REPORT
BAO CAO
TEST RESULT ON QUANLITY OF BORED PILES TIP BY
CORE DRILL METHOD.
KET QUA KIEM TRA CHAT LUQNG MUI CQC KHOAN NHOI
BANG PHUONG PHAP KHOAN LOI.
HANG MYC CONG TRINH | BORED PILES PIER P18 - TRA KHUC BRIDGE.
WORK ITEMS COC KHOAN NHOI TRY P18 - CAU TRA KHUC.
"| HANG MYC THI NGHIEM. | PILE C0.
TESTING ITEM. COC CH.
THE ENGINEER
(Resident Engineer)!
Peter Dinan
Resident Engineer
REPORT ON CORE DRILL TEST i PI8D TRA RHUC BRIDGEDA HANG-QUANG NGAIEXPHESSWAY DEVELOPMENT PROIEGT
PACKAGE AS : FROM KM 124+700 TO KM 1394204
Sein Pposco eac
CDM suru Inc
Posco Ec
CONTENT
NOIDUNG
1. GENERAL INTRODUCTION/GIOL THIEU CHUNG
2. APPLIED STANDARDS /TIEU CHUAN AP DUNG
oe THC HIEN
5. EVALUATION OF TEST RESULT /DANH GIA KET QUA THI NGHIEM
TOM TAT TRINH TU THI NGHIE
6. APPENDIX( TEST RESULT AND ON-SITE DIARY )
PHU LUC (KET QUA THI NGHIEM VA NHAT KY HIEN TRUONG)
REPORT ON CORE DRILL TEST Pi8 TRA RHUC BRIDGETA HANG-QUANG NGATEXPRESSWAY DEVELOPMENT PROJECT
PACKAGE AS : FROM KM 124¢700 TO KM 139+204
Min posco esac
com suiTH nc Osco E&c
1. GENERAL INTRODUCTION/GIOI THIEU CHUNG
Tra Khu Bridge of Da Nang — Quang Ngai expressway project is permanent
reinforced concrete bridge with foundation structures as bored pile foundation.
Céu Tra Khiie thuge dy dn dudng cao tée Da Nang - Quang Ngai la cdu bé
-moentng-cbt-thép.vinh.ctin.c6.Két.cdu méng. la. méng.coc Khoa, Bh
Core drilling work is carried out at 15h on 26/03/2016 and finish 19h on
26/03/2016 at pile No.03 pier 18 with diameter 1200mm under Tra Khuc Bridge
2, APPLIED STANDARDS AND TESTING METHOD
TIEU CHUAN AP DUNG VA PHUONG PHAP THI NGHIEM
Technical specifications of Da Nang — Quang Ngai expressway project.
Chi dan kf thudt thi cong du dn duong cao téc Da Ning — Quang Ngai
- Package AS/G6i thdu sé AS.
- ASTMC39/C39M: Standard Test Methods for Compressive Strength of Cylindrical
Concrete Specimens/ Tiéu chudin ASTM C39 /C39M Xée dink cng dé nén bé
tong:
ASTM C39/C39M: Methods of sampling, production and maintenance/ Tiéu chudn
ASTM C39/C39M . Phuong phip ldy méu, ché tao vas bdo cheting mii that
- TCXD 239:2006: Determination of concrete strength on the work structure/
Tiéu chudin TCXD 239 : 2006. Danh gid cudng ap bé tong trén két cdu cng trinh.
- 22 TCN 259:2000: Process of exploratory drilling of engineering geology/
22 TCN 259 : 2000. Quy trinh khoan thim do dia chit céng trinh.
- TCXDVN 326:2004: Bored piles- Construction and Acceptance Standards/
TCXDVN 326 : 2004 Coc khoan nhéi—Tiéu chudn thi cing va nghiém thu.
- TCXD 88-1982: Piles- Method of on-site test/ ICXD 88 - 1982 : Coc - phuong
hap thi nghiém hién treéng.
REPORT ON CORE DRILL TEST 3 PIS OTRA KHUC BRIDGEDA HANO-QUANG NGAIEXPAES SWAY DEVELOPMENT PROJECT
PACKAGE AS : FROM KM 124#700 TO KM 139+204
@ Quin posco esac
VEC
COM SMITH INC
SUPERVISION CONSULTANT CS1 posee ees:
3. TESTING APPARATUSES/THIET B] THI NGHIEM
Specialised equipments used in test as follows/ Cong tdc thi nghiém sit dung ede thiét bj
chuyén dung.
