You are on page 1of 20

TUBERIANudo inicial Nudo final

Qo estim. (lps)
L (m) D (m) c
1 1 2 200 400 0.30 100
2 2 3 80 400 0.25 100
3 3 4 20 300 0.20 100
4 2 5 40 300 0.25 100
5 4 5 30 400 0.20 100
6 5 1 50 500 0.30 100

1ra Iteración
Circuito Tubería L (m) D (m) A (m2) C (HW) Qest (m3/s) CONST. S^0.54 S h (m)
1 1 400 0.3 0.071 100 0.2000 1.174 0.1704 0.03775 15.100
1 4 300 0.25 0.049 100 0.0400 0.727 0.0551 0.00466 1.397
1 6 500 0.3 0.071 100 -0.0500 1.174 0.0426 0.00290 -1.449
DQ(1) = -0.0584 m3/s 15.048

Circuito Tubería L (m) D (m) A (m2) C (HW) Qest (m3/s) CONST. S^0.54 S h (m)
2 2 400 0.25 0.049 100 0.0800 0.727 0.1101 0.01681 6.725
2 3 300 0.2 0.031 100 0.0200 0.404 0.0495 0.00383 1.148
2 4 300 0.25 0.049 100 -0.0984 0.727 0.1354 0.02464 -7.393
2 5 400 0.2 0.031 100 -0.0300 0.404 0.0743 0.00811 -3.242
DQ(2) = 0.0046 m3/s -2.763
2Da Iteración
Circuito Tubería L (m) D (m) A (m2) C (HW) Qest (m3/s) CONST. S^0.54 S h (m)
1 1 400 0.3 0.071 100 0.1416 1.174 0.1207 0.01993 7.971
1 4 300 0.25 0.049 100 -0.0938 0.727 0.1290 0.02255 -6.766
1 6 500 0.3 0.071 100 -0.1084 1.174 0.0923 0.01213 -6.066
DQ(1) = 0.0142 m3/s -4.861

Circuito Tubería L (m) D (m) A (m2) C (HW) Qest (m3/s) CONST. S^0.54 S h (m)
2 2 400 0.25 0.049 100 0.0846 0.727 0.1164 0.01865 7.458
2 3 300 0.2 0.031 100 0.0246 0.404 0.0609 0.00561 1.684
2 4 300 0.25 0.049 100 -0.0795 0.727 0.1094 0.01662 -4.986
2 5 400 0.2 0.031 100 -0.0254 0.404 0.0629 0.00596 -2.382
DQ(2) = -0.0031 m3/s 1.774
3ra Iteración
Circuito Tubería L (m) D (m) A (m2) C (HW) Qest (m3/s) CONST. S^0.54 S h (m)
1 1 400 0.3 0.071 100 0.1559 1.174 0.1328 0.02380 9.519
1 4 300 0.25 0.049 100 -0.0826 0.727 0.1136 0.01783 -5.348
1 6 500 0.3 0.071 100 -0.0941 1.174 0.0802 0.00935 -4.673
DQ(1) = 0.0015 m3/s -0.501

Circuito Tubería L (m) D (m) A (m2) C (HW) Qest (m3/s) CONST. S^0.54 S h (m)
2 2 400 0.25 0.049 100 0.0815 0.727 0.1122 0.01742 6.966
2 3 300 0.2 0.031 100 0.0215 0.404 0.0533 0.00439 1.316
2 4 300 0.25 0.049 100 -0.0810 0.727 0.1115 0.01721 -5.164
2 5 400 0.2 0.031 100 -0.0285 0.404 0.0705 0.00735 -2.941
DQ(2) = -0.0003 m3/s 0.177
4ta Iteración
Circuito Tubería L (m) D (m) A (m2) C (HW) Qest (m3/s) CONST. S^0.54 S h (m)
1 1 400 0.3 0.071 100 0.1574 1.174 0.1342 0.02424 9.694
1 4 300 0.25 0.049 100 -0.08133 0.727 0.1119 0.01733 -5.200
1 6 500 0.3 0.071 100 -0.0926 1.174 0.0789 0.00906 -4.532
DQ(1) = 0.0001 m3/s -0.037

