You are on page 1of 162

Overview of Process Plant

Piping System Design

Participant’s Guide
CONTACT INFORMATION

ASME Headquarters
1-800-THE-ASME

ASME Professional Development


1-800-THE-ASME

Eastern Regional Office Southern Regional Office


8996 Burke Lake Road – Suite L102 1950 Stemmons Freeway – Suite 5037C
Burke, VA 22015-1607 Dallas, TX 75207-3109
703-978-5000 214-746-4900
800-221-5536 800-445-2388
703-978-1157 (FAX) 214-746-4902 (FAX)

Midwest Regional Office Western Regional Office


17 North Elmhurst Avenue – Suite 108 119-C Paul Drive
Mt. Prospect, IL 60056-2406 San Rafael, CA 94903-2022
847-392-8876 415-499-1148
800-628-6437 800-624-9002
847-392-8801 (FAX) 415-499-1338 (FAX)

You can also find information on


Northeast Regional Office
these courses and all of ASME,
326 Clock Tower Commons
including ASME Professional
Route 22
Development, the Vice President of
Brewster, NY 10509-9241
Professional Development, and other
914-279-6200
contacts at the ASME Web site……
800-628-5981
914-279-7765 (FAX)
http://www.asme.org

International Regional Office


1-800-THE-ASME
Overview of Process Plant
Piping System Design
By:

Vincent A. Carucci
Carmagen Engineering, Inc.

Copyright © 2000 by

All Rights Reserved


TABLE OF CONTENTS
PART 1: PARTICIPANT NOTES ..............................................................................3

PART 2: BACKGROUND MATERIAL .................................................................................... 73

I. Introduction ....................................................................................................................... 73
II. General ............................................................................................................................. 73
A. What is a piping system .......................................................................................... 73
B. Scope of ASME B31.3............................................................................................. 73
III. Material selection considerations...................................................................................... 75
A. Strength................................................................................................................... 75
B. Corrosion Resistance .............................................................................................. 77
C. Material Fracture Toughness .................................................................................. 77
D. Fabricability ............................................................................................................. 78
E. Availability and Cost ................................................................................................ 78
IV. Piping Components........................................................................................................... 79
A. Fittings, Flanges, and Gaskets................................................................................ 79
B. Flange Rating .......................................................................................................... 85
Sample Problem 1 - Determine Flange Rating ................................................................. 88
Solution ............................................................................................................................. 88
V. Valves ............................................................................................................................... 89
A. Valve Functions....................................................................................................... 89
B. Primary Valve Types ............................................................................................... 90
C. Valve Selection Process ......................................................................................... 98
Exercise 1 – Determine Required Flange Rating ............................................................. 99
VI. Design ............................................................................................................................. 100
A. Design Conditions ................................................................................................. 100
B. Loads and Stresses............................................................................................... 101
C. Pressure Design of Components .......................................................................... 105
Sample Problem 2 - Determine Pipe wall thickness ....................................................... 110
Sample Problem 3 .......................................................................................................... 116
Exercise 2: Determine Required Pipe Wall Thickness .................................................. 121
VII. System Design ................................................................................................................ 122
A. Layout Considerations .......................................................................................... 122
B. Pipe Supports and Restraints ............................................................................... 123
C. Piping Flexibility..................................................................................................... 129
D. Required Design Information for Piping Stress Analysis ...................................... 132
E. Criteria for Allowable Equipment Nozzle Loads .................................................... 132
F. When Should A Computer Analysis Be Used ....................................................... 134
G. Design Considerations for Piping System Stress Analysis ................................... 134
VIII. Fabrication, Assembly, and Erection .............................................................................. 140
A. Welding and Heat Treatment ................................................................................ 140
B. Assembly and Erection.......................................................................................... 144
IX. Quality Control ................................................................................................................ 151
A. Inspection .............................................................................................................. 151
B. Testing................................................................................................................... 154
X. Other Considerations ...................................................................................................... 156
A. Nonmetallic Piping................................................................................................. 156
B. Category M Fluid Service...................................................................................... 157
C. High Pressure Piping............................................................................................. 158
XI. Summary......................................................................................................................... 160
Part 1:
Participant Notes

3
OVERVIEW OF
PROCESS PLANT PIPING
SYSTEM DESIGN
By: Vincent A. Carucci
Carmagen Engineering, Inc.

Notes:

Piping System
Piping system: conveys fluid between
locations
Piping system includes:
• Pipe
• Fittings (e.g. elbows, reducers, branch
connections, etc.)
• Flanges, gaskets, bolting
• Valves
• Pipe supports
2

Notes:

4
ASME B31.3
• Provides requirements for:
– Design – Erection
– Materials – Inspection
– Fabrication – Testing

• For process plants including


– Petroleum refineries – Paper plants
– Chemical plants – Semiconductor
– Pharmaceutical plants plants
– Textile plants – Cryogenic plants
3

Notes:

Scope of ASME B31.3


• Piping and piping components, all fluid
services:
– Raw, intermediate, and finished chemicals
– Petroleum products
– Gas, steam, air, and water
– Fluidized solids
– Refrigerants
– Cryogenic fluids
• Interconnections within packaged equipment
• Scope exclusions specified
4

Notes:

5
Strength
• Yield and Tensile Strength
• Creep Strength
• Fatigue Strength
• Alloy Content
• Material Grain size
• Steel Production Process

Notes:

Stress - Strain Diagram


S B
A C

Notes:

6
Corrosion Resistance
• Deterioration of metal by chemical or
electrochemical action
• Most important factor to consider
• Corrosion allowance added thickness
• Alloying increases corrosion resistance

Notes:

Piping System Corrosion


General or Uniform metal loss. May be combined with erosion if
Uniform high-velocity fluids, or moving fluids containing
Corrosion abrasives.

Pitting Localized metal loss randomly located on material


Corrosion surface. Occurs most often in stagnant areas or areas of
low-flow velocity.

Galvanic Occurs when two dissimilar metals contact each other in


Corrosion corrosive electrolytic environment. Anodic metal develops
deep pits or grooves as current flows from it to cathodic
metal.

Crevice Corrosion Localized corrosion similar to pitting. Occurs at places


such as gaskets, lap joints, and bolts where crevice
exists.

Concentration Occurs when different concentration of either a corrosive


Cell Corrosion fluid or dissolved oxygen contacts areas of same metal.
Usually associated with stagnant fluid.

Graphitic Occurs in cast iron exposed to salt water or weak acids.


Corrosion Reduces iron in cast iron, and leaves graphite in place.
Result is extremely soft material with no metal loss.

Notes:

7
Material Toughness
• Energy necessary to initiate and
propagate a crack
• Decreases as temperature decreases
• Factors affecting fracture toughness
include:
– Chemical composition or alloying elements
– Heat treatment
– Grain size
9

Notes:

Fabricability
• Ease of construction
• Material must be weldable
• Common shapes and forms include:
– Seamless pipe
– Plate welded pipe
– Wrought or forged elbows, tees, reducers,
crosses
– Forged flanges, couplings, valves
– Cast valves
10

Notes:

8
Availability and Cost
• Consider economics
• Compare acceptable options based on:
– Availability
– Relative cost

11

Notes:

Pipe Fittings
• Produce change in geometry
– Modify flow direction
– Bring pipes together
– Alter pipe diameter
– Terminate pipe

12

Notes:

9
Elbow and Return

90° 45°

180° Return

13
Figure 4.1

Notes:

Tee

Reducing Outlet Tee Cross Tee

Figure 4.2
14

Notes:

10
Reducer

Concentric Eccentric

Figure 4.3
15

Notes:

Welding Outlet Fitting

16
Figure 4.4

Notes:

11
Cap

Figure 4.5
17

Notes:

Lap-joint Stub End


Note square corner

R
Enlarged Section
of Lap

18
Figure 4.6

Notes:

12
Typical Flange Assembly
Flange

Bolting

Gasket

19
Figure 4.7

Notes:

Types of Flange
Attachment and Facing
Flange Attachment Types Flange Facing Types

Threaded Flanges Flat Faced

Socket-Welded Flanges

Blind Flanges Raised Face

Slip-On Flanges

Lapped Flanges Ring Joint

Weld Neck Flanges

20
Table 4.1

Notes:

13
Flange Facing Types

21
Figure 4.8

Notes:

Gaskets
• Resilient material
• Inserted between flanges
• Compressed by bolts to create seal
• Commonly used types
– Sheet
– Spiral wound
– Solid metal ring

22

Notes:

14
Flange Rating Class
• Based on ASME B16.5
• Acceptable pressure/temperature
combinations
• Seven classes (150, 300, 400, 600, 900,
1,500, 2,500)
• Flange strength increases with class
number
• Material and design temperature
combinations without pressure indicated
not acceptable
23

Notes:

Material Specification List

24
Table 4.2

Notes:

15
Pressure - Temperature Ratings
Material
1.8 1.9 1.10
Group No.
Classes 150 300 400 150 300 400 150 300 400
Temp., °F
-20 to 100 235 620 825 290 750 1000 290 750 1000
200 220 570 765 260 750 1000 260 750 1000
300 215 555 745 230 720 965 230 730 970
400 200 555 740 200 695 885 200 705 940
500 170 555 740 170 695 805 170 665 885
600 140 555 740 140 605 785 140 605 805
650 125 555 740 125 590 785 125 590 785
700 110 545 725 110 570 710 110 570 755
750 95 515 685 95 530 675 95 530 710
800 80 510 675 80 510 650 80 510 675
850 65 485 650 65 485 600 65 485 650
900 50 450 600 50 450 425 50 450 600
950 35 320 425 35 320 290 35 375 505
1000 20 215 290 20 215 190 20 260 345

25
Table 4.3

Notes:

Sample Problem 1
Flange Rating
New piping system to be installed at
existing plant.
Determine required flange class.
• Pipe Material: 1 1 Cr − 1 Mo
4 2
• Design Temperature: 700°F
• Design Pressure: 500 psig

26

Notes:

16
Sample Problem 1 Solution
• Determine Material Group Number (Fig. 4.2)
Group Number = 1.9
• Find allowable design pressure at
intersection of design temperature and Group
No. Check Class 150.
– Allowable pressure = 110 psig < design pressure
– Move to next higher class and repeat steps
• For Class 300, allowable pressure = 570 psig
• Required flange Class: 300
27

Notes:

Valves
• Functions
– Block flow
– Throttle flow
– Prevent flow reversal

28

Notes:

17
Full Port Gate Valve
1. Handwheel Nut
2. Handwheel
3. Stem Nut
4. Yoke
5. Yoke Bolting
6. Stem
7. Gland Flange
8. Gland
9. Gland Bolts or
Gland Eye-bolts and nuts
10. Gland Lug Bolts and Nuts
11. Stem Packing
12. Plug
13. Lantern Ring
14. Backseat Bushing
15. Bonnet
16. Bonnet Gasket
17. Bonnet Bolts and Nuts
18. Gate
19. Seat Ring
20. Body
21. One-Piece Gland (Alternate)
22. Valve Port

29
Figure 5.1

Notes:

Globe Valve
• Most economic for throttling flow
• Can be hand-controlled
• Provides “tight” shutoff
• Not suitable for scraping or rodding
• Too costly for on/off block operations

30

Notes:

18
Check Valve
• Prevents flow reversal
• Does not completely shut off reverse flow
• Available in all sizes, ratings, materials
• Valve type selection determined by
– Size limitations
– Cost
– Availability
– Service
31

Notes:

Swing Check Valve


Cap
Pin

Seat
Ring
Hinge

Flow
Direction

Disc
Body

32
Figure 5.2

Notes:

19
Ball Check Valve

33
Figure 5.3

Notes:

Lift Check Valve

Seat
Ring
Piston
Flow
Direction

34
Figure 5.4

Notes:

20
Wafer Check Valve

35
Figure 5.5

Notes:

Ball Valve
No. Part Names
1 Body
2 Body Cap
3 Ball
4 Body Seal Gasket
5 Seat
6 Stem
7 Gland Flange
8 Stem Packing
9 Gland Follower
10 Thrust Bearing
11 Thrust Washer
12 Indicator Stop
13 Snap Ring
14 Gland Bolt
15 Stem Bearing
16 Body Stud Bolt & Nuts
17 Gland Cover
18 Gland Cover Bolts
19 Handle

36
Figure 5.6

Notes:

21
Plug Valve
Wedge

Molded-In Resilient Seal

Sealing Slip

37
Figure 5.7

Notes:

Valve Selection Process


General procedure for valve selection.
1. Identify design information including
pressure and temperature, valve function,
material, etc.
2. Identify potentially appropriate valve
types and components based on
application and function
(i.e., block, throttle, or reverse flow
prevention).
38

Notes:

22
Valve Selection Process,
cont’d
3. Determine valve application requirements
(i.e., design or service limitations).
4. Finalize valve selection. Check factors to
consider if two or more valves are
suitable.
5. Provide full technical description
specifying type, material, flange rating,
etc.
39

Notes:

Exercise 1 - Determine
Required Flange Rating
• Pipe: 1 1 Cr − 1 Mo
4 2

• Flanges: A-182 Gr. F11


• Design Temperature: 900°F
• Design Pressure: 375 psig

40

Notes:

23
Exercise 1 - Solution
1. Identify material specification of flange
A-182 Gr, F11
2. Determine Material Group No. (Table 4.2)
Group 1.9
3. Determine class using Table 4.3 with design
temperature and Material Group No.
– The lowest Class for design pressure of 375
psig is Class 300.
– Class 300 has 450 psig maximum pressure
at 900°F
41

Notes:

Design Conditions
• General
– Normal operating conditions
– Design conditions
• Design pressure and temperature
– Identify connected equipment and associated
design conditions
– Consider contingent conditions
– Consider flow direction
– Verify conditions with process engineer
42

Notes:

24
Loading Conditions
Principal pipe load types
• Sustained loads
– Act on system all or most of time
– Consist of pressure and total weight load
• Thermal expansion loads
– Caused by thermal displacements
– Result from restrained movement
• Occasional loads
– Act for short portion of operating time
43
– Seismic and/or dynamic loading

Notes:

Stresses Produced By
Internal Pressure
Sl

Sc
P
t

Sl = Longitudinal Stress

Sc = Circumferential (Hoop) Stress

t = Wall Thickness

P = Internal Pressure

44
Figure 6.1

Notes:

25
Stress Categorization
• Primary Stresses
– Direct
– Shear
– Bending
• Secondary stresses
– Act across pipe wall thickness
– Cause local yielding and minor distortions
– Not a source of direct failure

45

Notes:

Stress Categorization, cont’d


• Peak stresses
– More localized
– Rapidly decrease within short distance of
origin
– Occur where stress concentrations and
fatigue failure might occur
– Significance equivalent to secondary stresses
– Do not cause significant distortion

46

Notes:

26
Allowable Stresses
Function of
– Material properties
– Temperature
– Safety factors
Established to avoid:
– General collapse or excessive distortion from
sustained loads
– Localized fatigue failure from thermal
expansion loads
– Collapse or distortion from occasional loads
47

Notes:

B31.3 Allowable
Stresses in Tension
Basic Allowable Stress S, ksi. At Metal Temperature, °F.
°°
Spec. No/Grade
Material 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500

Carbon Steel A 106 B 20.0 20.0 20.0 20.0 18.9 17.3 16.5 10.8 6.5 2.5 1.0

C - ½Mo A 335 P1 18.3 18.3 17.5 16.9 16.3 15.7 15.1 13.5 12.7 4. 2.4

1¼ - ½Mo A 335 P11 20.0 18.7 18.0 17.5 17.2 16.7 15.6 15.0 12.8 6.3 2.8 1.2

18Cr - 8Ni pipe A 312 TP304 20.0 20.0 20.0 18.7 17.5 16.4 16.0 15.2 14.6 13.8 9.7 6.0 3.7 2.3 1.4

16Cr - 12Ni-2Mo A 312 TP316 20.0 20.0 20.0 19.3 17.9 17.0 16.3 15.9 15.5 15.3 12.4 7.4 4.1 2.3 1.3
pipe

Table 6.1

48

Notes:

27
Pipe Thickness Required
For Internal Pressure
PD
t=
• 2 (SE + PY )
P = Design pressure, psig
D = Pipe outside diameter, in.
S = Allowable stress in tension, psi
E = Longitudinal-joint quality factor
Y = Wall thickness correction factor
• t m = t + CA
tm
• t nom =
0.875
49

Notes:

Spec. Class (or Type) Description Ej


No.

