You are on page 1of 30
© 2 © & |G prodi-tr.com/webTest stWeb. ‘The owner of an existing building is planning a major renovation and wants to upgrade the building automation system and lighting retrofit to maximiz process manager must confirm \ergy-saving opportunities. The commissioning © A. who.willperform verification of lighting control performance. © B. adequate levels of knowledge of the users. © C. _ who.willperform calibration of bullding automation system, TH. adequate evels of knowledge of the service contractor. [exit | uch ES fobs istan|[S Yort coma Game Pees | she-rane [ aT stan See cage Game Pas es see ei [ Tet x € > © FD prodt txr-com/WebTesi/tes ‘The owner's project requirements document should include building (BIA. use, design standards, testing training, and documentation requirements, © B. appearance, envelope material ec. op. lection, and efficiency requirements. ‘systems manufacturer selection and operational and maintenance schedules. ‘equipment sizing calculations, coordination, and code verification analysis. 7 SP ee ala DSO sa © 2 © & |G prodi-tr.com/webTest Commissioning of a high school science laboratory and computer work space was completed 2 months ago as part of the ongoing commissioning process program. Which of the following Is the best ‘means for the commissioning process manager to ensure adequate training was achieved? 6 A_Dacues te ning proved ih OB sat ©. C Spode A new 25,000 ft? office building will be constructed in a community of 300,000 people. The building is being designed by a local team. A contractor is using the commissioning proce unsure about this approach to building. Which of the following activities is most important to execute prior to construction? for the first time andis [HJA. Review an environmental impact study based on similar buildings © B. Assemble detailed lists of codes for this building type. © €. Compose a statement of the owner's Intended beneft © D. Explain the commissioning proce 1nd benefits to contractors. ox me el | | Listar| [Test comke Grome Bares i rom ala DSO sa © 2 © & |G prodi-ter.com/webTest stWeb. ‘The commissioning process on an existing biological laboratory includes the integrated testing of the building alr congitioning systems, outside air controls, and the building pressurization alarm system. ‘The initial testing indicated electrical power control problems to the building controls and outside air system under emergency power conditions with no resulting alarm. In addition to a mechanical contractor, which of the following contractors should be engaged in the search fora solution? (AA. controls and electrical © 8. generat and plumbing © C._ general and electrics © DL contols and plumbing no soa Lista [Text cong Grome | _Picrwerest Si vnttes port a a Ee SG prodi tar.com/WebTesi/testWeb.aspx_ ‘When starting a new facility commissioning project, the first person added to a project team after an owner's project manager should be a © A. construction manager © B. design architect. [@]c. commissioning authority. © D. property manager. no "see Listare| [Test coogi Crome _f anos | ai spot en [eae CIS soa © 2 © & |G prodi-tr.com/WebTest stWeb. {An owner's project requirements state that the domestic hot water shall be available at the fixture within 30 seconds. A commissioning process manager receives reports from bullding occupants that there Is a lack of hot water atthe fixtures in one portion of the building. The commissioning process manager should © A. inform the commissioning authority that theres an issue with the hot water system. © B. inform the general contractor that there isan issue with the hot water system, Llc. review the nal commissioning report to see whether the system was proved functonal © D. review the record documents to see whether the system was Inealed correct EEX Ee Bee List| [E Te coos rome _ Plover og z-0m [

You might also like