Circuito Tubería L (m) D (m) A (m2) C (HW) Qest (m3/s) CONST. S^0.54 S h (m)
2 2 400 0.25 0.049 100 0.0812 0.727 0.1118 0.01729 6.918
2 3 300 0.2 0.031 100 0.0212 0.404 0.0526 0.00427 1.282
2 4 300 0.25 0.049 100 -0.0812 0.727 0.1118 0.01729 -5.186
2 5 400 0.2 0.031 100 -0.0288 0.404 0.0712 0.00750 -3.000
DQ(2) = 0.0000 m3/s 0.013

Q1 1 157.44 L/s
Q2 2 81.23 L/s
Q3 3 21.23 L/s
Q4 4 -81.33 L/s
Q5 5 -28.77 L/s
Q6 6 -92.56 L/s
h/Q
75.499
34.932
28.972
139.404

h/Q
84.061
57.383
75.172
108.074
324.691

h/Q
56.276
72.167
55.987
184.430

h/Q
88.161
68.448
62.714
93.788
313.112

h/Q
61.062
64.766
49.652
175.480

h/Q
85.436
61.119
63.734
103.338
313.627

h/Q
61.577
63.938
48.958
174.473

h/Q
85.163
60.380
63.861
104.282
313.686
TUBERIANudo inicial
NudoQofinal
estim. (lps)
L (m) D (m) c
1 1 2 200 400 0.30 100
2 2 3 80 400 0.25 100
3 3 4 20 300 0.20 100
4 2 5 40 300 0.25 100
5 4 5 30 400 0.20 100
6 5 1 50 500 0.30 100

Circuito Tubería L (m) D (m) A (m2) C Qest (m3/s) V (m/s) Re RHS f h (m)
1 1 400 0.3 0.071 100 0.2000 2.829 848826 2.090 0.2288 ###
1 4 300 0.25 0.049 100 0.0400 0.815 203718 1.932 0.2680 10.886
1 6 500 0.3 0.071 100 -0.0500 0.707 212207 2.090 0.2290 -9.733
1 #N/A 0.4 0.126 0.15 -0.1330 1.058 423352 7.638 0.0171 #N/A
DQ(1) = #N/A m3/s #N/A

Circuito Tubería L (m) D (m) A (m2) K (mm) Qest (m3/s) V (m/s) Re RHS f h (m)
2 2 300 0.3 0.071 0.15 0.0647 0.915 274595 7.359 0.0185 0.789
2 3 400 0.2 0.031 0.15 0.0247 0.786 157245 6.978 0.0205 1.294
2 4 300 0.2 0.031 0.15 -0.0253 0.805 161065 6.985 0.0205 -1.016
2 7 400 0.2 0.031 0.15 -0.0224 0.713 142603 6.949 0.0207 -1.073
DQ(2) = 0.0000 -0.007
h/Q
622.519
272.151
194.656
#N/A
#N/A

h/Q
12.187
52.392
40.169
47.912
152.660
TUBERIANudo inicial
NudoQofinal
estim. (lps)
L (m) D (m) K (mm)
1 1 2 150 300 0.40 0.15
2 2 3 50 300 0.30 0.15
3 3 4 10 400 0.20 0.15
4 4 5 40 300 0.20 0.15
5 5 6 70 300 0.30 0.15
6 6 1 130 400 0.40 0.15
7 2 5 40 400 0.20 0.15

1ra Iteración
Circuito Tubería L (m) D (m) A (m2) K (mm) Qest (m3/s) V (m/s) Re RHS f h (m)
1 1 300 0.4 0.126 0.15 0.150 1.194 477465 7.668 0.0170 0.926
1 7 400 0.2 0.031 0.15 0.040 1.273 254648 7.100 0.0198 3.278
1 5 300 0.3 0.071 0.15 -0.070 0.990 297089 7.380 0.0184 -0.918
1 6 400 0.4 0.126 0.15 -0.130 1.035 413803 7.632 0.0172 -0.936
DQ(1) = -0.0108 m3/s 2.351