= Geological drill XY-1, top of the drill made by diamond/ Mdy khoan dja chdt XY-
thép-khoanjkhoan-méu-béng mitt khoan kim-cwrongess<-~=-
- Cutting machine, ruler, caping mould, sulphyr mix/ Méy edt mdu, thude kep,
Khuén caping va hon hop heu hujnh. -
- Compressing machine 200 ton (MO CRS 83 apy d the other auxiliaries/
Méy nén 200 tén (MODEL TYA— Rg Hb piu tr Ede
4. TEST SEQUENCE AND VOLUME OF WOK) /TRINH TY THI NGHIEM
VA KHOI LUQNG THUC HIEN
4.1 Test sequence /Trinh tye thi nghiém
- Operating core drilling work at site in accordance with geological drilling process.
T6 chite thyee hién céng tée khoan lay mu tai hign trudng theo quy trinh khoan
théim de dia chat c6ng trinh.
- Maintenance of sample in accordance with stipulated process/ Bao dudng, gia
céng mau theo qui trinh qui dinh.
- Carrying out testing compressive strength of concrete cylinder sample when it has
enough conditions in accordance with stipulated standards! Tién hanh thi nghiém
nén mau khi mau dim bdo dis diéu kign thi nghiém theo tiéu chudn qui dinh.
- Making test reports (attached appendix Lap bdo cdo két qua thi nghiém. (Cé ede
hu luc kém theo)
4.2 Volume of works /Khdi legng thyc hign
PIER P18 / TRY P18
No/ | Pilenumber | Remark
1T Sé higu coc Ghi chit
1 P18-C03
"REPORT ON CORE DRILL TEST + PIB OTRARAUC BRIDGEA NANG-QUANG NGAIEXPRESSWAY DEVELOPMENT PROJECT
PACKAGE AS : FROM KM 124+700 TO KM 1394204
@ POSCO e2.c
VEC
DANANG - QUANG NGALEPMU Posco csc
4.3 CAc théng s6 coc thi nghigm P18-C03 clu Tra Khic.
Actual Design Actual
tube top | Actual tube | pile cut | pile toe
No | Tencoe | £1¥: | Bottometev. | offetev. | elev. | Wrst date-
“| Caodg | Caodpday | Caodp | Caoag | EY
weve-|-dinh.6ng..|....dng (mn).....|..cdt.ege | day ege |. NEMEM |
(m) (m) (m)
o1_| P18-Co3 =13.705 | +3.945 | -14.705 | 26/03/2016
4.4 M6 ta két qua khoan ZEN
2,
Acttal | Actual Sample-miu khoan
top | yore ears Diameter]
Pite | ‘lev 1 Chi sample
Cao | et "| Dud
ig
name | “Gy | Ca006| dat | ioh mk Length.
day | Khoan | M08 miu) | ene Deseripti
dinh (mm) " ption
ng (m) Stt | dai Mé ta
éng
(a) (m) (cm)
+ From elevation
-13.705m to -14.705m_
is Concrete sections
undisturbed samples
including 03 samples
collected: samples 1
with length of 44cm,
samples 2 with length
P18 - of 47cm and samples 3
cos. | +6706 | -13.708 | 1.65 2B ‘vith length of 7 Bem,
1 | 988
+ Tit cao dp -13.705m
dén cao dp -14.705m la
phan bé tong miu
nguyen dgng thu duge
gdm 03 mau: miu I dai
‘44cm, miiu 2 dai 470m
va mau 3 dai 7.8cm
2] 16 + From elevation
REPORT OW CORE DRILL TEST 3 PRCA TEREA HANO-QUANG NGAIEKPRESSWAY DEVELOPMENT PROIECT
Pi
PACKAGE AS : FROM KM 124+700 TO KM 1394204
S vec
ve
Brin
DANANG .QUANG NGALEPIU
COM SMITH Nc
SUPERVISION CONSULTANT CS1
posco eac
POSCO ERC
deposition drilling
thickness 1.6cm
+ Tie cao dp -14.705m
én -14.721m la lop
mitn khoan ling dong
weep fee AY DOOM sal
+ From elevation
-14.721m to -15.355m
is geological layers:
7X gray-black Granite.
