You are on page 1of 24

NOTA PEKERJAAN POLDA SU

PEKERJAAN JALAN BET

No. Tanggal Nama Barang QTY

1 7/31/2019 KAWAT BETON 10KG 50


2 8/2/2019 SEMEN TIGA RODA 40KG 500
3 8/5/2019 HLW40X80X1.8 A 1
4 8/6/2019 KAWAT BETON 10KG 50
5 8/6/2019 BESI BETON 14 SNI 100
6 8/6/2019 BESI BETON 12 SNI 20
7 8/7/2019 BESI BETON 8 SNI 100
8 8/17/2019 BESI 12 SNI 40
9 8/17/2019 BESI 8 SNI 100
10 8/17/2019 KAWAT BETON 10KG KG
11 8/26/2019 SEMEN ABU ABU - 40 KG 400

TOTAL JUMLAH
ERJAAN POLDA SUL-BAR 2019
PEKERJAAN JALAN BETON

Satuan Satuan Harga Jumlah Harga Penerima Nota

KG Rp 25,000.00 Rp 125,000.00 Udin


SAK Rp 50,000.00 Rp 25,000,000.00 Udin
BATANG Rp 300,000.00 Rp 300,000.00 Udin
KG Rp 25,000.00 Rp 1,250,000.00 Udin
KG Rp - Rp - Udin
KG Rp - Rp - Udin
BATANG Rp 300,000.00 Rp 300,000.00 Udin
BATANG Rp 100,000.00 Rp 4,000,000.00 Udin
BATANG Rp 46,000.00 Rp 4,600,000.00 Udin
50 Rp 25,000.00 Rp 1,250,000.00 Udin
SAK Rp - Rp - Udin

Rp 36,825,000.00
NOTA PEKERJAAN POLDA
CIPPING

No. Nota Tanggal Nama Barang QTY

126 8/10/2019 CIPPING 2/3 4


127 8/10/2019 CIPPING 2/3 4
128 8/10/2019 CIPPING 2/3 4
129 8/10/2019 CIPPING 2/3 4
130 8/10/2019 CIPPING 2/3 4
131 8/13/2019 CIPPING 2/3 4
132 8/13/2019 CIPPING 2/3 4
133 8/14/2019 CIPPING 2/3 4
134 8/14/2019 CIPPING 2/3 4
135 8/15/2019 CIPPING 2/3 4
136 8/15/2019 CIPPING 2/3 4
137 8/16/2019 CIPPING 2/3 4
138 8/16/2019 CIPPING 2/3 4
139 8/16/2019 CIPPING 2/3 4
140 8/18/2019 CIPPING 2/3 4
141 8/19/2019 CIPPING 2/3 4
142 8/19/2019 CIPPING 2/3 4
143 8/21/2019 CIPPING 2/3 4
144 8/21/2019 CIPPING 2/3 4
145 8/21/2019 CIPPING 2/3 4
146 8/21/2019 CIPPING 2/3 4
147 8/21/2019 CIPPING 2/3 4
148 8/21/2019 CIPPING 2/3 4
149 8/22/2019 CIPPING 2/3 4
150 8/22/2019 CIPPING 2/3 4
151 8/22/2019 CIPPING 2/3 4
152 8/22/2019 CIPPING 2/3 4
153 8/22/2019 CIPPING 2/3 4
154 8/22/2019 CIPPING 2/3 4
158 8/22/2019 CIPPING 2/3 4
160 8/22/2019 CIPPING 2/3 4
165 8/22/2019 CIPPING 2/3 4
168 8/22/2019 CIPPING 2/3 4

TOTAL JUMLAH
JAAN POLDA SUL-BAR 2019
CIPPING

Satuan Satuan Harga Jumlah Harga Penerima Barang/Nota

M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin

Rp 23,100,000.00
NOTA PEKERJAAN POLDA
KORAL

No. Nota Tanggal Nama Barang QTY

24 8/14/2019 KORAL 1
25 8/15/2019 KORAL 1
26 8/16/2019 KORAL 1
27 8/16/2019 KORAL 1
28 8/16/2019 KORAL 1
29 8/19/2019 KORAL 1
30 8/19/2019 KORAL 1
31 8/22/2019 KORAL 1
32 8/22/2019 KORAL 1
34 8/23/2019 KORAL 1
37 8/24/2019 KORAL 1
39 8/25/2019 KORAL 1
40 8/26/2019 KORAL 1

