You are on page 1of 61
SOIL INVESTIGATION REPORT PROJECT _: Soil Investigation Work At Punggol Central / Punggol Walk LOCATION — : Punggol Central / Punggol Walk CLIENT : Urban Redevelopment Authority V-PILE (SINGAPORE) PTE LTD Date: 6" October 2010 Certification by PE for SI Report Certification by Professional Engineer For Site Investigation Report 1. 1, Dr. Yong Deung Ming , the Professional Engineer, PE Registration No.3982 certify that the Site Investigation Report Soil Investigation Works For Punggol Central / Punggol Walk. Comprising all field and laboratory data, tests and result therein has been carried out by me or under my supervision of direction, and I have verified the accuracy of the information given in the site investigation report, and to the best on my knowledge and belief, all have been prepared in compliance in all respects with the provisions of the building Control Act and Regulations, relevant Codes of Practice and Standards, 2. I further certify that I have the appropriate qualifications and experience, and I am familiar with the purpose of the investigation for which this Site Investigation Report is prepared in reference to Project Ref. No: URA000EPO10000894/ 0. 3. Total number of pages in the Site Investigation Report is 6 06/10 12010 Professional Engineer for Site Investigation Date Signature and Stamp TABLE OF CONTENT 10 2.0 3.0 INTRODUCTION General SCOPE OF WORK 21 2.2 DESCRIPTION OF SOIL STRATA 3 32 Site Condition Field Investigation 2.2.1 Drilling 2.2.2 Standard Penetration Test Subsoil Condition General Geology Page artana APPENDICES A. TABLE AND CHARTS Table 1, Work-done summary field tests Table 2. Table showing relation of SPT results and consistency B. LOCATION PLAN & BOREHOLE LOCATION PLAN Fig 1. Location Plan Fig 2. Borehole Location Plan C. BOREHOLE LOGS Key to Boring Log Bore Hole Log Cross Sections 1.0 INTRODUCTION 1.1 General ‘This report presents the soil investigation based on & boreholes, conducted at the Punggol Central / Punggol Walk , (See location map in APPENDIX-B). The main purpose of the soil investigation is to obtain and understand the geotechnical information on the subsoil conditions required for the design and construction works. a) Name of the Project b) Location ©) Client 4) Period of Work ©) Scope of Work + Soil Investigation Works at Punggol Central / Punggol Walk + Punggol Central / Punggol Walk : Urban Redevelopment Authority 1 Field Work 20 August 2010 ~ 4 October 2010 : Field Work Number of Borehole 8 nos. Drilling in Soil 532.00. m. Standard Penetration Test (SPT) 124 nos. 2.0 SCOPE OF WORK 241 Site Condition The project site is located at the North Easter Part of Singapore, at Punggol Central / Punggol Walk. Project site, including location of the boreholes, is shown in APPENDIX-B. 2.2 Field Investigation The field work involved in the geotechnical investigation was carried out as recommended in BS 5930: 1999 “Code of Practice for Soil Investigation”. Prior to commencement of the site investigation, trial pit up to 1.5m and follow up drilling manually using hand auger till 3m in depth was condueted at each borehole before drilling. Summary on quantity of field works for this project is listed in APPENDIX - A (Table 1). 2.21 Drilling Drilling was carried out using hydraulic feed rotary boring machine. A metal crown bit as a cutting tool was attached at the lower end of the drilling rods and circulated mud water was pumped through hollow rods into the bottom of borehole to wash out the cuttings to ground surface 8 nos of boreholes were performed at within Punggol Central / Punggol Walk area, The diameter of the borehole is 100mm, The boring log data is summarized in APPENDIX - C. In this project, total drilling is 532.00 m. 2.2.2. Standard Penetration Test This test is done in accordance with BS 1377: 1990 Part 9 and covers the determination of the resistance of the penetration of a split-barrel sampler and obtaining disturbed samples of the soil for identification purpose. Once the borehole reached the required test depth, the borehole was cleaned by flushing with water before starting test .It was performed using a split-barrel sampler with a 50,8 mm extemal and 34.9mm internal diameter which is connected to the lower end of boring rods. The sampler was driven into soil by means of a 63.5kg hammer falling freely through a height of 76cm onto an anvil attached to the top of the rods. A trip-release mechanism and guiding assembly were used to control the falling hammer and the driving energy was thus transmitted through the rods to the SPT sampler, The sampler was driven 45cm into soil with the number of blows required for each 15cm of penetration recorded. The resistance, N-value, was taken as the number of blows for the last 30cm of penetration, At the end of the test, the sampler was withdrawn and some extracted soil was placed into a plastic container and then labeled. These samples were used to describe the type of soil existing in the boring points. In this project, total 124 numbers of SPT were taken in order to get the information and technical data on the strength and type of soil 3.0 DESCRIPTION OF SOIL STRATA. 