ANALISA UPAH BAHAN

NO URAIAN PEKERJAAN HARGA HARGA HARGA JUMLAH HARGA


SATUAN UPAH BAHAN (Rp)
(RP) (RP) (RP)

A PEKERJAAN TANAH
1 1 M3 Galian Tanah Biasa sedalam 1 m - SNI - 2007
0.4000 Oh Pekerja 70,000.00 28,000.00
0.0400 Oh Mandor 131,000.00 5,240.00
33,240.00 - 33,240.00

2 1 M3 Urugan Tanah kembali - SNI - 2007


0.1920 Oh Pekerja 70,000.00 13,440.00
0.0190 Oh Mandor 131,000.00 2,489.00
15,929.00 - 15,929.00

3 1 M3 Urugan Pasir bawah Lantai - SNI - 2007


1.2000 m³ Pasir urug 120,175.00 144,210.00
0.3000 Oh Pekerja 70,000.00 21,000.00
0.0100 Oh Mandor 131,000.00 1,310.00
22,310.00 144,210.00 166,520.00

4 1 M3 Urugan tanah dipadatkan dg stemper


1.2000 m³ Tanah urug 105,000.00 126,000.00
0.0100 Oh mandor 131,000.00 1,310.00
0.0300 Oh pekerja 70,000.00 2,100.00
0.1200 Ls stamper 100,000.00 12,000.00
15,410.00 126,000.00 141,410.00

B PEKERJAAN PEMANCANGAN
1 Memancang tiang manual
0.2500 Oh pekerja 70,000.00 17,500.00
0.1000 Oh tukang 101,000.00 10,100.00
0.0100 Oh kep tukang 108,000.00 1,080.00
0.0250 Oh mandor 131,000.00 3,275.00
31,955.00 31,955.00

2 1 Titik Memancang tiang Ulin 10x10, p = 4 m


0.0400 m3 Kayu ulin 10x10 4,100,000.00 164,000.00
0.0075 m3 Kalang dan sunduk 4,100,000.00 30,750.00
1.0000 m' Memancang tiang 31,955.00 31,955.00
226,705.00 226,705.00

C PEKERJAAN PASANGAN
1 1 M3 Pasangan batu gunung 1 : 5 - SNI-03-2836-2007
1.1000 m³ Batu Gunung 517,500.00 569,250.00
136.0000 Kg Semen portland 1,725.00 234,600.00
0.5440 m³ Pasir Pasang 160,000.00 87,040.00
0.6000 Oh Tukang batu 101,000.00 60,600.00
0.0600 Oh Kepala Tukang Batu 108,000.00 6,480.00
1.5000 Oh Pekerja 70,000.00 105,000.00
0.0750 Oh Mandor 131,000.00 9,825.00
181,905.00 890,890.00 1,072,795.00

2 1 M3 Pasangan batu kosong - SNI-03-2836-2007


1.2000 m³ Batu Belah 517,500.00 621,000.00
0.3000 m³ Pasir urug 120,175.00 36,052.50
0.0390 Oh Mandor 131,000.00 5,109.00
0.0390 Oh Kepala Tukang Batu 108,000.00 4,212.00
0.3900 Oh Tukang batu 101,000.00 39,390.00
0.7810 Oh Pekerja 70,000.00 54,670.00
103,381.00 657,052.50 760,433.50

3 1 M2 Pasangan batu bata camp 1 : 4 - SNI-03-2836-2007


70.0000 Bh Bata 750.00 52,500.00
11.5000 Kg Semen portland 1,725.00 19,837.50
0.0430 m³ pasir 160,000.00 6,880.00
0.1000 Oh Tukang batu 101,000.00 10,100.00
0.0100 Oh Kepala Tukang Batu 108,000.00 1,080.00
0.3200 Oh pekerja 70,000.00 22,400.00
0.0150 Oh mandor 131,000.00 1,965.00
35,545.00 79,217.50 114,762.50

4 1 M2 Plesteran tebal 15 cm 1 : 4 (SNI 03-2837-2007)


