SUB - TOTAL GENERAL 671,729.29 676,689.96 25,623.87 -20,663.21
DESCRIPCION DE MONTO TOTAL (Bs) %
MONTO TOTAL DE CONTRATO INICIAL = 671,729.29 INCREMENTO POR ORDEN DE CAMBIO 4,960.67 0.74% DIRECTOR DE OBRA MONTO TOTAL POR ORDEN DE CAMBIO #1 676,689.96 100.74%
DIRECTOR D.I.E.S.D. SECRETARIO MUNICIPAL DE DESARROLLO URBANO
RPTE. LEGAL EMP. CONST. ''CONISA" SUPERVISOR DE OBRA FISCAL DE OBRA
COMPUTOS METRICOS PROYECTO: CONST. ASFALTADO (CALLE LUIS MENDIZABAL SANTA CRUZ ENTRE LA PAZ Y 6 DE OCTUBRE) J. V. SANTA CRUZ LUGAR: J.V. SANTA CRUZ DIMENSIONES (m) Nº DE ÍTEM ITEM/DESCRIPCION UND. OBSERVACIONES PARCIAL TOTAL LARGO ANCHO ALTO AREA VECES 1 INSTALACION DE FAENAS GLB 1.00 TOTAL 1.00 2 REPLANTEO TRAZADO Y CONTROL ML 4,580.25 1 4,580.25 0.00 0.00 TOTAL 4,580.25 3 RETIRO DE LOSETAS C/CARGUIO M2 Area Todal las calles adyacentes 4,580.25 1 4,580.25 0.00 0.00 0.00 TOTAL 4,580.25 4 MOVIMIENTO DE TIERRAS CON MAQUINARIA M3 Resta Vol de Loseta -1 -458.03 de las secciones Trasnversales Calle Potosi 1 975.43 2839.76 Lira Abajo 1 526.80 Lira Arriba 1 336.76 Calle Obiltas 1 219.16 TOTAL 1,600.13 5 MEJORAMIENTO DE SUBRASANTE M2 Area Todal las calles adyacentes 4,580.25 1 4,580.25 0.00 0.00 0.00 0.00 TOTAL 4,580.25 6 CAPA SUB-BASE EST. GRANULOMETRICAMENT M3 Vol Todal las calles adyacentes 0.30 4,580.25 1 1,374.08 0.00 0.00 0.00 0.00 0.00 TOTAL 1,374.08 7 CAPA BASE EST. GRANULOMETRICAMENTE M3 Vol Todal las calles adyacentes 0.20 4,580.25 1 916.05 0.00 0.00 0.00 0.00 TOTAL 916.05 8 LIMPIEZA GENERAL DE LA OBRA M2 Area Todal las calles adyacentes 4,580.25 1 4,580.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TOTAL 4,580.25 9 REPLANTEO Y TRAZADO TUBERIAS ML De calle Lira a Oblitas 156.32 1 156.32 Nudo Oblitas y Potosi 39.39 1 39.39 de la Villarooel a Ob litas 100.77 1 100.77 0.00 0.00 0.00 0.00 TOTAL 296.48 10 EXCAVACION (0-2M) SUELO SEMIDURO M3 De calle Lira a Oblitas 156.32 0.60 0.90 1 84.41 Nudo Oblitas y Potosi 39.39 0.60 0.90 1 21.27 de la Villarooel a Ob litas 100.77 0.60 0.90 1 54.42 0.00 0.60 0.90 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TOTAL 160.10 11 CAMARA DE INSP. 1.5<H<=2M + INC. TAPA F.F. PZA 5 5.00 0.00 0.00 0.00 0.00 0.00 0.00 TOTAL 5.00 12 ASIENTO PARA TUBERIA M3 De calle Lira a Oblitas 156.32 0.60 0.15 