PLANTA ELEVACIÓN VOLUMEN

METRADO DE CONCRETO CANT.


(m²) ESP. (m³)
1 ZAPATA HEXAGONAL Z-1 2 4.04 1.275 5.15
2 ZAPATA Z-2 4 1.44 0.400 0.58
3 PEDESTAL P2 4 0.16 1.300 0.21
4 BASE HEXAGONAL B-1 2 2.22 0.500 1.11
5 LOSA NUEVA 1 44.21 0.150 6.63
6 CUNETA 1 6.02 0.139 0.84
7 SUMIDERO 1 BASE 1.69 5.000 9.10
MURO 0.65 1.000
TOTAL =

CUADRO RESUMEN
1 TOTAL DE (m³) DE CONCRETO f'c = 240 kg/cm² = 32.22
2 TOTAL DE fe. CORRUGADO Ø3/8x9m. = 26.42
3 TOTAL DE fe. CORRUGADO Ø1/2x9m. = 75.16
4 TOTAL DE fe. CORRUGADO Ø5/8x9m. = 19.60
VOLUMEN ACERO DE REFUERZO (m. LINEALES)
TOTAL #5 = Ø5/8 #4 = Ø1/2" #3 = Ø3/8" #5 = Ø5/8 #4 = Ø1/2"
10.29 96.62 132.37 299.53
2.30 12.00 74.40
0.83 8.10 15.46 50.20
2.22 59.68 185.01
6.63 459.94 910.68
0.84 89.94
9.10 56.68 56.12
159.86 158.26
32.22 176.40 676.48 237.78
KG/ML 1.55 0.99 0.56
#3 = Ø3/8" TOTAL KG
148.26 447.79
74.40
34.63 84.82
185.01
910.68
50.37 50.37
214.38

214