5.2000 Kg Semen portland 1,725.00 8,970.00
0.0200 m³ Pasir Pasang 160,000.00 3,200.00
0.0100 Oh Mandor 131,000.00 1,310.00
0.0150 Oh Kepala Tukang Batu 108,000.00 1,620.00
0.1500 Oh Tukang batu 101,000.00 15,150.00
0.2000 Oh Pekerja 70,000.00 14,000.00
32,080.00 12,170.00 44,250.00

5 1 M2 Pasangan Lantai Keramik 40/40 - SNI-03-2836-2007


1.1000 m2 Keramik 40 x 40 98,000.00 107,800.00
11.3800 Kg Semen portland 1,725.00 19,630.50
0.0420 m³ pasir pasang 160,000.00 6,720.00
1.5000 Kg semen warna 7,500.00 11,250.00
0.6200 Oh pekerja 70,000.00 43,400.00
0.3500 Oh tukang batu 101,000.00 35,350.00
0.0350 Oh kepala tukang 108,000.00 3,780.00
0.0300 Oh mandor 131,000.00 3,930.00
86,460.00 145,400.50 231,860.50

6 1 M2 Pasangan lantai keramik 20/20 - SNI - 2007


1.1000 m2 keramik 20 x 20 cm 82,000.00 90,200.00
11.3800 Kg semen portland 1,725.00 19,630.50
0.0420 m³ pasir pasang 160,000.00 6,720.00
1.5000 Kg semen warna 7,500.00 11,250.00
0.6200 Oh pekerja 70,000.00 43,400.00
0.3500 Oh tukang batu 101,000.00 35,350.00
0.0350 Oh kepala tukang 108,000.00 3,780.00
0.0300 Oh mandor 131,000.00 3,930.00
86,460.00 127,800.50 214,260.50

7 1 M2 Pasangan Keramik dinding 20/25 - SNI - 2007


1.1000 m2 Keramik dinding 20/20 82,000.00 90,200.00
9.3000 Kg semen portland 1,725.00 16,042.50
1.5000 Kg Semen Warna 7,500.00 11,250.00
0.0180 m³ Pasir Pasang 160,000.00 2,880.00
0.6000 Oh Pekerja 70,000.00 42,000.00
0.1000 Oh Tukang 101,000.00 10,100.00
0.0450 Oh Kepala Tukang 108,000.00 4,860.00
0.0300 Oh Mandor 131,000.00 3,930.00
60,890.00 120,372.50 181,262.50

8 1 M2 Pasangan batu alam


1.1000 m2 Batu alam 185,000.00 203,500.00
9.3000 Kg semen portland 1,725.00 16,042.50
1.5000 Kg Semen Warna 7,500.00 11,250.00
0.0180 m³ Pasir Pasang 160,000.00 2,880.00
0.6000 Oh Pekerja 70,000.00 42,000.00
0.1000 Oh Tukang 101,000.00 10,100.00
0.0450 Oh Kepala Tukang 108,000.00 4,860.00
0.0300 Oh Mandor 131,000.00 3,930.00
60,890.00 233,672.50 294,562.50

D PEKERJAAN BETON
1 1 M3 Beton K-225 (Ready Mix)
1.0000 m3 Beton K-225 (Ready Mix) 1,345,000.00 1,345,000.00
1.0000 Ls Concrete Pump 30,000.00 30,000.00
1.6500 Oh Pekerja 70,000.00 115,500.00
0.2500 Oh Tukang 101,000.00 25,250.00
0.0250 Oh Kepala Tukang 108,000.00 2,700.00
0.0800 Oh Mandor 131,000.00 10,480.00
153,930.00 1,375,000.00 1,528,930.00