Carbon Steel

API ... Seamless pipe 1.00


5L ... Electric resistance welded pipe 0.85
... Electric fusion welded pipe, double butt, straight or 0.95
spiral seam
Furnace butt welded

A 53 Type S Seamless pipe 1.00


Type E Electric resistance welded pipe 0.85
Type F Furnace butt welded pipe 0.60

A 106 ... Seamless pipe 1.00

Low and Intermediate Alloy Steel

A 333 ... Seamless pipe 1.00


... Electric resistance welded pipe 0.85

A 335 ... Seamless pipe 1.00

Stainless Steel

A 312 ... Seamless pipe 1.00


... Electric fusion welded pipe, double butt seam 0.85
... Electric fusion welded pipe, single butt seam 0.80

A 358 1, 3, 4 Electric fusion welded pipe, 100% radiographed 1.00


5 Electric fusion welded pipe, spot radiographed 0.90
2 Electric fusion welded pipe, double butt seam 0.85

Nickel and Nickel Alloy

B 161 ... Seamless pipe and tube 1.00

B 514 ... Welded pipe 0.80

B 675 All Welded pipe 0.80

50
Table 6.2

Notes:

28
Temperature, °F
Materials 900 & lower 950 1000 1050 1100 1150 & up
Ferritic 0.4 0.5 0.7 0.7 0.7 0.7
Steels
Austenitic 0.4 0.4 0.4 0.4 0.5 0.7
Steels
Other 0.4 0.4 0.4 0.4 0.4 0.4
Ductile
Metals
Cast iron 0.0 ... ... ... ... ...

Table 6.3
51

Notes:

Curved and Mitered Pipe


• Curved pipe
– Elbows or bends
– Same thickness as straight pipe
• Mitered bend
– Straight pipe sections welded together
– Often used in large diameter pipe
– May require larger thickness
• Function of number of welds, conditions, size
52

Notes:

29
Sample Problem 2 -
Determine Pipe Wall Thickness
Design temperature: 650°F
Design pressure: 1,380 psig.
Pipe outside diameter: 14 in.
Material: ASTM A335, Gr. P11 ( 1 14 Cr − 12 Mo ),
seamless
Corrosion allowance: 0.0625 in.

53

Notes:

Sample Problem 2 - Solution

PD
t=
2(SE + PY)

1,380 × 14
t=
2[(16,200 × 1) + (1,380 × 0.4 )]

t = 0.577 in.

54

Notes:

30
Sample Problem 2 -
Solution, cont’d
tm = t + c = 0.577 + 0.0625 = 0.6395 in.

0.6395
t nom = = 0.731 in.
0.875

55

Notes:

Welded Branch Connection


Db
Tb

Nom. Reinforcement
Reinforcement tb c Zone Limits
Thk.
Zone Limits
Mill
Tol.

A3
A3
L4 A4
A4

A1

Tr

c th
Th

Dh d1
Mill A2 A2
Tol.
Nom. d2 d2
Thk.
β

Pipe C

56
Figure 6.2

Notes:

31
Reinforcement Area

Db − 2(Tb − c)
d1 =
sin β

d1 = Effective length removed from run pipe, in.


Db = Branch outside diameter, in.
Tb = Minimum branch thickness, in.
c = Corrosion allowance, in.
β = Acute angle between branch and header
57

Notes:

Required Reinforcement Area


Required reinforcement area, A1:

A 1 = t h d1(2 − sin β)

Where: th = Minimum required header


thickness, in.

58

Notes:

32
Reinforcement Pad
• Provides additional reinforcement
• Usually more economical than increasing
wall thickness
• Selection variables
– Material
– Outside diameter
– Wall thickness
æ (D − Db ) ö
A 4 = çç p Tr
è sin β
59

Notes:

Sample Problem 3

• Pipe material: Seamless, A 106/Gr. B for


branch and header, S = 16,500 psi
• Design conditions: 550 psig @ 700°F
• c = 0.0625 in.
• Mill tolerance: 12.5%

60

Notes:

33
Sample Problem 3, cont’d
• Nominal Pipe Header: 0.562 in.
Thicknesses: Branch: 0.375 in.

• Required Pipe Header: 0.395 in.


Thicknesses: Branch: 0.263 in.

• Branch connection at 90° angle

61

Notes:

Sample Problem 3 - Solution


Db − 2(Tb − c)
d1 =
sin β
16 − 2 (0.375 × 0.875 − 0.0625 )
d1 = = 15.469 in.
sin 90°

A1 = thd1(2 − sinβ)

A1 = 0.395 × 15.469 (2 − sin90°) = 6.11in.2


62

Notes:

34
Sample Problem 3 -
Solution, cont’d
• Calculate excess area available in header, A2.

A 2 = (2d2−d1)(Th−th−c )

d2 = d1 = 15.469 in. < Dh = 24 in.


A2 = (2 × 15.469 - 15.469) (0.875 × 0.562 -
0.395 - 0.0625)
A2 = 0.53 in.2

63

Notes:

Sample Problem 3 -
Solution, cont’d
• Calculate excess area available in branch,

• A3.
2L 4(Tb − tb−c )
A3 =
sinβ
L 4 = 2.5 (0.875 × 0.375 − 0.0625 ) = 0.664 in.

2 × 0.664 (0.875 × 0.375 − 0.263 − 0.0625 )


A3 = = 0.003 in.2
sin 90°

64

Notes:

35
Sample Problem 3 -
Solution, cont’d
• Calculate other excess area available, A4.
A4 = 0.

• Total Available Area:


AT = A2 + A3 + A4
AT = 0.53 + 0.003 + 0 = 0.533 in.2 available
reinforcement.
AT < A1
∴ Pad needed
65

Notes:

Sample Problem 3 -
Solution, cont’d
• Reinforcement pad: A106, Gr. B, 0.562 in. thick
• Recalculate Available Reinforcement
L41 = 2.5 (Th - c) = 2.5 (0.875 × 0.562 - 0.0625) =
1.073 in.
L42 = 2.5 (Tb - c) + Tr
= 2.5 (0.875 × 0.375 - 0.0625) + 0.562 (0.875) =
1.16 in

66

Notes:

36
Sample Problem 3 -
Solution, cont’d
Therefore, L4 = 1.073 in.
2L 4 (Tb − t b − c)
A3 =
sin β

2 × 1.073 (0.875 × 0.375 − 0.263 − 0.0625 )


A3 =
sin90 o

A 3 = 0.005 in.2 (vs. the 0.003 in.2 previously calculated )


A T = A 2 + A 3 + A 4 = 0.53 + 0.005 + 0 = 0.535 in.2

67

Notes:

Sample Problem 3 -
Solution, cont’d
• Calculate additional reinforcement required and
pad dimensions:
A4 = 6.11 - 0.535 = 5.575 in.2
Pad diameter, Dp is:
Tr = 0.562 (0.875) = 0.492 in.

A 4 Db 5.575
Dp = + = + 16 = 27.3
Tr sin β 0.492

Since 2d2 > Dp, pad diameter is acceptable


68

Notes:

37
Exercise 2 - Determine
Required Pipe Wall Thickness
• Design Temperature: 260°F
• Design Pressure: 150 psig
• Pipe OD: 30 in.
• Pipe material: A 106, Gr. B seamless
• Corrosion allowance: 0.125
• Mill tolerance: 12.5%
• Thickness for internal pressure and
nominal thickness?
69

Notes:

Exercise 2 - Solution
• From Tables 6.1, 6.2, and 6.3 obtain values:
– S = 20,000 psi
– E = 1.0
– Y = 0.4
• Thickness calculation:
PD 150 × 30
t= =
2(SE + PY ) 2[(20,000 × 1.0 ) + (150 × 0.04 )]
t = 0.112 in.
70

Notes:

38
Exercise 2 - Solution, cont’d
• Corrosion allowance calculation:
t m = t + CA = 0.112 + 0.125
t = 0.237 in.

• Mill tolerance calculation:


tm 0.237
t nom = =
0.875 0.875
t nom = 0.271 in.
71

Notes:

Layout Considerations
• Operational
– Operating and control points easily reached
• Maintenance
– Ample clearance for maintenance equipment
– Room for equipment removal
– Sufficient space for access to supports
• Safety
– Consider personnel safety
– Access to fire fighting equipment
72

Notes:

39
Pipe Supports and Restraints
• Supports
– Absorb system weight
– Reduce:
+ longitudinal pipe stress
+ pipe sag
+ end point reaction loads
• Restraints
– Control or direct thermal movement due to:
+ thermal expansion
73 + imposed loads

Notes:

Support and Restraint


Selection Factors
• Weight load
• Available attachment clearance
• Availability of structural steel
• Direction of loads and/or movement
• Design temperature
• Vertical thermal movement at supports

74

Notes:

40
Rigid Supports

Shoe Saddle Base Adjustable


Support

Dummy Support Trunnion

75
Figure 7.1

Notes:

Hangers

76
Figure 7.2

Notes:

41
Flexible Supports
Load and Deflection Small Change in
Scale Effective Lever Arm

Large Change in
Effective Lever Arm
Relatively
Constant
Load
Typical Variable-Load Typical Constant-Load
Spring Support Spring Support Mechanism

77
Figure 7.3

Notes:

Restraints
• Control, limit, redirect thermal movement
– Reduce thermal stress
– Reduce loads on equipment connections
• Absorb imposed loads
– Wind
– Earthquake
– Slug flow
– Water hammer
– Flow induced-vibration
78

Notes:

42
Restraints, cont’d
• Restraint Selection
– Direction of pipe movement
– Location of restraint point
– Magnitude of load

79

Notes:

Anchors and Guides


• Anchor
– Full fixation
– Permits very limited (if any) translation or
rotation

• Guide
– Permits movement along pipe axis
– Prevents lateral movement
– May permit pipe rotation
80

Notes:

43
Restraints - Anchors

Anchor Anchor Partial Anchor

81
Figure 7.4

Notes:

Restraints - Guides

Guide Guide

Guide
Vertical Guide
82
Figure 7.5

Notes:

44
Piping Flexibility
• Inadequate flexibility
– Leaky flanges
– Fatigue failure
– Excessive maintenance
– Operations problems
– Damaged equipment

• System must accommodate thermal


movement
83

Notes:

Flexibility Analysis
• Considers layout, support, restraint
• Ensures thermal stresses and reaction
loads are within allowable limits
• Anticipates stresses due to:
– Elevated design temperatures
+ Increases pipe thermal stress and reaction
loads
+ Reduces material strength
– Pipe movement
84 – Supports and restraints

Notes:

45
Flexibility Analysis, cont’d
• Evaluates loads imposed on equipment
• Determines imposed loads on piping
system and associated structures
• Loads compared to industry standards
– Based on tables
– Calculated

85

Notes:

Design Factors
• Layout • Pipe diameter,
• Component thickness
design details • Design temperature
• Fluid service and pressure
• Connected • End-point movements
equipment type • Existing structural
• Operating steel locations
scenarios • Special design
considerations
86

Notes:

46
Equipment Nozzle Load
Standards and Parameters
Parameters Used
Equipment Item Industry Standard To Determine
Acceptable Loads

Centrifugal Pumps API 610 Nozzle size

Centrifugal API 617, 1.85 times Nozzle size, material


Compressors NEMA SM-23
allowable

Air-Cooled Heat API 661 Nozzle size


Exchangers

Pressure Vessels, Shell- ASME Code Section Nozzle size, thickness,


and-Tube Heat VIII, WRC 107, reinforcement details,
Exchanger Nozzles WRC 297 vessel/exchanger diameter,
and wall thickness. Stress
analysis required.

Tank Nozzles API 650 Nozzle size, tank diameter,


height, shell thickness, nozzle
elevation.

Steam Turbines NEMA SM-23 Nozzle size

87
Table 7.1

Notes:

Computer Analysis
• Used to perform detailed piping stress
analysis
• Can perform numerous analyses
• Accurately completes unique and difficult
functions
– Time-history analyses
– Seismic and wind motion
– Support motion
– Finite element analysis
88 – Animation effects

Notes:

47
Computer Analysis Guidelines
Maximum Differential
Type Of Piping Pipe Size, NPS Flexibility Temp.
General piping ≥4 ≥ 400°F
≥8 ≥ 300°F
≥ 12 ≥ 200°F
≥ 20 any
For rotating equipment ≥3 Any

For air-fin heat exchangers ≥4 Any

For tankage ≥ 12 Any

89
Table 7.2

Notes:

Piping Flexibility Temperature


• Analysis based on largest temperature
difference imposed by normal and
abnormal operating conditions
• Results give:
– Largest pipe stress range
– Largest reaction loads on connections,
supports, and restraints
• Extent of analysis depends on situation

90

Notes:

48
Normal Temperature
Conditions To Consider
Temperature range expected for most of time plant is
Stable in operation. Margin above operating temperature
Operation (i.e., use of design temperature rather than operating
temperature) allows for process flexibility.

Determine if heating or cooling cycles pose flexibility


Startup and problems. For example, if tower is heated while
Shutdown attached piping remains cold, piping flexibility should
be checked.

Regeneration Design for normal operation, regeneration, or


and Decoking decoking, and switching from one service to the
Piping other. An example is furnace decoking.

Requires multiple analyses to evaluate expected


temperature variations, for no flow in some of piping,
Spared
and for switching from one piece of equipment to
Equipment
another. Common example is piping for two or more
pumps with one or more spares.

91
Table 7.3

Notes:

Abnormal Temperature
Conditions To Consider
Temperature changes due to loss of cooling medium
Loss of Cooling flow should be considered. Includes pipe that is
Medium Flow normally at ambient temperature but can be blocked
in, while subject to solar radiation.

Most on-site equipment and lines, and many off-site


lines, are freed of gas or air by using steam. For 125
psig steam, 300°F is typically used for metal
temperature. Piping connected to equipment which
Steamout for Air will be steamed out, especially piping connected to
or Gas Freeing upper parts of towers, should be checked for tower at
300°F and piping at ambient plus 50°F. This may
govern flexibility of lines connected to towers that
operate at less than 300°F or that have a smaller
temperature variation from top to bottom.

If process flow can be stopped while heat is still being


No Process Flow
applied, flexibility should be checked for maximum
While Heating
metal temperature. Such situations can occur with
Continues
steam tracing and steam jacketing.

92
Table 7.4

Notes:

49
Extent of Analysis
• Extent depends on situation

• Analyze right combination of conditions

• Not necessary to include system sections


that are irrelevant to analysis results

93

Notes:

Modifying System Design


• Provide more offsets or bends
• Use more expansion loops
• Install expansion joints
• Locate restraints to:
– Minimize thermal and friction loads
– Redirect thermal expansion
• Use spring supports to reduce large
vertical thermal loads
• Use Teflon bearing pads to reduce friction
loads
94

Notes:

50
System Design Considerations
• Pump systems
– Operating vs. spared pumps

• Heat traced piping systems


– Heat tracing
+ Reduces liquid viscosity
+ Prevents condensate accumulation
– Tracing on with process off

95

Notes:

System Design
Considerations, cont’d
• Atmospheric storage tank
– Movement at nozzles
– Tank settlement
• Friction loads at supports and restraints
– Can act as anchors or restraints
– May cause high pipe stresses or reaction loads
• Air-cooled heat exchangers
– Consider header box and bundle movement
96

Notes:

51
Tank Nozzle

SHELL
NOZZLE

BOTTOM

97
Figure 7.6

Notes:

Welding
• Welding is primary way of joining pipe
• Provides safety and reliability
• Qualified welding procedure and welders
• Butt welds used for:
– Pipe ends
– Butt-weld-type flanges or fittings to pipe ends
– Edges of formed plate

98

Notes:

52
Butt-Welded Joint Designs
Equal Thickness

(a) Standard End Preparation (b) Standard End Preparation


of Pipe of Butt-Welding Fittings and
Optional End Preparation of (c) Suggested End Preparation,
Pipe 7/8 in. and Thinner Pipe and Fittings Over 7/8 in.
Thickness

99
Figure 8.1

Notes:

Butt-Welded Joint Designs


Unequal Thickness

3/32 in. max.


