You are on page 1of 57

DATA BASE PENERIMA BANTUAN PELAKSANAAN KEGIATAN BSPS TAHUN 2017 JAWA BARAT

DESA
SUBJEK

NAMA KEPALA
NO BNBA NAMA PENERIMA NO. KTP JENIS KELAMIN TEMPAT LAHIR TANGGAL LAHIR PEKERJAAN ALAMAT PENERIMA
DESA

- 1 = Laki-Laki
Depan - - - - -
Tanpa 0
2 = Perempuan

1 2 3 4 5 6 7 8 9 10
2
Blok B.Bajing RT.01,
1 1 LINDA SUMIATI 3212024108780001 Indramayu Wiraswasta
RW.01
Blok B.Bajing RT.01,
2 2 ERNAWATI 3212025710980001 2 Indramayu Petani/Pekebun
RW.01
Blok B.Bajing RT.01,
3 3 TARIKIN 3212020611890001 1 Indramayu Wiraswasta
RW.01
Blok B.Bajing RT.01,
4 4 DURMAN 3212021210450001 1 Indramayu Petani/Pekebun
RW.01
Blok B.Bajing RT.01,
5 5 WITRI 3212025810300001 2 Indramayu Wiraswasta
RW.01
Blok B.Bajing RT.01,
6 6 DULADI 3212020807530002 1 Indramayu Wiraswasta
RW.01
Blok B.Bajing RT.02,
7 7 KARPAN 3212022505680001 1 Indramayu Petani/Pekebun
RW.01
Blok B.Bajing RT.02,
8 8 JOHAN 3212022005620002 1 Indramayu Petani/Pekebun
RW.01
Blok B.Bajing RT.02,
9 9 CARMIN 3212021001640001 1 Indramayu Petani/Pekebun
RW.01
Blok B.Bajing RT.02,
10 10 DAWIN 3212020401790002 1 Indramayu Petani/Pekebun
RW.01
2
Blok B.Bajing RT.02,
11 11 DARILEM 3212024503440001 Indramayu Petani/Pekebun
RW.01
Blok B.Bajing RT.02,
12 12 ROHYATI 3212024504870003 2 Indramayu Mengurus Rumah Tang
RW.01
Blok B.Bajing RT.02,
13 13 SAKIM 3212020802830001 1 Indramayu Petani/Pekebun
RW.01
Blok B.Bajing RT.02,
14 14 KARTI 3212025011450001 2 Indramayu Petani/Pekebun
RW.01
Blok B.Bajing RT.02,
15 15 WASKINAH 3212025206650005 2 Indramayu Wiraswasta
RW.01
Blok B.Bajing RT.02,
16 16 WARSINIH 3212025003730006 2 Indramayu Wiraswasta
RW.01
Blok B.Bajing RT.02,
17 17 WARNATI 3212025506650004 2 Indramayu Wiraswasta
RW.01
Blok B.Bajing RT.02,
18 18 TARINI 3212025001640003 2 Indramayu Petani/Pekebun
RW.01
Blok B.Bajing RT.02,
19 19 RUSTINI 3212025206710008 2 Indramayu Wiraswasta RW.01
20 20 WENDI 3212020406650001 1 Indramayu Petani/Pekebun BlokRW.01
B.Bajing RT.02,
1
Blok B.Bajing RT.02,
21 21 ISONG 3212025203580001 Indramayu Petani/Pekebun
RW.01
Blok B.Bajing RT.03,
22 22 DARTEM 3212026005450001 2 Indramayu Wiraswasta
RW.01
Blok B.Bajing RT.03,
23 23 SARBAN 3212020203900002 1 Indramayu Petani/Pekebun
RW.01
Blok B.Bajing RT.03,
24 24 WARTO 3212021112500009 1 Indramayu Petani/Pekebun
RW.01
Blok B.Bajing RT.04,
25 25 DARMA 3212021206850003 1 Indramayu Wiraswasta
RW.02
Blok B.Bajing RT.04,
26 26 WARSITA 3212021404630001 1 Indramayu Petani/Pekebun
RW.02
1
Blok B.Bajing RT.04,
27 27 RASKITA 3214212003046774 Indramayu Petani/Pekebun
RW.02
Blok B.Bajing RT.04,
28 28 ABDUL SUKUR 3212020410590001 1 Indramayu Petani/Pekebun
RW.02
Blok B.Bajing RT.04,
29 29 WASTEM 3212024909500001 2 Indramayu Petani/Pekebun
RW.02
Blok B.Bajing RT.04,
30 30 CARKA 3212020510420001 1 Indramayu Petani/Pekebun
RW.02
Blok B.Bajing RT.04,
31 31 JAYADI 3212020206520001 1 Indramayu Mengurus R T
RW.02
Blok B.Bajing RT.04,
32 32 SANIP 3212026009570001 1 Indramayu Petani/Pekebun
RW.02
1
Blok B.Bajing RT.05,
33 33 WASTAR 3212021911710001 Indramayu Petani/Pekebun
RW.02
Blok B.Bajing RT.05,
34 34 DARSIKEM 3212025104500001 2 Indramayu Petani/Pekebun
RW.02
Blok B.Bajing RT.05,
35 35 TARWINAH 3212025004550001 2 Indramayu Wiraswasta
RW.02
Blok B.Bajing RT.05,
36 36 DASIKIN 3212021502790001 1 Indramayu Wiraswasta
RW.02
Blok B.Bajing RT.05,
37 37 SITI 3212024703620001 2 Indramayu Petani/Pekebun
RW.02
Blok B.Bajing RT.05,
38 38 RAMINI 3212025101620001 2 Indramayu Petani/Pekebun
RW.02
Blok B.Bajing RT.06,
39 39 KADIWAN 3212021107720001 1 Indramayu Petani/Pekebun
RW.02
Blok B.Bajing RT.06,
40 40 CASTIM 3212021205550005 1 Indramayu Wiraswasta
RW.02
2
Blok B.Bajing RT.06,
41 41 SATINAH 3212024610580001 Indramayu Wiraswasta
RW.02
Blok B.Bajing RT.06,
42 42 RASILAH 3212020702800008 1 Indramayu Wiraswasta
RW.02
Blok B.Bajing RT.06,
43 43 SADIK 3212022111670001 1 Indramayu Wiraswasta
RW.02
44 44
45 45
46 46
47 47
48 48
49 49
50 50
51 51
52 52
53 53
54 54
55 55
56 56
57 57
58 58
59 59
60 60
61 61
62 62
63 63
64 64
65 65
66 66
67 67
68 68
69 69
70 70
71 71
72 72
73 73
74 74
75 75
76 76
Indramayu, 28 Juni 2018
UBJEK

