Professional Documents
Culture Documents
BillFor8 2019 PDF
BillFor8 2019 PDF
SLOT TYPE C
Final Reading 8159.81 8733.84 2609.38 0.499
Average Consp.
SLOT TYPE C1
Final Reading 877.83 0.415
Average Consp.
SLOT TYPE C2
Final Reading 1041.17 0.484
Average Consp.
SLOT TYPE C3
Final Reading 332.96 0.359
Average Consp.
SLOT TYPE C5
Final Reading 2163.01 0.381
Average Consp.
DEMAND CALCULATION
QUOTA / 90% of sanctioned demand
READING RECORDED DAYS Amount
SANCTIONED Total Days (or) recorded demand MD Rate
STATUS DEMAND BILLED whichever is higher (Rs.)
DEMAND
Tax Calculation
I. E-Tax
1 ) Realised energy charges Amount (Rs.)
(a) Actual Energy Charges 5,07,365.00
(b) Peak Charges 23,804.88
(c) LT Charges 0.00
Total 5,31,169.88
2 ) Recorded Demand Charges including Transformer Loss 69,860.00
3 ) Low Pf Surcharge 0.00
Taxable Amount 6,01,029.88
E-Tax Amount (5%) 30,051.50
II. Old E-Tax 0.00
III. Self generation Tax 0.00
Total E-Tax (Electricity Tax+Self Gen. Tax+Self Consumption Tax) 30,051.50
TamilNadu Generation and Distribution Corporation Ltd.
Details C24 C1 C2 C3 C4 C5
Consumption Summed
79900.00 8220.00 10524.00 3192.00 38008.00 19956.00
(Gross (Recorded) egy. consumed)
Add Computed Consumption 0.00 0.00 0.00 0.00 0.00 0.00
IEX
THIRD PARTY
CAPTIVE
Wind Adjustment