(a) (b) (c)

(d)

100
Figure 8.2

Notes:

53
Fillet Welds

101
Figure 8.3

Notes:

Weld Preparation
• Welder and equipment must be qualified
• Internal and external surfaces must be
clean and free of paint, oil, rust, scale, etc.
• Ends must be:
– Suitably shaped for material, wall thickness,
welding process
– Smooth with no slag from oxygen or arc
cutting

102

Notes:

54
Preheating
• Minimizes detrimental effects of:
– High temperature
– Severe thermal gradients
• Benefits include:
– Dries metal and removes surface moisture
– Reduces temperature difference between
base metal and weld
– Helps maintain molten weld pool
– Helps drive off absorbed gases
103

Notes:

Postweld Heat Treatment


(PWHT)
• Primarily for stress relief
– Only reason considered in B31.3
• Averts or relieves detrimental effects
– Residual stresses
+ Shrinkage during cooldown
+ Bending or forming processes
– High temperature
– Severe thermal gradients
104

Notes:

55
Postweld Heat Treatment
(PWHT), cont’d
• Other reasons for PWHT to be specified
by user
– Process considerations
– Restore corrosion resistance of normal
grades of stainless steel
– Prevent caustic embrittlement of carbon steel
– Reduce weld hardness

105

Notes:

Storage and Handling


• Store piping on mounds or sleepers
• Stacking not too high
• Store fittings and valves in shipping crates
or on racks
• End protectors firmly attached
• Lift lined and coated pipes and fittings with
fabric or rubber covered slings and
padding
106

Notes:

56
Pipe Fitup and Tolerances
• Good fitup essential
– Sound weld
– Minimize loads
• Dimensional tolerances
• Flange tolerances

107

Notes:

Pipe Alignment
Load Sensitive Equipment
• Special care and tighter tolerances needed
• Piping should start at nozzle flange
– Initial section loosely bolted
– Gaskets used during fabrication to be replaced
• Succeeding pipe sections bolted on
• Field welds to join piping located near
machine

108

Notes:

57
Load Sensitive Equipment,
cont’d
• Spring supports locked in cold position
during installation and adjusted in locked
position later
• Final bolt tensioning follows initial
alignment of nozzle flanges
• Final nozzle alignment and component
flange boltup should be completed after
replacing any sections removed
109

Notes:

Load Sensitive Equipment,


cont’d
• More stringent limits for piping > NPS 3
• Prevent ingress of debris during
construction

110

Notes:

58
Flange Joint Assembly
• Primary factors
– Selection
– Design
– Preparation
– Inspection
– Installation
• Identify and control causes of leakage

111

Notes:

Flange Preparation,
Inspection, and Installation
• Redo damaged surfaces
• Clean faces
• Align flanges
• Lubricate threads and nuts
• Place gasket properly
• Use proper flange boltup procedure

112

Notes:

59
“Criss-Cross”
Bolt-tightening Sequence

113
Figure 8.4

Notes:

Causes of Flange Leakage


• Uneven bolt stress
• Improper flange alignment
• Improper gasket centering
• Dirty or damaged flange faces
• Excessive loads at flange locations
• Thermal shock
• Improper gasket size or material
• Improper flange facing
114

Notes:

60
Inspection
• Defect identification
• Weld inspection
– Technique
– Weld type
– Anticipated type of defect
– Location of weld
– Pipe material

115

Notes:

Typical Weld Imperfections


Lack of Fusion Between Weld Bead and Base Metal

a) Side Wall Lack of Fusion b) Lack of Fusion Between


Adjacent Passes

Incomplete Filling at Root on One Side Only Incomplete Filling at Root

c) Incomplete Penetration Due d) Incomplete Penetration of


to Internal Misalignment Weld Groove
External Undercut

Root Bead Fused to Both Inside Internal Undercut


Surfaces but Center of Root Slightly
Below Inside Surface of Pipe (Not
Incomplete Penetration)

e) Concave Root Surface f) Undercut


(Suck-Up)

g) Excess External Reinforcement

116
Figure 9.1

Notes:

61
Weld Inspection Guidelines
Type of Inspection Situation/Weld Type Defect

Visual All welds. • Minor structural welds.

• Cracks.

• Slag inclusions.

Radiography • Butt welds. • Gas pockets.

• Girth welds. • Slag inclusions.

• Miter groove welds. • Incomplete penetration.

Magnetic Particle • Ferromagnetic • Cracks.


materials.
• Porosity.
• For flaws up to 6 mm
(1/4 in.) beneath the • Lack of fusion.
surface.

Liquid Penetrant • Ferrous and • Cracks.


nonferrous materials.
• Seams.
• Intermediate weld
passes. • Porosity.

Weld root pass. • Folds.



Simple and • Inclusions.

inexpensive. Shrinkage.

• Surface defects.

Ultrasonic Confirms high weld • Laminations.


quality in pressure- Slag inclusions in thick
containing joints. •
plates.

• Subsurface flaws.

117
Table 9.1

Notes:

Testing
• Pressure test system to demonstrate
integrity
• Hydrostatic test unless pneumatic
approved for special cases
• Hydrostatic test pressure
– ≥ 1½ times design pressure

118

Notes:

62
Testing, cont’d
– For design temperature > test temperature:
1. 5 P S T
PT =
S
ST/S must be ≤ 6.5
PT = Minimum hydrostatic test pressure, psig
P = Internal design pressure, psig
ST = Allowable stress at test temperature, psi
S = Allowable stress at design temperature, psi

119

Notes:

Testing, cont’d
• Pneumatic test at 1.1P
• Instrument take-off piping and sampling
piping strength tested with connected
equipment

120

Notes:

63
Nonmetallic Piping
• Thermoplastic Piping
– Can be repeatedly softened and hardened by
increasing and decreasing temperature
• Reinforced Thermosetting Resin Piping
(RTR)
– Fabricated from resin which can be treated to
become infusible or insoluble

121

Notes:

Nonmetallic Piping, cont’d


• No allowances for pressure or temperature
variations above design conditions
• Most severe coincident pressure and
temperature conditions determine design
conditions

122

Notes:

64
Nonmetallic Piping, cont’d
• Designed to prevent movement from
causing:
– Failure at supports
– Leakage at joints
– Detrimental stresses or distortions
• Stress-strain relationship inapplicable

123

Notes:

Nonmetallic Piping, cont’d


• Flexibility and support requirement same
as for piping in normal fluid service. In
addition:
– Piping must be supported, guided, anchored
to prevent damage.
– Point loads and narrow contact areas avoided
– Padding placed between piping and supports
– Valves and load transmitting equipment
supported independently to prevent excessive
loads.
124

Notes:

65
Nonmetallic Piping, cont’d
• Thermoplastics not used in flammable
service, and safeguarded in most fluid
services.
• Joined by bonding

125

Notes:

Category M Fluid Service


Category M Fluid

• Significant potential for personnel


exposure

• Single exposure to small quantity can


cause irreversible harm to breathing or
skin.

126

Notes:

66
Category M Fluid Service, cont’d
• Requirements same as for piping in
normal fluid service. In addition:
– Design, layout, and operation conducted with
minimal impact and shock loads.
– Detrimental vibration, pulsation, resonance
effects to be avoided or minimized.
– No pressure-temperature variation
allowances.

127

Notes:

Category M Fluid Service, cont’d


– Most severe coincident pressure-temperature
conditions determine design temperature and
pressure.
– All fabrication and joints visually examined.
– Sensitive leak test required in addition to
other required testing.

128

Notes:

67
Category M Fluid Service, cont’d
• Following may not be used
– Miter bends not designated as fittings,
fabricated laps, nonmetallic fabricated branch
connections.
– Nonmetallic valves and specialty components.
– Threaded nonmetallic flanges.
– Expanded, threaded, caulked joints.

129

Notes:

High Pressure Piping


• Ambient effects on design conditions
– Pressure reduction based on cooling of gas or
vapor
– Increased pressure due to heating of a static
fluid
– Moisture condensation

130

Notes:

68
High Pressure Piping,
cont’d
• Other considerations
– Dynamic effects
– Weight effects
– Thermal expansion and contraction effects
– Support, anchor, and terminal movement

131

Notes:

High Pressure Piping,


cont’d
• Testing
– Each system hydrostatically or pneumatically
leak tested
– Each weld and piping component tested
– Post installation pressure test at 110% of
design pressure if pre-installation test was
performed
• Examination
– Generally more extensive than normal fluid
132
service

Notes:

69
Summary
• Process plant piping much more than just
pipe
• ASME B31.3 covers process plant piping
• Covers design, materials, fabrication,
erection, inspection, and testing
• Course provided overview of requirements

133

Notes:

70
Part 2:
Background Material

71
OVERVIEW OF PROCESS PLANT PIPING SYSTEM DESIGN
Carmagen Engineering, Inc.

72
I. INTRODUCTION

This course provides an overview of process plant piping system design. It


discusses requirements contained in ASME B31.3, Process Piping, plus
additional requirements and guidelines based on common industry practice. The
information contained in this course is readily applicable to on-the-job
applications, and prepares participants to take more extensive courses if
appropriate.

II. GENERAL

A. What is a piping system

A piping system conveys fluid from one location to another. Within


a process plant, the locations are typically one or more equipment
items (e.g., pumps, pressure vessels, heat exchangers, process
heaters, etc.), or individual process plants that are within the
boundary of a process facility.

A piping system consists of:

• Pipe sections
• Fittings (e.g., elbows, reducers, branch connections, etc.)
• Flanges, gaskets, and bolting
• Valves
• Pipe supports and restraints

Each individual component plus the overall system must be


designed for the specified design conditions.

B. Scope of ASME B31.3

ASME B31.3 specifies the design, materials, fabrication, erection,


inspection, and testing requirements for process plant piping
systems. Process plants include petroleum refineries; chemical,
pharmaceutical, textile, paper, semiconductor, and cryogenic
plants; and related process plants and terminals.

73
ASME B31.3 applies to piping and piping components that are used
for all fluid services, not just hydrocarbon services. These include
the following:

• Raw, intermediate, and finished chemicals.


• Petroleum products.
• Gas, steam, air, and water.
• Fluidized solids.
• Refrigerants.
• Cryogenic fluids.

The scope also includes piping that interconnects pieces or stages


within a packaged-equipment assembly.

The following are excluded from the scope of ASME B31.3:

• Piping systems for internal gauge pressures at or above zero


but less than 15 psi, provided that the fluid is nonflammable,
nontoxic, and not damaging to human tissue, and its design
temperature is from -20°F through 366°F.
• Power boilers that are designed in accordance with the ASME
Boiler and Pressure Vessel Code Section I and external boiler
piping that must conform to ASME B31.1.
• Tubes, tube headers, crossovers, and manifolds that are
located inside a fired heater enclosure.
• Pressure vessels, heat exchangers, pumps, compressors, and
other fluid-handling or processing equipment. This includes
both internal piping and connections for external piping.

74
III. MATERIAL SELECTION CONSIDERATIONS

Piping system material selection considerations are discussed below.

A. Strength

A material's strength is defined by its yield, tensile, creep, and


fatigue strengths. Alloy content, material grain size, and the steel
production process are factors that affect material strength.

1.0 Yield and Tensile Strength

A stress-strain diagram that is produced from a standard


tensile test (Figure 3.1) illustrates the yield and tensile
strengths. As the stress in a material increases, its
deformation also increases. The yield strength is the stress
that is required to produce permanent deformation in the
material (Point A in Figure 3.1).

If the stress is further increased, the permanent deformation


continues to increase until the material fails. The maximum
stress that the material attains is the tensile strength (Point B
in Figure 3.1). If a large amount of strain occurs in going
from Point A to Point C, the rupture point, the material is said
to be ductile. Steel is an example of a ductile material. If the
strain in going from Point A to Point C is small, the material
is brittle. Gray cast iron is an example of a brittle material.

S B
A C

Typical Stress-Strain Diagram for Steel


Figure 3.1

75
2.0 Creep Strength

Below about 750°F for a given stress, the strain in most


materials remains constant with time. Above this
temperature, even with constant stress, the strain in the
material will increase with time. This behavior is known as
creep. The creep strength, like the yield and tensile
strengths, varies with temperature. For a particular
temperature, the creep strength of a material is the minimum
stress that will rupture the material during a specified period
of time.

The temperature at which creep strength begins to be a


factor is a function of material chemistry. For alloy materials
(i.e., not carbon steel) creep strength becomes a
consideration at temperatures higher than 750°F.

3.0 Fatigue Strength

The term “fatigue” refers to the situation where a specimen


breaks under a load that it has previously withstood for a
length of time, or breaks during a load cycle that it has
previously withstood several times. The first type of fatigue
is called “static,” and the second type is called “cyclic.”
Examples of static fatigue are: creep fracture and stress
corrosion cracking. Static fatigue will not be discussed
further in this course.

One analogy to cyclic fatigue is the bending of a paper clip.


The initial bending beyond a certain point causes the paper
clip to yield (i.e., permanently deform) but not break. The
clip could be bent back and forth several more times and still
not break. However after a sufficient number of bending
(i.e., load) cycles, the paper clip will break under this
repetitive loading. Purely elastic deformation (i.e., without
yielding) cannot cause a cyclic fatigue failure.

The fatigue strength of a material under cyclic loading can


then be defined as the ability to withstand repetitive loading
without failure. The number of cycles to failure of a material
decreases as the stress resulting from the applied load
increases.

76
B. Corrosion Resistance

Corrosion of materials involves deterioration of the metal by


chemical or electrochemical attack. Corrosion resistance is usually
the single most important factor that influences pipe material
selection. Table 3.1 summarizes the typical types of piping system
corrosion.

General or Uniform Characterized by uniform metal loss over entire surface of material.
Corrosion May be combined with erosion if material is exposed to high-velocity
fluids, or moving fluids that contain abrasive materials.

Pitting Form of localized metal loss randomly located on material surface.


Corrosion Occurs most often in stagnant areas or areas of low-flow velocity.

Galvanic Corrosion Occurs when two dissimilar metals contact each other in corrosive
electrolytic environment. The anodic metal develops deep pits or
grooves as a current flows from it to the cathodic metal.

Crevice Corrosion Localized corrosion similar to pitting. Occurs at places such as


gaskets, lap joints, and bolts, where a crevice can exist.

Concentration Cell Occurs when different concentration of either corrosive fluid or


Corrosion dissolved oxygen contacts areas of same metal. Usually associated
with stagnant fluid.

Graphitic Corrosion Occurs in cast iron exposed to salt water or weak acids. Reduces
iron in the cast iron and leaves the graphite in place. Result is
extremely soft material with no metal loss.

Typical Types of Piping System Corrosion


Table 3.1

For process plant piping systems in corrosive service, corrosion


protection is usually achieved by using alloys that resist corrosion.
The most common alloys used for this purpose are chromium and
nickel. Low-alloy steels with a chromium content of 1¼% to 9%
and stainless steels are used in corrosive environments.

C. Material Fracture Toughness

One way to characterize the fracture behavior of a material is the


amount of energy necessary to initiate and propagate a crack at a
given temperature. This is the material's fracture toughness, which

77
decreases as the temperature decreases. Tough materials require
a relatively large amount of energy to initiate and propagate a
crack. The impact energy required to fracture a material sample at
a given temperature can be measured by standard Charpy V-notch
tests.

Various factors other than temperature affect the fracture


toughness of a material. These include the following:

• Chemical composition or alloying elements.


• Heat treatment.
• Grain size.

The major chemical elements that affect a material's fracture


toughness are carbon, manganese, nickel, oxygen, sulfur, and
molybdenum. High carbon content, or excessive amounts of
oxygen, sulfur, or molybdenum, hurts fracture toughness. The
addition of manganese or nickel improves fracture toughness.

D. Fabricability

A material must be available in the shapes or forms that are


required, and it typically must be weldable. In piping systems,
some common shapes and forms include the following:

• Seamless pipe.
• Plate that is used for welded pipe.
• Wrought or forged elbows, tees, reducers, and crosses.
• Forged flanges, couplings, and valves.
• Cast valves.

