IT Facilities, Energy
FY2010 Construction, Expansion, Consolidation Budget ($/year)
Annual Data Center Building Operational Cost ($/year)
Annual Data Center Electricity Cost ($/year)
Annual Total Electricity Usage (kWh/year)
Annual IT Electricity Usage (kWh/year) - Measured at the output of
the UPS meter, or if not available - at the PDU meter
Total Data Center IT Power Capacity (kW)
Rack Count (#)
Rack Space Utilization (%) - Estimated