1. Participant Demographics
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%
0-2 years 3-5 years 6-10 years 10-15 years 15+ years
Overall Years of Experience Green Building Years of Experience
2. Entity the respondent represents:
40.00%
35.00%
30.00%
25.00%
20.00%
15.00%
10.00%
5.00%
0.00%
Client/Client Contractor Consultant (i.e. Other (please
Representative Design or specify)
Supervision
Consultant)
Role In Project
40.00%
35.00%
30.00%
25.00%
20.00% Responses
15.00%
10.00%
5.00%
0.00%
Project Construction Quality Sustainability Facilities
Manager Manager Manager Manager Manager
3. Projects Information
Project Type:
20
18
16
14
12
10
8
6
4
2
0
Residential Commercial Office School/University Sports Complex Healthcare
PM CM QM SM FM Total
Residential
11%
22% Commercial
11%
Office
School/University
17%
Sports Complex
28%
11% Healthcare
Project Size
25
20
15
10
0
$ 5-10 Million $ 10-15 Million $ 15+ Million
PM CM QM SM FM
Delivery System PM CM QM SM FM
Design Bid Build 5 4 3 3 1
Design and Build 12 3 8 18 4
Construction Management Agency/@Risk 1 2 1 0 0
Hybrid (please specify) 0 0 1 3 0
Unable to Tell 0 0 0 0 2
Total 18 9 13 24 7
Payment Mechanism
Payment Provision PM CM QM SM FM
Unable to Tell 0 0 2 0 4
Other (please specify) 0 0 1 4 0
GMP 1 0 0 1 0
Fixed Price 2 3 0 6 1
Cost Reimbursable/Cost
plus 2 0 1 1 0
Lump Sum 13 6 9 12 2
Lump Sum
Fixed Price
Unable to Tell
0 5 10 15 20 25 30 35 40 45
PM CM QM SM FM
*The QM results were collated based on the Collector of the online platform. Also important to note
on occasions that the PM and QM worked on the same project so it was not feasible to separate the
results on certification type for a project but rather on managerial type.
Respondents’ asked to respond correctly to the definitions of Quality Assurance and Quality
Control:
Actual
QA Correct QC Correct Total Number of
Response Definition Definition Respondents
QM 3 5 13
CM 5 5 9
PM 5 5 18
SM 5 5 25
FM 4 5 7
Grand total 22 25 72
Expected
QA Correct QC Correct Total number of
Response Definition Defintion respondents
QM 3.972222222 4.51388889 13
CM 2.75 3.125 9
PM 5.5 6.25 18
SM 7.638888889 8.68055556 25
FM 2.138888889 2.43055556 7
Grand total 22 25 72
Cost
Assigning
Overruns Labor
Managerial Respondent Liquidated Reputation Schedule Material Team to
in Productivity
Type Number Damages Loss Delays Loss Work
Rectifying Loss
Overtime
Mistakes
QM
1 7 1 5 6 3 2 4
2 7 5 2 4 6 1 3
3 7 1 2 6 3 4 5
4 7 1 2 6 5 3 4
5 6 1 3 5 7 2 4
6 3 1 5 4 6 7 2
Cost
Assigning
Overruns Labor
Managerial Respondent Liquidated Reputation Schedule Material Team to
in Productivity
Type Number Damages Loss Delays Loss Work
Rectifying Loss
Overtime
Mistakes
7 4 3 1 2 5 6 7
PM 1 4 1 2 3 5 6 7
2 1 2 3 4 7 6 5
3 7 4 2 1 5 3 6
4 5 1 2 4 3 6 7
5 3 1 4 2 5 7 6
6 6 7 3 5 4 1 2
7 7 5 2 3 4 6 1
8 4 3 6 1 5 2 7
9 3 4 1 2 3 5 6
10 6 4 2 1 7 5 3
11 3 5 4 6 2 1 7
CM 1 3 5 4 1 2 7 6
2 5 1 3 2 4 6 7
3 6 7 5 3 4 1 2
4 7 6 5 4 3 2 1
5 6 7 1 3 4 2 5
6 7 5 2 1 6 3 4
7 1 2 3 5 6 4 7
8 1 2 3 4 6 7 5
Overall
W 126 85 77 88 120 105 123
A 7 7 7 7 7 7 7
N 26 26 26 26 26 26 26
0.6923076 0.42307692 0.67582417
RII 9 0.467033 3 0.483516484 0.65934066 0.576923077 6