E. Availability and Cost

The last factors that affect piping material selection are availability
and cost. Where there is more than one technically acceptable
material, the final selection must consider what is readily available
and what are the relative costs of the acceptable options. For
example, the use of carbon steel with a large corrosion allowance
could be more expensive than using a low-alloy material with a
smaller corrosion allowance.

78
IV. PIPING COMPONENTS

A. Fittings, Flanges, and Gaskets

1.0 Pipe Fittings

Fittings are used to make some change in the geometry of a


piping system. This change could include:

• Modifying the flow direction.


• Bringing two or more pipes together.
• Altering the pipe diameter.
• Terminating a pipe.

The most common types of fittings are elbows, tees,


reducers, welding outlets, pipe caps, and lap joint stub ends.
These are illustrated in Figures 4.1 through 4.6. Fittings may
be attached to pipe by threading, socket welding, or butt
welding.

An elbow or return (Figure 4.1) changes the direction of a


pipe run. Standard elbows change the direction by either
45° or 90°. Returns change the direction by 180°.

90° 45°

180° Return

Elbow and Return


Figure 4.1

79
A tee (Figure 4.2) provides for the intersection of three
sections of pipe.

• A straight tee has equal diameters for both the run and
branch pipe connections.
• A reducing-outlet tee has a branch diameter which is
smaller in size than the run diameter.
• A cross permits the intersection of four sections of pipe
and is rarely seen in process plants.

Tee
Figure 4.2

A reducer (illustrated in Figure 4.3) changes the diameter in


a straight section of pipe. The centerlines of the large and
small diameter ends coincide in a concentric reducer,
whereas they are offset in an eccentric type.

Concentric Eccentric

Reducer
Figure 4.3

A welding outlet fitting, or integrally reinforced branch


connection (Figure 4.4) has all the reinforcement required to
strengthen the opening contained within the fitting itself.

80
Typical Integrally Reinforced Branch Connection
Figure 4.4

A pipe cap (Figure 4.5) closes off the end of a pipe section.
The wall thickness of a butt-welded pipe cap will typically be
identical to that of the adjacent pipe section.

Cap
Figure 4.5

A lap-joint stub end (Figure 4.6) is used in conjunction with


lap-joint flanges.

Note square corner

R
Enlarged Section
of Lap

Lap-Joint Stub End


Figure 4.6

81
2.0 Flanges

A flange connects a pipe section to a piece of equipment,


valve, or another pipe such that relatively simple
disassembly is possible. Disassembly may be required for
maintenance, inspection, or operational reasons. Figure 4.7
shows a typical flange assembly. Flanges are normally used
for pipe sizes above NPS 1½.

Flange

Bolting

Gasket

Typical Flange Assembly


Figure 4.7

A flange type is specified by stating the type of attachment


and the type of face. The type of attachment defines how
the flange is connected to a pipe section or piece of

82
equipment (e.g., welded). The type of flange face or facing
defines the geometry of the flange surface that contacts the
gasket. Table 4.1 summarizes the types of flange
attachments and faces. Figure 4.8 illustrates flange facing
types.

Flange Attachment Types Flange Facing Types

Threaded Flanges Flat Faced

Socket-Welded Flanges

Blind Flanges Raised Face

Slip-On Flanges

Lapped Flanges Ring Joint

Weld Neck Flanges

Types of Flange Attachment and Facing


Table 4.1

83
Flange Facing Types
Figure 4.8

84
3.0 Gaskets

A gasket is a resilient material that is inserted between the


flanges and seated against the portion of the flanges called
the “face” or “facing”. The gasket provides the seal between
the fluid in the pipe and the outside, and thus prevents
leakage. Bolts compress the gasket to achieve the seal and
hold the flanges together against pressure and other
loadings.

The three gasket types typically used in pipe flanges for


process plant applications are:

• Sheet.
• Spiral wound.
• Solid metal ring.

B. Flange Rating

ASME B16.5, Pipe Flanges and Flanged Fittings, provides steel


flange dimensional details for standard pipe sizes through NPS 24.
Specification of an ASME B16.5 flange involves selection of the
correct material and flange "Class." The paragraphs that follow
discuss the flange class specification process in general terms.

Flange material specifications are listed in Table 1A in ASME B16.5


(excerpted in Table 4.2). The material specifications are grouped
within Material Group Numbers. For example, if the piping is
fabricated from carbon steel, the ASTM A105 material specification
is often used. ASTM A105 material is in Material Group No. 1.1.
Refer to ASME B16.5 for additional acceptable material
specifications and corresponding Material Group Numbers.

85
ASME B16.5, Table 1A, Material Specification List (Excerpt)
Table 4.2

After the Material Group has been determined, the next step is to
select the appropriate Class. The Class is determined by using
pressure/temperature rating tables, the Material Group, design
metal temperature, and design pressure. Selecting the Class sets
all the detailed dimensions for flanges and flanged fittings. The
objective is to select the lowest Class that is appropriate for the
specified design conditions.

Table 2 of ASME B16.5 provides the information that is necessary


to select the appropriate flange Class for the specified design
conditions. ASME B16.5 has seven classes: Class 150, 300, 400,
600, 900, 1,500, and 2,500. Each Class specifies the design
pressure and temperature combinations that are acceptable for a
flange with that designation. As the number of the Class increases,
the strength of the flange increases for a given Material Group. A
higher flange Class can withstand higher pressure and temperature
combinations. Table 4.3 is an excerpt from Table 2 of ASME B16.5
and shows some of the temperature and pressure ratings for
several Material Groups. Material and design temperature
combinations that do not have a pressure indicated are not
acceptable.

Specifying the flange size, material, and class completes most of


what is necessary for selecting an ASME B16.5 flange. The flange
type, facing, bolting material, and gasket type and material must be

86
added to complete the flange selection process. Discussion of
these other factors is beyond the scope of this course.

Material Group
1.8 1.9 1.10
No.
Classes 150 300 400 150 300 400 150 300 400
Temp., °F
-20 to 100 235 620 825 290 750 1000 290 750 1000
200 220 570 765 260 750 1000 260 750 1000
300 215 555 745 230 720 965 230 730 970
400 200 555 740 200 695 885 200 705 940
500 170 555 740 170 695 805 170 665 885
600 140 555 740 140 605 785 140 605 805
650 125 555 740 125 590 785 125 590 785
700 110 545 725 110 570 710 110 570 755
750 95 515 685 95 530 675 95 530 710
800 80 510 675 80 510 650 80 510 675
850 65 485 650 65 485 600 65 485 650
900 50 450 600 50 450 425 50 450 600
950 35 320 425 35 320 290 35 375 505
1000 20 215 290 20 215 190 20 260 345
ASME B16.5, Pressure-Temperature Ratings (Excerpt)
Table 4.3

87
SAMPLE PROBLEM 1 - DETERMINE FLANGE RATING

A new piping system will be installed at an existing plant. It is necessary to


determine the ASME class that is required for the flanges. The following design
information is provided:

• Pipe Material: 1¼ Cr – ½ Mo.


• Design Temperature: 700°F.
• Design Pressure: 500 psig.

SOLUTION

Determine the Material Group Number for the flanges by referring to ASME Table
1A (excerpted in Table 4.2). Find the 1¼ Cr – ½ Mo material in the Nominal
Designation Steel column. The material specification for forged flanges would be
A182 Gr. F11, and the corresponding material Group Number is 1.9.

Refer to Table 2 for Class 150 (excerpted in Table 4.3). Read the allowable
design pressure at the intersection of the 700°F design temperature and Material
Group 1.9. This is only 110 psig and is not enough for this service.

Now check Class 300 and do the same thing. The allowable pressure in this
case is 570 psig, which is acceptable.

The required flange Class is 300.

88
V. VALVES

A. Valve Functions

The possible valve functions must be known before being able to


select the appropriate valve type for a particular application. Fluid
flows through a pipe, and valves are used to control the flow. A
valve may be used to block flow, throttle flow, or prevent flow
reversal.

1.0 Blocking Flow

The block-flow function provides completely on or completely


off flow control of a fluid, generally without throttling or
variable control capability. It might be necessary to block
flow to take equipment out of service for maintenance while
the rest of the unit remains in operation, or to separate two
portions of a single system to accommodate various
operating scenarios.

2.0 Throttling Flow

Throttling may increase or decrease the amount of fluid


flowing in the system and can also help control pressure
within the system. It might be necessary to throttle flow to
regulate the filling rate of a pressure vessel, or to control unit
operating pressure levels.

3.0 Preventing Flow Reversal

It might be necessary to automatically prevent fluid from


reversing its direction during sudden pressure changes or
system upsets. Preventing reverse flow might be necessary
to avoid damage to a pump or a compressor, or to
automatically prevent backflow into the upstream part of the
system due to process reasons.

89
B. Primary Valve Types

1.0 Gate Valve

Most valves in process plants function as block valves.


About 75% of all valves in process plants are gate valves.
The gate valve is an optimum engineering and economic
choice for on or off service. The gate valve is not suitable to
throttle flow because it will pass the maximum possible flow
while it is only partially open. Figure 5.1 illustrates a typical
full-port gate valve.

90
1. Handwheel Nut
2. Handwheel
3. Stem Nut
4. Yoke
5. Yoke Bolting
6. Stem
7. Gland Flange
8. Gland
9. Gland Bolts or
Gland-Eye Bolts
and Nuts
10. Gland Lug Bolts
and Nuts
11. Stem Packing
12. Plug
13. Lantern Ring
14. Backseat Bushing
15. Bonnet
16. Bonnet Gasket
17. Bonnet Bolts and
Nuts
18. Gate
19. Seat Ring
20. Body
21. One-Piece Gland
(Alternate)
22. Valve Port

Full-Port Gate Valve


Figure 5.1

2.0 Globe Valve

The globe valve is the type most commonly used to throttle


flow in a process plant. In the smaller sizes, they are

91
typically used as hand-control valves. In larger sizes,
applications are limited primarily to bypasses at control valve
stations. They provide relatively tight shutoff in control valve
bypasses during normal operations; they serve as temporary
flow controllers when control valves must be taken out of
service.

Because all globe valve patterns involve a change in flow


direction, they are not suitable for piping systems that
require scraping or rodding. Globe valves are rarely used for
strictly on/off block valve operations because conventional
gate valves adequately serve that function at a lower cost
and a much lower pressure drop.

3.0 Check Valve

Check valves prevent flow reversal. Typical check valve


applications are in pump and compressor discharge piping
and other systems that require protection against backflow.
Valves which contain a disc or discs that swing out of the
flow passage area usually create a lower pressure drop in
the system than those which contain a ball or piston
element. These latter elements remain in the flowstream
and the port configurations frequently include an angular
change in flow direction. For all process designs, the
intended purpose of check valves is to prevent gross flow
reversal, not to effect complete leakage-free, pressure-tight
shutoff of reverse flow.

The selection of a particular check valve type generally


depends on size, cost, availability, and service. Ball and lift
check valves are usually the choice for sizes NPS 2 and
smaller, while swing check and plate check valves are used
in the larger sizes.

3.1 Swing Check Valve

The main components of a swing check valve (Figure


5.2) are the body, disc, cap, seat ring, disc hinge, and
pin. The disc is hinged at the top and closes against
a seat in the valve body opening. It swings freely in
an arc from the fully closed position to one that
provides unobstructed flow. The valve is kept open
by the flow, and disc seating is accomplished by
gravity and/or flow reversal.

92
Cap
Pin

Seat
Ring
Hinge

Flow
Direction

Disc
Body

Swing Check Valve


Figure 5.2

3.2 Ball Check Valve

The ball check valve utilizes a ball to prevent flow


reversal (Figure 5.3). The basic types are the
straight-through- and globe-type (90° change in
direction, similar to a typical globe valve body). Ball
check valves are available in sizes NPS ½ through 2
in all ratings and materials used in process plants.
Their low cost usually makes them the first choice for
valves sized NPS 2 and smaller, provided the
pressure drop is not a concern.

93
Ball Check Valve
Figure 5.3

3.3 Lift Check Valve

A lift check valve (Figure 5.4) usually depends on


gravity for operation. Under forward flow, a piston or
disc is lifted off the seat by the fluid while being
retained in the valve by guides. On reverse flow, the
piston or disc is forced against the seat to block
further flow. Some lift check valves utilize spring
loading to assure positive seating.

Lift check valves employing the disc- or piston-type


mechanism are available in sizes from NPS ½
through 2 in all ratings and materials used in process
plants. They are most commonly used in the higher
ASME B16.5 ratings (Class 300 and greater), and
where tighter shutoff is required. Valves of this type
should only be used in clean services.

94
Seat
Ring
Piston
Flow
Direction

Lift Check Valve


Figure 5.4

3.4 Wafer Check Valve

The wafer body or flangeless valve is a valve body


without flanges (Figure 5.5). Valves of this type are
placed between pipe flanges and held in place by the
compressive force between the flanges and
transmitted through the gaskets. The lug-wafer (or
single-flanged) valve is also shown in Figure 5.5.
Valves of this type are mounted between pipe flanges
and are held in place by cap screws, machine bolts,
or stud bolts which thread into the valve body.

95
Figure 5.5

3.5 Ball Valve

Ball valves (Figure 5.6) usually function as block


valves. Ball valves are well suited for conditions
where quick on/off and/or bubble-tight shut-off is
required. The pressure/temperature ratings for ball
valve soft seats above ambient temperatures are
usually lower than the ASME ratings for steel valves.
This is because of the lower physical properties of the
soft-seat materials. Soft-sealed ball valves are not
normally used for throttling service because the soft-
seats are subject to erosion or distortion/displacement
caused by fluid flow when the valve is in the partially
open position.

96
No. Part Names
1 Body
2 Body Cap
3 Ball
4 Body Seal Gasket
5 Seat
6 Stem
7 Gland Flange
8 Stem Packing
9 Gland Follower
10 Thrust Bearing
11 Thrust Washer
12 Indicator Stop
13 Snap Ring
14 Gland Bolt
15 Stem Bearing
16 Body Stud Bolt & Nuts
17 Gland Cover
18 Gland Cover Bolts
19 Handle

Ball Valve
Figure 5.6

3.6 Plug Valve

Plug valves (Figure 5.7) usually function as block


valves. They are well suited for conditions where
quick on/off and/or bubble-tight shutoff is required.
The soft-seal-types may have lower
temperature/pressure ratings than the ASME ratings
for steel valves because of the lesser physical
properties of the soft-seat materials. Soft-seal plug
valves are not normally used for throttling service
since the soft seals are subject to erosion or
distortion/displacement caused by fluid flow when the
valve is partially open.

97
Wedge

Molded-In Resilient Seal

Sealing Slip

Plug Valve
Figure 5.7

C. Valve Selection Process

The steps that follow provide a general procedure for selecting


valves and valve components.

1. Identify the necessary design information. This includes design


pressure and temperature, valve function, material, etc.

2. Identify potentially appropriate valve types (i.e., ball, butterfly,


check, etc.) and components based on application and function
(i.e., block, throttle, or reverse flow prevention).

3. Determine valve application requirements (i.e., design or service


limitations).

4. Finalize valve selection. Check which factors need consideration if


two or more valves are suitable.

5. Provide a full technical description. This is done by specifying the


valve type, material, flange rating, etc.

98
Exercise 1 – Determine Required Flange Rating
For the piping system described below, determine the required flange rating (or
Class) in accordance with ASME B16.5.

Pipe: 1¼ Cr – ½ Mo

Flanges: A - 182 Gr. F11

Design Temperature: 900°F

Design Pressure: 375 psig

99
VI. DESIGN

A. Design Conditions

1.0 General

Normal operating conditions are those expected to occur


during normal operation, excluding failure of any operating
device, operator error, and the occasional, short-term
variations stated in the applicable code. Startup and
controlled shutdown of plants and similar foreseeable
events are included within normal operation.

Design conditions are those which govern the design and


selection of piping components, and are based on the most
severe conditions expected to occur in service. A suitable
margin is used between the normal operating and design
conditions to account for normal operating variations.
ASME B31.3 does not specify what margins should be used
between operating and design conditions; suitable margins
are determined by the user based on his experience.

