You are on page 1of 4
LAG Internal Memo To Eng. Faris Date : 26/10/2009 Project : Renovation of City Season Hotel, Abu Dhabi Subject : Mechanical Report for City Season Hotel Dear Sir, With reference to the above said subject, please find attached herewith the Report on the status of Mechanical Works at City Season Hotel, Abu Dhabi This is for your information, Best regards, uf) auhele4 Eng. K.G. Sukumaran Mechanical Engineer Architecture & Planning Group 048-00 MECH, MEMO doo Poge tof MECHANICAL WORKS 26/10/2009 REPORT ON THE STATUS OF MECHANICAL WORKS AT THE CITY SEASON HOTEL, ABU DHABI The followings are the status of mechanical works in the above hotel building as on 26/10/09 are as follows A) Water Supply 1) A-cold water pipe work distribution from 1 to 15" floors are completed B-Filtration units are kept on foundation at roof The riser pipes through the shaft up to roof are completed D-Cold water pipe on roof (from shaft to water tanks) not yet done E-Water lifting pump set and cold water booster pump set not yet delivered F- Chiller units for cold water system not fixed G-Cold water pipe work at pent house ~Phase 1 part finished 2). A-Hot water pipe work distribution from 1" to 15" floors are completed, B-Hot water riser pipe (supply & return) through shaft completed. C-Hot water booster & recirculation pump sets are not yet delivered D-All central water heaters are kept on foundation at roof. 8) Fire fighting works It is regret to note that no progress is found in fire fighting work since our last Report on 4/10/09 ‘Aire fighting pipe work distribution in 1st to 15” floors completed. B-Hose reel cabinet installed without hose reel & accessories C-sprinkler heads are fixed almost 80%, but locations to be corrected in most of the cases D-Riser pipe work through shaft not done E- Fire Pump set delivered but not fixed €)_ Air conditioning Works ‘A:3 nos.of chillers and 3 chilled water pumps are installed on roof. B-Chilled water risers in 2 shaft and pipe connection to 1" to pent house completed C- Thermostats for FCUs and grilles and diffusers are fixed in 4" to 15" floors D) Drainage work A-Drainage pipe work for each toilet/bath/pantry is completed in ist to 15" floors are completed. 8. Floor traps are fixed from 5" floor to 15" floor C-Allriser pipe work for drainage (soil/waste/vent/rain water) completed and connected to external MH E) Sanitary wares & fittings fixed from 8" to 15" floors 16 n2"t Ve WATER SUPPLY (Hot Water) 26/10/2009 rem car | our | moze | ste | amar | arte | aime | seme | sine | rene | aenr | ome | aomne | stene | azine | rstne | samme | asene | one | MOR Se a mu [ves | ves | ves | ves | ves | ve | ves | ves | ves | ves | ver | ver | ves | ve | ves | om | 7% So ou foe [mn [ves [ves [ves [ ves | ves [ ves | ves | ves | ves | ves | ves | ves | ves | ves | ves | mv | 7mm fomcsonwenvaeratsnacrerame | oat | ot | ot | ves | ves | ves | ves | ves | ves | ves | ves | ves | ver | ver | ver | ver | ver | vee | ot | 79m fees ae aheion mu fot [om [ves [ves | ves [ves [ves | ve [ves | ves | ves | ver | ves | ver | ves | ver | ves | om | 76 === compuereo 0% [row tenes neon LUNDER PROGRESS (ALL WATER HEATER ON ROOF) som Se NOT DELIVERED % rein aot UNDER PROGRESS (ON ROOF] 30% WATER SUPPLY (Cold Water) 26/10/2008, tem Grr | mone | moze | ate | andr | arde | athe | sthe | ome | rene | athe | atu | sone | athe | sate | asthe | ratne | astm | rie cou a fot [nt [vm [ves [ov | ves [vee [ves | vee [vee [vee [vee | ver [vee | ver [vee | ver | ve | aan Jnere rena ot fot [ot [ves [ves [ves | ves [ves | ves [ves [ves [vee [ves | ve | ove [ver | ver | ve | re seater ne ou fo [me [ves [ves [ves [ves | ves [ves | ves [ves | ves [ves | ve [ver [ves | ver | ves | ve | ame Sry rt [rw [me [ves [ves [ves | ves | ves | ves | ves [ves | ves | ves | ves [ves | ves | ves | ves | ve | omm Jane tey ne tft [mt | vee [vee [ve | ves |v | ver [ver | ves [ve [vee [vee | ve | ver | vee | vee | om | oom fee ware a] [fom] ow | | ow [ow | ow | ow | ow [oe [oe le toe |e [oe |e | ow | ow [too pane miner NOT DELIVERED % [veneers UNDER PROGRESS 25% fae ee a UNDER PROGRESS 19% breton rw nse Tt [nt [ves [ves [ve [ves ] ves | ves ] ve | ves | ves [ves | ves [ve | ves [vee | ves [ve | om [nap tr ne foo [oo fom foo [oe Poo [ow foo [oo [ow [oo [oom [om [om | oom [ow | om [om | ow [rm sp Ponce sot NOTSTART om FIRE FIGHTING WORK 26/10/2009, ew con [ mous [ooze [ aste [ anar [sear [ ame [sor | oime [mmr [ ame [sine | xome | same | ame | same | come | sme | ear | SOE serie re fo [me [ves [ves | ves [ves | ves [ves | ves | ves | ve | ves | ves | ves | ves | ves | vee | mt | 70m ce rt ft [mt [ves [ves | ves [ves | ves | ves | ves | ves [ves | ves | ver | ve | ve | ves | ves | ot | em scat it [on [om [ves [ves | ves [ves | ves | ves | ves | ves | ves | ves | ves | ves | ves | ves | ves | ot | 0m ee ou [on [me [ves [ves | ves | ves | ves | ves | ves | ves | ves | ves | ves | vee | ves | ves | ves | mm | oom fm concave rt [ot [mt [ves [ves [ves [ves [ves [ves [ves [ves [ves [ves | ves | ves | ves [ ves | ves | mm | rm ios Fegan i foot fom foo foo [oo [ome [oot foo oot [ow [oom oo [oom Poo | oo | ot | om | mt | ow fener NOTSTART o — ‘eLiveReD o [AC WORK 26/10/2000 re cnr [ morr| moar [acer [ andr | acar [ aime | sine | eine [ ene | emer | ome [ome | sume | wme] tame | vane | sme | eae | SO fs non 3 nos, DEUVERED AND nos BALANCED om fcintten mu ot [mt [ve [ves [ve [ves [vm [ves [vee | ves [ove [ver | vee | ove | ver [vee | vee [ove | mm fovw rcomecton ou [ot [on [ves | ves [ves [ves [ove [ves [ves [ves [ves [ves [ves [ove [ves [ves [ves | om | oem forw rien mu fot [om | ves | ves | ves [ves [ves | ves | ves [ves [ves | ves | ves | ves | ves | ver | ver | ve | oem fcoutcomaton uf ow [mn | ves [ves | ves | ves | ve | ves | ves [ ves | ves | ves | ves | ves [ves | ves | ves | ves | omm [ruc nan ru [ot [on | ves [ves | ves [ves | ves | ves | ves [ ves | ves | ves | ves | ve | ves | ves | ves | ve | om f-xotonae vt [ot [on [ves [ves [ves [ves [ve [ves | ves [ves [ves [ves | ves [ves [ves | ves | ves | ve | ome fcaDeonae ru [ow [om | ves | ves [ves [ ves [ ves | ves [ ves [ves [ves [ves | ves [ves [ves | ves [ ves | ve | oom foc w rnin ow meen COMPLETED om fete anotaen START (15th FLOOR TOA FLOOR) = ina rt [ot [mt [ves [ves [ves [ves [ve [ves [ve | ves [ves | ves | ve ove [om | ove [om | oot | em = of % eb chest ve.

You might also like