Ref: COMDOE AS RETS-108 23 June 2015
Te: Posco Engineering & Consiruction Co. Lis
(CO: hr. Hoang Viet Hung: Decor of QN-DN EPI, VEC
'. Uang Huy Hoang, Deputy Decor EPH, Execulve anager of A2, Ad and 45, VEC
Ne. Gordon Edwards Team Leader, COM Srith ne
Subject’ Contract s20xD - VECI20¥4 (85)
Method Statement fr State Load Test Diameter, 1200mm,
“Tra Khe Bridge - Version 4
Dear Sir,
Posco's eter POS.OQAS-COM-15-283 dated 02 June 2015 which transmis Method Statement
for StaticLosd Test (Di. 1200mm pie) - Tra Kue Bridge (Version 1) refers.
By this wring, the Engineor informed tne Contractor that tis Method Statement need to be
‘revised, enclosed herein out typewriten corenens,
‘Thank you for your continued cooperation
Your try,
evan ouy
‘Acting Resident Engineer
i
ware none eRASPOMATON ERGY AGES]THE CONTRACTOR WAS TO GORECT AND RESUBT THE FOLLOWING FART
{NWATHAU Ch IEUCHINH-VATRINA LA CAC HAN SAU
ie er Bove Pea ose Test (0.12000 Pere uc i
wo | brewing no.
str] séhigubsave
Content tobe oreted
Nol dungeanchinh ste
metho statement of static ed Test (01.1200rm Pilea Khu Badge .
sen php th cng Thighs nén tinh ee khoan ai dvénglinh 1200mm.Cby TS Kode
: Jaden note: The ain equipments musthave he create
28 sung gh chi eb chon pave im inh
Determine cation of ts ple and desig oad fr eatin of apa of
loundation and bens.
a fc nn roe ngidn el wong eit atin toda sce tbc at rn
gs.
s |xssing deta secon show connection betwen block onrete an Ibe ars
assuna motcécen vdeo mtn itn he pio ede KD tdog nm de Dm
Posco enc cove Smith consuttanr
ee Ni,
ye Te & bw,
Daet IeA/2els