Analize
Analize
HARGA
UPAH BAHAN
ANALISA JENIS PEKERJAAN SATUAN
(Rp.) (Rp.)
(Rp.)
(1) (2) (3) (4) (5)
1,125.00
47.50
1,172.50
180.00
1,050.00
950.00
32,500.00
10.00
32,510.00
26,250.00
1,187.50
27,437.50
13,125.00
570.00
13,695.00
11,250.00
570.00
36,000.00
47,820.00
8,750.00
570.00
66,000.00
75,320.00
270,000.00
52,500.00
5,500.00
1,425.00
204,000.00
32,500.00
70,750.00
680,000.00
40,000.00
56,442.73
1,413,117.73
27,000.00
5,250.00
1,425.00
550.00
1,413,117.73
715,000.00
10,000.00
2,172,342.73
202,500.00
78,750.00
10,687.50
8,250.00
78,000.00
33,800.00
97,200.00
509,187.50
2,160.00
7,875.00
95.00
825.00
798,000.00
25,900.00
834,855.00
23,625.00
1,235.00
2,550.00
5,950.00
26,000.00
1,300.00
16,250.00
76,910.00
18,000.00
10,500.00
950.00
1,100.00
780.00
4,890.00
36,220.00
63,000.00
16,625.00
2,625.00
12,000.00
94,250.00
63,000.00
16,625.00
6,300.00
85,925.00
4,500.00
237.50
2,275.00
7,012.50
DAFTAR ANALISA BIAYA
PEKERJAAN : NORMALISASI SUNGAI
LOKASI : DESA LANCANG PASILO JUMERANG
KABUPATEN : PIDIE
PROPINSI : NANGGROE ACEH DARUSSALAM
B. PERALATAN
I. ASUMSI
1 Menggunakan alat berat ( cara mekanik )
2 Lokasi pekerjaan :
3 Kondisi drainase : selesai dibersihkan
4 Jam kerja efektif Ttk 7.00 Jam
5 Luas penampang saluran L 1.50 M2
1 ALAT
- Excavator C03 Ls
Kapasitas Bucket V 0.65 M3
Faktor Bucket Fb 0.90
Faktor Efisiensi Alat Fa 0.83
Waktu Siklus : TS1 -
- Menggali dan menimbun T1 0.50 Menit
- Lain - lain T2 0.50 Menit
TS1 1.00 M3/Jam
Kap. Produksi/Jam = V x Fb x fa x 60 Q1 29.13
TS1 -
Koef. Alat/Km = Galian Saluran -
Q1
= 1 (2 + 1)/2 x 1 C03 0.05 Jam
Q1
ALAT BANTU C10
- Cangkul Ls
- Sekop
2 TENAGA
Produksi Kebutuhan Tenaga Q1 22.41 M3
- Pekerja P 2.00 Jam
- Mandor M 0.25 Jam
Koefisien Tenaga :
- Pekerja (P x Tk) : Q1 L01 0.625 Jam
- Mandor (M x Tk) : Q1 L02 0.077 Jam
A. URAIAN PERALATAN
1 Jenis Peralatan BULDOZER 100 - 150 HP
2 Tenaga Pw 140.00 HP
3 Kapasitas Cp
4 Alat Baru :
a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 1,600.00 Jam
c. Harga Alat B 512,500,000.00 Rupiah
5 Alat yang dipakai :
a. Umur Ekonomis A' 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W' 1,600.00 Jam
c. Harga Alat ( * ) B' 410,000,000.00 Rupiah
E. LAIN - LAIN
WAGE/HOUR
WAGE/DAY
NO. EXPLANATI O N UNIT S
(Rp.) (Rp.)
(1) (2) (3) (4) (5)
TRANSPORTA
UNIT PRICE
NO. EXPLANATI O N UNIT TION
(Rp.) (Rp.)
(1) (2) (3) (4) (5)
RENTAL
PRICE
NO. EXPLANATI O N UNIT COST/HOURS
(Rp.) (Rp.)
(1) (2) (3) (4) (5)
C. EQUIPMENT RENTAL UNIT PRICE
1 Chain Saw Unit 4,510,000.00 25,995.80
2 Concrete Mixer Unit 9,840,000.00 23,424.11
3 Excavator 80 - 140 HP Unit 410,000,000.00 247,475.36
4 Buldozer 100 - 150 HP Unit 512,500,000.00 354,640.56
5 Dump Truck 3 - 4 M3 Unit 110,700,000.00 109,978.54
6 Dump Truck Unit 123,000,000.00 131,678.96
7 Stamper Unit 6,150,000.00 11,008.29
8 Jack Hammer Unit 5,330,000.00 16,306.18
9 Generator Set Unit 41,000,000.00 151,168.79
10 Supporting Equipment Unit 12,000.00 12,000.00
STRIC NANGGROE ACEH DARRUSALAM
GE WITH 6 METER SPAN
NOTE
(6)
PRICE ON
LOCATION
(Rp.)