3.1 Subsoil Condition This section briefly describes the soil conditions encountered at site. Detailed soil conditions are presented in each log of boring in the Appendices of Borehole Logs, Based on the data collected from 8 number of boreholes, it can be classified the soil layers as follows Soil Layers () Fill @)_ Silty SAND (3) Clayey SILT (4 Silty CLAY (5) Sandy SILT (© SAND (1) Fill From the surface to the depth of 1.3 meter was covered with back fill soil such as light yellowish brown to reddish brown Silty CLAY mixed with hard core materials and organic remains. Standard Penetration Tests (SPT) were not taken for this layer. (2) Silty SAND This soil type can be found in every bole holes. The layer consists of light grey to dark greenish grey, yellowish brown Silty SAND. Thickness is ranging about 2.9 to 12.85 meters and SPT consistency is medium dense to very dense. (3) Clayey SILT This soil type can be found in BH 1,7 & 8. The layer consists reddish brown, brownish yellow to dark grey Clayey SILT. Thickness is ranging about 6 to 6.5 meters and SPT consistency is hard, (4) Silty CLAY This soil type can be found in BH 2,3,4,6,7 & 8. The layer consists of brownish yellow, light grey to yellowish brown, greenish grey Silty CLAY, Thickness is ranging about 5 to 10 meters and SPT consistency is very stiff to hard, (5) Sandy SILT This soil type can be found in every bole holes. The layer consists of light grey, greenish grey to yellowish brown Sandy SILT. Thickness is ranging about 4.5 to 15.5 meters and SPT consistency is hard. (6) SAND This soil type can be found in every bore hole. The layer consists of greenish grey, light grey, brownish yellow, reddish yellow SAND, Thickness is ranging about 1,88 to 25,5 meters and SPT consistency is medium dense to dense. 42 General Geology The project area lies within the geological formation of Older Alluvium with layers of Silty SAND, Clayey SILT, Silty CLAY, Sandy SILT and SAND. APPENDIX - A TABLES & CHARTS Table 1. Work-done summary field testing eves ver | 0 zes 1e104 8e°69 oa | - 69 oroe asnany £z otoz “isnsny Oz sue | 8 98°69 au} 69 otoz “equiardes /z | oLoz ‘vequardeszz | CHA | & Lev9 st - ry orozseqoroy | otoz‘saquardasez | oHe | 9 1869 oT - 69 Oroz ‘saquiaidas z otoz asnny gz sHe | $ 9e'69 7 - 69 oraz aquardas tz | orozsequaidasst | pHa | y 28°69 ot - 69 otoz sequardes 6z | oto Yoquedastz | EHe | € 88°69 or - 69 oroz sequaidas ex | oroz‘iequadasy | zHa | z SE's et : +5 oraz “saquiardas zz | otoz sequadaset | THe | T (us) sueway tas | an aiea paysiuls aieg pauers ON Ha | ON wadeg uopewuney, ‘Tiisid GHOAVONIS THEA TODERIOD {vzs9TS7) 11eM 1088ung / esque joBBung 404 ArewwuNg 20 |S CHOU TTiy TWSMAOaRSpSY UeqIN WaT 12 Table 2. Tables showing relation of SPT results and consistency 2B CLAY AND SILT SAND Relative Density according to Approximate Relation of Consistency 0 Standard Penetration Test Standard Penetration Test Nevalue N-valve (blows/a00mm of Relative Densily (blows/300mm of consistency penetration) penetration) 0-4 Very loose <2 Very soft 2-4 Soft 4-10 Loose 4-8 Fim 10-30 Medium dense 8-15 itt | aoe oe 18-90 Very tt >60 Very dense >30 Hard | NOTE: EXTRAGTED FROM BS 5930 ROCK WEATHERING CLASSIFICATION tranapotd, | Term Description Grece| ‘Fresh No visible sign of rock material weathering, | 1 Ipertaps sigh discoloration on major siscontiuity surtaces. Slightly [Discoloration indicates weathering of rock It |weathered| material and discontinuty suraces, All the Jrock material may be discoloured by weathering, [Madorately Less tan half ofthe rock material is econt-| i weathered posed or dsintagrated to a sol, Fresh or aiscoloured rock is present elther as a continuous framework or as corestones, ‘Highly fore than alt of the rock material is decom) WV |weathered| posed or disintegrated toa sol. Fresh or | siscoloured rock's present either 2s a continuous framework or as corestones. Al rock materials decomposed ancvor v \sisintograted to sol. The original mass, structure is stl argely intact Residuat |All rock material is converted to soil The | vi sell |imass structure and material fabric are i \destroyed. Theres a large change in volume) but the soi has not been significantly | NOTE: EXTRACTED FROM TERZAGHI AND