You are on page 1of 27

Mining Risk

b e re s ik o re n d a h
b e re s ik o tin g g i (lo w ris k g a m b lin g )
(h ig h ris k g a m b lin g ) in v e s ta s i re la tif
in v e s ta s i re la tif k e c il besar

re s ik o g e o lo g i

r e s ik o r e s ik o
ekonom i a la m i

r e s ik o
e n jir ir in g

r e s ik o
p o lit ik

to k ’0 1
tin g k a t/ta h a p k e g ia ta n
d a la m in d u s tri m in e ra l
OPERASI PENAMBANGAN (MINING)

PASKA TAMABANG TANPA PERENCANAAN TAMBANG PTODUKSI >5 JT TON/TH


OPERASI PENAMBANGAN (MINING)

KUD TAMBANG PRODUKSI 2-3JT TON/TH

PETI TAMBANG PRODUKSI 2-3 JT TON/TH


OPERASI PENAMBANGAN (MINING)

TAMBANG PRODUKSI S/D 5 JT TON/TH


Stability analysis for layered wasted
dumps
Slope distance
measurement
with EDM
Equipment
Crack width measurement of crest failuer
movement

Wire extensometer on crest of slope


Circular type slope failure Toppling type slope failure

Plannar type slope failure


Influence of fold and fault on highwall
instability
Highwall failure mechanisms observed
in the Bowen Basin
Stabilization of pit slope using
horizontal drain

Influence of drainage adit on


water table
Relationship between cohesion ρ angle of
friction for cohesive strata

Stabilization of bedded rock slop by darinage


Ground Water
Dari Horisontal Bor

Ground Water
Dari Horisontal Bor
Di Pit Tengah
Kondisi Outlet
• Kapasitas : 2 x 180 liter/detik
: 360 liter/detik
• Pump : WP 266 (MFV 420)
: WP 175 (MFV 420)
PIT TIMUR PIT TENGAH

PIT BARAT
PENGELOLAAN LINGKUNGAN BEKAS TAMBANG
YANG TIDAK SEMESTINNYA
PENGELOLAAN LINGKUNGAN BEKAS TAMBANG
YANG TIDAK SEMESTINNYA
PENGELOLAAN LINGKUNGAN BEKAS TAMBANG
YANG SEMESTINNYA DILAKUKAN
PEMANTAUAN LINGKUNGAN PENAMBANGAN

You might also like