(6)
750,000.00
3,000,000.00
2,500,000.00
5,200.00
9,250.00
9,250.00
19,000.00
41,000.00
30,000.00
55,000.00
79,500.00
79,500.00
70,750.00
65,000.00
65,000.00
65,000.00
8,000.00
10,000.00
480,000.00
188,000.00
340,000.00
130,000.00
88,000.00
64,000.00
7,200.00
3,500.00
45,000.00
30,000.00
23,000.00
15,000.00
12,000.00
30,000.00
7,500.00
23,000.00
5,200.00
4,500.00
18,000.00
2,750.00
15,000.00
6,500.00
32,500.00
4,500.00
4,300.00
12,500.00
NOTE
(6)
DAFTAR HARGA SATUAN UPAH DAN BAHAN
UPAH/HARI UPAH/JAM
NO. URAIAN SATUAN KETERANGAN
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
EXPLANATION ASUMTION
1 Soil excavation doing by man 1 Using man power
power 2 Capacity of working group 100/ day
2 Result of soil excavation 3 Average of excavation up to 3 m
be moved from digging 4 For the stony the work with code K.224
3 Depth excavation be containing be multiplicated by 1,5 factor
water and having balance factor 5 For drying be suporting by pump
327,500.00
UNIT COST SUB TOTAL
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)
BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)
(Rp.)
- - - - - - -
0.00
EXPLANATION 1 For the pilling of building ASUMTION 1 Material cost be calculated on the job site
material must be clean 2 Compaction coefisien 1,30
from the organic matter
2 Construction of filling doing
layer by layer
ANGGAPAN : 1 Harga bahan sampai di lokasi pekerjaan
2 Koefisien pemadatan 1,30
780,000.00
166,500.00
EXPLANATION 1 Soil from excavation be filled ASUMTION 1 Tanah urugan diratakan dan dipadatkan dengan
to the digging location cara menumbuk.
2 The organic disposal from
digging be throwing ANGGAPAN : 1 Soil filler be flated and be compacted by
hand compaction
URAIAN : Tanah bekas galian diurug
1
kembali
ke bekas galian
2 Membuang sampah - sampah dari
bekas galian
- - - - - - -
0.00
EXPLANATION 1 Material on out of job site ASUMTION 1 Cost of material franco on pick up location
Transportation the material by 2
2 Length of timber 7 M be lifted by 4 man
man
power to the job site
Material be pilled on the pic up
3
location
The distance of pick up location
3 ANGGAPAN : 1 Harga bahan sesuai dengan tempat pengambilan
max
5 km 2 Panjang kayu kurang lebih 7 M diangkut oleh
4 orang
URAIAN : 1 Bahan/material berada diluar
lokasi pekerjaan
2 Bahan diangkut oleh tenaga
manusia ketempat pekerjaan
Bahan ditumpuk ditempat
3
pengambilan
Jarak pengambilan maksimum 5
4
Km
286,000.00
- - - - -
0.00
Hal. 5
EXPLANATION 1 Material and equipment stand ASUMTION 1 Weight of hammer minimum 0.75 - 1 Ton