PECK CLASSIFICATION OF ROCK QUALITY IN RELATION TO THE DISCONTINUITIES G-TOR Total Gore Recovery sample recovered. expressed asa percentage othe length of core run R-ROD Rock Quality The collective ra all Descrinion cove pieces which a ‘expressed as a pees ‘ength erie ‘The length ofthe total amount of core a 100mm of more, age of total core 14 Quality | ROD | Fracture frequency classification} % per metre Very poor | 0~25 ver 15 Poor} 25-50 15-8 Fair | 50-75 8-5 Good =| 75-90 6-1 Excellent | 90-100} Less than APPENDEX - B LOCATION PLAN & BOREHOLE LOCATION PLAN 15 Fig 1. Location Plan 16 PUNGGOL Punggel Emerald (w/o) Punggol Temporary Punggol us Sapphire interchange Punggol fy Residences ay Punggol 4 Regalo Ce LOCATION PLAN SCALE: 1:5000 7 Fig 2. Borehole Location Plan APPENDIX - C BOREHOLE LOGS 20 Key to Boring Log 2a ENGINEERING CLASSIFICATION ‘AS : ASPHALT, TAR cS : SANDY CLAY (EEE) Pt : PEATY GRAVEL : BACKFILL (CG : GRAVELY CLAY F] GC: CLAYEY GRAVEL : BEDROCK E=S] crt : PEATY CLAY GR: GRANITE + BRICK + CONGLOMERATE GO: ORGANIC GRAVEL + BOULDER + CONCRETE EES u : unestone 1 CLAY / MARINE CLAY SILTY GRAVEL Xx] Mo: SILT : SILTY CLAY E + GRAVEL (EER wrt: PEATY SLT +: ORGANIC CLAY E + SANDY GRAVEL [Ex] MG : GRAVELLY SILT + MUDSTONE + OLAYEY PEAT FRBQ S = SILTSTONE SANDY SILT + SAND SS sh: SHALE : CLAYEY SILT + GRAVELY SAND Sey SCH : SCHIST + ORGANIC SILT : ORGANIC SAND [T8_] 1B : TMBER 1 PEAT =z] SM : SILTY SAND : SANDY PEAT CLAYEY SAND + GRAVELLY PEAT : PEATY SAND : SILTY PEAT 1: SANDSTONE LEGEND OF SOIL PATTERN 2 rere : Sindy e~ = LEGEND OF SOIL PATTERN BORE HOLE LOG (BH -1 to BH-8) 24 V-PILE ¢S) [ENE PTE LTD |PROMCE BORELOG Urban Redevelopment Authority | Werk At Punggol Central / Punggol Walk (LSt6524) LOCATION: Punggol Central_/ Punggol Walk SHEET NO: 1 OF 3 PROJECT NO: URAO9OEFOTOODOES4/ 0 Borenout No. BH 1 [WATER LEVEL: 107.34 DRILLING DATE STARTED: 18/09/2010 BOREHOLE DIA: 100 mm [REDUCED LeveL: 100.84 DRILLING DATE COMPLETED:22/09/2010 (CORE DIA 50 mm foRTHING: PREPARED BY: SU DRLUNG METHOD: _W leasm: BI h 1 (Nv a3 cs 8] ops SLR RNR KEK ERE reaars aaRae Oa Hr Fine to coarse groined a a Weatam dense Light arey ISightly Silty SAND EK EK KER KEKE [To BE_ CONTINUED EMA: LEGEND: “Y ~Presratar Test (PT) © - vere sone Feat -Pemesty Tot (P51) ect Tsk (0) w a Oise She Test Lndiaturbod Sample (v0) ‘Open rive Teceat Sample (00) 25 [J -antompes (vo, (0) (5), (2) & (05) By =P sono (5) [H ~cove run (ca) BORELOG SHEET NO: 2 OF 3 V-PILE (S$) [OUENT: Urban Redevelooment Authority PTE LTD |PROMECT Si Work At Punggol Central / Punggol Wok (Lst6 LOCATION: Punggol Central / Punggol Walk PROJECT NO:_URAQOOEPOTO0008S4/ O| poREHOLE NO. BH 1 [WATER LEVEL: 107.34 ORILLING DATE STARTED: 18/09/2010 | BOREHOLE DIA:__100 mm JReDuceD LeveL: 109.86 DRILLING DATE COMPLETED:22/00/2010 | coRE OIA 50 mm Norrino: PREPARED BY: SU DRILNG WETHOD: W lEasmve: emer arresacc Fea ae agsee| £ oo orsarsre | Sense Dark yelow Fine to T Jecorse grained SAND | ] Danae UGE Gray STAT sity SAND cis Be * Jorown Stightly’ Sandy SILT Lex xxx nw e xx KH xxx ary Gane Crean Grey Fina greines SAND Re TO BE CONTINUED EARS. LEGEND: V ctr Tok) St iin -Aitemped (UD), (00), (PS), (M2) & (08) @ ere steer Tart ~tnotubod Semple (0) : @ ~emeeny te 07) Baan est Soe (0) bsieesace Ey Pech Tent (PKI (chores Saree (12), ~Core Run (CR) 26 BORELOG SHEET NO: 3 OF 3 \V=PILE. (S) |GUENE Usbon Redevelopment Author PTE LTD [PAOECH St Work At Punage Centrol_/ Punggol Wat (LSt652A) LOCATION: Punggol Cental / Purggo! Walk PROT No: URAGGOEPCTOODO8se/ Ol poREHOLE No BH 1 wareR Level 107.34 DRILUNG DATE STARTED: 16/09/2010 | BOREHOLE OIA” 100 mm feouceD tev: 108.64 ORILNG DATE CoMPLETED:22/00/2010 | cone O1K 50 mm ORTHNG PREPARED BY: SU DRILING METHOD: W leasmac: Sve) [Sanaln & Tne r fase |, fete a4] ald (dal [EEE ary dense Greenish Grey Fine greined SAND ery dense Greenish grey forevely Sity SAND HERE KR RE RE EEE ary Tene Weenieh ay siightly Sity SAND SHER RE KEE EERE Borehole terminated at 64.38} eunsns LEGEND: Y Ponte) ht [[]-Atemoes (0 (00) 5), 42 & (08) a »4 Sample (UO) at Piston Sample (PS) se Garman ECRESR oy geen Se [B-ee nn on ler Sap (Wi 27 BORELOG SHEET NO: 1 OF 4 PILE. (S) [CUENE Urban Redevelopment Autherit TE LTD /PROUECE Si Works For Punggol Centre! / Punggol Walk (\S16524) LOCATION: Punggol Centrol_/ Punggol Wolk PROVECT NO: _URAQOOEPO10000894/ | BOREHOLE NO: BH 2 WATER LEVEL: 108.14 rei 918 ise eral scm Tale 2 ht owen LBSL SILER] A i — psa t g2| one Fal 0) KHER KEK EEK EER EEK EE KEEN, Danse Light grey STghty siity SAND RNR RRR ERRERE: RRR ERRER®: SEND: Sawer” Eager [na 0h 2) 4 0) @ -Forsay Tt 8) operat nea: Sele (00) «BLP Some (5) cee Oe, To mn (on 28 BORELOG SHEET NO: 2 OF 4 V-PILE 6) [SUD