JML JML
KODE POS BANK NO. REKENING KELOMPOK TOKO MATERIAL NO. SK PPK TGL. SK PPK LATITUDE LONGITUDE
PENGHASILAN TANGGUNGAN

- - - - - - - -

11 12 13 14 15 16 17 18 19 20 21
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
OBJEK SARANA PENDUKUNG

BENTUK JENIS LUAS RUMAH JENIS KESANGGUPAN


KONDISI LANTAI KONDISI DINDING KONDISI ATAP BUKTI PENGUASAAN TANAH LISTRIK AIR BERSIH MCK
BANTUAN BSPS PEMBANGUNAN KERUSAKAN SWADAYA

Kode Lihat 1 = Layak 1 = Layak 1 = Layak Kode Lihat 1 = Sanggup Kode Lihat 0 = Tidak Ada 0 = Tidak Ada 0 = Tidak Ada
di isi dengan P L
angka 1
di Comment 2 = Tidak Layak 2 = Tidak Layak 2 = Tidak Layak di Comment 2 = Tidak Sanggup di Comment 1 = Ada 1 = Ada 1 = Ada

22 23 24 25 26 27 28 29 30 31 32 33 34
6 5
6 12
5 6
5 8
4 7
4 5
5.5 8
5.5 8
5.5 8
5 7
5 7
6 7
5 7
4 6
5 7
5 5
5 9
4 7
5 7
5 7
5 7
5 6
4 6
4 7
6 12
5 6
4 6
5 6
4 8
6 9
5 7
4 7
4 7
4 8
5 7
3 4
4 7
4 6
5 6
5 6
4 4
4 6
4 6
RENCANA ANGGARAN BIAYA