by on job site by supplyer 2 Pilling be stoped after 10 kali ditumbuk
2 Material be located near job masuk = 1 cm
site 3 Foundation using the timber piling and pillar
4 Pile set up be diging before
URAIAN : 1 Bahan/Alat siap dilapangan oleh
supplier
2 Bahan diletakkan kedudukannya ANGGAPAN : 1 Berat penumbuk minimal 0.75 - 1 Ton
dekat dengan lokasi pekerja 2 Penghentian pemancangan setelah 10 kali ditumbuk
masuk = 1 cm
3 Pondasi digunakan pemancang kayu dan pilar
4 Letak pancang dilubangi lebih dahulu.
- - - - - - -
1,598.10
JUMLAH (Rp.) 112,373.10
VOLUME E 1.000 SATUAN M'
Hal. 6
EXPLANATION 1 Filling be compacted ASUMTION 1 Material cost be calculated on the job site
each 20 cm per layer 2 Capacity of working group 100/ day
URAIAN : 1 Timbunan harus dipadatkan ANGGAPAN : 1 Harga bahan sampai dilokasi pekerjaan
2 Kapasitas kerja kelompok 100/ hariKoefisien
setiap lapisan setebal 20 cm
pemadatan 1 : 2
66,000.00
-
0.00
Hal. 7
EXPLANATION 1 Material and equipment stand ASUMTION 1 Using culvert, bridge and shear wall and
by on job site by supplyer ather structure with stone pairing
2 Stone crushed be install with wit water proofing mortar
PC and Sand mortar 2 Material be delivered on job site
3 Not included the excavation and filling
URAIAN : 1 Material disiapkan di lokasi oleh 4 Mortar 1 : 3
supplier
Batu belah dipasang dengan ANGGAPAN : 1
2 Digunakan pada gorong - gorong, jembatan, tembok
ikatan
spesi semen PC + Pasir penahan dan struktur-struktur yang lain yang
menggunakan pasangan batu kedap air
2 Material dikirim sampai lokasi
3 tidak termasuk pekerjaan galian/timbunan
4 Adukan spesi 1 : 3
0.00
Hal. 8
EXPLANATION 1 Material and equipment stand ASUMTION 1 Weight of hammer minimum 0.75 - 1 Ton
by on job site by supplyer 2 Pilling be stoped after 10 kali ditumbuk
2 Material be located near job masuk = 1 cm
site 3 Foundation using the timber piling and pillar
4 Pile set up be diging before
URAIAN : 1 Bahan/Alat siap dilapangan oleh
supplier ANGGAPAN : 1 Berat penumbuk minimal 0.75 - 1 Ton
2 Bahan diletakkan kedudukannya 2 Penghentian pemancangan setelah 10 kali ditumbuk
dengan pekerja masuk = 1 cm
3 Pondasi digunakan pemancang kayu dan pilar
4 Letak pancang dilubangi lebih dahulu.
0.00
Hal. 9
EXPLANATION 1 The equipment be installed on ASUMTION 1 Material cost be calculated on the job site
concrete or stone pairing 2 Cutting of PVC pipe dia. 2 " depend on wall thickess
with the slope to below or wall thickess.
ather 3 Palm fibre be install on the end of PVC
To be installed palm fibre round 4
2 PVC be calculated @ 40 m'
the PVC pipe
dalam peralon.
ANGGAPAN : 1 Harga bahan dihitung ditempat pekerjaan
URAIAN : 1 Memasang peralatan pada 2 Setiap potongan peralon 2 " panjang tergantung lebar/
pasangan batu/beton pada talud tebal dinding.
dengan miring ke bawah bagian 3 Ijuk dipasang diujung sekeliling peralon bagian dalam.
lainnya 4 Hitungan peralon per 40 m'
2 Memasang ijuk disekeliling bagian
dalam peralon.
680,000.00
EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTAL
PERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAH
ALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)
0.00
Hal. 9a
EXPLANATION 1 Canal excavation doing by ASUMTION 1 Using the excavator (140 M3/hari)
Excavation 2 Tree and any planting be clean up
2 Soil from canal excavation be following the dykes be construction.
throwing on side of canal
3 Man power be throwing the ANGGAPAN : 1 Menggunakan alat berat exavator (140 M3/hari)
roots and ather disposal 2 Pohon-pohon dan semak belukar sudah dibersihkan
pada waktu pembentukan tanggul samping.
URAIAN : Menggali saluran dengan
1
Exavator.
excavator
2 Tanah galian diangkat ke
samping saluran yang digali.
3 Tenaga manusia membuang akar-
akar kayu dan sampah-sampah
lainnya.
1,237,376.80
EXPLANATION ASUMTION
URAIAN : ANGGAPAN : 1 1/3 dari bahan masih dapat digunakan lagi untuk
1 Menyiapkan bahan memotong, pada cetakan lain.
mengergaji, memaku dan 2 Kapasitas produksi = 2 M3 / hari.
memasang
10 Formwork
10 Cetakan dibongkar oleh pekerja
atau ijin Direksi.
TOTAL TOTAL BILLING COST SUB TOTAL
LABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)
PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
ORANG HARI/ORANG UPAH (Rp.) A (Rp.)
(Rp./Hr/Orang
Foreman 1.000 1.000 1.000 47,500.00 47,500.00
Chief Laborer 1.000 1.000 1.000 55,000.00 55,000.00
Skill Laborer 6.000 1.000 6.000 52,500.00 315,000.00
Non Skill Laborer 4.000 1.000 4.000 35,000.00 140,000.00
557,500.00
UNIT COST SUB TOTAL
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)
BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)
(Rp.)
