You are on page 1of 12
DA HANG-QUANG NOAIEKPRESSWAY DEVELOPMENT PROJECT PACKAGE AS : FROM KM 124+700 TO KM 139+204 @ eM posco eac VEC com suri mc SUPERVISION CONSULTANT CSt VIETNAM EXPRESSWAY CORPORATION- VEC TONG CONG TY DAU TU PHAT TRIEN BUONG CAO TOC VIRT NAM - VEC. i Posco rac DA NANG - QUANG NGAI EXPRESSWAY DEVELOPMENT PROJECT PACKGE AS5: KM124+700 — KM139+203.627 “pi AN DUONG CAO TOC BA NANG= QUANG NGAI GOI THAU AS: KM124+700 — KM139+203.627 REPORT BAO CAO TEST RESULT ON QUANLITY OF BORED PILES TIP BY CORE DRILL METHOD. KET QUA KIEM TRA CHAT LUQNG MUI CQC KHOAN NHOI BANG PHUONG PHAP KHOAN LOI. HANG MYC CONG TRINH | BORED PILES PIER P18 - TRA KHUC BRIDGE. WORK ITEMS COC KHOAN NHOI TRY P18 - CAU TRA KHUC. "| HANG MYC THI NGHIEM. | PILE C0. TESTING ITEM. COC CH. THE ENGINEER (Resident Engineer)! Peter Dinan Resident Engineer REPORT ON CORE DRILL TEST i PI8D TRA RHUC BRIDGE DA HANG-QUANG NGAIEXPHESSWAY DEVELOPMENT PROIEGT PACKAGE AS : FROM KM 124+700 TO KM 1394204 Sein Pposco eac CDM suru Inc Posco Ec CONTENT NOIDUNG 1. GENERAL INTRODUCTION/GIOL THIEU CHUNG 2. APPLIED STANDARDS /TIEU CHUAN AP DUNG oe THC HIEN 5. EVALUATION OF TEST RESULT /DANH GIA KET QUA THI NGHIEM TOM TAT TRINH TU THI NGHIE 6. APPENDIX( TEST RESULT AND ON-SITE DIARY ) PHU LUC (KET QUA THI NGHIEM VA NHAT KY HIEN TRUONG) REPORT ON CORE DRILL TEST Pi8 TRA RHUC BRIDGE TA HANG-QUANG NGATEXPRESSWAY DEVELOPMENT PROJECT PACKAGE AS : FROM KM 124¢700 TO KM 139+204 Min posco esac com suiTH nc Osco E&c 1. GENERAL INTRODUCTION/GIOI THIEU CHUNG Tra Khu Bridge of Da Nang — Quang Ngai expressway project is permanent reinforced concrete bridge with foundation structures as bored pile foundation. Céu Tra Khiie thuge dy dn dudng cao tée Da Nang - Quang Ngai la cdu bé -moentng-cbt-thép.vinh.ctin.c6.Két.cdu méng. la. méng.coc Khoa, Bh Core drilling work is carried out at 15h on 26/03/2016 and finish 19h on 26/03/2016 at pile No.03 pier 18 with diameter 1200mm under Tra Khuc Bridge 2, APPLIED STANDARDS AND TESTING METHOD TIEU CHUAN AP DUNG VA PHUONG PHAP THI NGHIEM Technical specifications of Da Nang — Quang Ngai expressway project. Chi dan kf thudt thi cong du dn duong cao téc Da Ning — Quang Ngai - Package AS/G6i thdu sé AS. - ASTMC39/C39M: Standard Test Methods for Compressive Strength of Cylindrical Concrete Specimens/ Tiéu chudin ASTM C39 /C39M Xée dink cng dé nén bé tong: ASTM C39/C39M: Methods of sampling, production and maintenance/ Tiéu chudn ASTM C39/C39M . Phuong phip ldy méu, ché tao vas bdo cheting mii that - TCXD 239:2006: Determination of concrete strength on the work structure/ Tiéu chudin TCXD 239 : 2006. Danh gid cudng ap bé tong trén két cdu cng trinh. - 22 TCN 259:2000: Process of exploratory drilling of engineering geology/ 22 TCN 259 : 2000. Quy trinh khoan thim do dia chit céng trinh. - TCXDVN 326:2004: Bored piles- Construction and Acceptance Standards/ TCXDVN 326 : 2004 Coc khoan nhéi—Tiéu chudn thi cing va nghiém thu. - TCXD 88-1982: Piles- Method of on-site test/ ICXD 88 - 1982 : Coc - phuong hap thi nghiém hién treéng. REPORT ON CORE DRILL TEST 3 PIS OTRA KHUC BRIDGE DA