2.0 Determining Design Pressure and Temperature

The design pressure and temperature are used to calculate


the required thickness of pipe and other design details. The
design temperature is used to determine the material basic
allowable stress and other design requirements. The values
for design pressure and temperature are based on process
requirements.

Piping system design conditions generally are determined


based on the design conditions of the equipment to which
the piping is attached. Determining the piping design
conditions consists of:

1. Identifying the equipment to which the piping system is


attached.

2. Determining the design pressure and design temperature


for the equipment.

100
3. Considering contingent design conditions, such as upsets
not protected by pressure-relieving devices.

4. Considering the direction of flow between the equipment.

5. Verifying the values with the process engineer.

B. Loads and Stresses

1.0 Classification of Loading Conditions

Pipe loads are classified into three principal types: sustained


loads, thermal expansion loads, and occasional loads.

Sustained loads are those that act on the piping system


during all or most of its operating time. Sustained loads
consist of two main categories: pressure and weight. The
pressure load (caused by the design pressure) usually refers
to internal pressure, although some piping systems may also
be designed for external pressure. Design pressure is
defined as the maximum sustained pressure that a piping
system must contain without exceeding its allowable stress
limits. Design pressure is normally the governing factor in
determining the minimum required pipe wall thickness.

As shown in Figure 6.1, internal pressure produces both


circumferential (i.e., hoop) stress and longitudinal stress in
the pipe wall.

101
Sl

Sc
P
t

Sl = Longitudinal Stress

Sc = Circumferential (Hoop) Stress

t = Wall Thickness

P = Internal Pressure

Stresses Produced By Internal Pressure


Figure 6.1

The weight refers to the total design weight load. The total
weight load includes the weight of the pipe, the fluid in the
pipe, fittings, insulation, internal lining, valves, valve
operators, flanges, supports and any other concentrated
loads. The weight loads produce a longitudinal stress in the
pipe wall.

A piping system will expand or contract due to changes in its


operating temperature. Thermal expansion loads are
created when the free expansion and contraction of the
piping is prevented at its end points by connected
equipment, or prevented at intermediate points by supports
and/or restraints that are installed. The resulting loads
cause thermal stresses in the pipe. Increasing the restraint
in a system increases the loading and results in higher
thermal expansion stresses. Another cause of pipe thermal
loads can be from the thermal expansion of equipment at

102
pipe-to-equipment nozzle attachment points, causing
displacements in the piping system.

The third type of loading comes from occasional loads.


Occasional loads act during a small percentage of the
system’s operating time. Occasional loads involve seismic
and/or dynamic loading. The degree of seismic loading that
must be considered varies with geographic location and is
defined by a seismic zone (Ref. ANSI/ASCE 7). Dynamic
loads may be caused by safety-relief valve discharges, valve
operation (both opening and closing), steam/water hammer,
surge due to pump start-up and shutdown, and wind loads.

2.0 Stress Categorization

To evaluate the stresses in a piping system, it is necessary


to distinguish among primary, secondary, and peak stresses.

• Primary stresses are the direct, shear, or bending


stresses generated by the loading.
• Secondary stresses are those acting across the pipe wall
thickness due to a differential radial deflection of the pipe
wall. Secondary stresses cause local yielding and minor
distortions. Secondary stresses, unlike primary stresses,
are not a source of direct failure from a single load
application.
• Peak stresses are more localized stresses which die
away rapidly within a short distance from their origin.
Peak stresses occur in areas such as welds, fittings,
branch connections, and other piping components where
stress concentrations and possible fatigue failure might
occur. Peak stresses are considered equivalent in
significance to secondary stresses, but they do not cause
any significant distortion.

3.0 Allowable Stresses

The basic allowable stress is a function of material


properties, temperature, and safety factors. The basic
allowable stress provides an upper limit for the actual
stresses.

103
• Allowable stresses for sustained loads are established to
prevent general collapse or excessive distortion of the
piping system.
• Allowable stresses for thermal expansion loads are
established to prevent a localized fatigue failure.
• Allowable stresses for occasional loads are established
to prevent wind and earthquake type loads from
collapsing or distorting the piping system.

Actual stresses are calculated for the following load cases:

• Sustained loads
• Occasional loads
• Stress range due to differential thermal expansion

The piping system is designed such that the calculated


stresses are no larger than the appropriate allowable
stresses.

Table 6.1 (excerpted from ASME B31.3 Table A-1) lists


basic allowable stresses in tension versus temperature for
several materials.

104
Basic Allowable Stress S, ksi. At Metal Temperature, °F.
Material Spec. No/Grade 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500

Carbon Steel A 106 B 20.0 20.0 20.0 20.0 18.9 17.3 16.5 10.8 6.5 2.5 1.0

C - ½Mo A 335 P1 18.3 18.3 17.5 16.9 16.3 15.7 15.1 13.5 12.7 4. 2.4

1¼ - ½Mo A 335 P11 20.0 18.7 18.0 17.5 17.2 16.7 15.6 15.0 12.8 6.3 2.8 1.2

18Cr - 8Ni pipe A 312 TP304 20.0 20.0 20.0 18.7 17.5 16.4 16.0 15.2 14.6 13.8 9.7 6.0 3.7 2.3 1.4

16Cr - 12Ni-2Mo A 312 TP316 20.0 20.0 20.0 19.3 17.9 17.0 16.3 15.9 15.5 15.3 12.4 7.4 4.1 2.3 1.3
pipe

ASME B31.3, Table A-1 (Excerpt),


Basic Allowable Stresses in Tension for Metal
Table 6.1

C. Pressure Design of Components

1.0 General

Two different types of pressure may be imposed on a piping


system: external or internal. Most piping systems need only
be designed for internal pressure. Some piping systems
may be subject to a negative pressure or vacuum condition
during operation (e.g., process vacuum conditions, steam-
out, underwater lines, etc.) and must be designed for
external pressure. This section only discusses the internal
pressure design of straight sections of pipe. Refer to ASME
B31.3 for design requirements for external pressure.

2.0 Required Wall Thickness for Internal Pressure of


Straight Pipe

The required wall thickness for internal pressure is


calculated using the following equation:

PD
t=
2 (SE + PY )

Where:

t = Required thickness for internal pressure, in.

P = Internal design pressure, psig

105
S = Allowable stress in tension (Table 6.1), psi

E = Longitudinal-joint quality factor (Table 6.2)

Y = Wall thickness correction factor (Table 6.3)

The longitudinal-joint quality factor is based on:

• Whether the pipe is seamless or has a welded


longitudinal seam

• The pipe material and welding process (if welded pipe)

The wall thickness correction factor is based on the type of


steel and the design temperature.

106
Spec. Class (or Type) Description Ej
No.

Carbon Steel

API ... Seamless pipe 1.00


5L ... Electric resistance welded pipe 0.85
... Electric fusion welded pipe, double butt, straight or 0.95
spiral seam
Furnace butt welded

A 53 Type S Seamless pipe 1.00


Type E Electric resistance welded pipe 0.85
Type F Furnace butt welded pipe 0.60

A 106 ... Seamless pipe 1.00

Low and Intermediate Alloy Steel

A 333 ... Seamless pipe 1.00


... Electric resistance welded pipe 0.85

A 335 ... Seamless pipe 1.00

Stainless Steel

A 312 ... Seamless pipe 1.00


... Electric fusion welded pipe, double butt seam 0.85
... Electric fusion welded pipe, single butt seam 0.80

A 358 1, 3, 4 Electric fusion welded pipe, 100% radiographed 1.00


5 Electric fusion welded pipe, spot radiographed 0.90
2 Electric fusion welded pipe, double butt seam 0.85

Nickel and Nickel Alloy

B 161 ... Seamless pipe and tube 1.00

B 514 ... Welded pipe 0.80

B 675 All Welded pipe 0.80

ASME B31.3, Table A-1B (Excerpt),


Basic Quality Factors for Longitudinal Weld Joints, Ej
Table 6.2

107
Temperature, °F
Materials 900 & lower 950 1000 1050 1100 1150 & up
Ferritic 0.4 0.5 0.7 0.7 0.7 0.7
Steels
Austenitic 0.4 0.4 0.4 0.4 0.5 0.7
Steels
Other 0.4 0.4 0.4 0.4 0.4 0.4
Ductile
Metals
Cast iron 0.0 ... ... ... ... ...

ASME B31.3, Table 304.1.1 (Excerpt),


Values of Coefficient Y
Table 6.3

Two additional thickness allowances must be considered to


determine the final required pipe wall thickness: corrosion
allowance and mill tolerance.

Corrosion allowance (CA) is an additional thickness that is


added to account for wall thinning and wear that can occur in
service. The corrosion allowance is based on experience
and data for the particular pipe material and fluid service.
Thus:

tm = t + CA

Where:

tm = Total minimum required wall thickness, in.

Mill tolerance accounts for the difference between the actual


manufactured pipe wall thickness and the “nominal” wall
thickness specified in the relevant pipe dimensional
standard. The typical pipe mill tolerance is 12.5%. This
means that the as-supplied pipe wall thickness can be up to
12.5% thinner than the nominal thickness and still meet its
specification requirements. Use the following equation to
determine the minimum required nominal thickness to order:

108
tm
t nom =
0.875

Where:

tnom = Minimum required nominal pipe wall thickness, in.

Each pipe size has several standard nominal thicknesses


that are available. The nominal pipe thickness that is
specified for a system must be selected from those readily
available and be at least equal to tnom.

3.0 Curved and Mitered Pipe Segments

The minimum required thickness of curved pipe (elbows or


bends) is the same as that required for straight pipe
sections. A mitered bed is fabricated by welding straight
pipe sections together to produce the direction change. A
mitered bend is generally less expensive than a wrought
elbow for large pipe sizes (over ~ NPS 24). The minimum
required thickness for a miter may be greater that that of the
connected straight pipe sections, depending on the number
of miter welds, design conditions, size, etc. Refer to ASME
B31.3 for thickness calculation requirements.

109
SAMPLE PROBLEM 2 - DETERMINE PIPE WALL THICKNESS

A piping system must be modified to add a new, spare heat exchanger. You
have been assigned the responsibility to determine the required wall thickness
for the pipe from the heat exchanger to several pumps. The piping system will
have a design temperature of 650°F. The design pressure is 1,380 psig. The
pipe outside diameter is 14 in. The material is ASTM A335, Gr. P11 (1¼ Cr – ½
Mo), seamless. Corrosion allowance is 0.0625 in.

What is the minimum required thickness for this pipe?

SOLUTION

The following equation applies:

PD
t=
2 (SE + PY )

Based on the given information:

P = 1,380 psig.

D = 14 in.

For the A335, Gr. P 11 material:

S = 16,150 psi. [Table A-1 of ASME B31.3 at 650°F

E = 1.0 [Table A-1B of ASME B31.3]

Y = 0.4 [Table 304.1.1 of ASME B31.3, since the


material is ferritic and the temperature is below
900oF.

Since all the required parameters have now been determined, the required
internal pressure thickness may be calculated as follows:

110
1,380 × 14
t=
2 [(16,150 × 1) + (1,380 × 0.4)]
t = 0.577 in.

In this case, a 0.0625 in. corrosion allowance has been specified.

Therefore:

tm = t + c = 0.577 + 0.0625

tm = 0.6395 in.

0.6395
tnom = = 0.731 in.
0.875

4.0 Branch Reinforcement Requirements

A pipe with a branch connection is weakened by the required


opening. Unless the wall thickness of the pipe is sufficiently
greater than that required to sustain the pressure, additional
reinforcement must be provided.

ASME B31.3 contain rules for determining the required


reinforcement for both welded and extruded outlet-type
branch connections. Branch connections can also be made
using forged or wrought fittings (i.e., tees, laterals, crosses,
couplings, or half-couplings), or an integrally reinforced
branch connection. Reinforcement calculations are not
required for forged or wrought type branch connections
because they have adequate inherent reinforcement and
have been designed and tested to meet ASME B31.3
requirements. This section discusses only branch
connections that are fabricated by welding a branch pipe to
the run pipe.

111
4.1 Area Removed By Branch Connection

A volume of metal is removed from a pipe wall when a


hole is cut in it for a branch connection. However, a
simplification is made when evaluating branch
reinforcement requirements.

An imaginary plane is passed through the branch and


run pipes, and the intersection is viewed in cross-
section. The removed volume of pipe wall is then
looked at as an area (see Figure 6.2).

Db
Tb
Nom. Reinforcement
Reinforcement tb c Zone Limits
Thk.
Zone Limits
Mill
Tol.

A3
A3
L4 A4
A4

A1
Tr

c th
Th

Dh d1
Mill A2 A2
Tol.
Nom. d2 d2
Thk.
β
Pipe C

Welded Branch Connection


Figure 6.2

4.2 Limits of Reinforcement Zone

The reinforcing zone is the region where credit may


be taken for any reinforcement that is present. The
branch connection must have adequate reinforcement
to compensate for the weakening caused by cutting a
hole in the run pipe. This reinforcement:

112
• Must be located reasonably close to the opening
to provide any practical benefit.

• May be located in the branch pipe, the run pipe, or


both.

Additional material located outside of this zone is not


effective for reinforcement.

4.3 Branch Connection Reinforcement

Branch connection reinforcement located within the


reinforcement zone may come from one or more of
the following sources.

• Excess thickness available in the branch or


header pipe.
• Additional reinforcement added in the form of a
pad, ring, saddle, or weld metal.

If excess thicknesses in the branch and header pipes


do not provide enough reinforcement, additional metal
may be added.

4.4 Reinforcement Area

The required reinforcement area is based on the


metal area removed. This is calculated using:

D b − 2(Tb − c )
d1 =
sin β

Where:

d1 = Effective length removed from the run pipe,


in.
Db = Branch outside diameter, in.
Tb = Minimum branch thickness, in.
c = Corrosion allowance, in.
β = Acute angle between branch and header

113
The required reinforcement area, A1, is then
calculated using :

A1 = t h d1(2 − sin β)

Where:

th = Minimum required header thickness, in.

4.5 Reinforcement Pad

Additional branch reinforcement is needed when the


required area exceeds the available area, and may be
provided by locally increasing the thickness of either
the header or branch pipe. However, it is usually
more economical to provide a reinforcement pad to
supply the additional reinforcement.

There are three variables to select in designing the


reinforcement pad:

• Material
• Outside diameter
• Wall thickness

To calculate the area of the reinforcement pad, A4, the


following equation is used:

æ (D p − D b ) ö
A 4 = çç Tr
è sin β

Where:

D01p = Outside diameter of the pad, in.

Db = Outside diameter of the branch, in.

Tr = Pad thickness, in.

β= The acute angle between the branch and


header pipes.

114
The pad must be large enough to provide the
additional reinforcement needed and be within the
reinforcement zone. The pad material is generally
equivalent to that of the pipe.

The following Sample Problem illustrates the branch


reinforcement calculation procedure.

115
SAMPLE PROBLEM 3

A new steam turbine is being installed within a process plant. This will require a
new NPS 16 steam supply line to be connected to an existing NPS 24 distribution
header. The following design information has been determined:

• Pipe material - Seamless, A 106/Gr. B for both the branch and header.
• Design temperature - 700°F
• Design pressure - 550 psig
• Allowable stress - 16,500 psi.
• Corrosion allowance - 0.0625 in.
• Mill tolerance - 12.5%
• Nominal Pipe - Header: 0.562 in.
Thicknesses Branch: 0.375 in.
• Required Pipe - Header: 0.395 in.
Thicknesses for Pressure Branch: 0.263 in.
• The branch connection is made on top of the header at a 90° angle, and does
not penetrate a header weld.

Determine if additional reinforcement is required for this branch connection. If it


is, size the reinforcing pad, neglecting the area of any welds. Assume that the
pad material is equal to the header material, and that its thickness equals the
header thickness.

SOLUTION

See Figure 6.2 for the relevant nomenclature.

• The required thicknesses for pressure were given.


• Next, the value for the effective length removed from the run pipe, d1, must be
calculated. This equals the corroded inside diameter of the branch
connection after accounting for mill tolerance (i.e., the actual pipe wall
thickness may be up to 12.5% less than the nominal thickness).

Db − 2(Tb − c )
d1 =
sin β

116
16 − 2(0.375 × 0.875 − 0.0625 )
d1 =
sin 90°
d1 = 15.469 in.