Kayu Begisting 0.800 M3 1,300,000.00 1,040,000.00
Paku 8.000 Kg 10,000.00 80,000.00
1,120,000.00
0.00
EXPLANATION ASUMTION
URAIAN : ANGGAPAN : Bahan dihitung ditempat pekerjaan.
1 Membersihkan tempat yang akan 2 1 kg can be covered on 6 m2
dicat. 1 kg dapat menghasilkan 6 m2
3 Calculated per 1 m2
2 Cat dituang kedalam baskom Hitungan per 1 m2
dan dicatkan dengan roll kuas.
2,250.00
0.00
1,440,000.00
0.00
EXPLANATION 1 Material and equipment stand ASUMTION 1 Material cost be calculated on the job site
by on job site by supplyer 2 Productivity of concrete mixer is 10 M3/hari.
2 Before using the agregat must be 3 Mix design 1 : 2 : 3.
cleaning 4 Length of mixing is 9 minute
3 Concrete be mixed by mechanical 5 The weight of 1 M3 concrete 2.400 Kg and
mixer and near the job site. 1 Pocket PC 40 Kg.
187,392.88
Hal. 14
187,392.88
JUMLAH (Rp.) 4,447,390.38
VOLUME E 2.000 SATUAN M3
Hal. 15
12,000.00
Hal. 16
EXPLANATION 1 Kayu diketam terlebih dahulu. ASUMTION 1 Material cost be calculated on the job site
Kayu dipotong sesuai dengan 2
2 Be calculate per 1 M3
ukuran
dalam desain.
ANGGAPAN : 1 Hitungan bahan ditempat pekerjaan.
URAIAN : 1 Kayu diketam terlebih dahulu. 2 Dihitung per 1 M3
Kayu dipotong sesuai dengan
2
ukuran
dalam desain.
- - - - -
0.00
Hal. 17
EXPLANATION 1 Membersihkan tempat yang akan ASUMTION 1 Material cost be calculated on the job site
dicat. 2 1 Kg anty terminete can be covered 3 m2 area
2 Cat dikerjakan dengan kuas. 3 Calculated per 1 m2
URAIAN : 1 Membersihkan tempat yang akan ANGGAPAN : 1 Bahan dihitung ditempat pekerjaan
dicat. 2 1 Kg dapat menghasilkan 3 M2
2 Cat dikerjakan dengan kuas. 3 Hitungan per 1 M2
1,765,000.00
EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTAL
PERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAH
ALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)
12,000.00
Hal. 18
EXPLANATION 1 Papan diketam terlebih dahulu. ASUMTION 1 Material cost be calculated on the job site
2 Papan dipotong sesuai lebar 2 Papan lantai tebal 8 Cm dan lebar 20 - 25 Cm
jembatan. 3 Hitungan per 1 M2
3 Papan dibaut pada kayu bantalan
lantai ANGGAPAN : 1 Hitungan bahan ditempat pekerjaan
2 Papan lantai tebal 8 Cm dan lebar 20 - 25 Cm
URAIAN : 1 Papan diketam terlebih dahulu. 3 Hitungan per 1 M2
2 Papan dipotong sesuai lebar
jembatan.
3 Papan dibaut pada kayu bantalan
lantai
0.00
Hal. 19
EXPLANATION 1 Membersihkan kayu yang akan ASUMTION 1 Material cost be calculated on the job site
diteer. 2 1 Kg anty terminete can be covered 3 m2 area
2 Teer dioleskan dengan kuas. 3 Calculated per 1 m2
URAIAN : 1 Membersihkan kayu yang akan ANGGAPAN : 1 Bahan dihitung ditempat pekerjaan.
diteer. 2 1 Kg teer mengerjakan 3 m2 luasan
2 Teer dioleskan dengan kuas. 3 Hitungan per 1 m2
24,000.00
Hal. 20
EXPLANATION 1 Membersihkan kayu yang akan ASUMTION 1 Material cost be calculated on the job site
diteer. 2 1 Kg anty terminete can be covered 3 m2 area
2 Anty termite painting be 3 Calculated per 1 m2
coating by shaving brush
URAIAN : 1 Membersihkan kayu yang akan ANGGAPAN : 1 Bahan dihitung ditempat pekerjaan.
diteer. 2 1 Kg teer mengerjakan 3 m2 luasan
2 Teer dioleskan dengan kuas. 3 Hitungan per 1 m2
2,600.00
0.00