You are on page 1of 7
DST =NIMAT PROJECT 2019 - 20 Implemented by: Entrepreneurship Development Institute of India (EDI), Ahmedabad Under the aegis of: ‘The National Science & Technology Entrepreneurship Development Board, DST, Govt. of India yeen EDIT and Programme Impk ency (PIA) Entrepreneurship Development Institute of India (henceforth referred to as EDI) having its Head Office at, Village & P.O. Bhat 382-428, “~Dist. Gandhinagar Gujarat) and in PT band Pn Dusan d ‘ fi (Name & address of the Programme Implementing Agency (PLA)] hereby enter into the following Agreement on J)2014 Date) at hulyPlace). R aaa fy i cation, (Name of the Pld) has agtbed to conduct 62-EAC(s) (_— EDP() / _— WEDP(s) | — TEDP() / _— FDP(). The Programme (s)/ activity are to be conducted as per the terms and conditions enclosed, General Guidelines 1, ‘The grant Being released should be exclusively spent on the specified purpose for which it has been sanctioned within stipulated time, Any unspeit balance out of the amount sanctioned would be surrendered to EDI, Ahmedabad, Cary forward of unspent funds to the next financial year for utilisation for the same purpose may be considered only with the specific approval of the EDIT, Ahmedabad, 2. The Programme Implementing Agency will fumish progress report of the work on the programme from time to time. In addition, appropriate persons may visit the Programme Implementing Agency periodically for ascertaining the progress of work and resolve any difficulties that might be encountered in the course of implementation. During the progress of the projec, the PIA will provide all facilities to the Visiting Persons, On completion of the progremme, consolidated report ofthe work done on the subject in a bond from shall be sent to EDU, Almedabac. 3. The Programme Implementing Agency shall furnish to EDI, Ahmedabad, Utilisation Certificates (copy enclosed) and an Audited Statement of Accounts pertaining to the grant within three months of ‘completion of the programme / activity sanctioned. 4. The Programme Implementing Agency will maintain separate audited accounts for this project. If tis found expedient to keep a part or whole of the grant in a bank account earning interest, the interest ‘earned should be reported to the EDI, Ahmedabad. The interest thus eamed will be treated as a credit to the PIA and the same to be refunded to NSTEDB through EDI ‘The Programme Implementing Agency will not outsource the work for which the grant is being sanctioned. In case the PLA itself is not in 2 position to execute or complete the project, it would be required to refund the entire amount of grant-in-aid received by it to EDII, Ahmedabad, [P.1.0,) Now in witness whereof the parties to this present have here unto signed in this tespective names and allixed their respective seal, the date and the year herein above written Signed, Sealed and Delivered by: For Fer (EDu) Place: Date: Witnesses: ' 1 Signature: ln a 2 ‘Signature: (om the behalf of the PIA) (on the behalf of EDI) Name & Address ofthe Witness: Name & Addiess ofthe Witness: Ms. Phabhjot Kou # Village Bo opin Ladru- Mavdi CDerabasst) Distt - Mohali ‘TERMS AND CONDITIONS FOR CONDUCTING ENTREPRENEURSHIP AWARENESS CAMP (EAC) Each camp of three days duration to be conducted in the premises of the academic institution. Hach EAC should have minimum 75 students having $ & T background ic., S&T graduate/diploma holders, students of degree’ diploma in Science & Technology. Industrial visit to be organized as part of EAC. Programme Implementing Agency may like to provide inputs as per the suggested schedule placed at EDI website (www.ediindis.org>ProjectsOngoing Major Project™DST-NIMAT). Reading/reference material to be provided to the participants and the same can be downloaded from EDI website Financial assistance will be made available o the PIA @ Rs. 20,000/- per EAC as per the budget breakup given below: . Sr.No. Expenditure Head ‘Amountin Rs. |__| Manpower including honorarium to experts $000.00, 2 Travel a Factory visit 4500.00. '3___[ Miscellaneous & Contingene; "7500.00. 4 [ Administrative overheads "3000.00 Total 20,000.00 First installment ic, 80% to be released on receipt of the duly signed Agreement, Terms & Condition along with the Action Plan (as per Annexure) and Bank detail (Annexuré-I(A)). Activity Completion Statement (ACS) (as per Annexure ~ II) should be submitted within one week after completion of each activity Second and final installment ic,, 20% to be released on successful completion of EAC(s), submission of Post Programme Report (PPR) within one month st Word Kormat on CD & Hard Copy in Spiral Binding) and List of Participants (in excel format) as per the Proforma placed at EDI website, submission of statement of audited expenditure (as per Annexure-II) and utilization certificate (as per Annexure-IV), Pu jgnature of Head ofthe Institue ‘Aumesure=1 DST NIMAT Project 2019-20 ACHION ELAN FORMAT. (1a be submited with Agreement) Name of he Programme Implementog Agency ‘Name ofthe Che Programme Coordinator Punjab Institicte of Technical Pducation he Satiah Ruswar ee 7584059633 2 eX Aaah IS @ queiil-towe RT SOT TREE Bap bat Ricim] wy] Bese | nly | ee | em | cone | Roe a pee: | es, | te | eee ne Emit 1D Activities . He ep aa aay aK leet ys} lo}ms [Adapon +3 a ieee FRA = No Apt une = DST NIMAT Project 2019-20 ACTION FLAN EORMAT (ob submited with grooment Nantettieropranmeimpemening Arey = Punjab Tnatitide of Techmical Education Name othe Che Progra Coo By zatish dumad 7599059639 2 dates 95 © quail coun S| Aetna | Coon | Conninarrs | Tae (ox | Dates | Data] Daal | Davat | Ducat] DacatFin | Xo. |Pooem ‘Name Mette TEDP oly) | Sisins | toomcbies | selosion | Coreen | Campion | Talon Nenter ‘spement | Pomotia! | leew | ‘eens Meine “Email Asie "LO peleceat SS) oan] “| ]ez99]wiofoa] = ae lop =r ma 3) WED = = WAY = = = - = 3 + | Tepe ~ = = = = s FDP = WAY = NAY NAY re Name & Postal Address of Programme ‘Anmexure—1(A) DST NIMAT Project 2019 — 20 DETAILS (To be submitted with Agreement) Implementing Agency (with Phone, Mobile, Fax, Email) Punjab lnstiticte of Teelmicaleducation, vide! Sak kapta ,PD- of feeb Hallam, Via-Sithuind, TehBassi fathawa, Fatehgarh dadih-\Yotrd Powe + 8216312419 Swat ths -prvicifad . pile Ogquad-cow 1. Name of the Account Holder: Puja urslitrete 8 techwicol oducateon » rs . Saving Bank Account No. |. Name of Bank }. Address of Bank . 9 Digit Branch MICR Code : ). Bank IFSC Code . Branch Code ©5973 002190005756 " Pumjaly National Rawk + Padali bs Auigh FalohgetD ilo |4O4o7 000024000 + PUNBODS9800 059800 (Note: Please enclose a Cancelled Cheque with this information) mares rpeenst sweet sre ie (ater) " ran SADA ALAN age Sony P | = PUN! Y EE ca irre] singh E PUNIAG INSTITUTE OF TECHNICAL EDUCATION Fsp “O 70442" O00 24000 29

You might also like