NILAI SWADAYA JUMLAH TENAGA


CATATAN NILAI PROPOSAL NILAI BSPS
MASYARAKAT KERJA

Ditulis Tanpa Ditulis Tanpa Ditulis Tanpa


di isi dengan
catatan yang
diperlukan (.)(,)(Rp) (.)(,)(Rp) (.)(,)(Rp)

35 36 37 38 39
PENARIKAN DANA OLEH PENERIMA BANTUAN PELAKSANAAN PEMBANGUNAN

TAHAP 1 TAHAP 2
RIFKI DWI WANTORO,S.HUT
TANGGAL Rp TANGGAL Rp 0% 30% 100%

Ditulis Ditulis Tanpa Ditulis Tanpa 0 = Belum 0 = Belum 0 = Belum


AGUS BUDI SANTOSA, ST, MMT
(DD/MM/YYYY) NAMA DESA
(DD/MM/YYYY) (.)(,)(Rp) (.)(,)(Rp) 1 = Sudah 1 = Sudah 1 = Sudah
NIP. 19631001998031001
40 41 42 43 44 45 46 47 NAMA FASILITATOR
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
TEMIYANG SHOLEKH UTSMAN DJUFRI, ST
KARANGANYAR SHOLEKH UTSMAN DJUFRI, ST
KARANGANYAR
KARANGANYAR
KARANGANYAR
KARANGANYAR
KARANGANYAR
KARANGANYAR
KARANGANYAR
KARANGANYAR
KARANGANYAR
KARANGANYAR
KARANGANYAR
KARANGANYAR
KARANGANYAR
KARANGANYAR
KARANGANYAR
KARANGANYAR
KARANGANYAR
KARANGANYAR
KARANGANYAR
WARJONO
WARJONO
WARJONO
WARJONO
WARJONO
WARJONO
WARJONO
WARJONO
WARJONO
WARJONO
WARJONO
WARJONO
WARJONO
WARJONO
WARJONO
WARJONO
WARJONO
WARJONO
WARJONO
WARJONO
KARMA
KARMA
KARMA
KARMA
KARMA
KARMA
KARMA
KARMA
KARMA
KARMA
KARMA
KARMA
KARMA
KARMA
KARMA
KARMA
KARMA
KARMA
KARMA
KARMA
WARNOTO
WARNOTO
WARNOTO
WARNOTO
WARNOTO
WARNOTO
WARNOTO
WARNOTO
WARNOTO
WARNOTO
WARNOTO
WARNOTO
WARNOTO
WARNOTO
WARNOTO
WARNOTO
WARNOTO
WARNOTO
WARNOTO
WARNOTO
HARGA
NO SUMBER DAYA SAT
SATUAN (Rp.)

K Bahan Sanitair : 0
1 Kran Air bh 30,000
2 Kloset Jongkok INA bh 90,000
3 Kloset duduk ina bh 850,000
4 Floor Drain Plastik bh 15,000
5 Floor Drain (Alumunium) bh 35,000
6 Bak Air Fiber 55 x 55 bh 130,000
7 Bak Air Fiber 55 x 55 motif keramik bh 180,000
8 Bath Tub bh 0
9 Washtafel unit 200,000
10 Kitchen sink unit 200,000
11 Buis beton dia. 1 m bh 180,000
0
L Bahan Penutup Atap : 0
1 Genteng Beton bh 7,400
2 Nok Samping bh 9,025
3 Nok Ujung bh 14,500
0
M Bahan Alat Penggantung dan Kunci 0
1 Kunci Dua Slaag bh 0
2 Kunci Putar bh 0
3 Engsel Pintu bh 0
4 Engsel Jendela bh 0
5 Slot Pintu bh 0
6 Slot Jendela bh 0
7 Tarikan Jendela bh 0
FORMULIR
RENCANA ANGGARAN BIAYA (RAB) RUTILAHU
TAHUN ANGGARAN 2017/2018
Nomor BNBA : 39
Nomor KTP : KADIWAN
Nama Penerima Bantuan : 3212021107720001
Alamat : BLOK B. BAJINGRT/RW02/01
Desa : TEMIYANG
Kecamatan : KROYAKROYA
Kabupaten : INDRAMAYU