Circuito Tubería L (m) D (m) A (m2) K (mm) Qest (m3/s) V (m/s) Re RHS f h (m)
2 2 300 0.3 0.071 0.15 0.0500 0.707 212207 7.283 0.0189 0.481
2 3 400 0.2 0.031 0.15 0.0100 0.318 63662 6.647 0.0226 0.234
2 4 300 0.2 0.031 0.15 -0.0400 1.273 254648 7.100 0.0198 -2.459
2 7 400 0.2 0.031 0.15 -0.0290 0.923 184620 7.022 0.0203 -1.761
DQ(2) = 0.0113 -3.506

2da Iteración
Circuito Tubería L D A K (mm) Q (est) V Re RHS f h
1 1 300 0.4 0.126 0.15 0.1390 1.106 442451 7.649 0.0171 0.799
1 7 400 0.2 0.031 0.15 0.0180 0.573 114592 6.878 0.0211 0.707
1 5 300 0.3 0.071 0.15 -0.0810 1.146 343775 7.417 0.0182 -1.217
1 6 400 0.4 0.126 0.15 -0.1410 1.122 448817 7.653 0.0171 -1.096
DQ(1) = 0.0059 -0.806

Circuito Tubería L D A K (mm) Q (est) V Re RHS f h


2 2 300 0.3 0.071 0.15 0.0610 0.863 258892 7.343 0.0185 0.704
2 3 400 0.2 0.031 0.15 0.0210 0.668 133690 6.929 0.0208 0.949
2 4 300 0.2 0.031 0.15 -0.0290 0.923 184620 7.022 0.0203 -1.321
2 7 400 0.2 0.031 0.15 -0.0240 0.764 152789 6.970 0.0206 -1.225
DQ(2) = 0.0029 -0.893

3ra Iteración
Circuito Tubería L D A K (mm) Q (est) V Re RHS f h
1 1 300 0.4 0.126 0.15 0.1450 1.154 461549 7.659 0.0170 0.868
1 7 400 0.2 0.031 0.15 0.0210 0.668 133690 6.929 0.0208 0.949
1 5 300 0.3 0.071 0.15 -0.0750 1.061 318310 7.398 0.0183 -1.049
1 6 400 0.4 0.126 0.15 -0.1350 1.074 429718 7.642 0.0171 -1.007
DQ(1) = 0.0016 -0.240

Circuito Tubería L D A K (mm) Q (est) V Re RHS f h


2 2 300 0.3 0.071 0.15 0.0640 0.905 271624 7.356 0.0185 0.772
2 3 400 0.2 0.031 0.15 0.0240 0.764 152789 6.970 0.0206 1.225
2 4 300 0.2 0.031 0.15 -0.0260 0.828 165521 6.993 0.0205 -1.071
2 7 400 0.2 0.031 0.15 -0.0226 0.719 143876 6.952 0.0207 -1.092
DQ(2) = 0.0005 -0.166

4ta Iteración
Circuito Tubería L D A K (mm) Q (est) V Re RHS f h
1 1 300 0.4 0.126 0.15 0.1466 1.167 466642 7.662 0.0170 0.886
1 7 400 0.2 0.031 0.15 0.0221 0.703 140693 6.945 0.0207 1.046
1 5 300 0.3 0.071 0.15 -0.0734 1.038 311519 7.392 0.0183 -1.006
1 6 400 0.4 0.126 0.15 -0.1334 1.062 424625 7.639 0.0171 -0.984
DQ(1) = 0.0004 -0.058

