Professional Documents
Culture Documents
DESA
SUBJEK
NAMA KEPALA
NO BNBA NAMA PENERIMA NO. KTP JENIS KELAMIN TEMPAT LAHIR TANGGAL LAHIR PEKERJAAN ALAMAT PENERIMA
DESA
- 1 = Laki-Laki
Depan - - - - -
Tanpa 0
2 = Perempuan
1 2 3 4 5 6 7 8 9 10
2
Blok B.Bajing RT.01,
1 1 LINDA SUMIATI 3212024108780001 Indramayu Wiraswasta
RW.01
Blok B.Bajing RT.01,
2 2 ERNAWATI 3212025710980001 2 Indramayu Petani/Pekebun
RW.01
Blok B.Bajing RT.01,
3 3 TARIKIN 3212020611890001 1 Indramayu Wiraswasta
RW.01
Blok B.Bajing RT.01,
4 4 DURMAN 3212021210450001 1 Indramayu Petani/Pekebun
RW.01
Blok B.Bajing RT.01,
5 5 WITRI 3212025810300001 2 Indramayu Wiraswasta
RW.01
Blok B.Bajing RT.01,
6 6 DULADI 3212020807530002 1 Indramayu Wiraswasta
RW.01
Blok B.Bajing RT.02,
7 7 KARPAN 3212022505680001 1 Indramayu Petani/Pekebun
RW.01
Blok B.Bajing RT.02,
8 8 JOHAN 3212022005620002 1 Indramayu Petani/Pekebun
RW.01
Blok B.Bajing RT.02,
9 9 CARMIN 3212021001640001 1 Indramayu Petani/Pekebun
RW.01
Blok B.Bajing RT.02,
10 10 DAWIN 3212020401790002 1 Indramayu Petani/Pekebun
RW.01
2
Blok B.Bajing RT.02,
11 11 DARILEM 3212024503440001 Indramayu Petani/Pekebun
RW.01
Blok B.Bajing RT.02,
12 12 ROHYATI 3212024504870003 2 Indramayu Mengurus Rumah Tang
RW.01
Blok B.Bajing RT.02,
13 13 SAKIM 3212020802830001 1 Indramayu Petani/Pekebun
RW.01
Blok B.Bajing RT.02,
14 14 KARTI 3212025011450001 2 Indramayu Petani/Pekebun
RW.01
Blok B.Bajing RT.02,
15 15 WASKINAH 3212025206650005 2 Indramayu Wiraswasta
RW.01
Blok B.Bajing RT.02,
16 16 WARSINIH 3212025003730006 2 Indramayu Wiraswasta
RW.01
Blok B.Bajing RT.02,
17 17 WARNATI 3212025506650004 2 Indramayu Wiraswasta
RW.01
Blok B.Bajing RT.02,
18 18 TARINI 3212025001640003 2 Indramayu Petani/Pekebun
RW.01
Blok B.Bajing RT.02,
19 19 RUSTINI 3212025206710008 2 Indramayu Wiraswasta RW.01
20 20 WENDI 3212020406650001 1 Indramayu Petani/Pekebun BlokRW.01
B.Bajing RT.02,
1
Blok B.Bajing RT.02,
21 21 ISONG 3212025203580001 Indramayu Petani/Pekebun
RW.01
Blok B.Bajing RT.03,
22 22 DARTEM 3212026005450001 2 Indramayu Wiraswasta
RW.01
Blok B.Bajing RT.03,
23 23 SARBAN 3212020203900002 1 Indramayu Petani/Pekebun
RW.01
Blok B.Bajing RT.03,
24 24 WARTO 3212021112500009 1 Indramayu Petani/Pekebun
RW.01
Blok B.Bajing RT.04,
25 25 DARMA 3212021206850003 1 Indramayu Wiraswasta
RW.02
Blok B.Bajing RT.04,