UKURAN RUMAH 5 x 6
HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN SATUAN (Rp)
I Pekerjaan Persiapan
Bongkar Rumah Lama ls
II Pekerjaan Atap
1 Kuda-kuda dan Rangka Atap
- Kayu rangka kuda-kuda Dolken ɸ 10 Panjang 4 6 Btg 65,000
- Kayu (6cm x 12cm x 4 m) Meranti KLm 1 Btg 150,000
- Kayu Dolken ɸ 8 cm panjang 4 0 Btg 52,000
- Kayu Gapit (5cm x 10cm x 4 m) Meranti KLm 3 Btg 100,000
- Dolken Usuk ɸ 5 cm panjang 4 m jarak 0,4 m 70 Btg 15,000
- Kayu (5cm x 7cm x 4 m) Meranti KLm Btg 70,000

2 Penutup Atap 65 M2
- Genteng plentong kecil Jatiwangi 1000 Bh 1,900

3 Bubungan Genteng Jatiwangi 40 Bh 3,500

III Pekerjaan Dinding


1 Sloof (15 cm x 20 cm) di atas Batu Tapak 0.81 M3
- Besi beton Φ10 mm SNI 3 Btg 65,000
- Besi beton Φ 6 mm SNI 6 Btg 25,000
- Semen @ 50 kg Tigaroda 10 Zak 56,000
- Pasir Beton M3 274,000
- Batu Pecah M3 290,000
2 Kolom (10 cm x 10 cm x 300 cm) Bh
Beton 0.24 M3
- Besi beton Φ 10 mm SNI 11 Btg 56,500
- Besi beton Φ 6 mm SNI 7 Btg 22,200
- Semen @ 50 kg Tigaroda Zak 56,000
- Pasir Beton 0.2 M3 274,000
- Batu pecah 1 M3 290,000
3 Dinding Permanen
Tembok 66 M2
- Pasir pasang (cuci) 5 M3 206,000
- Semen @ 50 kg Tigaroda 30 Zak 54,000
- Batu Bata Merah Press Terisi 1500 Bh 650
4 Ring Balok (10 cm x 15 cm)
Beton 0.405 M3
- Besi beton Φ 8 mm SNI 10 Btg 39,000
- Besi beton Φ 6 mm SNI 8 Btg 22,200
- Semen @ 50 kg Tigaroda Zak 56,000
- Pasir beton 0 M3 274,000
- Batu pecah 0 M3 290,000
5 Kusen Pintu dan Jendela
- Kusen Pintu (200 cm x 80 cm) Mahoni 1 Unit 300,000
- Kusen Jendela (110 cm x 50 cm ) Mahoni 2 Unit 300,000
7 Daun Pintu dan Jendela
- Daun Pintu (Panel Kayu (200 cm x 80 cm) 1 Unit 450,000
- Daun Jendela Kaca (50 cm x 110 cm) 2 Unit 300,000
IV Pekerjaan Lantai
Lantai Rabat (Mutu Bo) 1:5 t=7 cm 2.1 M3
- Semen @ 50 kg Tigaroda 10 Zak 56,000
- Pasir pasang (cuci) 2 M3 206,000
Lantai Papan M2
Bis beton 80 x 50 cm 2 bh 140,000
Tutup bis beton 80 x 8 cm 1 bh 110,000
Kran air 2 bh 10,000

V MCK dan lain-lain


- Closet Jongkok INA 1 Unit 160,000
- Pipa PVC 3" 2 Btg 61,000
- Pipa PVC 1/2" 2 Btg 21,000
- Paku 4 2 Kg 20,000
- Paku 10 2 Kg 18,000
- Paku 7 3 Kg 18,000
- Paku 5 2 Kg 18,000
- Pintu WC 1 Unit 240,000
- Engsel Pintu 1 Set 19,000
- Engsel jendela 2 Set 16,000
- Slot Pintu 2 bh 10,000
- Slot Jendela 3 bh 7,500
- Kunci Pintu 1 bh 55,000
- Kawat Tali 1 Kg 24,000
- Rooster Kayu 7 Bh 30,000
VI Upah Kerja 1
- Tukang 15 Oh 120,000
- Pembantu Tukang 15 Oh 100,000
- Konsumsi 15 Kali 25,000
0
VII Administrasi Ls 240,000
JUMLAH
Dibulatkan (Rp)

