PT. SMCC Utama Indonesia.

Project : Warehouse (North Car Pool)


Location : KTB Pulogadung Jakarta
Total Bottom of Found. =GL. (m) -1.90 Base Wall
No TYPE Member Lean Conc. Thick (m) 0.05 Dimension C.Spacer 0.03 Dimension C.Spacer 0.03
Trench W.1000 ( Double Layer ) Place L. Conc. Each Space (m) 0.10 W L H/D Side Place W L/D H Side Place
( Base & Wall ) (Nos.) Gravel Thick (m) 0.15 (m) (m) (m) ( Nos. ) ( Nos. ) (m) (m) (m) ( Nos. ) ( Nos. )
1 Section / Bar Shape 1 Excav. Depth (m) 2.10 1.30 210.00 0.20 2 1 0.20 210.00 1.70 2 2
Item of Work Quantity Width Length Height Side Quantity Width Length Height Side Quantity
Excavation Space
Left Right Filling m3 0.00 1.90 210.60 0.00 0.00
Top 0.80 0.80 Excavation m3 1,108.80 2.50 211.20 2.10 1,108.80
Bottom 0.40 0.40 Gravel Lay m3 50.47 1.60 210.30 0.15 50.47
Average 0.60 0.60 Base Compaction m2 336.32 1.60 210.20 336.32
Plastic Sheet m2 0.00 1.50 210.20
Forming = 7.66 m2 / m3 Lean concrete m3 15.77 1.50 210.20 0.05 15.77
Re - Bar = 140.99 Kg / m3 Forming m2 1,512.52 1.30 210.00 0.20 2 84.52 210.00 1.70 2 1,428.00
Concrete = 0.72 m3 / m2 Chamfer m1 840.00 210.00 2 840.00
Wire Mesh m2 0.00 1.30 210.00
Re - Bar Ratio, According Design section Re-bar kg ### ### ###
Base = 8,190.00 Kg Concrete m3 197.40 1.30 210.00 0.20 54.60 0.20 210.00 1.70 1 142.80
Wall = 21,420.00 Kg Trowel finish m2 273.00 1.30 210.00 189.00 0.20 210.00 1 84.00
Total = 29,610.00 Kg Backfill & Compaction m3 469.26 469.26
= 150.00 Kg / m3 Disposal m3 639.54 1.30 210.00 2.10 639.54

Rebar ( Break Down ) Dia. 6 8 10 12 13 16 19 22 25 32


Base kg ### 0.00 0.00 0.00 0.00 5,577.21 ### 0.00 0.00 0.00 0.00
Wall kg ### 0.00 0.00 240.47 0.00 ### 0.00 0.00 0.00 0.00 0.00
Other kg 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL Kg ### 0.00 0.00 240.47 0.00 ### ### 0.00 0.00 0.00 0.00