tenant aso PTE LTD. PROUT Swe Fer Pugs! Cots / Pana Wak USE CoCATIN Punggol / Purge! Wak PROJECT NO: URADO0EPO10000694/ 0] BOREHOLE NO. _BH 2 WATER LEVEL: 108.14 OALLNG OAT STAN 04/0/20 | SOME DA 100 wm febiec Lvl ena0 RUNG ONE ovPeTE/on 0% cone O50 mm ora PrsPaRtD ets ORL NET asin € |, Lt ova [senpie « Tete ono hi ail oem on Pal tn 8] epwese Description oness8, iil mottled with light greenish ‘grey Silty CLAY eh © groentah_ gra to yellowish brown Signy sendy ST PX 2 io I KK KERR HEX HERRERA RRR Joreenish grey Sty CLAY [70.8 CONTINUED EGEND: ‘V -fromrente Tat OW) 6 Stand Pnetetin [[]-attenpes (U0), (00) (P8), (2) & (0s) Tat @) @ -ere shear Tet 9 Lnditebed Semple (UD) BE Pier some (8) Q ~Fernonmy Tost (967) -Open Drive Thickwoll Sample (0D) EE Pes Ft (700 emcee [If core run (68) ~esie Sale 29 V-PILE ¢S) [ouewe PTE LTD PRO BORELOG Urban Redevelopment Authority | Works For Punggol Central LOCATION: Punggo! Contral_ / Punggol Walk SHEET NO: 3 OF 4 Punggol Walk (1S16524) PROJECT NO: _URAQOOEPO10000894/ 0. porewout No. BH 2 [WATER LeveL: 108.14 DRILLING DATE STARTED: 04/09/2010 BOREHOLE DIA: 100. mm REDUCED LEVEL: 109.94 DRILLING DATE COMPLETED:13/08/2010 ‘CORE DIA 50 mm, Norns: PREPARED BY: SU DRILLING METHOD: W lEasTING: Description 33 ih S21 (WVate) i rain S20 (RS |See ia Hard YaTouan brows Jmattied with light Jareenish grey Sity CLAY fery dene Greenish ey cravelly Silty SAND HK EKH EK KER KEK EEX EE Imottied with yellowish brown Slightly Sandy SILT EHR RH HREM EEK KEE Wary sense Tight Grey lareenish grey Fine. to coarse greined SAND [TO BE CONTINUED LEGEND: Y ~Prnncanste Tot (PMT) @ -vene rar tot Q -Pornoasty Test (1) EE Pes tet (PH) Stents Pentti tet O) ~Undstrbed Sample (V0) “open Orv Trew Somple (0D) wai Seo, 2) Besser Sorple (08) 30 [atta (uo, (00) (PSD. (42) & (05) [Peo sonic @5) [H -core run (ca) BORELOG SHEET NO: 4 OF 4 \V-PILE. (S) [SUENT: _Urbon Redevelopment Authorit PTE LTD PROMECK Si Works For Punggol Cent LOCATION: Punggel Central / Punggol Walk Punggol Wolk (1816524) PRO.ECT NO: URAQODEPOIOOD0a04/ Ol BoREHOLE NO. BH 2. [WATER LEVEL: 108.14 DRILLING DATE STARTED: 04/09/2010 | BOREHOLE OIA: 100 mm DRILLING DATE COMPLETED:13/09/2010 | coRE IA: 50. mm. [REDUCED LeveL: 109.94 PREPARED BY: SU DRILLING METHOD: W INoRTANG: least: Description 3] E SPT (Neve) FT atl 1 cam se fmm opsus/e Wary dense ght gray te Jgreenish grey Fine to fcoarse grained SAND Borehole terminated ot 69.38", ROUEAS. LEGEND: Y ~Prnerente Tet (1) @ ~Vone stecr Text (H) © -Pormmtty To a0) Bl Pacer tet P40) “Stoner Peetaton eat Besar senete Wo) Open Ore Trent Sample (CO) BRE eS) BL [tempat (U0), (00), (3), () & (5) Bp -Pi sons (rs) [J cx run (or) BORELOG SHEET NO: 1 OF 4 \V-PILE. (S)[SUENE Ubon Redevelopment Authr PTE Lip [PROECT St wore for Puna! Cont / Punggol Wa USISS2A) LGCATION: Punggol Cental / Punggol Wa PROWECT NO; URAGGDEPOTODO0694/ OL poREOWE No. BH 3. WATER LEVEL _ 10700 ORILUNG DATE STARTED: 24/00/2010 | BOREHOLE OIA” 100 mm eouceo Level: 109.9 ORILUNG DATE COMPLETED:29/08/2010 [coRE DIA: 80 mn INoRTNG PREPARED a: SU DRLUNG METHOD! Ww leasma: Eee AT on xe i at ies as s/susfe Description, Top Sat Loose to wed dense Dork yellow to brown Sity ISAND with gravels HER EERE ER HERE REX EK EERE EE KERRY, Hard Reaaan Browa Jrotited with light grey & yellow Silty CLAY HART eco-ass ERE RED EERE RTE To BE_CONTAUED LEGEND: DN cereereeee ee eee pcae ae emcee [[]-attemed (v0), (00), (5), (Hz) & (08) © ~tew ee oH Unantuet. Sample (00) Bron sone (5) & ~Pemctity Tat 39 ‘pan rv. reso Sempe(00) ee ot (0 Boe, [lf -core run (or 32 BORELOG SHEET NO: 2 OF 4 PROWECT: Sl Works For Punggol Central / Pungaol Wolk (118524) LOCATION: Punggot Central / Punggol Wolk PROECT NO: URAQGOEPO10000884/ 0 | BoREHOLE NO: BH 3 [WATER LEVEL: 107.00 [aorerour OA: 100 mm REDUCED LEVEL: 108.8 ORILLNG OATE_COWPLETED:20/00/2010 | CORE OIA 50 mm orn: PREPARED BY: SU DRILUNG METHOD: W lexsme: Deserptin Bgihii con vei Be ir a8 en) i SSNS IC {nso Dense Yellowish grey Isightly Sity SAND Dance Dark yallow Fine tS lcoorse grained SAND os [TO BE_CONTINUED REIS: LEGEND: 1 Penryn ttn [T)-attompes (vo, (00, (PS, (42) & (05) 1 ~Vera sie Test (7 Bh cirstirtet sone (0) Q -Pormety Ta (0) “pen OrveThxwot Semple (0) EB Procter Tost (Pet) “Hoste Serpe (WZ) EO penton Sarsie 03) 33 V-PILE (S) PTE LTD LOCATION: Punggol Central BORELOG Punggol Walk SHEET NO: 3 OF 4 BH 3 BOREHOLE NO: WATER LEVEL: 107.00 DRILUNG DATE COMPLETED:29/09/2010 BOREHOLE OIA: 100 mmm CORE DIA 50 mm REDUCED LEVEL: 109.9 NorTHNe: PREPARED BY: SU DRILLING METHOD: _W EASTING: Description T a je SPT (N=Weive) [ Sompias & Teste i RS eneea8, ©) ord epsusre | Dense Cork yellow Fine t Jooarse grcined SAND ro) a ary Ras CSRTIEN Sey sightly Sity