Indramayu, 28
Diverifikasi
KETUA LPM Fasilitat

CARINYAN SAMSUL, S

Disahkan Oleh, Diketahui O


Koordinator Fasilitator Kab. Indramayu Tim Teknis Kabupat

RUDI HARTONO, S.Pd.I SUHARTONO


NIP. 1997 29494 2
RUTILAHU
018

T/RW02/01

15,373,800 11,232,000
TOTAL HARGA (Rp)
RUTILAHU SWADAYA

G
o
t
o
390,000 325,000 n
g
150,000
- R
300,000 o
y
1,050,000 1230000 o
- n
g
- K
1,900,000 47,500 P
B
140,000 70,000

195,000
150,000
560,000 270000
-
-

621,500
155,400
- 270000
54,800
290,000
1,030,000 618000
1,620,000 505,000
975,000 2301000

390,000
177,600
- 540000
-
-
-
300,000
600,000
-
450,000
600,000
-

560,000 555,500
412,000 412000

280,000
110,000

160,000
122,000 61000
42,000 21000
40,000
36,000 15500
54,000 15500
36,000 15500
240,000
19,000 57000
32,000 16000
20,000 10000
22,500 7500
55,000 110000
24,000 24000
210,000 60000

360,000 1,800,000
200,000 1,500,000
375,000
-
240,000
15,373,800 11,232,000
###
13,000,000 11,232,000

Indramayu, 28 Juni 2018


Diverifikasi oleh,
Fasilitator

SAMSUL, S.Pd.I

Diketahui Oleh,
m Teknis Kabupaten Indramayu

SUHARTONO, ST, MT
P. 1997 29494 200604 1 011
AHS11 RANGKA ATAP PELANA, a = 30o
Material Volume Satuan Harsat Harga Material
(Rp) (Rp)
Genteng 1617.0 Bh -
Bubungan 35.0 Bh -
Gording 11.0 btg -
Kaso 54.0 btg -
Reng 65.0 btg -
Balok Tekan 4.0 btg -
Balok Tarik 2.0 btg -
Balok Nok 2.0 btg -
Balok Ander 1.0 btg -
Balok Sekur 2.0 btg -
Balok Muurplat 2.0 btg -

AHS6
CONTOH REKAPITULASI JUMLAH KEBUTUHA
RUMAH TYPE 36
Perhitungan Kebutuh
CONTOH REKAPITULASI JUMLAH KEBUTUHAN BAHAN
No 39 rubah2
Rumah WC
Panjang Tapak, p 5 m 1.5 m Sloof 15 / 20
Lebar Tapak, l 6 m 1.5 m Kolom 15 / 15
Tinggi dinding, h 3 m 3 m Balok Ring 15 / 20
Luas Tapak, L = pxl 30 m2 2.25 m2
Keliling Dinding, K=2p+2l 22 m2 6 m2

RANGKA ATAP PELANA, a = 30o

Sudut atap, a = 30
Panjang atap, pa=p+2r = 5 + 2 x 1 = 7 m
Lebar atap, la=l+2r = 6 + 2 x 1 = 8 m
panjang batang, pbt = 4 m
Luas Atap, LA=(paxla)/cosa = 7 x 8 / COS30 = 64.6632 m2
Jarak kaso = 0.3 m
Jarak reng = 0.25 m

Genteng, LAxkoef 25 bh/m2 = 1617 bh = 1617.0


Bubungan, paxkoef 5 bh/m3 = 35.0 bh = 35.0
Gording pax6/pbt = 10.5 btg = 11.0
Kaso (LA/jrk)/pbt = 53.9 btg = 54.0
Reng (LA/jrk)/pbt = 64.7 btg = 65.0
Balok Tekan (nx2xl/cosa)/pbt = 3.5 btg = 4.0
Balok Tarik nxl/pbt = 1.5 btg = 2.0
Balok Nok pa/pbt = 1.8 btg = 2.0
Balok Ander lxsina/pbt = 0.8 btg = 1.0
Balok Sekur (nx0.5x2xl/cosa)/pbt = 1.7 btg = 2.0
Balok Muurplat 2xpa/pbt = 1.8 btg = 2.0