HANO-QUANG NGAIEXPAES SWAY DEVELOPMENT PROJECT PACKAGE AS : FROM KM 124#700 TO KM 139+204 @ Quin posco esac VEC COM SMITH INC SUPERVISION CONSULTANT CS1 posee ees: 3. TESTING APPARATUSES/THIET B] THI NGHIEM Specialised equipments used in test as follows/ Cong tdc thi nghiém sit dung ede thiét bj chuyén dung. = Geological drill XY-1, top of the drill made by diamond/ Mdy khoan dja chdt XY- thép-khoanjkhoan-méu-béng mitt khoan kim-cwrongess<-~=- - Cutting machine, ruler, caping mould, sulphyr mix/ Méy edt mdu, thude kep, Khuén caping va hon hop heu hujnh. - - Compressing machine 200 ton (MO CRS 83 apy d the other auxiliaries/ Méy nén 200 tén (MODEL TYA— Rg Hb piu tr Ede 4. TEST SEQUENCE AND VOLUME OF WOK) /TRINH TY THI NGHIEM VA KHOI LUQNG THUC HIEN 4.1 Test sequence /Trinh tye thi nghiém - Operating core drilling work at site in accordance with geological drilling process. T6 chite thyee hién céng tée khoan lay mu tai hign trudng theo quy trinh khoan théim de dia chat c6ng trinh. - Maintenance of sample in accordance with stipulated process/ Bao dudng, gia céng mau theo qui trinh qui dinh. - Carrying out testing compressive strength of concrete cylinder sample when it has enough conditions in accordance with stipulated standards! Tién hanh thi nghiém nén mau khi mau dim bdo dis diéu kign thi nghiém theo tiéu chudn qui dinh. - Making test reports (attached appendix Lap bdo cdo két qua thi nghiém. (Cé ede hu luc kém theo) 4.2 Volume of works /Khdi legng thyc hign PIER P18 / TRY P18 No/ | Pilenumber | Remark 1T Sé higu coc Ghi chit 1 P18-C03 "REPORT ON CORE DRILL TEST + PIB OTRARAUC BRIDGE A NANG-QUANG NGAIEXPRESSWAY DEVELOPMENT PROJECT PACKAGE AS : FROM KM 124+700 TO KM 1394204 @ POSCO e2.c VEC DANANG - QUANG NGALEPMU Posco csc 4.3 CAc théng s6 coc thi nghigm P18-C03 clu Tra Khic. Actual Design Actual tube top | Actual tube | pile cut | pile toe No | Tencoe | £1¥: | Bottometev. | offetev. | elev. | Wrst date- “| Caodg | Caodpday | Caodp | Caoag | EY weve-|-dinh.6ng..|....dng (mn).....|..cdt.ege | day ege |. NEMEM | (m) (m) (m) o1_| P18-Co3 =13.705 | +3.945 | -14.705 | 26/03/2016 4.4 M6 ta két qua khoan ZEN 2, Acttal | Actual Sample-miu khoan top | yore ears Diameter] Pite | ‘lev 1 Chi sample Cao | et "| Dud ig name | “Gy | Ca006| dat | ioh mk Length. day | Khoan | M08 miu) | ene Deseripti dinh (mm) " ption ng (m) Stt | dai Mé ta éng (a) (m) (cm) + From elevation -13.705m to -14.705m_ is Concrete sections undisturbed samples including 03 samples collected: samples 1 with length of 44cm, samples 2 with length P18 - of 47cm and samples 3 cos. | +6706 | -13.708 | 1.65 2B ‘vith length of 7 Bem, 1 | 988 + Tit cao dp -13.705m dén cao dp -14.705m la phan bé tong miu nguyen dgng thu duge gdm 03 mau: miu I dai ‘44cm, miiu 2 dai 470m va mau 3 dai 7.8cm 2] 16 + From elevation REPORT OW CORE DRILL TEST 3 PRCA TERE A HANO-QUANG NGAIEKPRESSWAY DEVELOPMENT PROIECT Pi PACKAGE AS : FROM KM 124+700 TO KM 1394204 S vec ve Brin DANANG .QUANG NGALEPIU COM SMITH Nc SUPERVISION CONSULTANT CS1 posco eac POSCO ERC deposition drilling thickness 1.6cm + Tie cao dp -14.705m én -14.721m la lop mitn khoan ling dong weep fee AY DOOM sal + From elevation -14.721m to -15.355m is geological layers: 7X gray-black Granite. LAS 8: + Tic cao d6 -14,72Im én cao dp -15.355m li lép dja chat: dé Granit mau xim den, 5. EVALUATION OF TEST RESULT /DANH GIA KET QUA THT NGHIEM After reviewing and analyzing recorded data from core drilling and test result of compressive strength of drilled core sample in the on-site laboratory, we have some comments as follows: Sau khi xem xét phan tich cdc sé liéu thu duge tie cong tée khoan Ii va nén méu Iéi khoan trong phong thi nghiém cé nhén xét nhu sau: 1. Concrete sample taken from pile tip show that pile tip concrete is clearn; Concrete strength meets technical requirements./ Mau bé tong Idy duge & miti coc cho thdy bé tong mii coc sach, ewéng dé bé tong dat yeu cdu ki thugt. 2. Residual mud layer under pile tip has the thickness that meets technical requirement./ Lop can lding duéi mii coc cé chiéu day théa man yéu cdu IB thudt. 3. Bottom pile are in black and gray Granite layer/ Day coc nam trong lép dé Granite mau xém den, REPORT ON CORE ORIL TEST 6 PIBOTRARHUC BRIDGE suc fe) sF 808 Sy7 say Seen NYA AL/LNVLINSNOD AYAL YAN ROLIVULNOD 6192 2 9007'862 NACKOL 01 BuecoypOaKL : UOISMIOLO MEX UEUN ~ 0. ose sivews | 2 psa | L ay een wweusy | OSe=nv) tere a ax UueEN aL awoveo} ou | 2 weall6 | US] oto van, po ine, ‘002.582 NACH 886 TE NOL pO RUDD IRENE NL Brus Baa OT SRNT FLL AAPA | 0002 WAL aua\per Supsax uersseiéieo - 0002 WAL Ut ARI: Fata. SUPE AER a eH Im up 5B pds peo fo amg gu upotry APB ides Bey-p Jo 209 | gu Bud 9s dus Jo squinys ‘oye Bunt ros asn popusi 2 10 /vonéucs9q G2) yung) st ut 8 pang 00620 enor £0-#14 ye sep po preps 2] “e014 EY an mabe oy onseeg (000 10W PLL IA TV NOW NVOHDL WGTHON JH) IQHN NVOHN 909 ONOL 3: XVOHM AYWW NAN WSIHON JBL Yad 194 (41 FNd_LV LSIL SAWAH) Td GIHOM 40 AIMS GAO NO SLINSIA 1S AALSSTAAWOD er De i aE APS VHD PN HOMER WOOO ‘Des oosod STERE ROWIAWEGNS Tijag PON ene ONMNS oes o0s0o0 =P THOTT rome 2oRf0ad LNIMAOTHRIE AYRSSHUSNG VGH ONO OMY VO DA NANG- QUANG NGATEXPRESSWAY DEVE! @.._ SFhith CDM SMITH INC DANANG -qUaNG NGalepMU | SUPERVISION CONSULTANT PACKAGE AS : FROM KM 124#700 TO KM 1394204 TOPMENT PROJECT POSco e2c cst POSco Eac Depth | Compressive starting to | test result of take | core drilling Pilename| sample | sample Comment Conclusion Petitions Tén coe | Chiéu sau | Két qué nén Nhgn xét Kétlugn Kién nghj bit dau miu loi Ty mau khoan (i) (Mpa) - Quality of concrete is unifrom| ~ Quality of in the whole length | CORetet at Pile tip of sample Chdv| Passes (Rn= ong bé tng ding| 3637 09 Rye= au theo subt chiéu| 77° MPa & Rain = ea 35.2>0.75 Rye = P18 - 03 22.05 35.9 22.5 Mpa)/ Chdt + Compressive | iron be tong miti strength of concrete coc dat yeu céu ( drilling sample isp _ 55 35 9.9 Re = 35.9 Mpa/ Cuong 46 mau bé tong toi Khoan dat) a 99 5 npg, Ry = 35.9 Mpa. The Chief of Lab Contractor Supervision Consultan Representative TP Thi nghiém Nha théu Dai dién tu vin gidm sdt Tran Viet Cuong upg well REPORT ON CORE DRILL TEST 8 P18 TRA KHUC BRIDGE DA NAWO- QUANG