SAND © Ford ant grey moter with yellowish Brown JSightly Sondy SILT S555 HX HHI RR ary Genes Creenieh Gey Fine to coarse grained ISAND with gravels, @ ~Permecty Test (3) Eh Pes at (Pa) See ae “set sent 0) eer are a (0) ee eet Beier Ese BH 34 {[]-attrps (wr (00), (9). (42) & (08) Bp-P 2: sonpe 5) [Pcs an co BORELOG aries ers (§) [EM unas Reet Auta PTE LTD LOCATION: Punggol Central / Punggol Wolk PROJECT NO: _uRAGODEPOTOGOOEI4/ 0 | BoREHOLE NO: BH 3 [WATER LEVEL: 107.00 DRILNG DATE STARTED: 24/09/2010 | BOREHOLE DIA: 100 mm laeouceD Level: 109.9 DRILLING DATE COMPLETED: 29/09/2010 | CORE DIA: 50mm NORTHING: PREPARED BY: SU DRLUNG WETHOD: W. EASTING: EH ge] peroneal oman Destin i a ih i i Bi] te i cone | Borehele terminated at 69.37n Paacarunsietail “tena Peet [J-tmoes 0), (00, (75.2) (8) i See Te (9 a ~LnaaturbedSempe (U0) ton Sa © -Paretty Te (7 apart wes Soon (co) Ml -Paen Some ©) Eh to tt 9 sate eee a, TD <2 in = 35 V-PILE (S) PTE LTD BORELOG LENT: _Urbon Redevelopment Author PROJECT: $1 Work At Punggol Central SHEET NO. 1 OF 4 Punggol Wolk (LSI652A) LOCATION: Punggol Central_/ Punggol Walk PROJECT NO: _URAOOOEPOTODOOES4/ 0] DRILLING DATE STARTED: 15, (09/2010 | BOREROLE DIA: 100 mm gorewoue No. BH 4 [WATER LEVEL REDUCED LeveL 708.00 110.1 DRILLING DATE COMPLETED: 21 09/2010 | coRe Oia: 50 mm ORTHING: PREPARED BY: SU DRILLING METHOO:_W leasmi Description $1 (-vaus) [sem Tote ae a il 2 ay reainie |B eps Dat or) 4 7 ft T 30 | 10 IReddieh brown to yellow Jmotties with light grey [sity SAND with gravels SRE RK RRR KERRY lowish grey mottied frith light grey Slightly [Sandy ‘SLT SSH HH I KKK HHH HER EERE RH ecosess [To BE CONTINUED LEGEND: TY -Fresueeter Txt (1) Q Vere shar at 0) Q ~Permecbity Yet P30) Petar Tet P40) sewn. Tate LUndaturbed Sample (UD) 36 ‘pan rie Tcl Semple (00) [2 -Attemped (UD), (00), (PS), (M2) & (0s) Beton Sense (5) [I ~core nun com) BORELOG SHEET NO: 2 OF 4 V-PILE (S> PTE LTD [PRQECE-S1Werk At Punagel Central / Punagl Wok (1518524) LOCATION: Punggol Central / Punggol Walk porcHour No. BH 4 [WATER LeveL: 108.00 DRIUING OATE STARTED: 15, BOREHOLE OIA: 100 mm JeeouceD LEVEL: 110.1 DRILLING DATE COMPLETED:21 (CORE DI 50 mm INoRTHING: PREPARED BY: SU RILING METHOD: W EASTING. 31 sve) [senate & et can ou [i 3] ons reins ff BS HB cause Desertion } j east] B ray aarre ras 1 elvish brown to atowisn grey motued in ight rey Signy Sonay Sit % So REA HG with light grey Fine to Jcocrse grcined SAND with gravels 76 BE CoMTWUED GEN YY meaner Ta) ain etn (C]-astaneet (90), (60) (PS), (42) & (08) © ~eos shee rest Dcirerntt sara Pion Sole (5) © Pewee tea 89 iSkin bine ace Sot (05) BB reset (4 atone Of -oxre un (08) a7 BORELOG SHEET NO: 3 OF & UP] V-PILe [cutter setecopnant ashen PTE Lip. [PROMOT Si Work at Puncasl Gonial / Punggol Wai (\SI6524) LOCATION: Punggol Cental / Punggol Wo PROJECT NO; _URADOOEPOTODO0E=4/ o| poREHOLE No__BH_ 4 __waTeR LEVEL: f08.00 DRIING DATE STARTED: 16/09/2010 | BOREHOLE OWA: 100 mm eouceD Level: 110: DRILLNG DATE coMRLETED;Z1/09/2010 |coRE DA 50 mm Nowra PREPARED BY: SU DRILLING WETHOO:_W least e] EF ys] | sreyoua [Seno tt [ruc [95] con sn Gliese ¢_TE Tso Deserpton Bigdiin| 4 i 8] on gett mane (EEL c | f cee fatal ones! Fal |B apni P8loogr) 0 8 18 [Ta ara Uient grey mated with yellowish brown be Senay Sit x ce oocn a Wary dense Dark jae a Fine to coorse grained [SAND with grovele (6.00) | © ary dara Yalowish brown to light grey & areenish grey Fie to fecerse grained SAND sane (0 on 70 BE CONTINUED OU: LEGEND: TW -Promuraater Teo (MT) “Br Peer [LJ-Attemees (Uo), (00), (PS), (2) & (08) @ vo Sar 0 nate Senge (WD) fiton Sapte (5) @ ternary tty ‘Capone aca Sete (on) -P#" Sve EE esr Tt By [J core mun (or) 38 BORELOG Somes ey ere |e ce Oe ep [ERR Sot A Pu nts / na Bo ERA penne ges PROJECT NO:_URADOGEPCIO000894¢/ 0| BOREHOLE NO: BH 4 [WATER LEVEL: 108.00 Seaire- letestui a Fenn ine os SSRN ne eur ooh fc patton vonnne Soe Sain tn a Slee) ober laeay a tas |e fon alli § i Ba] ome dels ig aaesat cee purse Very dense Yellowish Borehole terminated ot 69.56n} REARS LEGEND: Y -Prmnrete et) Sie ain [[J-ateroed (Uo), (60) (5). (Wz) (05) a Se : Swe Eatin soe ag) tion oe, Dx n 39 BORELOG SHEET NO: 1 OF 4 ‘CUENT, Urban Redevetoment Autherity PRO.ECT: 1 Works Far Punggol Cente LOCATION: Punggol Central / Punggol Welk PRO.ECT No-_uRagcoeeoroon0g04/ ol oreo Ko BH 5 [WATER LeveL: 107.98 BOREHOLE OIA: —_100_ mn lReoucen tevel: 11018 cone DA 80mm PREPARED BY: SU DRILLING METHOD: W SPT (hve) [Samotn Tents Description i 33] bon 89928 ed [op SOT Ted dese Ugh Gre sity SAND with groves” x * x Denes Vallowich brown To To oe cornu eu LEGEND: Seas “Sera tin [T]-ataes (nn. 00. 