Pek. Pasangan Bata Merah 1 : 5 m2 66.00 21 2 18 78

JUMLAH SARGA
Material Koef. Satuan KEBUTUHAN SATUAN

Bata Merah 70.000 bh 4620.0 4620


Semen @50 Kg 0.194 zak 12.8 13
Pasir Pasang 0.045 m3 3.0 3

Jumlah -

Perhitungan Keperluan Pengisi Dinding Per 1 m2


Jarak / Spasi = 0.015 m
Ukuran Pengisi
Panjang = 0.2 m
Lebar = 0.1 m
Tinggi = 0.05 m
Jumlah per 1 m = 2
72.00 bh

ITULASI JUMLAH KEBUTUHAN BAHAN

Perhitungan Kebutuhan Besi


Rumah WC
Panjang Tapak, p 5m 1.5 m Sloof 15 / 20
Lebar Tapak, l 6m 1.5 m Kolom 10 / 10
Tinggi dinding, h 3m 3m Balok Ring 10 / 15
Luas Tapak, L = pxl 30 m2 2.25 m2
Keliling Dinding, K=2p+2l 22 m 6m

Panjang Sloof 22 + 3 = 25 m
(Keliling Bangunan utama + Keliling WC)

Panjang Ring Balok 22 + 3 = 25 m


(Keliling Bangunan utama + Keliling WC )

Kolom
Tinggi (3.00 m) 3.8 m ( 3 m + 0.4 m + 0.4 m),
Jumlah Kolom 8 bh dimana 0.4 m panjang penyaluran atas bawah
Panjang Kolom 3.8 x 8 = 30.4 m

Besi Dia 10
(Panjang Sloof ) x 4 25 x 4 = 100 m
9 batang
1 batang, sambungan/penyaluran
10 batang

Besi Dia 10
(Panjang Kolom ) x 4
30.4 x 4 = 121.6 m
11 batang

(Panjang Ring balok ) x 4


25 x 4 = 100 m
9 batang
1 batang, sambungan/penyaluran
10 batang
Besi Dia 8 (Sengkang)
Panjang Sengkang Sloof (15/20) = 0.65 m
Panjang Sengkang Ring Balok (10/15) = 0.45 m
Panjang Sengkang Kolom (10/10) = 0.35 m

Panjang Sloof , Jarak Sengkang 15 cm = 25 m


Jumlah Sengkang per m
100 : 15 + 1= 7.66667 bh
Total sengkang (15/20) 25 x 7.6666666667 = 191.667 bh
191.666667 x 0.65 = 124.583 m
= 11 batang
Panjang Kolom , Jarak Sengkang 15 cm = 30.4 m
Jumlah Sengkang per m
100 : 15 + 1= 7.66667 bh
Total sengkang (10/10) 30.4 x 7.6666666667 = 233.067 bh
233.066667 x 0.35 = 81.5733 m
= 7 batang
Panjang Ring Balok , Jarak Sengkang 15 cm = 25 m
Jumlah Sengkang per m
100 : 15 + 1= 7.66667 bh
Total sengkang (15/20) 25 x 7.6666666667 = 191.667 bh
191.666667 x 0.45 = 86.25 m
= 8 batang
10 6
8 6
8 6

gan/penyaluran

gan/penyaluran
CONTOH REKAPITULASI JUMLAH KEBUTUHAN BAHAN
RUMAH TYPE 36
Perhitungan Kebutuhan Besi 1
Rumah WC
Panjang Tapak, p 6m 1.5 m Sloof 15 / 20 10
Lebar Tapak, l 6m 1.5 m Kolom 10 / 10 8
Tinggi dinding, h 3m 3m Balok Ring 10 / 15 8
Luas Tapak, L = pxl 36 m2 2.25 m2
Keliling Dinding, K=2p+2l 24 m 6m

Panjang Sloof 24 + 3 = 27 m
(Keliling Bangunan utama + Keliling WC)

Panjang Ring Balok 24 + 3 = 27 m


(Keliling Bangunan utama + Keliling WC )