Circuito Tubería L D A K (mm) Q (est) V Re RHS f h


2 2 300 0.3 0.071 0.15 0.0645 0.912 273747 7.358 0.0185 0.784
2 3 400 0.2 0.031 0.15 0.0245 0.780 155972 6.976 0.0206 1.274
2 4 300 0.2 0.031 0.15 -0.0255 0.812 162338 6.987 0.0205 -1.032
2 7 400 0.2 0.031 0.15 -0.0225 0.716 143239 6.950 0.0207 -1.082
DQ(2) = 0.0002 -0.056
h/Q
6.176
81.959
13.111
7.204
108.450

h/Q
9.616
23.375
61.469
60.736
155.196

h/Q
5.751
39.298
15.022
7.771
67.842

h/Q
11.542
45.178
45.552
51.030
153.302

h/Q
5.983
45.178
13.980
7.462
72.603

h/Q
12.065
51.030
41.189
48.302
152.586

h/Q
6.045
47.327
13.702
7.379
74.453

h/Q
12.153
52.003
40.460
48.107
152.723
TUBERIA Nudo inicial Nudo final Qo estim. (lps) L (m) D (m) K (mm)
1 1 2 150 300 0.40 0.15
2 2 3 50 300 0.30 0.15
3 3 4 10 400 0.20 0.15
4 4 5 40 300 0.20 0.15
5 5 6 70 300 0.30 0.15
6 6 1 130 400 0.40 0.15
7 2 5 40 400 0.20 0.15

1ra Iteración
Circuito Tubería L (m) D (m) A (m2) K (mm) Qest (m3/s) V (m/s)
1 1 300 0.4 0.126 0.15 0.150 1.194
1 7 400 0.2 0.031 0.15 0.040 1.273
1 5 300 0.3 0.071 0.15 -0.070 0.990
1 6 400 0.4 0.126 0.15 -0.130 1.035
DQ(1) = -0.0108 m3/s

Circuito Tubería L (m) D (m) A (m2) K (mm) Qest (m3/s) V (m/s)


2 2 300 0.3 0.071 0.15 0.0500 0.707
2 3 400 0.2 0.031 0.15 0.0100 0.318
2 4 300 0.2 0.031 0.15 -0.0400 1.273
2 7 400 0.2 0.031 0.15 -0.0290 0.923
DQ(2) = 0.0113

2da Iteración
Circuito Tubería L D A K (mm) Q (est) V
1 1 300 0.4 0.126 0.15 0.1390 1.106
1 7 400 0.2 0.031 0.15 0.0180 0.573
1 5 300 0.3 0.071 0.15 -0.0810 1.146
1 6 400 0.4 0.126 0.15 -0.1410 1.122
DQ(1) = 0.0059

Circuito Tubería L D A K (mm) Q (est) V


2 2 300 0.3 0.071 0.15 0.0610 0.863
2 3 400 0.2 0.031 0.15 0.0210 0.668
2 4 300 0.2 0.031 0.15 -0.0290 0.923
2 7 400 0.2 0.031 0.15 -0.0240 0.764
DQ(2) = 0.0029

3ra Iteración
Circuito Tubería L D A K (mm) Q (est) V
1 1 300 0.4 0.126 0.15 0.1450 1.154
1 7 400 0.2 0.031 0.15 0.0210 0.668
1 5 300 0.3 0.071 0.15 -0.0750 1.061
1 6 400 0.4 0.126 0.15 -0.1350 1.074
DQ(1) = 0.0016

Circuito Tubería L D A K (mm) Q (est) V


2 2 300 0.3 0.071 0.15 0.0640 0.905
2 3 400 0.2 0.031 0.15 0.0240 0.764
2 4 300 0.2 0.031 0.15 -0.0260 0.828
2 7 400 0.2 0.031 0.15 -0.0226 0.719
DQ(2) = 0.0005

4ta Iteración
Circuito Tubería L D A K (mm) Q (est) V
1 1 300 0.4 0.126 0.15 0.1466 1.167
1 7 400 0.2 0.031 0.15 0.0221 0.703
1 5 300 0.3 0.071 0.15 -0.0734 1.038
1 6 400 0.4 0.126 0.15 -0.1334 1.062
DQ(1) = 0.0004