7 2 1 3 5 4 6
Quality Managers
W 41 13 20 33 35 25 29
A 7 7 7 7 7 7 7
N 7 7 7 7 7 7 7
0.8367346 0.265306 0.40816326 0.59183673
RII 9 1 5 0.673469388 0.71428571 0.510204082 5
7 1 2 5 6 3 4
Project Managers
W 49 37 31 32 50 48 57
A 7 7 7 7 7 7 7
N 11 11 11 11 11 11 11
0.6363636 0.480519 0.40259740
RII 4 5 3 0.415584416 0.64935065 0.623376623 0.74025974
5 3 1 2 6 4 7
CM
W 36 35 26 23 35 32 37
A 7 7 7 7 7 7 7
N 8 8 8 8 8 8 8
0.6428571 0.57142857
RII 4 0.625 0.464285714 0.410714286 0.625 1 0.660714286
6 4 2 1 5 3 7
Mann Whitney Test results for each item shown in subsequent pages
Managerial opinion Rank ti Ti Mann-Whitney U test Schedule Delays QM and CM
1 1 6 14 3 2 Gender coding
2 1 4 8.5 4 5 1 Quality Manager
3 1 6 14 2 Construction Manager Step 1: Counts
4 1 6 14
5 1 5 11.5 2 0.5 Opinion coding Group n
6 1 4 8.5 1 Highest Quality M 7 =COUNTIF(A:A;G3)
7 1 2 3.5 2 0.5 2 Constructi 8
1 2 1 1.5 2 0.5 3 =SUM(M7:M8)
2 2 2 3.5 4 total 15
3 2 3 5.5 2 0.5 5 Step 2:
4 2 4 8.5 6
5 2 3 5.5 7 Lowest Group
6 2 1 1.5 Quality M 28 =M7*(M7+1)/2 𝑛□ × 𝑛□ + 1
7 2 5 11.5 Constructi 36 2
8 2 4 8.5 0 0
#N/A Step 3: Determine ranks
#N/A
#N/A Determine the rank for each respondent (use average rank)
#N/A C2: =RANK.AVG(B2;B:B;1)
#N/A
#N/A Step 4: Determine average rank and sum of ranks per group
#N/A
#N/A Group Avg. Rank Sum rank (Ri)
#N/A Quality M 10.57143 74 =SUMIF(A:A;G3;C:C)
#N/A Constructi 5.75 46
#N/A Constructi #DIV/0! 0
#N/A Step 5: Determine difference with Max rank (U)
#N/A
#N/A Group Difference
#N/A UDF 10 Quality M 46 =N24-M14 𝑛□ × 𝑛□ + 1
𝑛□ = 𝑛 □−
#N/A Constructi 10 2
#N/A
#N/A Step 6: Determine numerator for Z
#N/A
#N/A Group Denom.
#N/A Quality M 18 =M30-$M$7*$M$8/2 𝑛□ × 𝑛 □
𝑛□ −
#N/A Project Ma -18 2
#N/A
#N/A Step 7: Determine the number of tied scores (t i)
#N/A
#N/A See column D
#N/A D2: =IF(COUNTIF($C$1:C1;C2)>0;"";COUNTIF(C:C;C2))
#N/A
#N/A Step 8: Determine the adjustment for ties per tied rank
#N/A
See column E
𝑛□ − 𝑛□
□
E2: =IF(D2="";"";(D2^3-D2)/12) 𝑛□ =
12
Step 9: Sum the results of step 8
Sum Ti 9 =SUM(E:E) 𝑛 = □ 𝑛□
Sum Ti 9 =SUM(E:E) 𝑛 = □ 𝑛□
Sum Ti 15 =SUM(E:E) 𝑛 = □ 𝑛□
Sum Ti 16 =SUM(E:E) 𝑛 = □ 𝑛□
Sum Ti 20 =SUM(E:E) 𝑛 = □ 𝑛□
Sum Ti 18 =SUM(E:E) 𝑛 = □ 𝑛□
Sum Ti 17 =SUM(E:E) 𝑛 = □ 𝑛□
Sum Ti 17 =SUM(E:E) 𝑛 = □ 𝑛□
Sum Ti 18 =SUM(E:E) 𝑛 = □ 𝑛□
Sum Ti 20 =SUM(E:E) 𝑛 = □ 𝑛□
Sum Ti 16 =SUM(E:E) 𝑛 = □ 𝑛□
Sum Ti 15 =SUM(E:E) 𝑛 = □ 𝑛□
Sum Ti 9 =SUM(E:E) 𝑛 = □ 𝑛□
Sum Ti 9 =SUM(E:E) 𝑛 = □ 𝑛□
Likert Scale
# Items/Questions 11
1 Very Simple
Sum of item
variances 11.7031 2 Somewhat Simple
Variance of Total
Scores 38.9375 3 Neutral
Cronbach's alpha 0.76938 4 Complex
5 Very Complex
6 Not Feasible
8. T-test results for Complexity Comparisons between Managerial types
df 6 df 14 df 5 df 14
P(T<=t) one-tail 0.005847982 P(T<=t) one-tail 0.000844637 P(T<=t) one-tail 0.054933251 P(T<=t) one-tail 0.176740632
t Critical one-tail 1.943180281 t Critical one-tail 1.761310136 t Critical one-tail 2.015048373 t Critical one-tail 1.761310136
P(T<=t) two-tail 0.011695964 P(T<=t) two-tail 0.001689273 P(T<=t) two-tail 0.109866501 P(T<=t) two-tail 0.353481264
t Critical two-tail 2.446911851 t Critical two-tail 2.144786688 t Critical two-tail 2.570581836 t Critical two-tail 2.144786688