5) (2) & 3) Eee eee -Undisturbes Sample (U0) ton ie @ remotes coy Ean SR ENS Sag con) ‘Paton Sore 9 Brae ot eee [Jere nn = 40 BORELOG SHEET No: 2 0F 4 V=PILE. (S) [uENT: Urban Redevelopment Authority PTE LTD — |PROECT SI Works For Punggol Central / Pungoo! Walk (\st652A) LOCATION: Punggol Central_/ Punggol Walk PROVECT NO: _uRACOOEPOIOODNS4/ Ol soREHOLE No: BH 5. DRILLING DATE STARTED: 28/08/2010 | BOREHOLE OIA: 109 mm DRILLING DATE COMPLETED:02/09/2010 | CORE DIA PREPARED BY: SU [WATER LEVEL: 107.98 [REDUCED LEVEL: 110.18 50 mom NORTHING: DRILUNG METHOD: W EASTING: |, [set tu-votn) [somptes 4c Tests q 3 | eazy 3 a] ton ioe TT] | esoees| FEES opsuse Dense YaTowan Brown to light grey Slightly Sity ISAND. ery SUIT GAT Brey STIG clay "To BE_CONTNUED LEGEND: Prone Tet (Pu) “Spgs Peet [}-attenpet (uo), (00) (PS). 2) & 05) @ ~vern See ot By cases Saree wor i Seema Open Drive Tsao Semple (00) “atte Serle EB Pes tt Bae on Samale (PS) [core run (oR) 41 BORELOG SHEET NO: 3 OF 4 V-PILE. ¢S) |SUEWE Urnon Revevenment Author PTE LTD. [PROECE St Hts For Pungal Central / Pangaol Wa (316524) LOCATION: Punggol Central / Punggol Walk PRORGT NO; URAGGSEPOTC000804/ 0| porEwote no: BH 5. WATER Lives 107188 DRILLNG DATE STARTED: 26/08/2010 | BOREHOLE DIA: 100 mm eoucen even: 11018 CORE DA worms PREPARED BY: $0 DRLUNG METHOD. W EASTING: SPT (et i Saas c best Haye me nn Dark yellow Fine to coarse grained SAND Wary conse Tight aay sity SAND with gravels To Be coMUED ro: LEGEND: YY Prt Tt (a) ~Staed Penton [Jt (0, (00 5.2) (8) Ta) @ -eve sre Tost ~nasturbed somos (UD) sten Semple (PS) Q Forest tnt (P31) apa On Tecra Sole (CO) EE Poster wt 1) Leen “Het Senet 2) [I] ~core un (om) a2 BORELOG SHEET NO. 4 OF 4 UE _unen Redewopment Ahr PROCTS! Hos fr Puna! Cmte / Puna Wak (S682 LOCATON: Pung Genet Punggel Wal PROJECT NO: URAOOGEPO10000804/ 0 | BOREHOLE NO: BH 5. [WATER LEVEL: 107.98 DRILUNG DATE STARTED: 28, BOREHOLE DIA: 400_mm |REDUCED LEVEL: 110.18 ORANG OATE GoPuETeDe7/08/2010| cone ___50 am cane: PREPARED BY. RUNG WETHOO. Ww As cv Le j t i ee enosat| | opsasye cen a u IHW WHE BKB KB KK KEE orehole terminated at 69.57n] sou: LEGEND: z oem om “Rete Poti [p-attempes (uo, (002 (5, (42) (05) eee Sh Tet Undstrbed Sa “ 0 & -Pemeshty Tet (P07) per ies ence Sao (00) A “Paen saroe S) Poe tt ester, [core mun (ce) 43 BORELOG SHEET NO 1.0F 4 UP] v-Pice ¢s) fauct_uer ecetment suet PROT. SI Works For Punggol Centra / Punaael Wak (USIB52A PTE LTD LOGATIN: Punggl Central / Punggol Walk PROJECT NO: URAOEPOIO0DNRG4/ O| BOREHOLE NO: BH 6 WATER LEVEL: 107.09 ORULNG DATE STARTED: 28/00/2010 | gorewoue OA 100 mm eouceD Level: 10.08 ORILUNG DATE COMPLETED.04/10/2010 | cORE 1 50 mm NorTANG PREPARED BY: SU ORLUNG METHOD: w astna 2 Else ‘SFT (N-Value) [Sarplae de Teste eam se [BS] ier mat] &_[E Jrusrong Desrption dale i : ie wom TEI om / of + [ERs se eavaet| £ (HFS) enue o 21 [oT Top Soir om SoA to, Tih Reddish ae yelow ‘Sandy Sut wen |X HH | ae beer laser Groves ‘i ‘ah coo x bracahelee feos | | 5: [coose Yellow Sity SAND PE i -] fain revels, Fe : Gea) levee le) ane TT Vata 16 TaAT Gr sightly Sandy SET os % [sane [none 24 50) SS Fao loss L| raose DSK FaoW STV SAND kr E jew bys fis umn be lence 70 Be CONTUED, oe LEGEND: eee enc Sy enna [[]-atterpad (00), (00), (5) (zZ) & (05) @asewswe re) rare srt (0) Borie ono 9 @ ~Permectitty Test (PET) ‘Open oe ee ‘Sample (00) Eh Petr Tat (4 tee [cere Run om) 44 BORELOG SHEET NO: 2 OF 4 CUENT: Urban Redevelopment Authority LOCATION: Punggol Gentrol_/ Punggol Walk PROECT NO: URADOOEPOT0000694/ 0 [poREHOLE No: BH 6 WATER LEVEL: 107.08 DRILLING DATE STARTED: 28/09/2010 | BOREHOLE DIAL _100 mm REDUCED LEVEL: 110.09 DRILLING DATE COWPLETED:04/10/2010 | CORE DIA: 50 mm Normans: PREPARED BY: SU ‘BRILLNG METHOD: W T, lease SPT (W-Volue) | Somples & Teste Description u i i $ beg] scaot| E (REs| or 0.0) FRard Light oray yorow silty CLAY teat edu dense Yalow to lignt grey Gravelly Sity ISAND. RR REWER EERE KEE RE 8 o Ise conmeen rea a 7 Presmreeter Tost (a) “Syrgt reerton [Tattered (U0), (00) (PS. (2) & (08) Svevaae ono he me gy HH St Sorta aS Dome 45 BORELOG SHEET NO: 3 OF 4 VA v-rne © PTE LTD LOCATION: Punggol Cantrl_/ Punggol Walk PROJECT NO: _URAQOGEPOI0000884/ 0 | BoREHOLE No: BH 6 [WATER LEVEL: _ 107.09. DRILLING DATE STARTED: 26/09/20t0 | BOREHOLE OIA: _100 mm leeouceD LeveL: 110.08 DRILLING DATE COMPLETED:04/10/2010 | CORE DLA: 50 rom INORTHING: PREPARED BY: SU DRILLING METHOO:_W EASTING: Sel ge], [serine [Sans a te] roa [pl oan su fRgLoecmble [¥ totes ssroton Alga J as EGS come [EAD AL ed = ee eat dense Yelow to light grey Gravely Sity ISAND XERKE Danse Light Gray STghty sity SAND ox) HER RRR FRR RR RRR KNEE \Vary dense Brower jyetow to yellowish brown J& greenish grey Fine to Jcocrse grained SAND with