Kolom
Tinggi (3.00 m) 3.8 m ( 3 m + 0.4 m + 0.4 m),
Jumlah Kolom 8 bh dimana 0.4 m panjang penyaluran atas bawah
Panjang Kolom 3.8 x 8 = 30.4 m

Besi Dia 10
(Panjang Sloof ) x 4 27 x 4 = 108 m
9 batang
1 batang, sambungan/penyaluran
10 batang

Besi Dia 10
(Panjang Kolom ) x 4
30.4 x 4 = 121.6 m
11 batang

(Panjang Ring balok ) x 4


27 x 4 = 108 m
9 batang
1 batang, sambungan/penyaluran
10 batang
Besi Dia 8 (Sengkang)
Panjang Sengkang Sloof (15/20) = 0.65 m
Panjang Sengkang Ring Balok (10/15) = 0.45 m
Panjang Sengkang Kolom (10/10) = 0.35 m

Panjang Sloof , Jarak Sengkang 15 cm = 27 m


Jumlah Sengkang per m
100 : 15 + 1= 7.667 bh
Total sengkang (15/20) 27 x 7.667 = 207 bh
207 x 0.65 = 135 m
= 12 batang
Panjang Kolom , Jarak Sengkang 15 cm = 30.4 m
Jumlah Sengkang per m
100 : 15 + 1= 7.667 bh
Total sengkang (10/10) 30.4 x 7.667 = 233 bh
233 x 0.35 = 81.57 m
= 7 batang
Panjang Ring Balok , Jarak Sengkang 15 cm = 27 m
Jumlah Sengkang per m
100 : 15 + 1= 7.667 bh
Total sengkang (10/15) 27 x 7.667 = 207 bh
207 x 0.45 = 93.15 m
= 8 batang
6
6
6
AHS1 Pek. Pasangan Bouwplank m1 28,800.00
Material Koef. Satuan Harsat Harga Material
(Rp) (Rp)
Kayu Albasia 5/7 0.012 m3 1,500,000.00 18,000.00
Paku 5 - 7 cm 0.020 kg 15,000.00 300.00
Kayu papan 3/20 0.007 m3 1,500,000.00 10,500.00

Jumlah 28,800.00
AHS2 Pas. Aanstamping Batu Belah m3 250,560.00
Material Koef. Satuan Harsat Harga Material
(Rp) (Rp)
Batu belah 1.200 m3 180,000.00 216,000.00
Pasir urug 0.432 m3 80,000.00 34,560.00

Jumlah 250,560.00
AHS3 Pek. Urugan Pasir m3 180,000.00
Material Koef. Satuan Harsat Harga Material
(Rp) (Rp)
Pasir pasang 1.200 m3 150,000.00 180,000.00

Jumlah 180,000.00
AHS4 Pek. Pasangan Batu Belah 1 : 5 m3 434,960.00
Material Koef. Satuan Harsat Harga Material
(Rp) (Rp)
Batu belah 1.200 m3 180,000.00 216,000.00
Semen @ 50 Kg 2.720 zak 50,500.00 137,360.00
Pasir pasang 0.544 m3 150,000.00 81,600.00

Jumlah 434,960.00

atas 0.2
bawah 0.4
tinggi 0.6
Luas 0.18 m2
Panjang 27 m
Volume 4.86
AHS5 Pek. Beton 1 : 2 : 3 m3 538,430.00
Material Koef. Satuan Harsat Harga Material
(Rp) (Rp)
Semen @50 Kg 7.000 zak 50,500.00 353,500.00
Spleet 2/3 0.333 m3 210,000.00 69,930.00
Pasir Beton 0.500 m3 230,000.00 115,000.00

Jumlah 538,430.00
AHS6 Pek. Pasangan Bata Merah 1 : 5 m2 51,526.80
Material Koef. Satuan Harsat Harga Material
(Rp) (Rp)
Bata Merah 70.000 bh 500.0 35000.0
Semen @50 Kg 0.194 zak 50500.0 9776.8
Pasir Pasang 0.045 m3 150000.0 6750.0