14.07 Nudo Oblitas y Potosi 39.39 0.60 0.15 3.55 de la Villarooel a Ob litas 100.77 0.60 0.15 9.07 0.00 0.60 0.15 0.00 0.00 TOTAL 26.69 13 ML 175.60 1 175.60 0.00 0.00 0.00 TOTAL 175.60 14 PROV/TENDIDO TUBERIAS PVC SDR-41 D=8" ML De calle Lira a Oblitas 156.32 1 156.32 Nudo Oblitas y Potosi 39.39 1 39.39 de la Villarooel a Ob litas 100.77 1 100.77 0.00 1 0.00 0.00 TOTAL 296.48 15 RELLENO ZANJA TIERRA CERNIDA SIN MATERI M3 De calle Lira a Oblitas 156.32 0.60 0.20 18.76 Nudo Oblitas y Potosi 39.39 0.60 0.20 4.73 de la Villarooel a Ob litas 100.77 0.60 0.20 12.09 0.00 0.60 0.20 0.00 0.00 TOTAL 35.58 16 RELLENO Y COMP. DE ZANJAS SIN MAT. DE PR M3 De calle Lira a Oblitas 156.32 0.60 0.55 51.59 Nudo Oblitas y Potosi 39.39 0.60 0.55 13.00 de la Villarooel a Ob litas 100.77 0.60 0.55 33.25 0.00 0.60 0.55 0.00 0.00 TOTAL 97.84 17 RETIRO DE ESCOMBROS C/CARGUIO M3 0.00 0.00 0.00 0.00 TOTAL 0.00 18 CUNETA PLUVIAL M3 Potosi Izq 97.97 0.40 0.10 3.92 Potosi Izq 154.94 0.40 0.10 6.20 Potosi Izq 28.73 0.40 0.10 1.15 Potosi Der 92.18 0.40 0.10 3.69 Potosi Der 262.98 0.40 0.10 10.52 Potosi Der 131.51 0.40 0.10 5.26 Lira der 79.24 0.40 0.10 3.17 Lira IzQu 77.65 0.40 0.10 3.11 Oblitas Der 82.92 0.40 0.10 3.32 Oblitas Izq 81.31 0.40 0.10 3.25 TOTAL 43.59 19 IMPRIMACION ASFALTICA M2 0.00 0.00 TOTAL 0.00 20 CARPETA DE CONCRETO ASFALTICO E=7CM M2 0.00 0.00 TOTAL 0.00 21 HUMEDECIMIENTO DE SUELO M2 0.00 0.00 0.00 0.00 TOTAL 0.00 22 DELIMITACION DE AREAS ML 0.00 0.00 0.00 0.00 TOTAL 0.00 23 SEñALIZACION PARA LA PROTECCION AMBIEN PZA 0.00 0.00 0.00 0.00 TOTAL 0.00 24 SEñALIZACION CON PARANTE PZA 0.00 0.00 0.00 0.00 TOTAL 0.00 25 SEñALIZACION DE MADERA PZA 0.00 0.00 0.00 0.00 TOTAL 0.00 26 SEñAL DE IDENTIFICACION PZA 0.00 0.00 0.00 0.00 TOTAL 0.00 27 MONITOREO DE RUIDO PTO 0.00 0.00 0.00 0.00 TOTAL 0.00 28 MEDICION DE GASES AN1 0.00 0.00 0.00 0.00 TOTAL 0.00 29 MEDICION CALIDAD DE AIRE AN1 0.00 0.00 0.00 0.00 TOTAL 0.00 30 EQUIPO CONTRA INCENDIOS PZA 0.00 0.00 0.00 0.00 TOTAL 0.00 31 BOTIQUIN PRIMEROS AUXILIOS PZA 0.00 0.00 0.00 0.00 TOTAL 0.00 32 CAPACITACION AMBIENTAL EV1 0.00 0.00 0.00 0.00 TOTAL 0.00 33 CONTENEDORES DIFERENCIADOS PZA 0.00 0.00 0.00 0.00 TOTAL 0.00 34 CONTENEDORES DIFERENCIADOS DE ACOPIO PZA 0.00 0.00 0.00 0.00 TOTAL 0.00