foravels: [TO BE CONTINUED Renata EGEND: aes adiatiad = oe mane [Jatt (U0, (0), (FS), (U2) & (0) Linaatrbd Sone (0 pees @ Pemty To (80 1 Si nas Ste (00) -Peton See OS) EB Poster tnt (9 een [J core un (08) 46 VAV-Pie > PTE LTD BORELOG CLIENT: _Usbon Redevelopment Autherit PROJECT: i Worke For Pungo! LOCATION: Punggol Central / Punggol Walk entra SHEET NO: 4 OF 4 Punggol Wolk (LS1652A) PROJECT NO. URAGD9EPO10000884/ 0 | BOREHOLE NO: BH 6 [WATER LEVEL: 107.08 DRILLING DATE STARTED: 28; 09/2010 | BOREHOLE DIA: _ 100 mm [REDUCED LeveL: 110.08 DRILLING DATE. COMPLETED.04, 10/2010 50 erm CORE Dis INORTHNG: PREPARED 8¥: SU DRILUNG METHOD: W. EASTING: Deserption SPT (N-vau) | Sarg i gllt|s fie Wed svaus/e ay Seat Browaish yellow to yellowish brown lu greenish grey Fine to coarse grained SAND with Jsravels F Borehole terminates ot 64.37m REARS, EGEND. Y -Prenraetr Tat @ -Vone Seer Test (V) a @ Poesy Tat (P27) Petr tnt (4) om “Stn Petia Rae Unastirbed Saree (0) pan Se Trice Serle (00) Dota Ses. ~beniin Sent (OS) 47 [J-attempad (U0), (2) (8) a) & (08) ~Piaton Semple (PS) [I ~core ron tom) BORELOG SHEET NO: 1 OF 4 GUENT: Urban Redevelopment Authority PROLECT: SI Works For Punggol Central_/ Pungaol Wolk (LSi652A) LOCATION: Punggol Central / Punggol Walk PROJECT WO: URAGDoEPOLooD08e4/ o [poREHOLE no: BH 7 [WATER LEVEL: 107.7 DRILLING DATE STARTED: 22/08/2010 | BOREHOLE DIA: _100_ mm, JReDuceD LeveL: 110.17 DRILLING DATE COMPLETED:27/09/2010 | CORE OWA: 50mm INorTiaN: PREPARED BY: SU DRILUNG METHOD: _W EASTING: Bue " oon i aS I i an epens/e Description se [op Sor jediam donee Redaien forown to yellow Silty, ISAND with gravels EE RXR EERE vary sth Light grey sightly Sondy SLT rare bark yellow mated ith light grey Silty CLAY oa nea [70 BE CONTINUED LEGEND: 3 eee “ae Pome []]-Attenped (vo), (CD). (PS) (Mz) & (08) er -Undisturbed Sample (UD) Piston © crecnony mn oon =a: Sete ony BE -Pato See 9) Brome Bs, ee 48 BORELOG SHEET NO: 2 OF 4 V-PILE. ¢S) |SUENT:_Urbon Redevelopment Author PTE LTp _ [POSE Si Works for Punoaol Cntr! / Punggol Wak (LS1652A) LOCATION: Punggol Gentrl_/ Punggol Walk PROJECT NO: _vRAocEPo1oe008=4/ 0 [poweHoLs No; __BH 7. waren Levels 107.77 ORLUNG DATE STARTED: _22 SOREHOLE DIAL_—_100 mm REDUCED LEVEL: 11017 DRILLING DATE COMPLETED:27/09/2010 | CORE Dia 50 mm NoRTHING: PREPARED BY: SU DRILLING METHOD: _W lEasTine: a j 1 (W-Votue) [Serpien & Teste paaray Description | 3 oth edt i: =| 7 | oneeet a oman rare Dark pela motes 7 frith ight grey Sity CLAY 50) | forey Fine to coarse igraned SAND Wary canse Greenish Grey slightly Silty SAN. EEK RE KEK EEK REEE [To BE CONTINUED. UA: EGEND: i dectanitastantaal ee [J-atange 0), (0) (84, 02) & 05) © We Se 60 Bi sstees Spee wo alan Sone (8) © -renwy ta eat a coy By tee tt 09 ciao, [I <2. an (8) 49 BORELOG SHEET NO: 3 OF 4 PILE ¢S> LOCATE: Punggel Gente / Punggl Wa PROWEOT NO! URAQOOEDSIOo0oRe4/ OfeoRENOLE No; BH 7 WaER REL 1077 DRLLNG DATE STARTED: 22/09/2010 | BOREHOLE OW _100 mm eDUoeD LeveL: 10.7 DRLLNG DATE COMPLETEDZ7/03/2010 | cone pxs__—80 mm or PREPATED BY: 50 RULING METIOD._W exsmHc: |. [-et.ocvnn [sarin a Tete aa A i i i s2] | tos oneeat oo) ssa ey Description REX REX KERR EKREKEKKEN gnc fareenish grey Cloyey SILT ary ane Vallowieh forowa Grovelly Siity SAND BE KEKE RE EEE e000 Fro se CONTINUED EWS. LEGEND: rer ny aaa []-atempse (Uo). (0), (#S), (Uz) & (05) re © Yor Sher Tor issn senpte 0) Piston Sample (PS) [I-22 sun (68) & -termeiny Tet 2D he te aah Spl (0) retreat (0 ee cee 50 VP v-PLe PTE LTD BORELOG LOCATION: Punggol Central / Punggol Wolk SHEET NO: 4 OF 4 PROJECT NO: URADOSEPOIONG0894/ 0] BOREHOLE No. __BH 7 [WATER LEVEL: 107.77 DRILLING OATE STARTED: 22/09/2010 | BOREHOLE O'A:_100 mm [REDUCED LEVEL: 110.17 DRILLING DATE COMPLETED:27/09/2010 | CORE DIA 50 mm NORTHING: PREPARED BY: SU DRULNG WETHOD:_W leasmne: Description e 1 (N-vele) [Sorpin & Tete | aan sue ae bes onegat oo : Ba) ceva \Very dense Yalrowiah lorown Gravely Sity SAND ary aorise Greenish grey Fine to coorse grained ISAND Borehole terminated ot 68.3Er4 ROMA V -Prseanete Tet (PAT) © ven Star Tot © Peres Test (37) EB Pek Tat (0) “Berend Feet BB rome sees WO) open Drive Taserat Sample (00) eae er Doreen Sorsie 08) st [J -stonpes (U0). (00). (FS). 