2 1 M3 Cor beton camp. 1 : 2 : 3 (struktur) - SNI 03-3435-2007


336.0000 Kg semen portland 1,725.00 579,600.00
0.5400 m³ pasir beton 517,500.00 279,450.00
0.8100 m³ kerikil beton 517,500.00 419,175.00
2.0000 Oh pekerja 70,000.00 140,000.00
0.3500 Oh tukang batu 101,000.00 35,350.00
0.0350 Oh kepala tukang 108,000.00 3,780.00
0.0035 Oh mandor 131,000.00 458.50
179,588.50 1,278,225.00 1,457,813.50

3 1 M3 beton tumbuk camp. 1 : 3 : 5 - SNI-03-2836-2007


218.0000 Kg semen portland 1,725.00 376,050.00
0.5200 m³ pasir 160,000.00 83,200.00
0.8700 m³ kerikil beton 517,500.00 450,225.00
1.6500 Oh pekerja 70,000.00 115,500.00
0.2500 Oh tukang batu 101,000.00 25,250.00
0.0250 Oh kepala tukang 108,000.00 2,700.00
0.0800 Oh mandor 131,000.00 10,480.00
153,930.00 909,475.00 1,063,405.00

4 1 kg Pekerjaan Tulangan beton ( SNI-03-3435-2007 )


1.0500 Kg Besi 20,000.00 21,000.00
0.0150 Kg Kawat Bendrat 25,000.00 375.00
0.0003 Oh Mandor 131,000.00 39.30
0.0007 Oh Kepala Tukang Besi 108,000.00 75.60
0.0070 Oh Tukang Besi 101,000.00 707.00
0.0070 Oh Pekerja 70,000.00 490.00
1,272.60 21,414.30 22,686.90

5 1 M2 Pekerjaan bekisitng untuk pondasi (3 x pakai), (SNI-03-3435-2007)


0.0133 m³ kayu meranti 2,300,000.00 30,666.67
0.3000 Kg kg Paku 20,700.00 6,210.00
0.1000 ltr Minyak bekisting 17,250.00 1,725.00
0.0050 Oh Mandor 131,000.00 655.00
0.0260 Oh Kepala Tukang Kayu 108,000.00 2,808.00
0.2600 Oh Tukang Kayu 101,000.00 26,260.00
0.3000 Oh Pekerja 70,000.00 21,000.00
50,723.00 38,601.67 89,324.67

6 1 M2 Pekerjaan bekisitng untuk sloof / tie beam (3 x pakai) - SNI-03-3435-2007


0.0150 m³ kayu meranti 2,300,000.00 34,500.00
0.3000 Kg kg Paku 20,700.00 6,210.00
0.1000 ltr Minyak bekisting 17,250.00 1,725.00
0.0050 Oh Mandor 131,000.00 655.00
0.0260 Oh Kepala Tukang Kayu 108,000.00 2,808.00
0.2600 Oh Tukang Kayu 101,000.00 26,260.00
0.1000 Oh Pekerja 70,000.00 7,000.00
36,723.00 42,435.00 79,158.00

7 1 M2 Pekerjaan bekisitng untuk kolom (3 x pakai) - SNI-03-3435-2007


0.0200 m³ kayu meranti 2,300,000.00 46,000.00
0.4000 kg kg Paku 20,700.00 8,280.00
0.2000 ltr Minyak bekisting 17,250.00 3,450.00
0.1167 lbr plywood 9 mm 230,000.00 26,833.33
0.6667 btg kayu galam 9,200.00 6,133.33
0.0060 Oh Mandor 131,000.00 786.00
0.0330 Oh Kepala Tukang Kayu 108,000.00 3,564.00
0.3300 Oh Tukang Kayu 101,000.00 33,330.00
0.3000 Oh Pekerja 70,000.00 21,000.00
58,680.00 90,696.67 149,376.67

8 1 M2 Pekerjaan bekisitng untuk balok (3 x pakai) - SNI-03-3435-2007


0.0193 m³ kayu meranti 2,300,000.00 44,466.67
0.4000 kg kg Paku 20,700.00 8,280.00
0.2000 ltr Minyak bekisting 17,250.00 3,450.00
0.1167 lbr plywood 9 mm 230,000.00 26,833.33
0.6667 btg kayu galam 9,200.00 6,133.33
0.0060 Oh Mandor 131,000.00 786.00
0.0330 Oh Kepala Tukang Kayu 108,000.00 3,564.00
0.3300 Oh Tukang Kayu 101,000.00 33,330.00
0.3200 Oh Pekerja 70,000.00 22,400.00
60,080.00 89,163.33 149,243.33