• Now the required reinforcement area, A1, may be calculated.

A1 = t h d1 (2 − sinβi

A1 = 0.395 × 15.469 (2 − sin90°)

A1 = 6.11in.2

The available reinforcement areas in the header and branch pipe are now
calculated. This is determined using any “excess” thickness available in the
header and branch that is not necessary to withstand the pressure (or other)
loads. Disregard any contribution from nozzle attachment welds since this is
minimal.

• Calculate the excess area available in the header, A2.

A2 = (2d2 − d1)(Th − th − c )

First determine d2 which is the greater of d1, or,

d1
(Tb−c ) + (Th−c ) +
2 , but less than the header diameter, Dh

(0.875 × 0.375 − 0.0625 ) + (0.875 × 0.562 − 0.0625 ) + 15.469 = 8.43 in.


2

∴ d2 = d1 = 15.469 in., which is less than the header diameter of 24 in.

A2 = (2 x 15.469 - 15.469) (0.875 x 0.562 - 0.395 - 0.0625)

A2 = 0.53 in.2

• Calculate the excess area available in the branch, A3.

117
2L4(Tb − tb−c )
A3 =
sin β

First determine L4.

L4= 2.5 (Th−c ) or 2.5 (Tb−c ) + Tr, whichever is smaller .

Since Tr = 0 (i.e., no reinforcing pad initially) and Th is greater than Tb, L4 is


based on the second equation.

L4 = 2.5 (0.875 x 0.375 - 0.0625)

L4 = 0.664 in.

2 × 0.664 (0.875 × 0.375 − 0.263 − 0.0625 )


A3 =
sin 90°

A3 = 0.003 in.2

• Calculate other excess area that may be available, A4.

There is no reinforcing pad and the area contribution from the branch weld is
being disregarded. Therefore, A4 = 0.

• Total Available Area:

The total available reinforcement area, AT, is calculated by adding the


contributions from each source.

AT = A2 + A3 + A4

AT = 0.53 + 0.003 + 0

AT = 0.533 in.2 available reinforcement.

The available total reinforcement of 0.533 in.2 is obviously much less than the
required reinforcement area of 6.11 in.2. Therefore, a reinforcing pad is
required. The reinforcement pad will now be sized.

118
A106, Gr. B material will be used for the reinforcement pad. Its thickness is
set to be equal to the header nominal thickness of 0.562 in.

• Recalculate Available Reinforcement:

Now that a reinforcing pad is being used, the available reinforcement in the
branch must be recalculated since the height of the reinforcement zone in the
branch pipe will change slightly.

L41 = 2.5 (Th - c)

L41 = 2.5 (0.875 × 0.562 - 0.0625)

L41 = 1.073 in.

L42 = 2.5 (Tb - c) + Tr

L42 = 2.5 (0.875 × 0.375 - 0.0625) + 0.562 (0.875)

L42 = 1.16 in.

Therefore, L4 = 1.073 in.

2L 4 (Tb − t b − c)
A3 =
sin β

2 × 1.073 (0.875 × 0.375 − 0.263 − 0.0625)


A3 =
sin 90 o

A 3 = 0.005 in.2 (vs. the 0.003 in.2 previously calculated)


A T = A 2 +A 3 + A 4
A T = 0.53 + 0.005 + 0
A T = 0.535 in.2 available reinforcement

• Calculate additional reinforcement required and the pad dimensions:

The required reinforcement area is 6.11in.2, and the available area is 0.535
in.2. Therefore, the additional reinforcement area to be provided in the pad,
A4, is:

119
A4 = 6.11 - 0.535

A4 = 5.575 in.2

• Determine the diameter of the pad, Dp.

Tr = 0.562 (0.875) = 0.492 in.

Db = 16 in.

A4 Db
Dp = +
Tr sin β
5.575
Dp = + 16
0.492
D p = 27.3 in.

The pad diameter must be at least 27.3 in. to provide adequate


reinforcement. Since 2d2 = 30.938 in., this pad diameter is within the
reinforcement zone along the header and is acceptable.

The following approach of calculating the required pad width, Lr, may be used
as an alternative to calculating the pad diameter.

0.5 A4
Lr =
Tr
0.5 × 5.575
Lr =
0.492
L r = 5.66 in.

120
EXERCISE 2: DETERMINE REQUIRED PIPE WALL
THICKNESS

A new project is being considered to transport 48° API crude oil in a carbon steel
pipe between two areas within a tank farm. The fluid being transported will have
a design temperature of 260°F. The system design pressure is 150 psig, the
pipe outside diameter is 30 in., and the pipe being used is A 106, Gr. B seamless
pipe. A corrosion allowance of 1/8 in. has been specified for the pipe. All piping
within the tank farm is designed in accordance with ASME B31.3. Assume there
is a 12.5% mill tolerance.

a. What is the thickness required for internal pressure?

b. What is the minimum required nominal wall thickness?

Use Table 6.1 along with Tables 6.2 and 6.3 for the necessary information.

121
VII. SYSTEM DESIGN

A. Layout Considerations

Operational, maintenance, and safety considerations influence the


layout of a piping system. These factors must be recognized when
designing the layout and spacing of piping and equipment. This
section discusses how these factors influence piping layout.

1.0 Operations Requirements

Operating and control points (e.g., valves, flanges,


instruments, sample points, drains, and vents) should be
located so that they can be used safely and easily. For
example, valves must be located so that they can be
reached.

There must be enough clearance above and below the pipe


to perform basic operations on valves and flanges.

There must also be enough lateral space to access valves,


sample points, vessel flanges, and other equipment that may
require operator attention.

2.0 Maintenance Requirements

The piping system must be laid out so that its components


can be inspected, repaired, or replaced with minimum
difficulty. There must be ample clearance for maintenance
equipment (e.g., cranes) and for vehicles (e.g., trucks).
Access must be provided so supports can be maintained.
There must be enough space to access and remove large
pieces of equipment if they require maintenance.

• Access near rotating equipment is important because


cranes must reach the equipment when removal or
realignment is required.
• Heat exchanger bundles must be pulled out for cleaning.
• Large valves must be removed to repair or replace their
seats.

122
• Rotating equipment requires frequent monitoring and
maintenance.

3.0 Safety Considerations

Piping layout must consider the safety of personnel near the


pipe. This specifically includes access for fire fighting
equipment and fire prevention. Fire fighting equipment
needs clearance to access major pieces of equipment (e.g.,
heat exchangers, vessels, and tankage). Pipeways must be
routed and designed to provide the necessary clearances.
There must be enough space beneath pipeways for people
to walk and work. Firewater piping must be routed so that it
would not be damaged by piping containing hazardous fluids
that could rupture.

B. Pipe Supports and Restraints

A piping system needs supports and restraints because of the


various loads that are imposed upon it. Supports absorb system
weight and reduce longitudinal pipe stress, pipe sag, and end point
reaction loads. Restraints control or direct the thermal movement
of a piping system. The control of thermal movement may be
necessary either to keep pipe thermal expansion stresses within
allowable limits, or to limit the loads that are imposed on connected
equipment.

Selection of a specific type of support or restraint to use in a


particular situation depends on such factors as:

• Load to be supported or absorbed.


• Clearance available for attachment to pipe.
• Availability of nearby structural steel that is already there.
• Direction of loads to be absorbed or movement to be
restrained.
• Design temperature.
• Need to permit vertical thermal movement at a support.

123
1.0 Rigid Supports

Rigid supports are used in situations where weight support is


needed and no provision to permit vertical thermal
displacement is required. A rigid support always will prevent
vertical movement downward, will sometimes prevent
vertical thermal movement upward, and will permit lateral
movement and rotation. See Figure 7.1.

Shoe Saddle Base Adjustable


Support

Dummy Support Trunnion

Rigid Supports
Figure 7.1

Hangers are a type of rigid support. They support pipe from


structural steel or other facilities that are located above the pipe
and carry piping weight loads in tension. Pipe hangers are typically

124
one or more structural steel rods bolted to a pipe attachment and to
the overhead member. A hanger rod is designed to move freely
both parallel and perpendicular to the pipe axis, and not restrict
thermal expansion in these directions. A hanger will prevent
movement both down and up. See Figure 7.2.

Hangers
Figure 7.2

2.0 Flexible Supports

Flexible or resilient supports allow the piping system to move


in all three directions while still supporting the required
weight load. Weight is supported by the use of a coil spring
having an appropriate stiffness to carry the applied weight

125
load. Since the spring is resilient, it permits vertical thermal
movement while still carrying the weight. This type of
support is used in situations where support must be provided
at a particular location, and vertical thermal expansion must
also be permitted.

There are two basic types of flexible supports: variable load


and constant-load-type. In the variable-load type flexible
support, the amount of vertical load exerted by the support
changes as a result of the pipe thermal movement (which
compresses or extends the spring). The amount of vertical
load exerted by a constant-load type support does not
change throughout its movement range. See Figure 7.3.

Load and Deflection Small Change in


Scale Effective Lever Arm

Large Change in
Effective Lever Arm
Relatively
Constant
Load
Typical Variable-Load Typical Constant-Load
Spring Support Spring Support Mechanism

Flexible Supports
Figure 7.3

3.0 Typical Restraints and Anchors

3.1 Restraints

Restraints have two primary purposes in a piping


system.

126
• Restraints control, limit, or redirect the unrestricted
thermal movement of a pipe. They are used to
either reduce the thermal stress in the pipe or the
loads exerted by the pipe on equipment
connections.

• Restraints absorb loads imposed on the pipe by


other conditions such as wind, earthquake, slug
flow, water hammer, or flow-induced vibration.
Excessive loads could result in high pipe stress or
equipment reaction loads, or cause flange
leakage.

There are several different types of restraints that


may be used. The selection of which type to use and
its specific design details depends primarily on the
direction of pipe movement that must be restrained,
the location of the restraint point, and the magnitude
of the load that must be absorbed. It is also possible
to restrain more than one direction at one location in a
piping system, or to combine a restraint with a
support.

3.2 Anchors

An anchor is a special type of restraint that stops


movement in all three directions. Anchors provide full
fixation of the pipe, permitting very limited, if any,
translation or rotation. An anchor is used in situations
where it is necessary to totally isolate one section of a
piping system from another from the standpoint of
load and deflection. A total anchor that eliminates all
translation and rotation at one location is not used as
commonly as one or more restraints that act at a
single location. A directional anchor which restrains
the line only in its axial direction is more commonly
used. Figure 7.4 provides several examples of
anchors.

127
Anchor Anchor Partial Anchor

Restraints/Anchors
Figure 7.4

3.3 Guides

A guide is a particular type of restraint that permits


movement along the pipe axis while preventing lateral
movement. Depending on the particular guide details
employed, pipe rotation may or may not be restricted.
Common situations where guides are used are in long
pipe runs on a pipe rack to control thermal movement
and prevent buckling, and in straight pipe runs down
the side of a tower to prevent wind-induced
movement and control thermal expansion. See
Figure 7.5.

128
Guide Guide

Guide
Vertical Guide

Examples of Guides
Figure 7.5

C. Piping Flexibility

Piping must have sufficient flexibility to accommodate thermal


expansion (or contraction) effects. Piping systems must be
designed to ensure that they do not fail because of thermal
stresses or produce excessive forces and moments at connected
equipment. If a system does not provide adequate flexibility, the
results can be leaky flanges, fatigue failure of the pipe, excessive
maintenance, operations problems, and damaged equipment.

129
A structure that is subject to a change in temperature will change in
dimensions. If these thermal movements are allowed to occur
without any restraint whatsoever, no pipe stresses or reaction loads
result. However, in real systems, stresses are developed in the
pipe and moments and forces are imposed on the connected
equipment and at supports and restraints installed in the system.
The basic problem is to determine the internal pipe stresses and
the external loads, and then decide if they are acceptable. A
thermal flexibility analysis is done to ensure that the piping system
is laid out, supported, and restrained such that the thermal stresses
in the pipe and the loads on the end points are within allowable
limits.

1.0 Rationale for Piping Flexibility and Support Design

Support and flexibility design is a combination of art and


science with multiple factors to consider and usually more
than one way to design the system. It requires knowledge of
how the operating and design conditions of a piping system
influence its overall design, and the supports and restraints
required for the system.

A piping system can be described as an irregular structural


frame in space because of its relatively slender proportions
when compared to structural steel systems. Elevated design
temperatures or various operating scenarios may cause
sufficient pipe thermal stress or reduce material strength
such that supplementary structural assistance to support the
piping system is required. It is also often necessary to limit
the pipe movement at specific locations to protect sensitive
equipment, control vibration, or to resist external forces (e.g.,
wind, earthquake, or shock loading).

Attention must also be paid to pipe support/restraint design


details to ensure that localized stresses in the pipe wall are
kept within allowable limits. In those situations, design
details that spread the applied load over a wider portion of
the pipe surface are used.

Planning for pipe supports and restraints should be done


simultaneously with establishing possible layout
configurations to achieve the most cost-effective design.

130
2.0 Approaches to Design

Due to the complexity of the piping flexibility and support


design process, there is no single procedure or design
method applicable for all situations. The following is one
way to approach the problem.

• Examine the layout and operation of the piping system to


identify:
- Layout geometry.
- Pipe diameter and thickness, and locations of any
changes in these parameters.
- Piping component design details such as branch
connection details and type of elbows used (i.e., long
radius or short radius).
- Design temperature and pressure.
- Fluid service, including its potential danger.
- End-point movements.
- Type of connected equipment (i.e., rotating or fixed).
- Locations of existing structural steel.
- Relevant operating scenarios.
- Special design considerations (e.g., wind, vibration-
prone services, orientation of loads).
• Determine the potential effects of those conditions (e.g.,
thermal movements, loads, and stresses).
• Determine the types of support or restraint required and
their approximate locations.
• Determine if the situation warrants a detailed computer
analysis.
• If required, identify which conditions apply for the
analysis and utilize an appropriate computer program.
• Interpret the results of the analysis.

131
D. Required Design Information for Piping Stress Analysis

Detailed piping stress analysis is done using a computer program


such as Caesar II, Simflex, or Triflex. Such programs have the
capability to consider any combination of pipe geometry, support,
restraint, and load conditions. However, several things must be
considered:

• Applicable design conditions and operating scenarios for the


piping system.
• Allowable stresses from ASME B31.3.
• Load limitations, if any, on connected equipment.
• Extent of analysis required to identify most severe case.

Design conditions that must be known to perform a detailed pipe


stress analysis are listed below:

• Layout geometry of the piping system.


• Pipe diameter and wall thickness.
• Design temperature and pressure.
• Fluid service, including whether it is dangerous.
• End-point movements.
• Type of connected equipment.
• Structural steel located in the vicinity.
• Special design considerations and load cases.

Another consideration is the number of cycles that the system will


undergo during its design life. This influences piping flexibility
design because the allowable flexibility stress is based on fatigue
failure. All ASME B31.3 piping systems are designed for a
minimum of 7000 cycles. Systems that will undergo more than
7000 operating cycles during their design life are designed using a
reduced allowable stress basis.

E. Criteria for Allowable Equipment Nozzle Loads

A poorly designed piping system can cause damage to the


equipment it is connected to, whether the equipment is a rotating

132
type (e.g., pump or compressor) or stationary type (e.g., pressure
vessel or heat exchanger). Rotating equipment is the more
sensitive with respect to imposed piping loads because of the
moving parts and small clearances involved in its design.
Excessive piping loads imposed on rotating equipment can cause
damage, poor operation, and/or maintenance problems at levels
well below those that would cause pipe or equipment stress
concerns.

Loads that are imposed by the piping system on connected


equipment are determined from the results of the piping flexibility
analysis. These loads are then compared to allowable values
based on industry standards for particular types of equipment to
determine if they are acceptable. The allowable values can
sometimes be read from a table contained in the applicable industry
standard. Other times, the allowable loads or the equipment
stresses that they cause must be calculated. Equipment vendors
will sometimes have allowable load criteria that must be
considered. Table 7.1 summarizes industry standards that apply to
equipment nozzle load evaluations, and the parameters that are
used to determine the allowable loads.

