You are on page 1of 7
USER MANUAL For Vantage Pro2™ and Vantage Pro2 Plus™ Weather Stations ge Pe tap Ph Wot a ma fe et oy teeth Weeesiree apelaeacecsmoe Table of Contents ‘Welcome to Vantage Prd Vantage Pr? Opions 3 Powering the Console $ Instalng be AC Power Ade. Connecting Caled Stations a Conse Lietog nn oie ‘Seup Mode Soumt'she time db Lie Lage te ‘Stem 1 Dg Sin Tine Sings St te Cuno Wenher Mode on Salting Unis of Measure 30 Dispaying the Forces 36 alti, Sting and Clering Varies a Hiphrand Laws Mode - Ie Graph Mode va ls ‘Troubleshoating and Maltence mms "Vantage Pro? Treblesbooting Guide 36 Conse Dingosie Mode oe Cone Manone 2 One YeurLimiedWaranty a2 Appenis A: Weather Dat ‘Append B Specfeations sms oar emcemnn Console Spits ° ‘Wises Communication Specifications ° Console Data Display Speifeatons 0 ‘Wiener Data Specittons Appendix C: Wises Repeater Contguration = Vantage P12 Con 1688 nena CONE {Comteting Davis Teche Support msnemnnonnan Bath COVEE Chapter 1 Welcome to Vantage Pro2™ ° oo © tna ha geen ge a Vantage Pro2 Console Display Features | om nen, [eh oaaget | (she ange Pr on at Shar ete) these ngs pogrom el ‘wile Vnage Po sna ee en nt Se Judo not verte the smn by sng thaw od he por S| {Ujour conic rofl system thet isan) ie Finis Pot Quick Refonee Gude alo wih yor ation Va ey ose elerence frst cs ae Console Features Keyboard & Display “Tethys dat elms, Ronn et os cataon mertanl ew pa st Sent, ean tone Tc tej conn of 2 comma eye Tein au sen dpa emp tye bow te commune STi aero commit pine oc cmmand {SOEs Uicec ater pied il te ch comand eyo Basa second fc which i rid {Bove be leyonbecomole se Toke th conday tocon, EP {resales 2ND (on thes econ up ih Coe) ‘ton nodal pes ey fort Feneon ‘Aer preng2ND, he IND xn dps above he brome digo he ‘coon thoes Alsen Kyneton cae rig his tine Keyes nama persion aire co app ‘Thevand- rite heyy alongwith and nition Kee are edinwiat cmimdonns ost vals. and wove |g “inn! Rec chr lin connie ab crmmandhe, Console Modes ‘The como oper in ive se mado: Sat, Cent Went, igh od Ties Alm mad Gogh ach mae you anes awn tf commole Faso olay eet ane of your water ae intage Pro? Options. Optional Sensors & Transmitting Stations: ‘ere Presto ate exe fei Ue he loin pina sore sccm enhance ie weather aig eps of oar ‘eae Pr Scour web ste far cope we cm a kaa Str Raton Serer) SEES eee sag orem | Seater tt Optional WeatherLink® Software The WeatherLnk sor an ta ogg conme you Vantage Po? sation Seth wou empl pring nhc wear tring cabins 2 “oi reer to power eat sues Te |WrateLink dt pats eat on the come and ore eater data een amet ‘Shon of abs a4 arage Pr consle ExvoyAX cane pio 8 ‘Stn in any onaton scree age ab Sensor Merting Sb (1573) era for mowing eptioal Sol Raton sor UV sees. ‘aston! Vantoge Pr (W622) Vantage We Const (8651) ‘jy weather norman seer Tos. USB Sorat (08-0) Cae 8494) [Aloo ib Sera version of Wear (HSOSER, 540,644, 650,650) {comet 4 USE pro our compa, Estrnon Caio (17876) ‘Alay lash Cale Visage rT ate way nthe me Bea econ able rn Wy Das esrumens, Maxim ae > Ie ibe 00m). ate 4 (12m), 10 (0. e200) Chapter 2 Installing the Console “The Vinge Po? canoes digo pve xeeney acute edings AS ‘hans pen marumen ne ren tem and Manin Alou ‘taling th console elt simple flowing the sep eto thin ‘Sapternd smb Vara Prods en te atl beat ‘tow a ft etrer witha minima fine an fot Powering the Console cabled Vantage Pro? Stations Cate Vote Pr consol ipl power the gt Sens Sut (SS) ‘tough hcl bl, Beats dd power omsunpn si ISS, ‘teal comale rae an AC power adage the ma omer) ‘he cml bers provide ack power or ype four six wets. Wireless Vantage Prez Stations Wor Vana Prez consol ot equi the ofan AC ape. You ‘mayan eine ade s9ou wish bat te the Co te shld poner mires onsale for up nine mons Installing the AC Power Adapter 1. Removed ty covered the ack ft coe y pressing down ‘nie wo ahs hop of cove. 5. me he ower ade ag tte como porte pig these ‘foyer an pepe power et 4 Check tat iret comole ats heap ie posite ‘ssw On omer phe one ply al he LCD pen and SSE Ran yt i soe ha ly ia Setop ModePrese ‘SSipowr cape meng ol ener S Mae CERI pls tees eee cn tin Se SS ai onps nem anon Installing Batteries TRemune the atry cover loa onthe kf the come reine dors tht hs atthe cove Connecting Cabled Stations ‘Cited Vintage Prats ome wit 10 ft (0m) fale Th ale ‘ste fercomectg the cre th 8. sium ale gh om the consol th 1 | Fay inset te ens ed of the tig songh foursome ‘cme en ae 5a cna pe Do 7 AW 2 tse etait the batery ciel neti a min 4 apc te ater cover 2 huh the Scale rt ried hgh cen prt. TERR R RES ‘One one nd SS seth powered py cae connection Shad Be telah eee cone powell xe Setup Mode You can ‘ep tiouph he Seep Mode opto, ee the Soup Md et he ‘Stecton an esr ealing Cire Weather Mose Se "Sp Mok™ ‘page I fr Setup Mose apts Sx "Crest Wee Mode eps 20 {ervewing an ering aren wear da conan rm he ced “Tovey hat te cone receiving dat forthe 15 hgh the case onan se "ated SS Asso” ntbe Inga Sem Sate Console Location Pacethe cope aloaton where behead scsi ad ‘he dp tayo ond For mor scraps 1 avo pacing the conan desu Ths may cas eroncous {retort nd amy red aay dara he + odd ping te cnc nerds orheinp i cedtonng +300 aremounig he cone ona wal cosa iio wall. Avoid tere walls tendo a pe coal down Seeing onthe Wea soy ons py enor ‘eo. Bn a 20811 594 DS fd ae = a PERE 8 wm HUES GO 9 HF

You might also like