9 1 M2 Pekerjaan bekisitng untuk lantai (3 x pakai) - SNI-03-3435-2007


0.0183 m³ kayu meranti 2,300,000.00 42,166.67
0.4000 kg kg Paku 20,700.00 8,280.00
0.2000 ltr Minyak bekisting 17,250.00 3,450.00
0.1167 lbr plywood 9 mm 230,000.00 26,833.33
2.0000 btg kayu galam 9,200.00 18,400.00
0.0060 Oh Mandor 131,000.00 786.00
0.0330 Oh Kepala Tukang Kayu 108,000.00 3,564.00
0.3300 Oh Tukang Kayu 101,000.00 33,330.00
0.3200 Oh Pekerja 70,000.00 22,400.00
60,080.00 99,130.00 159,210.00

10 1 M3 Sloof 15x20
1.00 m3 Beton 1,457,813.50 1,457,813.50
130.70 kg Besi 22,686.90 2,965,177.83
13.33 m2 Beksiting 79,158.00 1,055,440.00
5,478,431.33 5,478,431.33

11 1 M3 Kolom praktis
1.00 m3 Beton 1,457,813.50 1,457,813.50
156.80 kg Besi 22,686.90 3,557,305.92
20.00 m2 Beksiting 149,376.67 2,987,533.33
8,002,652.75 8,002,652.75

12 1 M3 Ring balk
1.00 m3 Beton 1,457,813.50 1,457,813.50
156.80 kg Besi 22,686.90 3,557,305.92
13.33 m2 Beksiting 149,243.33 1,989,911.11
7,005,030.53 7,005,030.53

13 1 M' Kanopi beton atas jendela


0.05 m3 Beton 1,457,813.50 72,890.68
2.36 kg Besi 22,686.90 53,495.71
0.60 m2 Beksiting 159,210.00 95,526.00
0.60 m2 Cat AEP 38,130.90 22,878.54
244,790.93 244,790.93

E PEKERJAAN PINTU DAN JENDELA


1 1 M3 Pek kusen pintu/jendela kayu bengkirai - SNI 03 - 3432 - 2007
1.1000 m³ kayu bengkirai
4,100,000.00 4,510,000.00
6.0000 Oh pekerja 70,000.00 420,000.00
20.0000 Oh Tukang Kayu 101,000.00 2,020,000.00
2.0000 Oh kepala Tukang 108,000.00 216,000.00
0.3000 Oh mandor 131,000.00 39,300.00
2,695,300.00 4,510,000.00 7,205,300.00

2 1 M3 Pek kusen pintu/jendela kayu ulin - SNI 03 - 3432 - 2007


1.1000 m³ kayu ulin' 4,100,000.00 4,510,000.00
6.0000 Oh pekerja 70,000.00 420,000.00
20.0000 Oh Tukang Kayu 101,000.00 2,020,000.00
2.0000 Oh kepala Tukang 108,000.00 216,000.00
0.3000 Oh mandor 131,000.00 39,300.00
2,695,300.00 4,510,000.00 7,205,300.00

3 1 M2 Pek daun pintu panil kayu bengkirai - SNI 03 - 3432 - 2007


0.0400 m³ kayu bengkirai
4,600,000.00 184,000.00
1.0000 Oh pekerja 70,000.00 70,000.00
2.5000 Oh Tukang Kayu 101,000.00 252,500.00
0.2500 Oh kepala Tukang 108,000.00 27,000.00
0.0500 Oh mandor 131,000.00 6,550.00
356,050.00 184,000.00 540,050.00