26 26 WARSITA 3212021404630001 1 Indramayu Petani/Pekebun
RW.02
1
Blok B.Bajing RT.04,
27 27 RASKITA 3214212003046774 Indramayu Petani/Pekebun
RW.02
Blok B.Bajing RT.04,
28 28 ABDUL SUKUR 3212020410590001 1 Indramayu Petani/Pekebun
RW.02
Blok B.Bajing RT.04,
29 29 WASTEM 3212024909500001 2 Indramayu Petani/Pekebun
RW.02
Blok B.Bajing RT.04,
30 30 CARKA 3212020510420001 1 Indramayu Petani/Pekebun
RW.02
Blok B.Bajing RT.04,
31 31 JAYADI 3212020206520001 1 Indramayu Mengurus R T
RW.02
Blok B.Bajing RT.04,
32 32 SANIP 3212026009570001 1 Indramayu Petani/Pekebun
RW.02
1
Blok B.Bajing RT.05,
33 33 WASTAR 3212021911710001 Indramayu Petani/Pekebun
RW.02
Blok B.Bajing RT.05,
34 34 DARSIKEM 3212025104500001 2 Indramayu Petani/Pekebun
RW.02
Blok B.Bajing RT.05,
35 35 TARWINAH 3212025004550001 2 Indramayu Wiraswasta
RW.02
Blok B.Bajing RT.05,
36 36 DASIKIN 3212021502790001 1 Indramayu Wiraswasta
RW.02
Blok B.Bajing RT.05,
37 37 SITI 3212024703620001 2 Indramayu Petani/Pekebun
RW.02
Blok B.Bajing RT.05,
38 38 RAMINI 3212025101620001 2 Indramayu Petani/Pekebun
RW.02
Blok B.Bajing RT.06,
39 39 KADIWAN 3212021107720001 1 Indramayu Petani/Pekebun
RW.02
Blok B.Bajing RT.06,
40 40 CASTIM 3212021205550005 1 Indramayu Wiraswasta
RW.02
2
Blok B.Bajing RT.06,
41 41 SATINAH 3212024610580001 Indramayu Wiraswasta
RW.02
Blok B.Bajing RT.06,
42 42 RASILAH 3212020702800008 1 Indramayu Wiraswasta
RW.02
Blok B.Bajing RT.06,
43 43 SADIK 3212022111670001 1 Indramayu Wiraswasta
RW.02
44 44
45 45
46 46
47 47
48 48
49 49
50 50
51 51
52 52
53 53
54 54
55 55
56 56
57 57
58 58
59 59
60 60
61 61
62 62
63 63
64 64
65 65
66 66
67 67
68 68
69 69
70 70
71 71
72 72
73 73
74 74
75 75
76 76
Indramayu, 28 Juni 2018
UBJEK
JML JML
KODE POS BANK NO. REKENING KELOMPOK TOKO MATERIAL NO. SK PPK TGL. SK PPK LATITUDE LONGITUDE
PENGHASILAN TANGGUNGAN
- - - - - - - -
11 12 13 14 15 16 17 18 19 20 21
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
OBJEK SARANA PENDUKUNG
Kode Lihat 1 = Layak 1 = Layak 1 = Layak Kode Lihat 1 = Sanggup Kode Lihat 0 = Tidak Ada 0 = Tidak Ada 0 = Tidak Ada
di isi dengan P L
angka 1
di Comment 2 = Tidak Layak 2 = Tidak Layak 2 = Tidak Layak di Comment 2 = Tidak Sanggup di Comment 1 = Ada 1 = Ada 1 = Ada
22 23 24 25 26 27 28 29 30 31 32 33 34
6 5
6 12
5 6
5 8
4 7
4 5
5.5 8
5.5 8
5.5 8
5 7
5 7
6 7
5 7
4 6
5 7
5 5
5 9
4 7
5 7
5 7
5 7