Jumlah 51,526.80

Panjang
Perhitungan Keperluan Pengisi Dinding Per 1 m2
Jarak / Spasi = 0.015 m
Ukuran Pengisi
Panjang = 0.2 m
Lebar = 0.1 m
Tinggi = 0.05 m
Jumlah per 1 m2 = 72.00 bh

Spasi
Panjang Lebar
Tinggi
Spasi
AHS7 Pek. Plesteran Dinding 1 : 5 t=15mm m2 9,135.84
Material Koef. Satuan Harsat Harga Material
(Rp) (Rp)
Semen @50 Kg 0.1037 zak 50,500.00 5,235.84
Pasir Pasang 0.0260 m3 150,000.00 3,900.00

Jumlah 9,135.84
AHS8 Pek. Acian Dinding m2 3,282.50
Material Koef. Satuan Harsat Harga Material
(Rp) (Rp)
Semen @50 Kg 0.0650 zak 50,500.00 3,282.50

Jumlah 3,282.50
AHS9 Pek. Rabat Lantai 1 : 4 : 6 m3 488,530.00
Material Koef. Satuan Harsat Harga Material
(Rp) (Rp)
Semen @50 Kg 3.460 zak 50,500.00 174,730.00
Spleet 2/3 0.870 m3 210,000.00 182,700.00
Pasir Beton 0.570 m3 230,000.00 131,100.00

Jumlah 488,530.00
AHS10 Pek. Pembesian Beton Btg CONTOH REKAPITULASI JUM
Material Volume Satuan Harsat Harga Material RUMAH TYPE 36
(Rp) (Rp)
Besi dia 10 mm 29.0 btg 82,000.00 2,378,000.00 Panjang Tapak, p
Besi dia 8 mm 21.00 btg 55,000.00 1,155,000.00 Lebar Tapak, l
Tinggi dinding, h
Luas Tapak, L = pxl
Jumlah Keliling Dinding, K=2p+2l

Panjang Sloof = Ring Balok


(Keliling Bangunan utama +

Kolom
Tinggi
Jumlah Kolom
Panjang Kolom

Besi Dia 10
(Panjang Sloof + Panjang Rin

Besi Dia 8 (Sengkang)


Panjang Sengkang Sloof & R

Panjang Sengkang Kolom (15

(Panjang Sloof + Panjang Rin

Jumlah Sengkang per m

Total sengkang (15/20)

(Panjang Kolom ), Jarak Seng

Jumlah Sengkang per m

Total sengkang (15/15)

Total Besi Dia 8 (Sengkang)


CONTOH REKAPITULASI JUMLAH KEBUTUHAN BAHAN
RUMAH TYPE 36
Rumah WC
Panjang Tapak, p 6m 1.5 m Sloof 15 / 20
Lebar Tapak, l 6m 1.5 m Kolom 15 / 15
Tinggi dinding, h 3m 3m Balok Ring 15 / 20
Luas Tapak, L = pxl 36 m2 2.25 m2
Keliling Dinding, K=2p+2l 24 m 6m

Panjang Sloof = Ring Balok 24 + 3 = 27 m


(Keliling Bangunan utama + Keliling WC)

3 m
Jumlah Kolom 11 bh
Panjang Kolom 3 x 11 = 33 m

(Panjang Sloof + Panjang Ring Balok + Panjang Kolom) x 4


27 + 27 + 33 = 87 m
87 x 4= 348 m
29 batang

Besi Dia 8 (Sengkang)


Panjang Sengkang Sloof & Ring Balok (15/20) = 0.5 m

Panjang Sengkang Kolom (15/15) = 0.4 m

(Panjang Sloof + Panjang Ring Balok ), Jarak Sengkang 20 cm


27 + 27 = 54 m
Jumlah Sengkang per m
100 : 20 + 1= 6 bh
Total sengkang (15/20) 54 x 6= 324 bh
324 x 0.5 = 162 m

(Panjang Kolom ), Jarak Sengkang 20 cm = 33 m

Jumlah Sengkang per m


100 : 20 + 1= 6 bh
Total sengkang (15/15) 33 x 6= 198 bh
198 x 0.4 = 79.2 m

Total Besi Dia 8 (Sengkang) 162 + 79.2 = 241.2 m


21 batang
2095184.91
52209.91
2,042,975 253 8500 2150500
8075 107,525 5

You might also like