Costs accounted with rectifying non-conformance Inspection costs for Extra Low Voltage Systems Total cost for QAQC personnel for a specific task Plumbing defects: Water hammer, back-
through construction rework (HVAC and Lighting Control) (Activity-Based costing) siphonage (FM Only)
df 8 df 5 df 14 df 5
P(T<=t) one-tail 0.070556641 P(T<=t) one-tail 0.04212076 P(T<=t) one-tail 0.001246391 P(T<=t) one-tail 0.101555332
t Critical one-tail 1.859548038 t Critical one-tail 2.015048373 t Critical one-tail 1.761310136 t Critical one-tail 2.015048373
P(T<=t) two-tail 0.141113281 P(T<=t) two-tail 0.08424152 P(T<=t) two-tail 0.002492782 P(T<=t) two-tail 0.203110664
t Critical two-tail 2.306004135 t Critical two-tail 2.570581836 t Critical two-tail 2.144786688 t Critical two-tail 2.570581836
Total cost for QAQC personnel for a specific task Indoor Humidity and Mould Growth (FM
(Activity-Based costing) Both Groups Factory Tests for High Voltage Switchgears Indoor Humidity and Mould Growth QM Only Only)
df 14 df 14 df 7 df 4
P(T<=t) one-tail 0.001246391 P(T<=t) one-tail 0.002672192 P(T<=t) one-tail 0.392440757 P(T<=t) one-tail 0.186950483
t Critical one-tail 1.761310136 t Critical one-tail 1.761310136 t Critical one-tail 1.894578605 t Critical one-tail 2.131846786
P(T<=t) two-tail 0.002492782 P(T<=t) two-tail 0.005344384 P(T<=t) two-tail 0.784881513 P(T<=t) two-tail 0.373900966
t Critical two-tail 2.144786688 t Critical two-tail 2.144786688 t Critical two-tail 2.364624252 t Critical two-tail 2.776445105
Total cost for QAQC personnel for a specific task Inspection costs for Extra Low Voltage Systems Indoor Humidity and Mould Growth (QM
(Activity-Based costing) FM Only (HVAC and Lighting Control) Indoor Humidity and Mould Growth FM Only Only)
df 5 df 5 df 4 df 7
P(T<=t) one-tail 0.003007795 P(T<=t) one-tail 0.04212076 P(T<=t) one-tail 0.186950483 P(T<=t) one-tail 0.392440757
t Critical one-tail 2.015048373 t Critical one-tail 2.015048373 t Critical one-tail 2.131846786 t Critical one-tail 1.894578605
P(T<=t) two-tail 0.006015591 P(T<=t) two-tail 0.08424152 P(T<=t) two-tail 0.373900966 P(T<=t) two-tail 0.784881513
t Critical two-tail 2.570581836 t Critical two-tail 2.570581836 t Critical two-tail 2.776445105 t Critical two-tail 2.364624252
Repair of Green building technology defects after
Total cost for QAQC personnel for a specific task Indoor humidity and Mold Growth from Ventilation 6 Month Chemical and Bacterial Test of
handover (HVAC/greywater system/rainwater
(Activity-Based costing) QM Only (Both groups) Drinking Water Systems
system
df 7 df 7 df 14 df 5
P(T<=t) one-tail 0.051775855 P(T<=t) one-tail 0.392440757 P(T<=t) one-tail 0.194743662 P(T<=t) one-tail 0.050969739
t Critical one-tail 1.894578605 t Critical one-tail 1.894578605 t Critical one-tail 1.761310136 t Critical one-tail 2.015048373
P(T<=t) two-tail 0.10355171 P(T<=t) two-tail 0.784881513 P(T<=t) two-tail 0.389487323 P(T<=t) two-tail 0.101939479
t Critical two-tail 2.364624252 t Critical two-tail 2.364624252 t Critical two-tail 2.144786688 t Critical two-tail 2.570581836
df 7 df 14 df 14