5 6
4 6
4 7
6 12
5 6
4 6
5 6
4 8
6 9
5 7
4 7
4 7
4 8
5 7
3 4
4 7
4 6
5 6
5 6
4 4
4 6
4 6
RENCANA ANGGARAN BIAYA
35 36 37 38 39
PENARIKAN DANA OLEH PENERIMA BANTUAN PELAKSANAAN PEMBANGUNAN
TAHAP 1 TAHAP 2
RIFKI DWI WANTORO,S.HUT
TANGGAL Rp TANGGAL Rp 0% 30% 100%
K Bahan Sanitair : 0
1 Kran Air bh 30,000
2 Kloset Jongkok INA bh 90,000
3 Kloset duduk ina bh 850,000
4 Floor Drain Plastik bh 15,000
5 Floor Drain (Alumunium) bh 35,000
6 Bak Air Fiber 55 x 55 bh 130,000
7 Bak Air Fiber 55 x 55 motif keramik bh 180,000
8 Bath Tub bh 0
9 Washtafel unit 200,000
10 Kitchen sink unit 200,000
11 Buis beton dia. 1 m bh 180,000
0
L Bahan Penutup Atap : 0
1 Genteng Beton bh 7,400
2 Nok Samping bh 9,025
3 Nok Ujung bh 14,500
0
M Bahan Alat Penggantung dan Kunci 0
1 Kunci Dua Slaag bh 0
2 Kunci Putar bh 0
3 Engsel Pintu bh 0
4 Engsel Jendela bh 0
5 Slot Pintu bh 0
6 Slot Jendela bh 0
7 Tarikan Jendela bh 0
FORMULIR
RENCANA ANGGARAN BIAYA (RAB) RUTILAHU
TAHUN ANGGARAN 2017/2018
Nomor BNBA : 39
Nomor KTP : KADIWAN
Nama Penerima Bantuan : 3212021107720001
Alamat : BLOK B. BAJINGRT/RW02/01
Desa : TEMIYANG
Kecamatan : KROYAKROYA
Kabupaten : INDRAMAYU
UKURAN RUMAH 5 x 6
HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN SATUAN (Rp)
I Pekerjaan Persiapan
Bongkar Rumah Lama ls
II Pekerjaan Atap
1 Kuda-kuda dan Rangka Atap
- Kayu rangka kuda-kuda Dolken ɸ 10 Panjang 4 6 Btg 65,000
- Kayu (6cm x 12cm x 4 m) Meranti KLm 1 Btg 150,000
- Kayu Dolken ɸ 8 cm panjang 4 0 Btg 52,000
- Kayu Gapit (5cm x 10cm x 4 m) Meranti KLm 3 Btg 100,000
- Dolken Usuk ɸ 5 cm panjang 4 m jarak 0,4 m 70 Btg 15,000
- Kayu (5cm x 7cm x 4 m) Meranti KLm Btg 70,000
2 Penutup Atap 65 M2
- Genteng plentong kecil Jatiwangi 1000 Bh 1,900
Indramayu, 28
Diverifikasi
KETUA LPM Fasilitat
CARINYAN SAMSUL, S
T/RW02/01
15,373,800 11,232,000
TOTAL HARGA (Rp)
RUTILAHU SWADAYA
G
o
t
o
390,000 325,000 n
g
150,000
- R
300,000 o
y
1,050,000 1230000 o
- n
g
- K
1,900,000 47,500 P
B
140,000 70,000
195,000
150,000
560,000 270000
-
-
621,500
155,400
- 270000
54,800
290,000
1,030,000 618000
1,620,000 505,000
975,000 2301000
390,000
177,600
- 540000
-
-
-
300,000
600,000
-
450,000
600,000
-
560,000 555,500
412,000 412000
280,000
110,000
160,000
122,000 61000
42,000 21000
40,000
36,000 15500
54,000 15500
36,000 15500
240,000
19,000 57000
32,000 16000
20,000 10000
