY DUTY TOWER SYSTEM  –Tower spindle
take advantage of the fluidity of concrete and create
High load carrying capacity is> 25 with lever nut RADHA SRINIVAS
Pouring concrete in the form-
highly optimised, architecturally interesting, building
tons per tower. 1DS16AT041
 –Beam span 2230
Securing the formwork work forms. VII B