GEHC SITE PLANNING 8.0ct.14, REVISION 0 APPENDIX A PAGE A~185 POWER SPECIFICATIONS Brivo 385 (REV. DATE. 30.APR.13) VOLTAGE PRIVARY SOURCE IS_ REQUIRED FOR ALL INSTALLATIONS. ANCE, Of ENE VOLTAGES NOWINAL LINE VOLTAGE OF 580 TO REQUIRED POWER JPPLY: WYE CONNECTED MAXIMUM DAILY VOLTAGE VARIATION MUST FALL WITHIN ONE OF THE RANGES IN TABLE A TABLE A ALLOWABLE VINA WINIVUME § NPUT vOUTAGe ROTECTION VOLTAGES/ ct CURRENT 380 | 342-418 90a DEMAND 400 360-440 90-A 480 (ALL RiSic:, ESERIES MRS RRL Ee BALANCE. TRANSIENT VOLTAGE SHOULD SE ‘LIMITEL TAGE, TRANSIENT, OR IMPULSE. ONL THE, INCOWING POWER MU BEHELD TO. 8 BINIVUM. © TRANSIENTS cee UGHTMING, s LOAD’ SWITCHING, STATIC “ELECTRICITY Gi, IN EVE INSTANCES, (CoM SYSTEM POWER 6.5 KVA (MAX DEMAND = 40 kVA) DEMAND TABLE 8 = MAXIMUM DEMAND ct MOMENTARY POWER Kae DEMAND Power Factor a’ | 0.88 * DEMAND INCLUDES POWER FOR ENTIRE CT SYSTEM LINE VOLTAGE. REGULATION_AT VAXIMUM 2OWER DEMAND MUST BE LESS THAN OR EQUAL TO 6 PERCENT DISTRIBUTION NIT INSTALLATION, THE WINIMUM TRA IH 2.4% RATED SECULATION AT NT MAXIMUM ALLOWABLE FEEDER TRANSFORMER GE Healthcare 8.0ct.14, REVISION 0 APPENDIX A PAGE A~186 GERC SITE PLANNING FEEDER TABLE FEEDER TABLE — Brivo CT385 ‘2 CALCULATIONS BASED UPON NOMINAL VOLTAGE, WIRE SIZE IN AWG. (© RECOMMENDED FEEDER SIZES FROM OISTRIBUTION TRANS. TO POWER DISTRIBUTION UNIT, (© THE GROUNDING CONDUCTOR ( ) WILL SE A 1/0 MINIMUM. THIS GROUND WILL RUN FROM THE EQUIPMENT BAC TO THE POWER SOURCE/MAIN GROUNDING POINT AND ALWAYS TRAVEL IN THE SAVE CONDUIT WITH THE FEEOERS AND” NEUTRAL © NEUTRAL MUST BE TERVINATED PRIOR TO OR INSIDE THE MAIN DISCONNECT PANEL AND NOT BROUGHT INTO\ THE POWER DISTRIBUTION UNIT. FOR A FULL SYSTEM UPS REFER TO ELECTRICAL OETAILS FOR UPS FEEDER WIRES. POWER SUPPLY VOLTAGE sun tenets | Soomro | sea—ase | Sae—aea “ase 50 4 4 4 (1/0) 100 4 4 4 (1/0) 150 3 4 4 (1/0) 200 3 4 4 (1/0) 250 3 3 (1/0) 1 2 3 (170) 2 (1/0) 400 1 (1/0) (REV. DATE 30.APR.13)

You might also like