Parameters Used
Equipment Item Industry Standard To Determine
Acceptable Loads

Centrifugal Pumps API-610 Nozzle size

Centrifugal Compressors API-617, 1.85 times Nozzle size, material


NEMA SM-23 allowable
Air-Cooled Heat Exchangers API-661 Nozzle size

Pressure Vessels, Shell- ASME Code Section Nozzle size, thickness, reinforcement
and-Tube Heat Exchanger VIII, WRC-107, details, vessel/exchanger diameter,
Nozzles WRC-297 and wall thickness. Stress analysis
required.

Tank Nozzles API-650 Nozzle size, tank diameter, height,


shell thickness, nozzle elevation.

Steam Turbines NEMA SM-23 Nozzle size

Equipment Nozzle Load Standards and Parameters


Table 7.1

133
F. When Should A Computer Analysis Be Used

Computer programs can perform numerous analyses with many


different combinations of design conditions and system geometries.
They can perform many functions that would be difficult for a piping
analyst to do “by hand.” Computers can also perform unique
functions that would be difficult or impossible to do by hand or other
methods with sufficient accuracy. Even though hand calculations
can be used in many situations, a computer program can often be
used to finalize and optimize the final design.

A computer analysis should also be used when there are several


operating combinations to be considered and other methods would
be inadequate or too time consuming, when greater accuracy is
required due to the nature of the system, and for complicated piping
systems. Computer programs are also very useful for analyzing the
stresses and loads at piping components such as valves, branches,
and bends. A piping system designer should remember that a
computer program only gives quantitative guidelines, to which they
must apply common sense and judgement.

The guidelines listed in Table 7.2 may be used to help determine


when a computer analysis should be performed:

Type Of Piping Pipe Size, NPS Maximum Differential


Flexibility Temp.
General piping ≥4 ≥ 400°F
≥8 ≥ 300°F
≥ 12 ≥ 200°F
≥ 20 any
For rotating equipment ≥3 Any
For air-fin heat exchangers ≥4 Any
For tankage ≥ 12 Any
Computer Analysis Guidelines
Table 7.2

G. Design Considerations for Piping System Stress Analysis

The following paragraphs discuss several design considerations in


piping system stress analysis.

134
1.0 Piping Flexibility Temperature

Flexibility analysis should be made for the largest


temperature difference that may be imposed on the pipe by
normal and abnormal operating conditions. This results in
the largest pipe stress range to be considered in fatigue
failure evaluation, and the largest reaction loads imposed on
equipment end connections, supports, and restraints.
Tables 7.3 and 7.4 provide guidelines to determine the
temperatures to consider in a flexibility analysis. Note that
more than one of these items might require consideration in
a particular system and lead to the need for multiple
computer calculations to identify the case that governs the
system design.

Gives the temperature range expected for most of the time a plant is in
Stable operation. Some margin above equipment operating temperature (i.e.,
Operation use of the design temperature rather than operating temperature)
allows for process flexibility.

Must be examined to determine if the heating or cooling cycles pose


Startup and flexibility problems. For example, if a tower is heated while some
Shutdown attached piping remains cold, the piping flexibility should be checked
for that case.

Regeneration Must be designed for normal operation, regeneration, or decoking, and


and Decoking switching from one service to the other. An example is the decoking of
Piping furnaces.

Requires multiple analyses to determine if the piping is adequate for


the expected variations of temperature, for no flow in some of the
Spared
piping, and for switching from one piece of equipment to another. A
Equipment
common example is the piping for two or more pumps with one or more
spares.

Normal Temperature Conditions To Consider


Table 7.3

135
Temperature changes due to a loss of cooling medium flow
Loss of Cooling should be considered. This includes pipe that is normally at
Medium Flow ambient temperature but can be blocked in, while subject to
solar radiation.

Most on-site equipment and lines, and many off-site lines, are
freed of gas or air by the use of steam. For 125 psig steam,
300°F is typically used for the metal temperature. Piping
connected to equipment which will be steamed out, especially
Steamout for Air
piping connected to the upper parts of towers, should be
or Gas Freeing
checked for the tower at 300°F and the piping at ambient plus
50°F. This situation may govern the flexibility of lines connected
to towers that operate at less than 300°F or that have a smaller
temperature variation from top to bottom.

If process flow can be stopped while heat is still being applied,


No Process Flow
the piping flexibility should be checked for the maximum metal
While Heating
temperature. Such situations can occur with steam tracing and
Continues
steam jacketing.

Abnormal Temperature Conditions To Consider


Table 7.4

Metal temperatures that govern the flexibility design of a piping


system are not necessarily the ones associated with the most
severe coincident pressure and temperature which govern the wall
thickness of the pipe. Piping flexibility depends only on the
temperature. Therefore, a condition of high temperature and low
pressure may govern the piping flexibility design while the wall
thickness is based on a higher pressure but a lower temperature.

Pipe thermal movement is caused by a temperature change from


the piping installation temperature (i.e., the ambient temperature).
Piping analysis computer programs typically include a “default”
ambient temperature (commonly 70°F). Then, all thermal
movements and resulting thermal stresses are calculated based on
the difference between the specified pipe design temperature and
the default ambient temperature. A realistic ambient installation
temperature (typically lower than 70°F) must be used for the
specific plant site to accurately calculate the maximum thermal
stress range and reaction loads.

136
2.0 Extent of Analysis

The extent of a piping system analysis depends on the


situation. The overall purpose of the analysis is to provide
enough flexibility for the system. The engineer must analyze
the right combination of operating conditions to determine
where, and if, additional flexibility is needed to reduce pipe
stresses or loads at end points. The engineer must also
decide if it is desirable and acceptable to not include portions
of a large, complex system in the analysis to simplify the
modeling. For example, including an NPS 4 branch run in
the model of a NPS 24 main system may not be necessary.
Judicious installation of anchors or other restraints in a large
system could also help simplify the modeling by separating
the system into sections.

Use the following steps to develop the piping design:

• Define line size, wall thickness, material, number of


temperature cycles, layout, maximum differential
temperature, and any alternative operating scenarios.
• Determine conditions of end-point restraint and
movements.
• Locate intermediate points of restraint and define any
limitations that they impose on piping movement.
• Select a suitable analysis method and calculate the loads
and stresses.
• Compare the results with the allowable stress range for
thermal expansion stresses, the allowable stress at
design temperature for weight-plus-pressure stresses,
and the applicable load criteria for connected equipment.

3.0 Modifying System Design

The initial piping system layout may not be satisfactory for


thermal flexibility stresses or loads on connected equipment.
The following guidelines may help the situation.

• Provide more offsets or bends, or use more expansion


loops within the same space. These make the system
more flexible and reduce the thermal stresses.

137
• Install expansion joints. However, this approach should
be the exception rather than the rule. Expansion joints
represent a "weak link" in a piping system. They may
affect the life of the system since they are more
susceptible to damage than pipe, and can create
maintenance and operational problems. Thus, the use of
expansion joints should only be considered as a last
resort. One situation where expansion joints must be
used is where pressure drop or other process
requirements dictate the use of relatively straight pipe
runs (e.g., fluidized solids transfer lines).
• Strategically locate restraints to minimize thermal and
friction loads at equipment. Restraints could also be
used to direct pipe thermal expansion into a section of
the system that has more inherent flexibility to absorb it.
• Use spring supports if large vertical thermal movements
are expected, or if thermal expansion causes pipe to lift
off fixed supports. Avoid fixed supports that result in
large thermal stresses.
• Use Teflon bearing pads at supports for large-diameter
pipe or other large weight loads if friction loads are
excessive on equipment connections or structural
members.

4.0 System Design Considerations

Each type of piping system has particular factors that must


be considered when performing a detailed analysis. For
example:

• Pump systems will often be installed with spared pumps.


Thus, various scenarios of operating vs. spared pump(s)
must be considered since portions of the system near the
pumps will be hot while other portions are cold.
• Piping systems are sometimes heat traced. This might
be done either to reduce liquid viscosity to allow the
necessary flow, or to prevent condensate accumulation.
The condition with the process flow off while the heat
tracing remains on must also be considered since the
pipe metal temperature for this case may be higher than
the normal design temperature.
• Piping systems connected to atmospheric storage tanks
must be designed considering movement that occurs at

138
the tank nozzle. When the tank is filled with liquid, the
shell will bulge outward and the nozzle will rotate down
due to this shell bulging (see Figure 7.7). Over a period
of time, the tank may also settle down into its foundation
with respect to the pipe. Because of these expected tank
movements, it is often necessary to use a flexible-type
pipe support located near the tank nozzle to ensure that
the tank nozzle is not overloaded.

NOZZLE SHELL

BOTTOM

Tank Nozzle
Figure 7.7
• It may be necessary to consider pipe frictional effects at
support points. If large enough, friction loads can restrict
pipe movement and cause unexpectedly high pipe
stresses or end point reaction loads. Typical situations
where it may be necessary to consider friction loads are
for long horizontal pipe runs, or where large concentrated
weight loads are supported near equipment nozzles.
• The most common configuration for air-cooled heat
exchanger piping uses short, straight sections of pipe to
connect the manifold to the exchanger nozzles. The
manifold is located directly above or below the exchanger
header box. The heat exchanger tube bundle is allowed
to move laterally to accommodate the thermal expansion
of the pipe manifold. The flexibility analysis should
include the restraining effect of friction from movement of
the exchanger bundle, which will resist lateral movement
of the bundle.

139
VIII. FABRICATION, ASSEMBLY, AND ERECTION

Individual sections of pipe must be fabricated into convenient sections (i.e., spool
pieces). Individual spool pieces are then assembled and erected in the field.

A. Welding and Heat Treatment

Welding is one of the primary ways of joining pipe. Welded joints


represent the ultimate in safety and reliability. All design codes call
for welding to be carried out using a qualified procedure and
welders. Included in the welding procedure are: base-metal
specification, electrode type and material, joint preparation (i.e.,
geometry), weld position (e.g., vertical, overhead, etc.), welding
process (including whether it is manual or automatic), techniques,
electrical details, preheat and interpass temperatures, and post-
weld heat treatment (PWHT) requirements.

1.0 Butt-Welds

Butt-welds are made between two components whose edges


are in close proximity. Butt-welded joints in piping systems
are primarily of the single-V configuration and are welded
from the pipe outside surface. The joint preparation and the
procedure that is used ensure that there is complete fusion
between the edges of the components being joined. Joint
designs shown in Figure 8.1 are typically used for ends of
equal thickness. The transition between ends of unequal
thickness may be accomplished by taper grinding the thicker
pipe to match the thinner, or by using weld metal to provide
a smooth transition as shown in Figure 8.2. Butt-welds are
always used to weld pipe ends together, to weld butt-weld-
type flanges or fittings to pipe ends, or to weld the edges of
formed plate together when plate is used to manufacture
pipe.

140
(a) Standard End Preparation (b) Standard End Preparation
of Pipe of Butt-Welding Fittings and
Optional End Preparation of (c) Suggested End Preparation,
Pipe 7/8 in. and Thinner Pipe and Fittings Over 7/8 in.
Thickness

Butt-Welded Joint Designs


Equal Thickness
Figure 8.1

3/32 in. max.


(a) (b) (c)

(d)

Butt-Welded Joint Design


Unequal Thickness
Figure 8.2

2.0 Fillet Weld

The fillet weld generally requires no special joint preparation.


It is an angular weld bead that joins components normally
positioned at a 90° angle to each other. The size of a fillet
weld is stated as a leg length of the largest inscribed right
isosceles triangle. In piping systems, fillet welds are only
used for slip-on flanges, socket welds, and for welding

141
attachments to piping components (e.g., reinforcing pads,
supports, etc.). See Figure 8.3.

Fillet Welds
Figure 8.3

142
3.0 Welding Preparation Steps

The following outlines the overall steps that are required for
welding.

• The individuals and equipment executing the welding


procedure must be confirmed to be qualified to produce
acceptable results.
• Internal and external surfaces to be welded shall be
clean and free from paint, oil, rust, scale, or other
material that would be detrimental to either the weld or
base metal when heat is applied.
• The ends of the components to be welded must be set to
the correct geometric shape suitable for the materials,
wall thickness, and welding process involved.

4.0 Preheating

Preheating is used, along with heat treatment, to minimize


the detrimental effects of high temperature and severe
thermal gradients that are inherent in welding. The following
identifies the benefits of preheating:

• Dries the metal and removes surface moisture which


could result in weld porosity.
• Reduces the temperature difference between the base
metal and the weld to reduce the cooling rate of the
weldment. This lowers the weld hardness and reduces
cooling/shrinkage stresses.
• Helps maintain the weld pool molten longer to permit
maximum separation of impurities.
• Helps drive off absorbed gases (e.g., hydrogen) which
could contribute to weld porosity.

5.0 Postweld Heat Treatment (PWHT)

PWHT averts or relieves the detrimental effects of high


temperature and severe temperature gradients that are
inherent in welding, and relieves residual stresses that are
created by bending and forming. Specific heat treatment
temperature and procedure requirements are specified in

143
ASME B31.3 based on the pipe material and wall thickness
being joined.

The following summarizes the principal reasons for PWHT:

• Stress relief is the most common reason for specifying


PWHT. This is the only consideration for the PWHT
requirements specified in ASME B31.3. Other reasons for
PWHT (e.g., due to process considerations) must be
specified by the user or contractor. Residual stresses will
remain in the pipe and result from shrinkage as the weld
and adjacent pipe metal cool down from elevated welding
temperatures. Residual stresses will also remain after
bending or forming processes. If these residual stresses
are too high, they can lead to premature failure of the
pipe.
• After welding the normal grades of stainless steels (i.e.,
those that are not stabilized with alloy additions), the
material must be heat treated to restore its maximum
corrosion resistance.
• PWHT is required to prevent caustic embrittlement of
welded carbon steel pipe that handles alkaline solutions.
Caustic embrittlement is a form of stress corrosion where
the residual stresses due to welding are sufficient to
cause failure.
• PWHT is sometimes necessary to reduce weld hardness
in certain materials. Minimizing weld hardness reduces
the tendency to crack, especially in certain process
environments (e.g., wet H2S).

B. Assembly and Erection

Additional piping fabrication requirements must be considered.


Several of these are discussed below.

1.0 Storage and Handling

Improper handling and storage of pipe materials and welding


filler metals can cause damage and result in poor
construction quality and failures during operation.

144
• Pipe should not be stored directly on the ground to help
prevent rainwater accumulation around the pipe, which
could result in corrosion.
• Pipe should not be stacked so high that pipes or their
coatings may be damaged.
• Fittings and valves should be stored in shipping crates or
on racks to provide protection until used.
• End protectors should be firmly attached to prevent
damage to weld bevels, flange faces, threads, or socket-
weld ends.
• Lined and coated pipes and fittings should be lifted with
wide fabric or rubber-covered slings and padding to
prevent damage.

2.0 Pipe Fitup and Tolerances

Good joint fitup is essential to making a sound weld and


minimizing the loads imposed on the piping system and
connected equipment. Depending on the welding process
used, a slight mismatch may be permissible.

• Pipe fitup for welded joints shall be as required by the


welding procedure.
• The tolerance for axial dimensions, face-to-face, center-
to-face, and location of attachments should be ±1/8 in.
maximum.
• Flattening of bends, measured as the difference between
the largest and smallest outside diameter at any cross-
section, should not exceed 5% of the nominal diameter of
the pipe (3% at the ends).
• Lateral translation of branches and connections from
centerline of run should not exceed ±1/16 in.
• Flange bolt holes shall straddle the centerlines. Rotation
of flanges, measured as the offset between elevation of
bolt holes on opposite sides of a flange centerline, should
not exceed ±1/16 in.
• The tilt of flanges measured at the periphery across any
diameter should not exceed 1/32 in. from the square
position. Use of a 1/64 in. tolerance is often necessary
for flanges at load-sensitive equipment.

145
3.0 Alignment of Pipe Attached to Load-Sensitive
Equipment

Special care must be taken for load-sensitive equipment,


especially rotating equipment. Specifically, in attaching pipe
to rotating equipment, the installation should avoid putting
excessive forces and moments on the machinery nozzles
which could result in misalignment.