4 1 M2 Pek daun pintu panil kayu ulin - SNI 03 - 3432 - 2007


0.0400 m³ kayu ulin
4,600,000.00 184,000.00
1.0000 Oh pekerja 70,000.00 70,000.00
2.5000 Oh Tukang Kayu 101,000.00 252,500.00
0.2500 Oh kepala Tukang 108,000.00 27,000.00
0.0500 Oh mandor 131,000.00 6,550.00
356,050.00 184,000.00 540,050.00

5 1 M2 Daun Pintu PVC


1.0000 m2 Pintu PVC 380,000.00 380,000.00
1.0500 Oh Pekerja 70,000.00 73,500.00
1.0500 Oh Tukang 101,000.00 106,050.00
0.1500 Oh Kepala Tukang 108,000.00 16,200.00
0.0050 Oh Mandor 131,000.00 655.00
196,405.00 380,000.00 576,405.00

6 1 M2 Pek daun jendela kaca bening 5 mm kayu bengkirai - SNI 03 - 3432 - 2007
0.0350 m³ kayu bengkirai 4,600,000.00 161,000.00
0.7500 m2 Kaca bening 5 mm 380,951.00 285,713.25
0.8000 Oh pekerja 70,000.00 56,000.00
2.0000 Oh tk.Kayu 101,000.00 202,000.00
0.2000 Oh kepala Tukang 108,000.00 21,600.00
0.0400 Oh mandor 131,000.00 5,240.00
284,840.00 446,713.25 731,553.25

7 1 M2 Jalusi kayu bengkirai


0.0240 m3 papan bengkirai 4,600,000.00 110,400.00
0.2000 kg paku 25,000.00 5,000.00
0.8000 oh tk. kayu 101,000.00 80,800.00
0.0800 oh kep. tukang 108,000.00 8,640.00
0.2800 oh pekerja 70,000.00 19,600.00
0.0140 oh mandor 131,000.00 1,834.00
110,874.00 115,400.00 226,274.00

8 1 M2 Kaca Bening 5 mm
1.1000 m2 Kaca Bening 5 mm 330,000.00 363,000.00
0.0150 Oh Pekerja 70,000.00 1,050.00
0.1500 Oh Tukang 101,000.00 15,150.00
0.0150 Oh Kepala Tukang 108,000.00 1,620.00
0.0010 Oh Mandor 131,000.00 131.00
17,951.00 363,000.00 380,951.00

9 1 Bh Pintu Double P1
0.0310 m3 Kusen ky bengkirai 7,205,300.00 223,364.30
3.5200 m2 Daun pintu panel ky bengkirai 540,050.00 1,900,976.00
6.0000 bh Engsel pintu 82,918.25 497,509.50
1.0000 bh Kunci tanam 502,935.00 502,935.00
1.2400 m2 Pengecatan kusen dgn cat Melamic 80,000.00 99,200.00
7.0400 m2 Pengecatan daun pintu dgn cat Melamic 80,000.00 563,200.00
3,787,184.80 3,787,184.80

10 1 Bh Pintu Ruang P2
0.0270 m3 Kusen ky bengkirai 7,205,300.00 194,543.10
1.7600 m2 Daun pintu panel ky bengkirai 540,050.00 950,488.00
3.0000 bh Engsel pintu 82,918.25 248,754.75
1.0000 bh Kunci tanam 502,935.00 502,935.00
1.0800 m2 Pengecatan kusen dgn Melamic 80,000.00 86,400.00
3.5200 m2 Pengecatan daun pintu dgn Melamic 80,000.00 281,600.00
2,264,720.85 2,264,720.85

11 1 Bh Pintu km/wc P3
0.0260 m3 Kusen ky ulin 7,205,300.00 187,337.80
1.5400 m2 Daun pintu PVC 576,405.00 887,663.70
3.0000 bh Engsel pintu 82,918.25 248,754.75
1.0000 bh Kunci tanam 502,935.00 502,935.00
1.0400 m2 Pengecatan kusen dgn Melamic 80,000.00 83,200.00
1,909,891.25 1,909,891.25