TOTAL JUMLAH
JAAN POLDA SUL-BAR 2019
KORAL

Satuan Satuan Harga Jumlah Harga Penerima Barang/Nota

RES Rp 300,000.00 Rp 300,000.00 Udin


RES Rp 300,000.00 Rp 300,000.00 Udin
RES Rp 300,000.00 Rp 300,000.00 Udin
RES Rp 300,000.00 Rp 300,000.00 Udin
RES Rp 300,000.00 Rp 300,000.00 Udin
RES Rp 300,000.00 Rp 300,000.00 Udin
RES Rp 300,000.00 Rp 300,000.00 Udin
RES Rp 300,000.00 Rp 300,000.00 Udin
RES Rp 300,000.00 Rp 300,000.00 Udin
RES Rp 300,000.00 Rp 300,000.00 Udin
RES Rp 300,000.00 Rp 300,000.00 Udin
RES Rp 300,000.00 Rp 300,000.00 Udin
RES Rp 300,000.00 Rp 300,000.00 Udin

Rp 3,900,000.00
NOTA PEKERJAAN POLDA
SOLAR

No. Nota Tanggal Nama Barang QTY

126 7/16/2019 SOLAR -


127 7/19/2019 SOLAR -
128 7/25/2019 SOLAR -
129 7/30/2019 SOLAR -
130 7/31/2019 SOLAR -
131 8/1/2019 SOLAR -
132 8/2/2019 SOLAR -
133 8/3/2019 SOLAR -
134 8/5/2019 SOLAR -
135 8/16/2019 SOLAR -
136 8/16/2019 SOLAR -

TOTAL JUMLAH
JAAN POLDA SUL-BAR 2019
SOLAR

Satuan Satuan Harga Jumlah Harga Penerima Barang/Nota

LITER Rp 5,150.00 Rp 100,000.00 Udin


LITER Rp 5,500.00 Rp 750,000.00 Udin
LITER Rp 5,500.00 Rp 950,000.00 Udin
LITER Rp 5,150.00 Rp 620,000.00 Udin
LITER Rp 5,500.00 Rp 260,000.00 Udin
LITER Rp 5,150.00 Rp 449,000.00 Udin
LITER Rp 5,150.00 Rp 373,000.00 Udin
LITER Rp 5,150.00 Rp 639,000.00 Udin
LITER Rp 5,150.00 Rp 300,000.00 Udin
LITER Rp 5,500.00 Rp 776,000.00 Udin
LITER Rp 5,600.00 Rp 226,000.00 Udin

Rp 5,443,000.00
NOTA PEKERJAAN POLDA
SPKT

No. Tanggal Nama Barang QTY

1 8/6/2019 BATANG 1
2 8/6/2019 BATANG 1
3 8/6/2019 BATANG 1
4 8/6/2019 BATANG 1
5 8/19/2019 BATANG 1
5 8/26/2019 BESI BETON 12 SNI 50

TOTAL JUMLAH
JAAN POLDA SUL-BAR 2019
SPKT

Satuan Satuan Harga Jumlah Harga Penerima Barang/Nota

BATANG Rp - Rp - Udin
BATANG Rp - Rp - Udin
BATANG Rp - Rp - Udin
BATANG Rp - Rp - Udin
BATANG Rp - Rp 450,000.00 Udin
BATANG Rp - Rp - Udin

Rp 450,000.00
NOTA PEKERJAAN POLDA
POS KIRI KANAN

No. Tanggal Nama Barang QTY

1 7/30/2019 AM 87 20 KG 10
2 8/2/2019 BAN COMPLIT ARTCO 2
3 8/2/2019 BAN DALAM ARTCO 5
4 8/2/2019 BAN LUAR ARTCO 2
5 8/5/2019 BESI BETON 14 SNI 100
6 8/5/2019 SKIMCOT A+ 20KG 20
7 8/6/2019 KNEE 3 GREST 4
8 8/7/2019 PAKU 7CM 2
9 8/7/2019 KNEE 1/2 GREST 4
10 8/15/2019 WASSER PC 380 EA 1
11 8/15/2019 KNEE 1/2 GREST 10
12 8/15/2019 TEE 1/2 GREST + DRAT LUAR 1 -1/2 7
13 8/15/2019 ISOLASI YUKA 2
14 8/15/2019 SOK 1/2 RUCIKA 5
15 8/15/2019 STEKER ARDE UTC 2
16 8/15/2019 VINILON / POWER 3/4"AW" 1
17 8/15/2019 VINILON 11/4"AW" 1
18 8/23/2019 SKIMCOAT A+ 20KG 5
19 8/23/2019 PAKU 5CM 5
20 8/23/2019 PAKU 7CM 5
21 8/23/2019 CONCORD 40X40 DINO CREAM / 2
22 8/23/2019 OPTIMA 25X25 CARLTON BROWN / 1
23 8/23/2019 SARINGAN GOT BESI SSK
24 8/23/2019 MONOBLOK INNO/SERICITE WC 1035+SOFT WHATE
25 8/23/2019 SIGNATURE 25X40 ORYZA BROWN / 1