22,500 7500
55,000 110000
24,000 24000
210,000 60000
360,000 1,800,000
200,000 1,500,000
375,000
-
240,000
15,373,800 11,232,000
###
13,000,000 11,232,000
SAMSUL, S.Pd.I
Diketahui Oleh,
m Teknis Kabupaten Indramayu
SUHARTONO, ST, MT
P. 1997 29494 200604 1 011
AHS11 RANGKA ATAP PELANA, a = 30o
Material Volume Satuan Harsat Harga Material
(Rp) (Rp)
Genteng 1617.0 Bh -
Bubungan 35.0 Bh -
Gording 11.0 btg -
Kaso 54.0 btg -
Reng 65.0 btg -
Balok Tekan 4.0 btg -
Balok Tarik 2.0 btg -
Balok Nok 2.0 btg -
Balok Ander 1.0 btg -
Balok Sekur 2.0 btg -
Balok Muurplat 2.0 btg -
AHS6
CONTOH REKAPITULASI JUMLAH KEBUTUHA
RUMAH TYPE 36
Perhitungan Kebutuh
CONTOH REKAPITULASI JUMLAH KEBUTUHAN BAHAN
No 39 rubah2
Rumah WC
Panjang Tapak, p 5 m 1.5 m Sloof 15 / 20
Lebar Tapak, l 6 m 1.5 m Kolom 15 / 15
Tinggi dinding, h 3 m 3 m Balok Ring 15 / 20
Luas Tapak, L = pxl 30 m2 2.25 m2
Keliling Dinding, K=2p+2l 22 m2 6 m2
Sudut atap, a = 30
Panjang atap, pa=p+2r = 5 + 2 x 1 = 7 m
Lebar atap, la=l+2r = 6 + 2 x 1 = 8 m
panjang batang, pbt = 4 m
Luas Atap, LA=(paxla)/cosa = 7 x 8 / COS30 = 64.6632 m2
Jarak kaso = 0.3 m
Jarak reng = 0.25 m
JUMLAH SARGA
Material Koef. Satuan KEBUTUHAN SATUAN
Jumlah -
Panjang Sloof 22 + 3 = 25 m
(Keliling Bangunan utama + Keliling WC)
Kolom
Tinggi (3.00 m) 3.8 m ( 3 m + 0.4 m + 0.4 m),
Jumlah Kolom 8 bh dimana 0.4 m panjang penyaluran atas bawah
Panjang Kolom 3.8 x 8 = 30.4 m
Besi Dia 10
(Panjang Sloof ) x 4 25 x 4 = 100 m
9 batang
1 batang, sambungan/penyaluran
10 batang
Besi Dia 10
(Panjang Kolom ) x 4
30.4 x 4 = 121.6 m
11 batang
gan/penyaluran
gan/penyaluran
CONTOH REKAPITULASI JUMLAH KEBUTUHAN BAHAN
RUMAH TYPE 36
Perhitungan Kebutuhan Besi 1
Rumah WC
Panjang Tapak, p 6m 1.5 m Sloof 15 / 20 10
Lebar Tapak, l 6m 1.5 m Kolom 10 / 10 8
Tinggi dinding, h 3m 3m Balok Ring 10 / 15 8
Luas Tapak, L = pxl 36 m2 2.25 m2
Keliling Dinding, K=2p+2l 24 m 6m
Panjang Sloof 24 + 3 = 27 m
(Keliling Bangunan utama + Keliling WC)
Kolom
Tinggi (3.00 m) 3.8 m ( 3 m + 0.4 m + 0.4 m),
Jumlah Kolom 8 bh dimana 0.4 m panjang penyaluran atas bawah
Panjang Kolom 3.8 x 8 = 30.4 m
Besi Dia 10
(Panjang Sloof ) x 4 27 x 4 = 108 m
9 batang
1 batang, sambungan/penyaluran
10 batang
Besi Dia 10
(Panjang Kolom ) x 4
30.4 x 4 = 121.6 m
11 batang
Jumlah 28,800.00
AHS2 Pas. Aanstamping Batu Belah m3 250,560.00
Material Koef. Satuan Harsat Harga Material
