Inspection Method / Acceptance Criteria Reporting Format Inspection By Sub- Remarks Con

HHI SEC/ OE 2 Installation Cable Tray, Ladder and Conduit Installation. 100% Installation All
Route Approved drawing. Vender Drawing - Check hold down clamp and brackets are
installed. - Check cable ladder properly supported. - Check cover installed(to be installed
after all the cables are tested and properly terminated) - Check junction box supports
independent from conduit and tray. - Check conduit supports within the specified interval
according to approved drawing. - Check touch up of galvanizing performed (if required) - No
sharp edges. - No obstructi