Nilai z (waktu tetap) juga dipengaruhi oleh metode tersebut, disamping tergantung dari jenis
transmissi dari shovel/leader (lihat tabel).
Contoh :
Sebuah Shovel (Torque Flow) yang mempunyai bucket 1,8 M3 digunakan untuk mengisi
Dump Truck. Metode loading adalah V-Shape Loading.
𝐾𝐵 𝑥 60 𝑥 𝐹𝐾
TP = 𝐽 𝐽
( + )𝑛 + 𝑍
𝐹 𝑅
1,8 𝑥 60 𝑥 0,4
= 5 5
(50+ 58,33) 2 + 0,2
43,2
= 0,57
= 116 M3/Jam
𝐾𝐵 𝑥 60 𝑥 𝐹𝐾
TP = 𝐽 𝐽 M3/Jam
( + )𝑛 + 𝑍
𝐹 𝑅
Keterangan :
FK = Faktor koreksi
Z = loading time +
Model Selection EXCAVATORS BACKHOE
The concept of the combination of bucket size, arm length, and boom length for hydraulic
excavator to match the nature oh the operation is as follows.
Boom/arm + Bucket
1. Wider working range Loong boom
Long Arm + Small capacity
bucket
2. Larger production Short boom
Short arm + Large capacity
bucket
3. Larger digging force, larger lifting capacity Short arm + Narrow bucket
+ Ripper bucket
4. Heavy-duty work Strengthened boom
Strengthened arm + Heavy-
duty bucket