LAS 8: + Tic cao d6 -14,72Im
én cao dp -15.355m li
lép dja chat: dé Granit
mau xim den,
5. EVALUATION OF TEST RESULT /DANH GIA KET QUA THT
NGHIEM
After reviewing and analyzing recorded data from core drilling and test
result of compressive strength of drilled core sample in the on-site laboratory, we
have some comments as follows:
Sau khi xem xét phan tich cdc sé liéu thu duge tie cong tée khoan Ii va nén
méu Iéi khoan trong phong thi nghiém cé nhén xét nhu sau:
1. Concrete sample taken from pile tip show that pile tip concrete is clearn;
Concrete strength meets technical requirements./ Mau bé tong Idy duge &
miti coc cho thdy bé tong mii coc sach, ewéng dé bé tong dat yeu cdu ki
thugt.
2. Residual mud layer under pile tip has the thickness that meets technical
requirement./ Lop can lding duéi mii coc cé chiéu day théa man yéu cdu
IB thudt.
3. Bottom pile are in black and gray Granite layer/ Day coc nam trong lép
dé Granite mau xém den,
REPORT ON CORE ORIL TEST 6 PIBOTRARHUC BRIDGEsuc fe) sF
808 Sy7
say Seen
NYA AL/LNVLINSNOD
AYAL YAN ROLIVULNOD
6192 2 9007'862 NACKOL 01 BuecoypOaKL : UOISMIOLO MEX UEUN ~
0. ose sivews | 2 psa
| L
ay een
wweusy | OSe=nv) tere a
ax UueEN aL awoveo} ou | 2
weall6 | US] oto van,
po ine,
‘002.582 NACH 886
TE NOL pO RUDD IRENE NL Brus Baa OT SRNT FLL AAPA |
0002 WAL aua\per Supsax uersseiéieo - 0002 WAL Ut ARI: Fata. SUPE AER a eH Im up 5B pds peo fo amg
gu upotry APB ides Bey-p Jo 209 |
gu Bud 9s dus Jo squinys
‘oye Bunt ros asn popusi 2
10 /vonéucs9q
G2) yung) st ut 8 pang 00620
enor £0-#14 ye sep po preps 2] “e014 EY an mabe oy onseeg
(000 10W PLL IA TV NOW NVOHDL WGTHON JH) IQHN NVOHN 909 ONOL 3:
XVOHM AYWW NAN WSIHON JBL Yad 194
(41 FNd_LV LSIL SAWAH) Td GIHOM 40 AIMS GAO NO SLINSIA 1S AALSSTAAWOD
er De i aE APS VHD PN HOMER WOOO
‘Des oosod STERE ROWIAWEGNS Tijag PON ene ONMNS
oes
o0s0o0
=P
THOTT rome
2oRf0ad LNIMAOTHRIE AYRSSHUSNG VGH ONO OMY VODA NANG- QUANG NGATEXPRESSWAY DEVE!
@.._ SFhith
CDM SMITH INC
DANANG -qUaNG NGalepMU | SUPERVISION CONSULTANT
PACKAGE AS : FROM KM 124#700 TO KM 1394204
TOPMENT PROJECT
POSco e2c
cst
POSco Eac
Depth | Compressive
starting to | test result of
take | core drilling
Pilename| sample | sample Comment Conclusion Petitions
Tén coe | Chiéu sau | Két qué nén Nhgn xét Kétlugn Kién nghj
bit dau miu loi
Ty mau khoan
(i) (Mpa)
- Quality of
concrete is unifrom| ~ Quality of
in the whole length | CORetet at Pile tip
of sample Chdv| Passes (Rn=
ong bé tng ding| 3637 09 Rye=
au theo subt chiéu| 77° MPa & Rain =
ea 35.2>0.75 Rye =
P18 - 03 22.05 35.9 22.5 Mpa)/ Chdt
+ Compressive | iron be tong miti
strength of concrete coc dat yeu céu (
drilling sample isp _ 55 35 9.9
Re = 35.9 Mpa/
Cuong 46 mau bé
tong toi Khoan dat) a 99 5 npg,
Ry = 35.9 Mpa.