12 1 Bh Jendela J1
0.0456 m3 Kusen ky bengkirai 7,205,300.00 328,291.48
0.5400 m2 Daun jendela 731,553.25 395,038.76
0.9000 m2 Kaca mati 5 mm 380,951.00 342,855.90
0.0024 m3 Sekat kayu bengkirai 4,100,000.00 9,840.00
2.0000 bh Engsel jendela 60,918.25 121,836.50
2.0000 bh grendel jendela 43,000.00 86,000.00
2.0000 bh Hak angin jendela 68,802.50 137,605.00
1.0000 bh Handle jendela 43,000.00 43,000.00
1.8225 m2 Pengecatan kusen dgn cat Melamic 80,000.00 145,800.00
0.3240 m2 Pengecatan daun jendela dgn cat Melamic 80,000.00 25,920.00
1,636,187.64 1,636,187.64

13 1 Bh Jendela J2
0.0205 m3 Kusen ky bengkirai 7,205,300.00 147,708.65
0.7500 m2 Kaca mati 5 mm 380,951.00 285,713.25
0.0024 m3 Sekat kayu bengkirai 4,100,000.00 9,840.00
0.8200 m2 Pengecatan kusen dgn cat Melamic 80,000.00 65,600.00
508,861.90 508,861.90

14 1 Bh Jendela J3
0.0225 m3 Kusen ky bengkirai 7,205,300.00 162,119.25
0.6600 m2 Kaca mati 5 mm 380,951.00 251,427.66
0.9000 m2 Pengecatan kusen dgn Melamic 80,000.00 72,000.00
485,546.91 485,546.91

15 1 Bh Jendela J4
0.0140 m3 Kusen ky bengkirai 7,205,300.00 100,874.20
0.3200 m2 Jalusi kayu bengkirai 226,274.00 72,407.68
0.5600 m2 Pengecatan kusen dg Melamic 80,000.00 44,800.00
1.6320 m2 Pengecatan Jalusi dg Melamic 80,000.00 130,560.00
348,641.88 348,641.88

16 1 Bh Bouven BV
0.0120 m3 Kusen ky bengkirai 7,205,300.00 86,463.60
0.3600 m2 Kaca bening 5 mm 380,951.00 137,142.36
0.4800 m2 Pengecatan kusen dg Melamic 80,000.00 38,400.00
262,005.96 - 262,005.96

17 1 Bh Bouven atas jendela


0.0070 m3 Kusen ky bengkirai 7,205,300.00 50,437.10
0.0600 m2 Kaca bening 5 mm 380,951.00 22,857.06
0.2800 m2 Pengecatan kusen dg Melamic 80,000.00 22,400.00
95,694.16 - 95,694.16

18 1 Bh Jendela atap
0.0335 m3 Kusen ky bengkirai 7,205,300.00 241,377.55
1.6006 m2 Jalusi kayu bengkirai 226,274.00 362,174.16
1.3400 m2 Pengecatan kusen dg Melamic 80,000.00 107,200.00
1.6006 m2 Pengecatan Jalusi dg Melamic 80,000.00 128,048.00
838,799.71 838,799.71

F PEKERJAAN ATAP
1 1 M3 kuda-kuda kayu Bengkirai - SNI-03-2836-2007
1.1000 m³ Kayu Bengkirai #REF! #REF!
2.0000 kg Baut #REF! #REF!
15.0000 Kg Besi strip / begel #REF! #REF!
4.0000 Oh pekerja #REF! #REF!
12.0000 Oh tukang #REF! #REF!
1.2000 Oh kep tukang #REF! #REF!
0.2000 Oh mandor #REF! #REF!
#REF! #REF! #REF!

2 1 M3 Memasang gording kayu Bengkirai - SNI-03-2836-2007


1.1000 m³ Kayu Bengkirai #REF! #REF!
2.2000 kg paku #REF! #REF!
1.9400 Oh pekerja #REF! #REF!
5.8000 Oh tukang #REF! #REF!
0.5800 Oh kep tukang #REF! #REF!
0.0970 Oh mandor #REF! #REF!
#REF! #REF! #REF!

