You are on page 1of 2

* C24A * 1ST FLOOR TO FOOTING X-X : Unbraced

Y-Y : Unbraced
Mark Type Span Section Ang F.E.M.
Top Beam : A1B19 1 9.158 400x600 180.0 269.759( 36.901)
A1B20 1 4.562 500x600 0.0 46.279( 7.479)
A1B33 1 7.240 400x600 270.0 650.467( 179.253)

Colm.Pro.: Hux Huy Section Hcx Hcy Section Hlx Hly Section
None 4.750 4.750 500x600 Footing

Slender : Lex= 5.436 Lamx= 10.87 > 10 Ley= 6.389 Lamy= 10.65 > 10

Vert.Load: DL.= 690.750(35.625) LL.= 148.800


Top :+Mdx= 22.593 -Mdx= -131.691 +Mdy= 0.000 -Mdy= -515.249
+Mlx= 3.651 -Mlx= -18.014 +Mly= 0.000 -Mly= -141.990
Bot.:+Mdx= 65.845 -Mdx= -11.296 +Mdy= 257.625 -Mdy= -0.000
+Mlx= 9.007 -Mlx= -1.826 +Mly= 70.995 -Mly= -0.000

Wind Load: Mwtx Mwty Pw Mwbx Mwby


A-A -5.907 -26.976 6.500 5.019 38.023
B-B -8.167 -47.324 11.896 6.959 67.616
C-C 7.604 -47.489 15.002 -8.461 67.097
D-D 5.345 -67.837 20.398 -6.521 96.691
E-E -5.345 67.837 -20.398 6.521 -96.691
F-F -7.604 47.489 -15.002 8.461 -67.097
G-G 8.167 47.324 -11.896 -6.959 -67.616
H-H 5.907 26.976 -6.500 -5.019 -38.023
I-I -15.872 16.852 -7.946 15.580 -24.197
J-J -18.131 -3.496 -2.550 17.520 5.396
K-K 17.906 -34.429 13.309 -18.121 48.489
L-L 15.647 -54.777 18.705 -16.181 78.083
M-M -15.647 54.777 -18.705 16.181 -78.083
N-N -17.906 34.429 -13.309 18.121 -48.489
O-O 18.131 3.496 2.550 -17.520 -5.396
P-P 15.872 -16.852 7.946 -15.580 24.197
Q-Q -1.386 27.384 -8.147 1.597 -40.018
R-R -8.916 -40.444 9.840 8.063 58.626
S-S 8.748 12.000 -1.771 -8.514 -18.212
T-T 1.217 -55.828 16.216 -2.047 80.432
U-U -1.217 55.828 -16.216 2.047 -80.432
V-V -8.748 -12.000 1.771 8.514 18.212
W-W 8.916 40.444 -9.840 -8.063 -58.626
X-X 1.386 -27.384 8.147 -1.597 40.018

Concrete : C60 Fcu= 60 Ec = 30000 Cover = 30


Steel : GRADE 500 Fy = 500.0 Es = 200000

Assume : Asx= 4046 Asy= 4855 r = 2.967%


Nu = 0.35*Fcu*(Ac-Asc)+0.67*Fy*Asc = 9095.091 > 1255.005 O.K.
Vxmax = 20.063 Vs = 0.074 Vc = 0.944 O.K.
Vymax = 99.846 Vs = 0.363 Vc = 0.916 O.K.

Crack Width: Pmin/fcu/Ac = 0.037 > 0.000 The calculation is not required.
--------------------------------------------------------------------------------
Load Case P(kN) Mx(kN-M) Msx(kN-M) My(kN-M) Msy(kN-M) Load Fraction
D+L(Top) 1205.130 190.597 226.207 948.533 989.531 1.028458578
D+L+Wd(Top) 1031.938 149.680 180.172 883.402 918.507 1.116355682
D+L-We(Top) 1031.938 149.680 180.172 883.402 918.507 1.116355682
D+Wd(Top) 719.307 153.172 174.426 831.849 856.319 1.151499618
D-We(Top) 719.307 153.172 174.426 831.849 856.319 1.151499618
--------------------------------------------------------------------------------

--------------------------------------------------------------------------------
WONG & CHENG CONSULTING ENGINEERS B17018 CP2013 25/3/2019 Page: C1
Reinforcement : Vert.Bar: 10T40 Link: T10 @300 Sec. = 500x600

--------------------------------------------------------------------------------
Critical Region of Column
Case: 1.0D+1.4We(T) (Y-Y)
Hs =4.750 N = 662.193
Mtop = 610.849 Mbot = 225.308
Mmax = 558.039 Mmin = 225.308
S = N/Ag/fcu = 0.037, Case 1
H1 = 0.600 M = 474.333
Hc = 4.450 Hm = 0.476
Critical Region H = 0.742 Round to: 0.750 Provide: T10 @150
--------------------------------------------------------------------------------

--------------------------------------------------------------------------------
WONG & CHENG CONSULTING ENGINEERS B17018 CP2013 25/3/2019 Page: C2

You might also like