Circuito Tubería L D A K (mm) Q (est) V


2 2 300 0.3 0.071 0.15 0.0645 0.912
2 3 400 0.2 0.031 0.15 0.0245 0.780
2 4 300 0.2 0.031 0.15 -0.0255 0.812
2 7 400 0.2 0.031 0.15 -0.0225 0.716
DQ(2) = 0.0002
Re RHS f h (m) h/Q
477465 7.668 0.0170 0.926 6.176
254648 7.100 0.0198 3.278 81.959
297089 7.380 0.0184 -0.918 13.111
413803 7.632 0.0172 -0.936 7.204
2.351 108.450

Re RHS f h (m) h/Q


212207 7.283 0.0189 0.481 9.616
63662 6.647 0.0226 0.234 23.375
254648 7.100 0.0198 -2.459 61.469
184620 7.022 0.0203 -1.761 60.736
-3.506 155.196

Re RHS f h h/Q
442451 7.649 0.0171 0.799 5.751
114592 6.878 0.0211 0.707 39.298
343775 7.417 0.0182 -1.217 15.022
448817 7.653 0.0171 -1.096 7.771
-0.806 67.842

Re RHS f h h/Q
258892 7.343 0.0185 0.704 11.542
133690 6.929 0.0208 0.949 45.178
184620 7.022 0.0203 -1.321 45.552
152789 6.970 0.0206 -1.225 51.030
-0.893 153.302

Re RHS f h h/Q
461549 7.659 0.0170 0.868 5.983
133690 6.929 0.0208 0.949 45.178
318310 7.398 0.0183 -1.049 13.980
429718 7.642 0.0171 -1.007 7.462
-0.240 72.603

Re RHS f h h/Q
271624 7.356 0.0185 0.772 12.065
152789 6.970 0.0206 1.225 51.030
165521 6.993 0.0205 -1.071 41.189
143876 6.952 0.0207 -1.092 48.302
-0.166 152.586

Re RHS f h h/Q
466642 7.662 0.0170 0.886 6.045
140693 6.945 0.0207 1.046 47.327
311519 7.392 0.0183 -1.006 13.702
424625 7.639 0.0171 -0.984 7.379
-0.058 74.453

Re RHS f h h/Q
273747 7.358 0.0185 0.784 12.153
155972 6.976 0.0206 1.274 52.003
162338 6.987 0.0205 -1.032 40.460
143239 6.950 0.0207 -1.082 48.107
-0.056 152.723
Circuito Tubería L D C (HW) Q (est) S h
+ +
- -
h/Q
+
+
TUBERIA Nudo inicial Nudo final Qo estim. L D K (mm) A
1 1 2 0.150 300 0.40 0.15 0.126
2 2 3 0.060 300 0.30 0.15 0.071
3 3 4 0.010 400 0.20 0.15 0.031
4 4 5 0.030 300 0.20 0.15 0.031
5 5 6 0.070 300 0.30 0.15 0.071
6 6 1 0.120 400 0.40 0.15 0.126
7 2 5 0.030 400 0.20 0.15 0.031
1ra Iteración
Circuito Tubería L D A K (mm) Q (est) V
1 1 300 0.4 0.126 0.15 0.150 1.194
1 7 400 0.2 0.031 0.15 0.030 0.955
1 5 300 0.3 0.071 0.15 -0.070 0.990
1 6 400 0.4 0.126 0.15 -0.120 0.955
DQ(1) = -0.0061

Circuito Tubería L D A K (mm) Q (est) V


2 2 300 0.3 0.071 0.15 0.0600 0.849
2 3 400 0.2 0.031 0.15 0.0100 0.318
2 4 300 0.2 0.031 0.15 -0.0300 0.955
2 7 400 0.2 0.031 0.15 -0.0239 0.761
DQ(2) = 0.0064

2da Iteración
Circuito Tubería L D A K (mm) Q (est) V
1 1 300 0.4 0.126 0.15 0.1439 1.145
1 7 400 0.2 0.031 0.15 0.0175 0.557
1 5 300 0.3 0.071 0.15 -0.0761 1.077
1 6 400 0.4 0.126 0.15 -0.1261 1.003
DQ(1) = 0.0033