NGAIEXPRESSWAY DEVELOPHIENT PROJECT PACKAGE AS : FROM KM 124#700 TO KM 139+204 Shin posco esc COM SMITH INC SUPERVISION CONSULTANT CS1 poseteee DAILY RECORD ON CORE DRILLING OF PILE TIP (NHAT KY KHOAN LAY LOI MUICOC) Borehole No. (Hé khoan): Coc P18-03/TRA KHUC Starting date (Ngay bit diu): 26-Mar-16 Completion date (Ngay két thie): 26-Mar-16 ‘Underground Water (Mite nude _-| LeveL of sonie tube top(Cao 46 dinh én sonie): 6.706... layeeate eee ‘Total Depth (Chiéu su 18 khoan): 22.05 m ‘Technician (Can b§ KT hign truong): Nguyn Van Chung, : z Page / Form, GI-03 Layer | Boreh : Depth | Layer Description ; Length of united depth | ole Sample eee Detail /Tén e6ng vigo ila ‘Cite Pig ait e a roman | Mdutt i hip khoan mm nghigm) miu) | 6p) 6p) | ichoan) tang) Core dling of pile From | “ro_| tip/Khoan fy 161 du coe | From 15800 | 19800 | Take 3 samples with total ae length of 98 cmv Ly 3 miu_|-13,705 loa} D90_| Pie So / 38 6 tbng chidu d3i 98 cm fect ‘Sane Tem aT sem) ‘Sone 2:47 cm (Miu 2: 47 Sepia Tom WAST em) Layer Humus 14,705 |-14,721 |-14,721 | 2/l6p | 1.6 layer /Lép 2 min ling Layer Granit gray 14,721 |-15,385 |-15,355 |3/l6p | 63.4 | p90 | /Dé granit 3 xém den Tabortary Contractor The consultant Bon yj thi nghigm Dai dign nha théu Tu van gid sét gf Pyayon Vis 0K ‘Nguyen Manh Cuong [lw wih te ‘REPORT ON CORE DRILL TEST 9 PIS OTRAKHUC BRIDGE (DA HAWG - QUANG NGAI EXPRESSWAY DEVELOPHIEHT PROJECT VIETNAM EXPRESSWAY CORPORATION PROJECT COORDWATION UNIT ~ VEC PACKAGE AS: KNM1244700-KN1306204 com suITH ne ‘SUPERVISION CONSULTANT CONTRACTOR: POSCO ERC e z (Inspection sheet for core test of bored pile) THOT glan (Date and tina): 2b/ 08/a2n/ 6 ‘Bau myc thanh toan (Bil amy: Hang myc chF tét (Rem description) ‘Phigu yéu cdunghigm thu (RFTNO: ‘Can cir vao (Based on). + Shop drawing: “+ Method statement: + Section of specification Form No: Nigu) _ Shhh PoKSgo | BIfN-BAN KIEM TRA KHOAN-LOLCQC KHOAN NHOL Hang myc thanh toan (Pay Remy: IL- Pile diameter (uting kinh ooo) bz. _m = Design Bottom Elevation of Sonic Tube D.4i¥... (cao d6 TK day 6ng sonic 3d m | = Design Pile toe elev (cao d9 thigh k& mdi coc) Adem | = Actual Bottom Elevation of Sonic Tube D ug thre tf aay Sng sonic _|-(g. dog ms |S - Actual Pile too elev (cao 44 thyc te LF toc im | - Thickness of sedimentation (Chigu d ad) & om [7- SPT value N30 ‘Recon ~ Graph of test result (bi8u 66 kB qua thi nghie o Deseription (M618) 2 cao. The Contractor (Nha thau) The Engineer (Tw vin) Site Engineer ce tr Wanager Inspector Resident Engineer acm We Upp vn Uy testy Aes TA HANG-QUANG NOAIEXPRESSWAY DEVELOPMENT PROJECT PACKAGE AS : FROM KM 124+700 TO KM 136+204 @ ein POSco eac VEC COM smarTH nc SUPERVISION CONSULTANT CS1 DRILLING SAMPLE PICTURE PIER P18-03, TRA KHUC/ HINH ANH MAU. KHOAN TRY P18-03, TRA KHUC Posco ac REPORT ON CORE DRILL TEST 10 PISO TRA KHUC BRIDGE LUANG HOATEKPRESSWAY DEVELOPMENT PROIEGT PACKAGE AS : FROM KM 124#700 TO KM 1394204 & Sen POSsco eas VEC COM SMITH INC DANANG QUANG NGAIEPpMU | SUPERVISION CONSULTANT C51 poeeo ess Eee OT Pa Vee ‘REPORT ON CORE DRILL TEST ‘PIS OTRAKAUC BRIDGE

You might also like