TOTAL JUMLAH
AN POLDA SUL-BAR 2019
S KIRI KANAN

Satuan Satuan Harga Jumlah Harga Penerima Barang/Nota

ZAK Rp 83,000.00 Rp 830,000.00 Udin


SET Rp 148,000.00 Rp 296,000.00 Udin
BUAH Rp 27,000.00 Rp 135,000.00 Udin
BUAH Rp 55,000.00 Rp 110,000.00 Udin
BATANG Rp - Rp - Udin
SAK Rp 65,000.00 Rp 1,300,000.00 Udin
BUAH Rp 14,000.00 Rp 56,000.00 Udin
KG Rp 19,000.00 Rp 38,000.00 Udin
BUAH Rp 3,000.00 Rp 12,000.00 Udin
BUAH Rp 2,000,000.00 Rp 2,000,000.00 Udin
BUAH Rp 2,000.00 Rp 20,000.00 Udin
BUAH Rp 3,000.00 Rp 21,000.00 Udin
BUAH Rp 5,000.00 Rp 10,000.00 Udin
BUAH Rp 2,000.00 Rp 10,000.00 Udin
BUAH Rp 13,000.00 Rp 26,000.00 Udin
BATANG Rp 32,000.00 Rp 32,000.00 Udin
BATANG Rp 67,000.00 Rp 67,000.00 Udin
SAK Rp 65,000.00 Rp 325,000.00 Udin
KG Rp 19,000.00 Rp 95,000.00 Udin
KG Rp 19,000.00 Rp 95,000.00 Udin
- Rp - Rp - Udin
- Rp - Rp - Udin
- Rp - Rp - Udin
- Rp - Rp - Udin
- Rp - Rp - Udin

Rp 5,478,000.00
NOTA PEKERJAAN POLDA
PENUTUP SALURA

No. Tanggal Nama Barang QTY

1 7/30/2019 BESI SIKU 30X30 KS 62


1 7/30/2019 BESI SIKU L 40X40 TEBAL 50
1 8/6/2019 BESI SIKU L 40X40 100
2 8/6/2019 BESI SIKU 40X40 TEBAL 50
3 8/16/2019 BESI SIKU L 30X30 10
3 8/22/2019 BESI SIKU L 40X40 TEBAL 18
3 8/22/2019 BESI SIKU L 40X40 X 6 43

TOTAL JUMLAH
AN POLDA SUL-BAR 2019
UTUP SALURAN

Satuan Satuan Harga Jumlah Harga Penerima Barang/Nota

BATANG Rp - Rp - Udin
BATANG Rp - Rp - Udin
BATANG Rp 64,000.00 Rp 6,400,000.00 Udin
BATANG Rp - Rp - Udin
BATANG Rp 35,000.00 Rp 350,000.00 Udin
BATANG Rp - Rp - Udin
BATANG Rp - Rp - Udin

Rp 6,750,000.00
NOTA PEKERJAAN POLDA
SPKT

No. Tanggal Nama Barang QTY

1 5/11/2019 MOLEN STAHLEISON + MESIN LICING FA R180 H 1


2 5/13/2019 STEMPEL BIASA 3
3 7/16/2019 PIPA 5/10 10
4 7/16/2019 FLEKNBAL 5
5 7/16/2019 SADEL 17 1
6 7/16/2019 TALI NO.12 33
7 7/16/2019 SELANG BESAR 1 1/2 1
8 7/16/2019 SOKET ALCON 1
9 7/30/2019 SADEL 1" 73
10 7/30/2019 AM 87 20 KG 10
11 8/2/2019 BAN COMPLIT ARTCO 2
12 8/2/2019 BAN DALAM ARTCO 5
13 8/2/2019 BAN LUAR ARTCO 2
14 8/5/2019 BESI BETON 14 SNI 2
15 8/14/2019 BONGKAR BAN + PASANG BAN BARU 2
16 8/14/2019 TAMBAH ANGIN 9
17 8/14/2019 NOPDEL 2
18 8/14/2019 BALON H3 1
19 8/14/2019 FOTO COPY 990
20 8/14/2019 JILID SPIRAL 26
21 8/14/2019 FOTO COPY A3 198

