f ' | CHAMELIYA HYDROELECTRIC PROJECT INTRODUCTION Chameliya HydroEleciric Project (CHEP) site lies in the for-west of Nepal about 950 km west of Kothmandu in remate Saile-Shikhar Municipality, Bolanch, Dorchulo Dithict. Chomeliya is one of the major tributaries ‘of Mahokali River. This Project is @ sichour peaking run of river (PROR) ‘ype hydro-electric plant with an insfalled capacity of 30 MW and with overage annual energy generation of 184.21 GWh. This project was implemented to cope with growing power and energy demand and for the regional economic balance in the farwestem development region by the construction of a hydroelectric power plont. Consiruction of ivil work of Project was storied on January, 2007, with appointment of Civil Contractor, M/S China Gethiouba Group Co. Lid (CGGOQ), Ching, Similarly in April 30, 2009 M/s KHNP CONSORTIUM, Korea was ‘appointed as the Coniractor of Electro-Mechanical/ Hydro-Mechanical and 132 KV Transmission Line (EM/ HM/T). The construction supervision ond construction Tonagement sublet to SHAH/SILI/ICON JV, and for EM/ HM/IL work is Soman Corporation, Korea. As per the Joint Co-Ordinafed Working Schedule the completion date {including Testing and Commissioning) is December 2017, FINANCIAL SOURCES The soft loan of 45 million USD between the GoN ‘ond the Export-Import Bank of Korea {entrusted by the Government of the Republic of Korea) wos agreed on 23 October 2008 for consulting, supply, delivery and Commissioning of EM/HM/TL works. Remaining amount of 7.55 million USD for installation to be provided by the GoN and NEA. Similarly, NRs. 2.88 billion were estimated for the Civil Works. Apart, from the main works the funds from the GoN ond NEA hove been uilized for the administrative expenses, environment management, cond lond acquisition and compensation expenses. Till date the project has already acquired 862-0-3-0 ropanis of land CIVIL WORKS Civil works of the project comprises of 54 mhigh concrete) gravity dam with gated spillway and stilling basin, Take, two conneting tunnels ond desander basin, 067 kim long headrace tunnel with three construction qudit tunnels, surge tank, vertical shai and horizonial oe ne Ue oe eg priistock surfezs powerhouse ond tailrace. Similarly, EM/FIM/TL work comprising of two spillway radial gates with accessories, intake gates, desander basin and gate with flushing valves ond tunnels. ye The excavation of headrace tunnel (HRT) started on audit, 4% no. 1 on 6th March 2009, audit no. 2 on 30th May * 2008, and from audit no. 3 on 31st July, 2008, The excavations were compleled on November 1, 2010 for section of headrace tunnel between audit no. | upstream {0 desander bosin downsiteam, for section of headrace funnel between audit no, 1 downstream, fo audit no. 2 upsiream on Noveriber 16, 2011, for section of heodrace tunnel between oudit no.2 downstream end audit no. 3 upstream on May 12, 2012. The squeezing occurred in about 843 meters ofheadrace tunnel between audit no.2 downstream to audit no. 3 upstream. So, the further works on this section were impossiBI6 prior to its treatment, The squeezing ireatment work started on June aac) 5 i | pleted before being Februc A a mitment bel loyer, the Consultont and jaan 2016 in the Ministry 0 Be Haier ess resumed from Se cies ergy the treatment proce be 28, 2016 and the remaining 232 meters were comple ‘on March 8, 2017 Feo cuca lfEPiaorcte olden colle a eet ond headworks has been completed excep! f bosin, intake The construction of necting tu ig work at inoke control room. The design of desander basin has bes availabilty of Consolidation grouting hos been strengthen the changed to floating foundation because of non: ce fo excavate ip to designed level ne up to rock level to indation. The construction of intake and connecting tunnel hy been completed as per design The construction of two underground desander basin cluding concrete lining and installation of gates have been already completed. The desander basin has been consirucied os per design. works being ¢ sjage of completi es L completed and lua ® Excovatios ing : erhouse roofing completed. Fi nting W femal power panel for HVA\ ber 30, 2017 In EM/HM/TL works installation of spillway radial goes, basin gates, steel lining of nioke gates, desand penstock pipes, draft tube gates, two Francis turbines two vertical axis generator, all control and accessor Construction of switchyard area has been comple 2 nos. of 16 MYA power transformers being installed Foundation ond erection works of 412 number o as, transmission line towers have already been compl by 2013, Likewise, the siringing works of ACSR ‘Bea’ conductor and ©PGW for 131 km, 132 KV single circ transmission line, switchyard and substations ot Bolonct and Attariya respectively have also been completed Minor works of communic: ation system is expected Ic completed before the wet test. The Project has initiated the fal Outside the right of way, completed. The transmissi cherged prior to initiation ling of danger trees line Majority of the works bee jon line is expected to & of the wet test HURDLES FACED BY THE PROJECT Increase in construction quantity in headwork, [ headrace tunnel, penstock and tailrace. The project has been delayed because of following reasons. : j 6. Blockage of access road during monsoon of yeor 2007-2009 1, Poor geological condition in headroce tunnel which caused the squeezing of the the tunnel in section of Adit No. 2 Downstream and Adit No.3 Upstream. 7. Far western Region Banda on May 2012 2. Shifting of powerhouse towards hill side resulting in 8. Poor security at construction site falling of the hill slope . With no any unforeseen circumstance, the civil works is 3 Conerete lining in the headrace tunnel of the expected to be completed within September 30, 2017 squeezed orea and the whole project works including wet testing and commissioning is expected to be completed on December 20, 2017. The overall progress of Project is 99.19% ea ea ee Waheed coef 4 Delay in diversion of river. Type of Project Peaking run of river plant (with 6 hr daily peaking) ‘Maximum Gross Head 103.70." Roted Net Head 94m é Designed Flow 36 m/sec F Installed Capacity 30 MW Dam/Spillway Tye Concrete Gravity, 88 m crest length, max. hi. 54m Inioke Side Intake Desanding Basin Underground, 2 nos. (LxBxH, 80mx12mx25m) Headrace Tunnel 4067 m, horse shoe size 5.2 (m)/4,2 (m) Surge Tank Resiricied Orifice (hi. 48.4 m, dia, 8 m) Penstock Concrete Lined and Steel Lined, Length 302m, dia. 3.9 m ie Powerhouse Surface, LeWsH, 37.5 m, 23.5 m, 27.4 m Tailrace Box Culvert, LWXH, 714m, 4.8 m, 3.8 m Turbine 2 Verical shaft, francis, rated output 2X15.6 MW, rated speed 428.6 ‘pm. . ; Generator 2/3-phase synchronous, rated output 2x16.2 MVA ‘Switchyard Outdoor, LxB, 57m, 47 m. ee seniiae Length 131 km, 132 KV single circuits from Balanch to Attariya Sub-station Annual Average Energy 184.21 GWh Revised Completion date December 30, 2017 eae 7

You might also like