LAYERED AUDITSLAYERED AUDITS
PURPOSE:
To provide a system to:
verify compliance to the documented process
instill discipline
improve communication
improve overall quality
Assembly Area
Manufacturing Operations
Shipping/Receiving
Repair/Rework Area
All Operations and other support functions
RESPONSIBILITY:
+ Single Ownership
- Plant Manager
+ Supported By
- Quality Manager
(0107282005. OSB WORKSHOP REV. 11 (02/1802) 2REQUIREMENT:
Layered Audits shall be conducted for manufacturing and
assembly of high risk items at a minimum of once per shift.
Frequency of Layered Audits based on production volume or level of risk
associated with process.
Layered Audits supplement ongoing control plan and job instruction
checks.
A check list of high risk items to be verified during Layered Audits
shall be established.
Elements should be considered in developing the check list. (Example)
07012872005 OSB WORKSHOP REV. 11 (02/1802) 3(Example)
Elements
Utilization of manufacturing assists (as applicable)
Gages functioning and calibration confirmation
‘Stacking / packing techniques
Build / manufacturing techniques
Visual aids presence and content
Process parameter setting
Job instructions
Correct product identification
Process steps adhered to
Required inspections completed
Torque monitoring (if applicable)
Product dimensions or visual inspection
Documentation / record completion
Quality Gates (as applicable)
Customer feedback
(0107252008. OSB WORKSHOP REV. 11 (02/1803) 4 Sresenesneancaneses BaroneREQUIREMENTS (continued):
+ Layered Audits results shall be recorded.
+ Non-conformities shall be addressed immediately
+ Reaction plan(s) for non-conformities detected during Layered
Audits shall be documented and available for use.
+ Corrective actions shall be documented.
+ Results shall be summarized and reviewed by the
manufacturing site leadership.
+ Layered Audit documentation shall be compiled in the
Lessons Learned (key strategy) database.
(0107282005 O88 WORKSHOP REV. 11 (02/1803) 5REQUIREMENTS (continued):
* Customer used features shall be identified, listed and checked in
the manufacturing process with emphasis on:
Supplier pass through features
Mounting (holes, taps, etc.)
Electrical connections/connectors
Mounting surfaces
Clearances
Missing/wrong brackets
Incorrect parts
Others as identified by customer
(0025/2005 OSB WORKSHOP REV. 11 (02/803) 6REQUIREMENTS (continued):
+ The following is an example of a Layered Audit with three levels
of management involved in the process:
- The manufacturing supervisor shall verify (daily) all quality
documentation is completed by operators.
- The manufacturing area manager shall verify (weekly) that
supervisor verification is being completed.
- Site leadership shall conduct layered audits at a
frequency defined locally.
(0107282008. OSB WORKSHOP REV. 11 (02/1809) 7 aRole NBS Rese a ani baie
Example
ered Rutan cS) GMPT model
‘CUSTOMER CONCERNS iseke pec riche
External- PRR's, ete TEAMS
Cross Functional
Internal ‘Shainin
AUDIT THE PROCESS
8 STEP Corrective Formal Line item document |,
"Action CONTROL PLANS ~-Ttems Checked daily
— Is the system working?
“12:15pm, Report outs ‘What's critical to
“Fast Response the process?
|AUDIT % COMPLIANCE)
JOB INSTRUCTIONS} ~Data Collection
Participation
-Standerdized Work Responsiveness
“Integrity
oy {
RESULTS
“Quality Improved
-Quality Stabilized
(0107252005 OSB WORKSHOP REV. 11 (02/7809) aLAYERED AUDIT MATRIX (Exampl
(0102872005 QS@ WORKSHOP REV. 11 (02/180) °(Example)
ane NAM:
PRT NOME smurr:
Clsrosne:
DEPARTMENT werk ENDING:
alellalele
Plgye)ilali
alflelé lila
Ooi [ Ban
i oi ar wit ance TGR)
Has perpereviry boon goged 402-9507) Specs 20 ines
Is there any broach tear? (Chock one part Fom each broach)
op0 | Goksons
1s the 10 on size (Coline #2 & 377
isthe 1D run out win specications?
sth 1D taper (etweon columns 2 & 3) within specication?
‘Op30_[ Hones
asthe 1b Mleo been checked and the Mero Log completed?
>| Entre Deparment
‘Are operators vericaion sheets completed daly by ahs?
‘Are ho tagging procedures beng flowed?
‘Are any Temporary Alert Notices posted thathave pied?
0028/2005 088 WORKSHOP REV. 11 (02/1803) 0(Example)
PART NAME:
PART NUMBEI
‘sur:
WEEK ENDING:
omb
the bulla checking eiion & martina prs ouch point?
Have the e-nole sprogs been nspeced for prosonce of holes
and identified th orange marker?
‘Ae barcode labels ttced to shipping cvtaner in coreck
locaten?
hioing conainars checked or acual count?
‘Machining Operations Total Non-Conforming tems [_[—T [TT]
Assembly Total Non-Conformina tems [TTT TT]
LIST ANY QUALITY OR MANUFACTURING CONCERNS ON ALL OPERATIONS,
(01072572005 SB WORKSHOP REV. +1 (02/1803) 1"(Example)
DEPARTMENT LAYERED AUDIT RESULTS
ITEMS NOT IN COMPLIANCE
__ NUMBER OF OCCURANCES
070128/2005 OSB WORKSHOP REV. 11 (02/8103) 2(Example)
LAYERED AUDITS RESULTS
DEPT..,
{FOF ITEMS ON ASSESSMENT:
"FOF ASSESSMENTS]
TOTAL WOF Meus ASSESSED.
"FOF TENS IN COMPLIANCE}
(01072812005 O88 WORKSHOP REV. 11 (02/1803) 8