3 1 M2 memasang atap metal - SNI 03-3436-2007


1.6200 lbr #REF! #REF! #REF!
0.2000 Kg Paku Atap Metal #REF! #REF!
0.1000 Oh Tukang #REF! #REF!
0.0100 Oh Kepala Tukang #REF! #REF!
0.2000 Oh Pekerja #REF! #REF!
0.0010 Oh Mandor #REF! #REF!
#REF! #REF! #REF!

4 1 M1 bubungan metal roof - SNI 03-3436-2007


2.5000 Bh Bubungan metal #REF! #REF!
0.0500 kg Paku Biasa #REF! #REF!
0.1250 Oh Tukang #REF! #REF!
0.0130 Oh Kepala Tukang #REF! #REF!
0.0840 Oh Pekerja #REF! #REF!
0.0040 Oh Mandor #REF! #REF!
#REF! #REF! #REF!

5 1 M' papan listplank 2 x 2/20 kayu Bengkirai - SNI 03-3434-2007


0.0086 m³ Papan Bengkirai 2/20 #REF! #REF!
0.0600 Kg Paku Biasa #REF! #REF!
0.1000 Oh Pekerja #REF! #REF!
0.1000 Oh Tukang #REF! #REF!
0.0100 Oh Kepala Tukang #REF! #REF!
0.0500 Oh Mandor #REF! #REF!
#REF! #REF! #REF!

6 1 M2 Pasang rangka plafond (30 x 60) kayu meranti - SNI 03-3434-2007


0.0230 m³ Kayu meranti 5/7 #REF! #REF!
0.1500 kg paku biasa #REF! #REF!
0.2000 Oh Pekerja #REF! #REF!
0.3000 Oh Tukang #REF! #REF!
0.0300 Oh Kepala Tukang #REF! #REF!
0.0100 Oh Mandor #REF! #REF!
#REF! #REF! #REF!

7 1 M2 Memasang plafond Gypsum 9 mm - SNI 03-2838-2007


0.3640 lbr Gypsum #REF! #REF!
0.1100 kg paku #REF! #REF!
0.1000 Oh Pekerja #REF! #REF!
0.0500 Oh Tukang #REF! #REF!
0.0050 Oh Kepala Tukang #REF! #REF!
0.0050 Oh Mandor #REF! #REF!
#REF! #REF! #REF!

8 1 M' List plafond gypsum profill 5 x 5


1.0500 M' Gypsum profil 5 x 5 #REF! #REF!
0.0210 Oh Pekerja #REF! #REF!
0.0210 Oh Tukang #REF! #REF!
0.0020 Oh Kepala Tukang #REF! #REF!
0.0010 Oh Mandor #REF! #REF!
#REF! #REF! #REF!

G PEK. CAT-CATAN/LABURAN
1 1 M2 mengecat bidang kayu baru dg cat kilap
1 lapis plamir, 1 lapis cat dasar, 3 lapis penutup - SNI - 2007
0.2000 Kg Cat meni #REF! #REF!
0.1500 Kg Plamir #REF! #REF!
0.1700 Kg Cat dasar #REF! #REF!
0.3500 Kg Cat penutup #REF! #REF!
0.0700 Oh Pekerja #REF! #REF!
0.1050 Oh Tukang cat #REF! #REF!
0.0040 Oh Kepala Tukang #REF! #REF!
0.0025 Oh Mandor #REF! #REF!
#REF! #REF! #REF!

2 1 M2 mengecat dinding dengan cat tembok (eksterior) 2 x sapu


1 lapis plamir, 1 lapis cat dasar, 2 lapis penutup - SNI - 2007
0.1000 ltr Alkali primer #REF! #REF!
0.2600 Kg cat tembok (eksterior) #REF! #REF!
0.0200 Oh pekerja #REF! #REF!
0.0630 Oh tukang cat #REF! #REF!
0.0063 Oh kep tukang #REF! #REF!
0.0025 Oh mandor #REF! #REF!
#REF! #REF! #REF!