The Chief of Lab Contractor Supervision Consultan Representative
TP Thi nghiém Nha théu Dai dién tu vin gidm sdt
Tran Viet Cuong
upg well
REPORT ON CORE DRILL TEST 8
P18 TRA KHUC BRIDGEDA NAWO- QUANG NGAIEXPRESSWAY DEVELOPHIENT PROJECT
PACKAGE AS : FROM KM 124#700 TO KM 139+204
Shin posco esc
COM SMITH INC
SUPERVISION CONSULTANT CS1 poseteee
DAILY RECORD ON CORE DRILLING OF PILE TIP (NHAT KY KHOAN LAY LOI MUICOC)
Borehole No. (Hé khoan): Coc P18-03/TRA KHUC Starting date (Ngay bit diu): 26-Mar-16
Completion date (Ngay két thie): 26-Mar-16
‘Underground Water (Mite nude
_-| LeveL of sonie tube top(Cao 46 dinh én sonie): 6.706... layeeate eee
‘Total Depth (Chiéu su 18 khoan): 22.05 m ‘Technician (Can b§ KT hign truong): Nguyn Van Chung,
: z Page / Form, GI-03
Layer | Boreh :
Depth | Layer Description
; Length of united depth | ole Sample
eee Detail /Tén e6ng vigo ila ‘Cite Pig ait e a roman | Mdutt
i hip khoan mm nghigm)
miu) | 6p) 6p) | ichoan) tang)
Core dling of pile
From | “ro_| tip/Khoan fy 161 du coe | From
15800 | 19800 | Take 3 samples with total ae
length of 98 cmv Ly 3 miu_|-13,705 loa} D90_| Pie So / 38
6 tbng chidu d3i 98 cm fect
‘Sane Tem aT
sem)
‘Sone 2:47 cm (Miu 2: 47
Sepia Tom WAST
em)
Layer Humus
14,705 |-14,721 |-14,721 | 2/l6p | 1.6 layer /Lép
2 min ling
Layer Granit gray
14,721 |-15,385 |-15,355 |3/l6p | 63.4 | p90 | /Dé granit
3 xém den
Tabortary Contractor The consultant
Bon yj thi nghigm Dai dign nha théu Tu van gid sét
gf Pyayon Vis 0K
‘Nguyen Manh Cuong [lw wih te
‘REPORT ON CORE DRILL TEST 9 PIS OTRAKHUC BRIDGE(DA HAWG - QUANG NGAI EXPRESSWAY DEVELOPHIEHT PROJECT
VIETNAM EXPRESSWAY CORPORATION
PROJECT COORDWATION UNIT ~ VEC
PACKAGE AS: KNM1244700-KN1306204
com suITH ne
‘SUPERVISION CONSULTANT
CONTRACTOR: POSCO ERC
e
z (Inspection sheet for core test of bored pile)
THOT glan (Date and tina): 2b/ 08/a2n/ 6
‘Bau myc thanh toan (Bil amy:
Hang myc chF tét (Rem description)
‘Phigu yéu cdunghigm thu (RFTNO:
‘Can cir vao (Based on). + Shop drawing:
“+ Method statement:
+ Section of specification
Form No:
Nigu)
_ Shhh
PoKSgo |
BIfN-BAN KIEM TRA KHOAN-LOLCQC KHOAN NHOL
Hang myc thanh toan (Pay Remy:
IL- Pile diameter (uting kinh ooo) bz. _m
= Design Bottom Elevation of Sonic Tube D.4i¥... (cao d6 TK day 6ng sonic 3d m |
= Design Pile toe elev (cao d9 thigh k& mdi coc) Adem |
= Actual Bottom Elevation of Sonic Tube D ug thre tf aay Sng sonic _|-(g. dog ms
|S - Actual Pile too elev (cao 44 thyc te LF toc im |
- Thickness of sedimentation (Chigu d ad) & om
[7- SPT value N30
‘Recon
~ Graph of test result (bi8u 66 kB qua thi nghie o
Deseription (M618)
2 cao.
The Contractor (Nha thau) The Engineer (Tw vin)
Site Engineer ce tr Wanager Inspector Resident Engineer
acm
We
Upp vn Uy
testy AesTA HANG-QUANG NOAIEXPRESSWAY DEVELOPMENT PROJECT
PACKAGE AS : FROM KM 124+700 TO KM 136+204
@ ein POSco eac
VEC
COM smarTH nc
SUPERVISION CONSULTANT CS1
DRILLING SAMPLE PICTURE PIER P18-03, TRA KHUC/ HINH ANH MAU.
KHOAN TRY P18-03, TRA KHUC
Posco ac
REPORT ON CORE DRILL TEST 10 PISO TRA KHUC BRIDGELUANG HOATEKPRESSWAY DEVELOPMENT PROIEGT
PACKAGE AS : FROM KM 124#700 TO KM 1394204
& Sen POSsco eas
VEC
COM SMITH INC
DANANG QUANG NGAIEPpMU | SUPERVISION CONSULTANT C51 poeeo ess
Eee OT Pa Vee
‘REPORT ON CORE DRILL TEST ‘PIS OTRAKAUC BRIDGE