TOTAL JUMLAH
AAN POLDA SUL-BAR 2019
SPKT

Satuan Satuan Harga Jumlah Harga Penerima Barang/Nota

SET Rp - Rp 11,500,000.00 Udin


BUAH Rp 35,000.00 Rp 105,000.00 Udin
BATANG Rp 5,000.00 Rp 50,000.00 Udin
MLR Rp 4,000.00 Rp 20,000.00 Udin
BUNGKUS Rp 14,000.00 Rp 14,000.00 Udin
METER Rp 167,000.00 Rp 167,000.00 Udin
UNIT Rp - Rp 412,500.00 Udin
BUAH Rp - Rp 30,000.00 Udin
BUAH Rp - Rp - Udin
ZAK Rp 83,000.00 Rp 830,000.00 Udin
SET Rp 148,000.00 Rp 296,000.00 Udin
BUAH Rp 27,000.00 Rp 135,000.00 Udin
BUAH Rp 55,000.00 Rp 110,000.00 Udin
BUAH Rp 55,000.00 Rp 110,000.00 Udin
UNIT Rp - Rp - Udin
BAN Rp - Rp - Udin
PC Rp - Rp - Udin
PC Rp - Rp - Udin
LEMBAR Rp 300.00 Rp 297,000.00 Wahab
X Rp 15,000.00 Rp 390,000.00 Wahab
X Rp 600.00 Rp 118,800.00 Wahab

Rp 14,585,300.00
NOTA PEKERJAAN POLDA
NOTA LUNAS

No. Tanggal Nama Barang QTY

1 8/27/2019 BESI 8 SNI 25

TOTAL JUMLAH
JAAN POLDA SUL-BAR 2019
NOTA LUNAS

Satuan Satuan Harga Jumlah Harga Penerima Barang/Nota

BATANG Rp 46,000.00 Rp 1,150,000.00 Udin

Rp 1,150,000.00
NOTA PEKERJAAN POLDA SU
GERBANG DALAM SAYAP KIRI SA

No. Tanggal Nama Barang QTY

1 6/18/2019 BAUT BAJA RINGAN 10X19 ISI 500 1


2 6/18/2019 BATU POTONG WD 4X1.2 20
3 6/18/2019 PAKU BETON 4CM 2
4 6/18/2019 PAKU BETON 7CM 4
5 8/24/2019 SKIMCOAT A+ 20KG 5
6 8/24/2019 AMPLAS 10

TOTAL JUMLAH
ERJAAN POLDA SUL-BAR 2019
G DALAM SAYAP KIRI SAYAP KANAN

Satuan Satuan Harga Jumlah Harga Penerima Nota

DOS Rp 100,000.00 Rp 100,000.00 Udin


DOS Rp 5,000.00 Rp 100,000.00 Udin
DOS Rp 20,000.00 Rp 40,000.00 Udin
DOS Rp 35,000.00 Rp 140,000.00 Udin
SAK Rp 65,000.00 Rp 325,000.00 Udin
METER Rp 8,000.00 Rp 80,000.00 Udin

Rp 785,000.00
NOTA PEKERJAAN POLDA
NOTA LUNAS

No. Nota Tanggal Nama Barang QTY

149 8/22/2019 CIPPING 2/3 4


150 8/22/2019 CIPPING 2/3 4
151 8/22/2019 CIPPING 2/3 4
152 8/22/2019 CIPPING 2/3 4
153 8/22/2019 CIPPING 2/3 4
154 8/22/2019 CIPPING 2/3 4
158 8/22/2019 CIPPING 2/3 4
160 8/22/2019 CIPPING 2/3 4
165 8/22/2019 CIPPING 2/3 4
168 8/22/2019 CIPPING 2/3 4
31 8/22/2019 KORAL 1
32 8/22/2019 KORAL 1
34 8/23/2019 KORAL 1
37 8/24/2019 KORAL 1
39 8/25/2019 KORAL 1
40 8/26/2019 KORAL 1

TOTAL JUMLAH
JAAN POLDA SUL-BAR 2019
NOTA LUNAS

Satuan Satuan Harga Jumlah Harga Penerima Barang/Nota

M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
M3 Rp - Rp 700,000.00 Udin
RES Rp 300,000.00 Rp 300,000.00 Udin
RES Rp 300,000.00 Rp 300,000.00 Udin
RES Rp 300,000.00 Rp 300,000.00 Udin
RES Rp 300,000.00 Rp 300,000.00 Udin
RES Rp 300,000.00 Rp 300,000.00 Udin
RES Rp 300,000.00 Rp 300,000.00 Udin

Rp 8,800,000.00