• Installation of piping that is connected to rotating


equipment should preferably start at the machine nozzle
flange. This will reduce the possibility of having a large
mismatch between the pipe and machine flanges if pipe
installation is begun from the opposite end of the system.
• Bolt on succeeding pipe sections as appropriate up to the
first support. Adjust this support as required to just
contact the pipe at its bearing point. Proceed to any
other adjacent supports which should be similarly
adjusted.
• One or more field welds are typically used to join the
piping nearest to the machine with the rest of the system.
The number and location of these field welds are
determined such that they will permit final position
adjustments to achieve acceptable flange alignment at
the machine nozzle.
• Spring supports should be locked in their cold position
during pipe installation.
• All spring supports will be adjusted in the locked position
just until they contact their respective support points. If
spring-support adjustment is insufficient, modifications to
associated structural members or shimming will be
required.
• Final bolt tensioning of component flanges close to the
machinery should be done after initial alignment of nozzle
flanges.
• Piping that requires any sections to be removed for
flushing after completing field welds should have final
nozzle alignment and component flange boltup
completed after replacing flushed sections.
• For piping over NPS 3 connected to machinery, flange
alignment must be within more stringent limits than is

146
specified for general piping systems. More stringent
limits are required to minimize the loads that are imposed
by flange boltup.
• Precautions should be taken to prevent ingress of debris
into machine internals during construction of connecting
pipework.

4.0 Flange Joint Assembly

Flange joint assembly procedures directly affect the ability of


the flange to be leak-tight in service. In many low-pressure,
low-temperature, and/or nonflammable services, many rules
of good flanged joint design and makeup can and have been
violated with no adverse consequences. However, it is
dangerous to break these rules in critical, high-temperature
services since the results can be serious leakage problems
with consequent fires. The primary factors for successfully
making up a flanged joint and controlling leakage are the
following:

• Proper selection and design of the flanged joint.


• Proper preparation, inspection, and installation of the
flanged joint.
• Identifying and controlling the causes of leakage.

Flanged joint assembly and leakage control are discussed


below.

5.0 Flange Preparation, Inspection, and Installation

The following discusses the primary steps that are required


to achieve a properly assembled flanged joint.

• Redo Damaged Surfaces. Warped or badly corroded


flanges should be replaced or refaced. Reface flanges
with tool marks or scratches across the gasket seating
surface.
• Clean Faces. All gasket and flange surfaces should be
clean. Remove all burrs, rust, and dirt from flange faces
with scrapers or wire brushes.

147
• Align flanges. Flanges at rest should be within the
alignment tolerances previously discussed, with the
flanges practically mating before the bolts are installed.

Bringing the flanges into alignment should not leave any


residual stresses in the piping system. Residual stresses
could lead to flange leakage in service or overload
problems in systems that are connected to load-sensitive
equipment. This becomes more important with
increasing pipe diameter, as the residual stress increases
with increasing diameter for the same amount of
misalignment.

• Lubricate Threads and Nuts. Lubricate the bolt threads


and the nut faces where they will contact the flange.
Lubrication helps increase the amount of bolt load that
goes into tightening the flange rather than into
overcoming friction.
• Place Gasket Properly. The gasket must be centered on
the flange faces to achieve a reliable joint, but holding the
gasket in place can be a problem. If something must be
used to hold the gasket, a high-temperature grease may
be used sparingly in systems that operate at less than
200°F. No grease, paste, or adhesive should be used to
hold gaskets for systems operating at 200°F or more.
The high temperature causes these materials to burn off,
which could damage the gasket and cause leakage.

Thin cellophane tape may be used on the outside edges


of a gasket, but never on the seating surfaces. Tape on
the seating surfaces will deform the gasket during joint
assembly, burn out at operating temperature, and thus
provide a leakage path. Centering rings on spiral-wound
gaskets help by allowing the gasket to be supported in
the proper position by a few bolts while the other bolts
are inserted. Sheet gaskets should be cut so that their
outside diameter corresponds to the bolt position, again
to help centering.

• Use Proper Flange Boltup Procedure. Flanges may be


made up using a wrench and hammer, an impact wrench,
a torque wrench, or a stud tensioner. The most important
aspects of a proper boltup procedure, regardless of
method, are to:

148
- Use a "criss-cross" pattern bolt-tightening sequence,
as is used when bolting a wheel onto a car. This
approach helps to achieve a uniform bolt load around
the flange. See Figure 8.4.
- Use at least three rounds of tightening around the
flange, increasing the applied load in each round,
with two rounds at the maximum load. This
approach helps achieve uniform bolt load around the
flange circumference.
- For the most critical high-temperature or high-
pressure flanges, use a method that permits
measuring the applied load (i.e., torque wrench or
stud tensioner). In this way, there is greater
assurance that uniform bolt load is achieved. For
such applications, a maximum stud stress during
boltup of 40-50,000 psi is the normal target.

6.0 Causes of Flange Leakage

Most of the primary causes of flange leakage are directly


related to poor inspection or installation. These are
summarized below:

• Uneven Bolt Stress. An incorrect boltup procedure or


limited working space near one side of a flange can leave
some bolts loose while others crush the gasket. This is
especially troublesome in high-temperature services,
when the heavily loaded bolts relax during operation.
• Improper Flange Alignment. Improper flange alignment,
especially nonparallel faces, causes uneven gasket
compression, local crushing, and subsequent leakage.
• Improper Gasket Centering. If a gasket is off-center, it
will be unevenly compressed and more prone to leakage.
• Dirty or Damaged Flange Faces. Dirt, scale, scratches,
protrusions, or weld spatter on gasket seating surfaces
provide leakage paths or can cause uneven gasket
compression that results in leakage.
• Excessive Loads in the Piping System at Flange
Locations. Excessive piping system forces and moments
at flanges can distort them and cause leaks. Common
causes of this are inadequate flexibility, using excessive

149
force to align flanges, and improper location of supports
or restraints.
• Thermal Shock. Rapid temperature fluctuations can
cause flanges to deform temporarily and leak.
• Improper Gasket Size or Material. Using the wrong
gasket size or material can cause leakage.
• Improper Flange Facing. A rougher flange-surface finish
than specified for spiral-wound gaskets can result in
leakage.

Typical "Criss-Cross" Bolt-Tightening Sequence


Figure 8.4

150
IX. QUALITY CONTROL

A. Inspection

Prior to initial operation, each piping installation, including individual


components and overall workmanship, shall be examined. The
following requirements are based on ASME B31.3.

Defects must be identified before a piping system can be tested or


go into operation. Defect identification is especially important in
welded areas. A good weld starts with a proper design and is
executed using a qualified procedure and welder. However, the
quality that is achieved in a particular instance may not be
acceptable for a variety of reasons. The method of weld
examination needed to ensure that welds of acceptable quality are
achieved must be specified. Not all welds are inspected in the
same manner. Determining the proper type of weld inspection is a
function of technique, weld type, anticipated type of defect, location
of weld, and pipe material.

The following are common weld defects (illustrated in Figure 9.1):

• Lack of fusion between adjacent weld passes.


• Lack of fusion between weld bead and base metal.
• Incomplete penetration due to internal misalignment.
• Incomplete penetration of weld groove.
• Concave root surface.
• Undercut.
• Excess external reinforcement.
• Cracks.

Table 9.1 summarizes the primary weld inspection methods, where


they are typically used, and the types of defects they can locate.

151
Typical Weld Imperfections
Figure 9.1

152
Type of Inspection Situation/Weld Type Defect

Visual All welds • Minor structural welds


• Cracks
• Slag inclusions
Radiography • Butt welds • Gas pockets
• Girth welds • Slag inclusions
• Miter groove welds • Incomplete penetration
Magnetic Particle • Ferromagnetic materials • Cracks
• For flaws up to ¼ in. • Porosity
beneath the surface
• Lack of fusion
Liquid Penetrant • Ferrous and nonferrous • Cracks
materials
• Seams
• Intermediate weld passes
• Porosity
• Weld root pass
• Folds
• Simple and inexpensive
• Inclusions
• Shrinkage
• Surface defects
Ultrasonic Confirms high weld quality in • Laminations
pressure-containing joints
• Slag inclusions in thick plates
• Subsurface flaws
Guidelines for Weld Inspection
Table 9.1

The following inspection guidelines also apply:

• ASME B31.3 specifies weld examination requirements and


acceptance criteria based on fluid service category (i.e.,
Normal, Severe Cyclic Conditions, and Category D fluid
services).
• For P-Nos. 3, 4, and 5 materials, examination shall be
performed after heat treatment. Thus, any defects caused by
heat treatment will be present.
• For a welded branch connection, the examination of and any
necessary repairs to the pressure-containing weld shall be
completed before any reinforcing pad or saddle is added.
Thus, the reinforcement will not prevent inspection and repair.

153
• At least 5% of all fabrication shall be visually examined.
• 100% of fabrication for longitudinal welds, except in
components made in accordance with a listed specification,
shall be visually inspected.
• Random visual examination of the assembly of threaded,
bolted, and other joints.
• Random visual examination during the erection of piping.
• Not less than 5% of circumferential butt- and miter-groove
welds shall be examined fully by random radiography or
random ultrasonic examination.
• Not less than 5% of all brazed joints shall be examined, by in-
process examination.
• Piping in severe cyclical service requires additional
examination.

B. Testing

The piping system must be pressure tested after it has been


completely fabricated, erected, and inspected. The pressure test
demonstrates the mechanical integrity of the system before it is
placed into operation. The following highlights several test
requirements.

• A hydrostatic test must be used unless otherwise approved for


special situations.
• The hydrostatic test pressure at any point in a metallic piping
system shall be as follows:

a) Not less than 1½ times the design pressure.

b) For design temperatures that are above the test


temperature, the minimum test pressure shall be calculated
as follows, except that the value of ST/S shall not exceed
6.5:

1.5 PS T
PT =
S

154
Where:

PT = Minimum hydrostatic test pressure, psig

P = Internal design pressure, psig

ST = Allowable stress at test temperature,


psi

S = Allowable stress at design temperature,


psi

c) If the test pressure as defined above would produce a


stress in excess of the yield strength at test
temperature, the test pressure may be reduced to the
maximum pressure that will not exceed the yield
strength at test temperature.

• Pneumatic strength tests, when approved, shall be conducted at


110% of the design pressure.
• Instrument take-off piping and sampling system piping, up to
the first block valve, shall be strength tested with the piping or
equipment to which it is connected.

155
X. OTHER CONSIDERATIONS

A. Nonmetallic Piping

The following highlights several aspects of nonmetallic piping


design. Refer to ASME B31.3 for additional details.

Examples of nonmetallic piping include:

• Thermoplastic Piping. Piping fabricated from a plastic which


is capable of being repeatedly softened by an increase of
temperature and hardened by a decrease of temperature.
• Reinforced Thermosetting Resin Piping (RTR). Piping
fabricated from a resin capable of being changed into a
substantially infusible or insoluble product when cured at room
temperature, or by application of heat, or by chemical means.

Some differences in the design of nonmetallic piping vs. metallic


piping in normal fluid service include:

• Allowances for variations of pressure or temperature, or both,


above design conditions are not permitted. The most severe
conditions of coincident pressure and temperature will be used
to determine design conditions.
• Piping systems shall be designed to prevent thermal expansion
or contraction, pressure expansion, or movement of piping
supports and terminals from causing:
- Failure of piping supports from overstrain or fatigue.
- Leakage at joints.
- Detrimental stresses or distortions in connected equipment.
• The stress-strain behavior of most nonmetals differs
considerably from that of metals. Therefore, the assumptions
that stresses throughout the piping system can be predicted
from strains, or that displacement strains will produce
proportional stress because of fully elastic behavior of the piping
materials, are generally not valid.
• In addition to the requirements of flexibility and support for
metallic piping in normal fluid service:

156
- Nonmetallic piping shall be supported, guided, and
anchored to prevent damage to the piping.
- Point loads and narrow areas of contact between piping and
supports shall be avoided.
- Suitable padding shall be placed between piping and
supports where piping damage may occur.
- Valves and equipment that would transmit excessive loads
to the piping shall be independently supported.
• Thermoplastics shall not be used in flammable fluid service
above ground and shall be safeguarded when used in most fluid
services.
• Nonmetallic piping is joined by bonding. Bonding can be
achieved through many methods including adhesive, wrapping,
heat fusion, hot gas welding, and solvent cementing.

B. Category M Fluid Service

The following highlights several aspects of Category M fluid


service. Refer to ASME B31.3 for additional details.

Category M defines a fluid service in which the potential for


personnel exposure is judged to be significant, and a single
exposure to a very small quantity of the toxic fluid can cause
irreversible harm to breathing or points of bodily contact. The
following highlights several provisions, in addition to those specified
for normal fluid service, that apply to Category M Fluid Service.

• Design, layout, and operation of piping shall be conducted to


minimize impact and shock loads.
• Conditions which could lead to detrimental vibration, pulsation,
or resonance effects should be avoided or minimized.
• No allowances may be made for pressure-temperature
variations. The coincident pressure-temperature conditions
requiring the greatest wall thickness or the highest component
rating will determine design temperature and pressure.
• All fabrication, as well as all threaded, bolted, and other
mechanical joints, shall be visually examined.
• A sensitive leak test in addition to the required leak test must
be included.

157
• The following may not be used:
- Miter bends not designated as fittings, fabricated laps, and
nonmetallic fabricated branch connections
- Nonmetallic valves and specialty components
- Threaded nonmetallic flanges
- Expanded, threaded, and caulked joints

C. High Pressure Piping

The following highlights several aspects of high pressure piping


design. Refer to ASME B31.3 for additional details.

Design Conditions and Criteria

Piping is generally considered to be high pressure if it has a


pressure over that allowed by Class 2500 for the specific
design temperature and Material Group. However, there are
no specific pressure limitations for the application of the
rules for high pressure piping.

In most cases, the design pressure of each component in a


high pressure piping system must be at least equal to the
pressure at the most severe condition of coincident internal
or external pressure and temperature expected during
service. The design temperature of each component in a
piping system is the temperature at which, under the
coincident pressure, the greatest thickness or highest
component rating is required.

Consideration must be given to the ambient effects on a


piping system.

• The cooling of a gas or vapor may reduce the pressure


sufficiently to create a vacuum.
• The heating of a static fluid in a piping component causes
a pressure increase.
• Moisture condensation can result in atmospheric icing
when piping system design minimum temperature is less
than 32°F.

158
In any case, the design must allow the system to either
withstand or provide some type of relief from the ambient
effects.

Other effects to consider include:

• Dynamic Effects (e.g., impact, wind, earthquake,


vibration, discharge reactions).
• Weight Effects (e.g., live loads, dead loads).
• Thermal Expansion and Contraction Effects.
• Effects of Support, Anchor, and Terminal Movements.
• Allowable stresses.
• Wall thickness calculation requirements.
• No allowance for pressure above the design pressure
permitted.
• Particular fabrication details not permitted (e.g., miters).

2.0 Examination

While the examination of High Pressure Piping is very similar


to that of piping in normal fluid service, it must be more
extensive. For example, in normal fluid service, a sample
selected at random per the inspector's judgement is
sufficient to make a determination as to the acceptability of
the material. In high pressure piping, 100% of the material
and components must be examined. Also, only 5% of the
fabrication must be examined for normal fluid service,
whereas 100% of fabrication must be examined in high
pressure piping.

3.0 Testing

Prior to initial operation, each piping system shall be either


hydrostatically or pneumatically leak tested. Each weld and
each piping component (except bolting and individual
gaskets to be used during final assembly) shall be tested. If
the testing is done on the equipment prior to installation, an
additional test of the installed piping system shall be
conducted at a pressure not less than 110% of the design
pressure. If the initial testing is done on the installed piping,
then the additional test is not necessary.

159
XI. SUMMARY

A process plant piping system includes much more than just straight sections of
pipe. It also includes fittings, flange assemblies, valves, pipe supports, and
restraints. ASME B31.3 specifies the design, materials, fabrication, erection,
inspection, and testing requirements for process plant piping systems. This
course provided an overview of process plant piping system requirements,
including items that are not explicitly included in B31.3 (e.g., valve selection and
design, flexibility analysis guidelines, equipment nozzle load requirements, etc.).
Participants can use this information on their jobs, and are prepared to take more
extensive courses if appropriate.