2) & (5) BE -Pstc sanpe (5) [I cove run (08) BORELOG SHEET NO: 1. OF 4 \V-PILE. (S> [QUENT _Urbon Redevelopment Authorit PTE LTD /PROECI: Si Works for Punggol Central / Punggel Wak (LSt6528 LOCATION: Punggol Central / Punggol Walk PROJECT NO: _URAGOoEPOtoooDEs4/ O[soREHoLE Nox BH 8 [WATER LEVEL: 107.16 DRILLING DATE STARTED: 20/08/2010 | BOREHOLE DIA: _100 mm [REDUCED LEVEL: 110.16, DRILLING DATE COWPLETED:27/08/2010 | CORE DIA: 50 mm. NoRTANG: PREPARED BY: SU DRILLING METHOD: W |EASTING: Description #8 K i SPT (No rf ’ a aoe Hi nese? erousre | int yelowian gray Sit SAND with gravels Hord Light grey mowed wth yellowish brown Slightly Sondy SLT EE Rw Jrottied with light grey & purple Sity CLAY parse Dare yalow STghty ity SAND race LEGEND: 7 cree ores Penetration [[]-Attemped (U0), (00), (5). (MZ) & (05) Beet, GERTEE g) Btee os amen See Doewmn co 52 V-PILE (S) PTE LTD ‘LOCATION: Punggol Central BORELOG SHEET NO: 2 OF 4 Punggol Wok PROMOT NG. URAoDoEPaToo00EE4/ 0 porcHouE NO _BH_B aTeR LEVEL 10776, DRLUNG OATE STARTED: 20/08/2010 | BOREHOLE OU: 100 mm JeDuceD LeveL: 110.16 RLLNG OATE COMPLETED:27/06/2010 | coRE pia 50 mm INorTaNG: PREPARED BY: ORIUNG NETHOO:_W east Leal ge] « | sercvcyoue [senses « tnt [mack TaE] cen suo [Beer stmaal | Desertion By Bla S lgadl om fall ee 4 ara E encset| EEE] oo [E18 PS cawere Pela o (8 Dense Cork yellow SIghUy sity SAND Ireaiurs cerse Baik alow x) 1V -Frsnrenter To) © ee Ser Tet & ~Paroesty To FP) Pet et (0 a u [T]-Attamped (v0. (00), (P8), (42) & (08) inte Sols 0) 4, fl -Palon Sore 3) 2 [I ore an 53 BORELOG SHEET NO: 3.OF 4 \V-PILE. (S) |QUENT: Urban Redevelopment Authority PROJECT: Si Works For Punggol Central / Punggol Walk (LSI6S2A) PTE LTD LOCATION: Punggol Centr / Punggol Walk PROJECT No; URAOGGEPOI0000894/ O| BOREHOLE NO:__BH 8 [WATER LeveL: 107.16 DRILNG DATE STARTED: 20/08/2010 | BOREHOLE O1A: 100 mmm REDUCED LEVEL: 110.10 DRILLING DATE COWPLETED:27/08/2010 | CORE OA: 50mm NoRTHNG: PREPARED BY: SU RING METHOD. W least: |, [serine [serntes a Tete sg hie Tiel = ; i fn) Deseription ie onasel [Sense to very dense Light grey to greenish grey Slightly Sity SAND. HE HHH KEK KE EE [Dense to very dense Dark yellow to yellowish grey & greenish grey Fine to [coarse grained SAND 70 SE CONTINUED, EWS. LEGEND: x Prorat Tet (PAT) Serer {[]-Atemped (Wr, (00) (PS (Mz) & (05) Vane Shae Tet) Lnésturbed Sample (U0) Piston Sole © -reneny et C00 Gh area cr Sopa (00) Mi -Paton some 5) Fos tt) ones ee [I -core Run (om) 54 BORELOG SHEET NOL 4 OF 4 V-PILE (S) [cunt ovlopmant kuthorty PTE LTD [ERE LOCATION: Punggol Central / Pucggol Wale FROLECT NO; URAGDOEPOTOD0OSO4/ OL aoRENoUE No BH 8. ATER LeveL: 107.8 DRILUNG OATE STARTED: 20/06/2010 | BOREHOLE bls: 100_mm eouceD Level: 110.6 DRILLNG DATE cowPLtTED:27/08/2010 | cone Di 50 mn INorrin PREPARED 8Y: 50 DRILLING METHOD: _W leasTuc. 2] [stein [Sonne Tt Jee i i ile ee I — ongees Aa] 8 oysapsfe Deecrpton is i yellow to yellowish grey & greenish grey Fine to Heoarse graines SAND Boreiole terminated ot 68. aria 7 spat “Sard Pet [}-Attempes (up, (00). (PS) (M2) & (05) Dress Son 0) * @ Percy Tet (7) “Bharat Ste (00) ‘A -Ps'e» Serve *S) EB eter tat (9) [ene [I ~cere pun (ca) 55 CROSS SECTIONS 56 aoe" U1 Ad @UOIVONIS) Ad - A yom je66ung / joven yoSbung | ene | oe | —~ coma menm renee ca mncenneen as Tepe Sor a STO | 0 a a 18 Tuoaay ywoudopropey wan ee hewe ane att ee ee | 9 Ha CHE Hea Sa | [sonnel i sonore ‘ JN40dd WOS T1avEodd 37 U1 Ald (AUOAVONIS) Td - A wen niin / piuag ving [ew | ome | oregon aT TR DIOR 701780 6 wa UL 1S CGBUITY WRUDIDAOFEY LOGIT |e pl wae Soria - as ne ian Ea E g = ene ; ; \ fb bob $$ $ 8 8 S58 T1sO0dd OS TavEowdd 58 sa) G11 ald (@HOAVONTS) TMA- A 0 jo66ung / penveg peSbung |r" | ws | amare oe eeeerae e707 95 | 00 WLU 7s HOARY TOURDRASPH UOWN |p pe oe onra : Ove Aero | aaa mu tena) OO BHO? SHE | E 4. Ee | ! sprene JIWdONd WOS AavEodd 59 oe eed ee eee o10e7 01780 20 on ns ‘Ruoumy qauidojenspey LOGIN |e reo on ens @ He? y He DHE ~ sane ae aie =n { E E 4 | (ere H L Pee _t [pone - on) wm was fly JWs4OUd “WOS TWVEONd 60 Certification by PE for SI Report —— Certification by Professional Engineer For Site Investigation Report 1. 1, Dr. Yong Deung Ming , the Professional Engineer, PE Registration No.3982 certify that the Site Investigation Report Soil Investigation Works For Punggol Central / Punggol Walk. Comprising all field and laboratory data, tests and result therein has been carried out by me or under my supervision of direction, and I have verified the accuracy of the information given in the site investigation report, and to the best on my knowledge and belief, all have been prepared in compliance in all respects with the provisions of the building Control Act and Regulations, relevant Codes of Practice and Standards. 2. I further certify that I have the appropriate qualifications and experience, and 1 am familiar with the purpose of the investigation for which this Site Investigation Report is prepared in reference to Project Ref. No: URA000EPO10000894/ 0. 3. Total number of pages in the Site Investigation Report is et 06 1101 2010 Professional Engineer for Site Investigation Date Signature and Stamp 61

You might also like