(Rp) (Rp)
Batu belah 1.200 m3 180,000.00 216,000.00
Pasir urug 0.432 m3 80,000.00 34,560.00
Jumlah 250,560.00
AHS3 Pek. Urugan Pasir m3 180,000.00
Material Koef. Satuan Harsat Harga Material
(Rp) (Rp)
Pasir pasang 1.200 m3 150,000.00 180,000.00
Jumlah 180,000.00
AHS4 Pek. Pasangan Batu Belah 1 : 5 m3 434,960.00
Material Koef. Satuan Harsat Harga Material
(Rp) (Rp)
Batu belah 1.200 m3 180,000.00 216,000.00
Semen @ 50 Kg 2.720 zak 50,500.00 137,360.00
Pasir pasang 0.544 m3 150,000.00 81,600.00
Jumlah 434,960.00
atas 0.2
bawah 0.4
tinggi 0.6
Luas 0.18 m2
Panjang 27 m
Volume 4.86
AHS5 Pek. Beton 1 : 2 : 3 m3 538,430.00
Material Koef. Satuan Harsat Harga Material
(Rp) (Rp)
Semen @50 Kg 7.000 zak 50,500.00 353,500.00
Spleet 2/3 0.333 m3 210,000.00 69,930.00
Pasir Beton 0.500 m3 230,000.00 115,000.00
Jumlah 538,430.00
AHS6 Pek. Pasangan Bata Merah 1 : 5 m2 51,526.80
Material Koef. Satuan Harsat Harga Material
(Rp) (Rp)
Bata Merah 70.000 bh 500.0 35000.0
Semen @50 Kg 0.194 zak 50500.0 9776.8
Pasir Pasang 0.045 m3 150000.0 6750.0
Jumlah 51,526.80
Panjang
Perhitungan Keperluan Pengisi Dinding Per 1 m2
Jarak / Spasi = 0.015 m
Ukuran Pengisi
Panjang = 0.2 m
Lebar = 0.1 m
Tinggi = 0.05 m
Jumlah per 1 m2 = 72.00 bh
Spasi
Panjang Lebar
Tinggi
Spasi
AHS7 Pek. Plesteran Dinding 1 : 5 t=15mm m2 9,135.84
Material Koef. Satuan Harsat Harga Material
(Rp) (Rp)
Semen @50 Kg 0.1037 zak 50,500.00 5,235.84
Pasir Pasang 0.0260 m3 150,000.00 3,900.00
Jumlah 9,135.84
AHS8 Pek. Acian Dinding m2 3,282.50
Material Koef. Satuan Harsat Harga Material
(Rp) (Rp)
Semen @50 Kg 0.0650 zak 50,500.00 3,282.50
Jumlah 3,282.50
AHS9 Pek. Rabat Lantai 1 : 4 : 6 m3 488,530.00
Material Koef. Satuan Harsat Harga Material
(Rp) (Rp)
Semen @50 Kg 3.460 zak 50,500.00 174,730.00
Spleet 2/3 0.870 m3 210,000.00 182,700.00
Pasir Beton 0.570 m3 230,000.00 131,100.00
Jumlah 488,530.00
AHS10 Pek. Pembesian Beton Btg CONTOH REKAPITULASI JUM
Material Volume Satuan Harsat Harga Material RUMAH TYPE 36
(Rp) (Rp)
Besi dia 10 mm 29.0 btg 82,000.00 2,378,000.00 Panjang Tapak, p
Besi dia 8 mm 21.00 btg 55,000.00 1,155,000.00 Lebar Tapak, l
Tinggi dinding, h
Luas Tapak, L = pxl
Jumlah Keliling Dinding, K=2p+2l
Kolom
Tinggi
Jumlah Kolom
Panjang Kolom
Besi Dia 10
(Panjang Sloof + Panjang Rin
3 m
Jumlah Kolom 11 bh
Panjang Kolom 3 x 11 = 33 m