Kanban y EPEC (Every Product Every Cycle)

• Nº Kanban (a) = (EPEC + SS) x da / ka


• Lote kanban (a) = EPEC x da / ka
• Invent. medio (a) ≈ (½EPEC + SS) x da / ka
https://libros-lean-manufacturing.blogspot.com.es/ © Francisco Madariaga
Kanban y EPEC (Every Product Every Cycle)

https://libros-lean-manufacturing.blogspot.com.es/ © Francisco Madariaga


Kanban y EPEC (Every Product Every Cycle)

https://libros-lean-manufacturing.blogspot.com.es/ © Francisco Madariaga


Kanban y EPEC (Every Product Every Cycle)

https://libros-lean-manufacturing.blogspot.com.es/ © Francisco Madariaga


Kanban y EPEC (Every Product Every Cycle)

• Lote (a) = EPEC x da = 5 x 180 = 900 unidades = 15 kanban


• Lote (b) = EPEC x db = 5 x 120 = 600 unidades = 10 kanban
• Lote (c) = EPEC x dc = 5 x 60 = 300 unidades = 5 kanban
https://libros-lean-manufacturing.blogspot.com.es/ © Francisco Madariaga