Circuito Tubería L D A K (mm) Q (est) V


2 2 300 0.3 0.071 0.15 0.0664 0.939
2 3 400 0.2 0.031 0.15 0.0164 0.522
2 4 300 0.2 0.031 0.15 -0.0236 0.751
2 7 400 0.2 0.031 0.15 -0.0208 0.662
DQ(2) = 0.0015

3ra Iteración
Circuito Tubería L D A K (mm) Q (est) V
1 1 300 0.4 0.126 0.15 0.1472 1.171
1 7 400 0.2 0.031 0.15 0.0193 0.614
1 5 300 0.3 0.071 0.15 -0.0728 1.030
1 6 400 0.4 0.126 0.15 -0.1228 0.977
DQ(1) = 0.0009
Circuito Tubería L D A K (mm) Q (est) V
2 2 300 0.3 0.071 0.15 0.0679 0.961
2 3 400 0.2 0.031 0.15 0.0179 0.570
2 4 300 0.2 0.031 0.15 -0.0221 0.703
2 7 400 0.2 0.031 0.15 -0.0202 0.643
DQ(2) = 0.0004

4ta Iteración
Circuito Tubería L D A K (mm) Q (est) V
1 1 300 0.4 0.126 0.15 0.1481 1.179
1 7 400 0.2 0.031 0.15 0.0198 0.630
1 5 300 0.3 0.071 0.15 -0.0719 1.017
1 6 400 0.4 0.126 0.15 -0.1219 0.970
DQ(1) = 0.0003

Circuito Tubería L D A K (mm) Q (est) V


2 2 300 0.3 0.071 0.15 0.0683 0.966
2 3 400 0.2 0.031 0.15 0.0183 0.583
2 4 300 0.2 0.031 0.15 -0.0217 0.691
2 7 400 0.2 0.031 0.15 -0.0201 0.640
DQ(2) = 0.0001
V
1.194
0.849
0.318
0.955
0.990
0.955
0.955

Re RHS f h h/Q
477465 7.668 0.0170 0.926 6.176
190986 7.031 0.0202 1.880 62.672
297089 7.380 0.0184 -0.918 13.111
381972 7.611 0.0173 -0.802 6.687
1.086 88.645

Re RHS f h h/Q
254648 7.338 0.0186 0.682 11.367
63662 6.647 0.0226 0.234 23.375
190986 7.031 0.0202 -1.410 47.004
152152 6.968 0.0206 -1.215 50.835
-1.709 132.582

Re RHS f h h/Q
458048 7.658 0.0171 0.855 5.940
111408 6.868 0.0212 0.671 38.315
322978 7.401 0.0183 -1.078 14.171
401389 7.624 0.0172 -0.883 7.002
-0.436 65.429

Re RHS f h h/Q
281810 7.366 0.0184 0.829 12.484
104406 6.845 0.0213 0.593 36.147
150242 6.965 0.0206 -0.889 37.688
132417 6.926 0.0208 -0.932 44.787
-0.399 131.107

Re RHS f h h/Q
468552 7.663 0.0170 0.893 6.068
122868 6.902 0.0210 0.808 41.850
308973 7.390 0.0183 -0.990 13.598
390885 7.617 0.0172 -0.839 6.832
-0.128 68.348
Re RHS f h h/Q
288177 7.372 0.0184 0.865 12.745
113955 6.876 0.0212 0.700 39.102
140693 6.945 0.0207 -0.784 35.495
128597 6.916 0.0209 -0.881 43.614
-0.100 130.956

Re RHS f h h/Q
471417 7.665 0.0170 0.904 6.103
126051 6.910 0.0209 0.848 42.830
305153 7.387 0.0183 -0.966 13.441
388020 7.615 0.0172 -0.827 6.785
-0.042 69.159

Re RHS f h h/Q
289874 7.374 0.0184 0.875 12.815
116501 6.884 0.0211 0.730 39.888
138146 6.939 0.0208 -0.758 34.910
127961 6.915 0.0209 -0.873 43.418
-0.025 131.030