3 1 M2 mengecat dinding dengan cat tembok (interior)


1 lapis plamir, 1 lapis cat dasar, 2 lapis penutup - SNI - 2007
0.1000 kg Plamir #REF! #REF!
0.1000 kg cat dasar #REF! #REF!
0.2600 kg cat tembok (interior) #REF! #REF!
0.0200 Oh pekerja #REF! #REF!
0.0630 Oh tukang cat #REF! #REF!
0.0063 Oh kep tukang #REF! #REF!
0.0025 Oh mandor #REF! #REF!
#REF! #REF! #REF!

H PEK. KUNCI DAN PENGGANTUNG


1 Pasang 1 buah Kunci slot 2 slaag - SNI-03-2836-2007
1.0000 Bh Kunci #REF! #REF!
0.0100 Oh Pekerja #REF! #REF!
0.5000 Oh Tukang #REF! #REF!
0.0100 Oh Kepala Tukang #REF! #REF!
0.0050 Oh Mandor #REF! #REF!
#REF! #REF! #REF!

2 Pasang 1 Buah Engsel Pintu - SNI


1.0000 Bh Engsel pintu 4" (SES) #REF! #REF!
0.0150 Oh Pekerja #REF! #REF!
0.1500 Oh Tukang kayu #REF! #REF!
0.0150 Oh Kepala Tukang #REF! #REF!
0.0008 Oh Mandor #REF! #REF!
#REF! #REF! #REF!

3 Pasang 1 Buah Engsel jendela - SNI


1.0000 Bh Engsel jendela 3" (Magnum) #REF! #REF!
0.0150 Oh Pekerja #REF! #REF!
0.1500 Oh Tukang kayu #REF! #REF!
0.0150 Oh Kepala Tukang #REF! #REF!
0.0008 Oh Mandor #REF! #REF!
#REF! #REF! #REF!

4 Pasang 1 Buah Hak Angin - SNI


1.0000 Set Hak Angin #REF! #REF!
0.0150 Oh Pekerja #REF! #REF!
0.1500 Oh Tukang #REF! #REF!
0.0150 Oh Kepala Tukang #REF! #REF!
0.0075 Oh Mandor #REF! #REF!
#REF! #REF! #REF!

I PEKERJAAN SANITAIR
1 Memasang 1 bh klosed jongkok
1.0000 bh Klosed jongkok #REF! #REF!
14.0000 bh Bata merah #REF! #REF!
12.0000 kg Semen portland #REF! #REF!
0.0100 m³ pasir pasang #REF! #REF!
1.0000 Oh Pekerja #REF! #REF!
1.5000 Oh Tukang #REF! #REF!
0.3000 Oh Kepala Tukang #REF! #REF!
0.1100 Oh Mandor #REF! #REF!
#REF! #REF! #REF!

2 Memasang 1 bh floor drain


1.0000 bh floor drain #REF! #REF!
0.0100 Oh Pekerja #REF! #REF!
0.1000 Oh Tukang #REF! #REF!
0.0100 Oh Kepala Tukang #REF! #REF!
0.0050 Oh Mandor #REF! #REF!
#REF! #REF! #REF!

3 Memasang 1 bh keran air


1.0000 bh Keran #REF! #REF!
0.0250 bh Seal tape #REF! #REF!
0.0100 Oh Pekerja #REF! #REF!
0.1000 Oh Tukang #REF! #REF!
0.0100 Oh Kepala Tukang #REF! #REF!
0.0050 Oh Mandor #REF! #REF!
#REF! #REF! #REF!

J PEKERJAAN LAIN-LAIN
1 1 m' Pekerjaan Saluran Keliling Bangunan
0.2025 m3 Galian tanah 33,240.00 6,731.10
0.0200 m3 Urugan pasir bawah lantai 166,520.00 3,330.40
1.0500 m2 Pasangan bata 114,762.50 120,500.63
1.1000 m2 Plesteran 44,250.00 48,675.00
179,237.13 179,237.13