Materials Request: For STA 825 - 900 (S)
Materials Request: For STA 825 - 900 (S)
To : Logistics
CC ; Pak Ulya
Subject : Geocomposite Requirement
For STA 825 - 900 ( S )
Elev.24.031
14 m 5th Layer
20 M 20m
14 M
0 + 805
Brantas
20 m
0 + 825
1 1 3 4 5 6 Total : 6 Roll
Pelita
30 m
1
2
3
4
5
6
0 + 855
Requested By :
28/12/2016
T. Ginting
file:///conversion/tmp/scratch/438142903.xlsx Page 1
0 + 900 Field Constr.Supv.
file:///conversion/tmp/scratch/438142903.xlsx Page 2
Requested By :
file:///conversion/tmp/scratch/438142903.xlsx Page 3
Field Constr.Supv.
file:///conversion/tmp/scratch/438142903.xlsx Page 4
PT.BINA PRATAMA PERSADA
Jalan S. A Mahmudsyah no.6 BANDA ACEH
Prepared By :
Tergian Ginting
MATERIALS REQUEST
To : Pak Ulya
3.20 m
25 M 20
1+000 1
20 m
2
5
14/2 = 7 Roll
6
10
11
12
13
14
1+050
Requested By :
T. Ginting
Field Constr.Supv.
MATERIALS REQUEST
To : Pak Ulya
3.20 m
19.5
25 M
1+000 19 .5 m
1 Roll
1+050
Requested By :
T. Ginting
Field Constr.Supv.
To : Pak Ulya
1 st Layer
To : Pak Ulya
1 st Layer
MATERIALS REQUEST
25 M 20
1+140 1
20 m
2
5
9/2 = 4,5 Roll
6
9
1+175
Requested By :
T. Ginting
Field Constr.Supv.
MATERIALS REQUEST
20
25 M
1+140 1
20 m
2
5
9/2 = 4,5 Roll
6
8
9
1+175
Requested By :
T. Ginting
Field Constr.Supv.
To : Pak Ulya
1 st Layer
To : Pak Ulya
2 nd Layer
GEOCOMPOSITE & GEOGRID
INSTALLED FOR SCUNDER
SUB TOTAL 31 3
STA
0.1000-1050 ROLL 7 1/10/2016
ROLL 1 4/10/2016
SUB TOTAL 7 1
STA
0.1140-1175 ROLL 4.5 0 14/08/16
ROLL 4.5 0 19/09/16
SUB TOTAL 9 0
TOTAL 47 4
Prepared By :
T. Ginting
Field Constr.Supv.
To : Pak Ulya
REMARKS
1st Layer
2nd Layer
3rd Layer
1st Layer
4th Layer
1st Layer
1st Layer
2nd Layer