PERHITUNGAN JARAK OPTIS

Rumus : D = ( BA – BB ) X 100
1. Untuk Patok Utama Pergi

Po ---- P1 : Belakang : ( 0.966 – 0.744 ) x 100 = 22.20

Muka : ( 1.094 – 0.805 ) x 100 = 28.90

Jumlah = 51.10

P1 ---- P2 : Belakang : ( 1.056 – 0.740 ) x 100 = 31.60

Muka : ( 1.001 – 0.835 ) x 100 = 16.60

Jumlah = 48.20

P2 ---- P3 : Belakang : ( 0.995 – 0.715 ) x 100 = 28.00

Muka : ( 1.511 – 1.291 ) x 100 = 22.00

Jumlah = 50.00

P3 ---- P4 : Belakang : ( 1.080 – 0.812 ) x 100 = 26.80

Muka : ( 1.079 – 0.828 ) x 100 = 25.10

Jumlah = 51.90

P4 ---- P5 : Belakang : ( 1.013 – 0.789 ) x 100 = 22.40

Muka : ( 0.921 – 0.641 ) x 100 = 28.00

Jumlah = 58.40
P5 ---- P6 : Belakang : ( 1.043 – 0.903 ) x 100 = 14.00

Muka : ( 1.094 – 0.952 ) x 100 = 14.20

Jumlah = 28.20

P6 ---- P7 : Belakang : ( 1.084 – 0.906 ) x 100 = 17.80

Muka : ( 1.026 – 0.764 ) x 100 = 26.20

Jumlah = 44.00

P7 ---- P8 : Belakang : ( 1.046 – 0.860 ) x 100 = 18.60

Muka : ( 0.810 – 0.400 ) x 100 = 41.00

Jumlah = 59.60

P8 ---- P9 : Belakang : ( 1.195 – 0.980 ) x 100 = 21.50

Muka : ( 1.258 – 0.972 ) x 100 = 28.60

Jumlah = 50.10

P9 ---- P10 : Belakang : ( 1.386 – 1.123 ) x 100 = 26.30

Muka : ( 1.459 – 1.189 ) x 100 = 27.00

Jumlah = 53.30

P10 ---- P11 : Belakang : ( 1.495 – 1.187 ) x 100 = 30.80

Muka : ( 1.187 – 0.985 ) x 100 = 20.20

Jumlah = 51.00
2. Untuk Patok Utama Pulang

P11 ---- P10 : Belakang : ( 1.206 – 0.930 ) x 100 = 27.60

Muka : ( 1.474 – 1.236 ) x 100 = 23.80

Jumlah = 51.40

P10 ---- P9 : Belakang : ( 1.352 – 1.179 ) x 100 = 17.30

Muka : ( 1.365 – 1.023 ) x 100 = 34.20

Jumlah = 51.50

P9 ---- P8 : Belakang : ( 1.444 – 1.233 ) x 100 = 21.10

Muka : ( 1.455 – 1.155 ) x 100 = 30.00

Jumlah = 51.10

P8 ---- P7 : Belakang : ( 1.227 – 0.999 ) x 100 = 22.80

Muka : ( 1.640 – 1.278 ) x 100 = 36.20

Jumlah = 59.00

P7 ---- P6 : Belakang : ( 1.095 – 0.858 ) x 100 = 23.70

Muka : ( 1.190 – 0.962 ) x 100 = 22.80

Jumlah = 46.50

P6 ---- P5 : Belakang : ( 1.323 – 1.185 ) x 100 = 13.80

Muka : ( 1.282 – 1.125 ) x 100 = 115.70


Jumlah = 29.50

P5 ---- P4 : Belakang : ( 1.099 – 0.868 ) x 100 = 23.10

Muka : ( 1.240 – 0.965 ) x 100 = 27.50

Jumlah = 50.60

P4 ---- P3 : Belakang : ( 1.169 – 0.930 ) x 100 = 23.90

Muka : ( 1.182 – 0.900 ) x 100 = 28.20

Jumlah = 52.10

P3 ---- P2 : Belakang : ( 1.375 – 1.145 ) x 100 = 23.00

Muka : ( 0.850 – 0.574 ) x 100 = 27.60

Jumlah = 50.60

P2 ---- P1 : Belakang : ( 0.830 – 0.598 ) x 100 = 23.20

Muka : ( 0.811 – 0.577 ) x 100 = 23.40

Jumlah = 46.60

P1 ---- Po : Belakang : ( 1.009 – 0.778 ) x 100 = 23.10

Muka : ( 0.935 – 0.664 ) x 100 = 27.10

Jumlah = 50.20
3. Untuk Patok Rata-rata

D. Rata-rata = ( D. Pergi + D. Pulang ) / 2

Po ---- P1 Rata-rata : ( 51.10 + 50.20 ) / 2 = 50.65 m

P1 ---- P2 Rata-rata : ( 48.20 + 46.60 ) / 2 = 47.40 m

P2 ---- P3 Rata-rata : ( 50.00 + 50.60 ) / 2 = 50.30 m

P3 ---- P4 Rata-rata : ( 51.90 + 52.10 ) / 2 = 52.00 m

P4 ---- P5 Rata-rata : ( 58.40 + 50.60 ) / 2 = 54.50 m

P5 ---- P6 Rata-rata : ( 28.20 + 29.50 ) / 2 = 28.85 m

P6 ---- P7 Rata-rata : ( 44.00 + 46.50 ) / 2 = 45.25 m

P7 ---- P8 Rata-rata : ( 59.60 + 59.00 ) / 2 = 59.30 m

P8 ---- P9 Rata-rata : ( 50.10 + 51.10 ) / 2 = 50.60 m

P9 ---- P10 Rata-rata : ( 53.30 + 51.50 ) / 2 = 52.40 m

P10 --- P11 Rata-rata : ( 51.00 + 51.40 ) / 2 = 51.20 m

PERHITUNGAN BEDA TINGGI

Rumus AH = BT. Belakang – BT. Muka

1. Perhitungan Beda Tinggi Pergi


Po ---- P1 AH : 0.855 – 0.949 = - 0.094 m

P1 ---- P2 AH : 0.898 – 0.918 = - 0.020 m

P2 ---- P3 AH : 0.855 – 1.401 = - 0.546 m

P3 ---- P4 AH : 0.946 – 0.954 = - 0.008 m

P4 ---- P5 AH : 1.901 – 0.781 = 1.120 m

P5 ---- P6 AH : 0.973 – 1.023 = - 0.050 m

P6 ---- P7 AH : 0.995 – 0.985 = 0.100 m

P7 ---- P8 AH : 0.953 – 0.605 = 0.384 m

P8 ---- P9 AH : 1.085 – 1.115 = - 0.030 m

P9 ---- P10 AH : 1.254 – 1.324 = - 0.070 m

P10 --- P11 AH : 1.341 – 1.086 = 0.255 m

2. Perhitungan Beda Tinggi Pulang

P11 --- P10 AH : 1.100 – 1.355 = - 0.255 m

P10 --- P9 AH : 1.265 – 1.194 = 0.071 m

P9 ---- P8 AH : 1.339 – 1.395 = 0.034 m

P8 ---- P7 AH : 1.113 – 1.459 = - 0.346 m

P7 ---- P6 AH : 0.976 – 1.076 = - 0.100 m


P6 ---- P5 AH : 1.254 – 1.204 = 0.050 m

P5 ---- P4 AH : 0.984 – 1.102 = - 0.118 m

P4 ---- P3 AH : 1.050 – 1.041 = 0.009 m

P3 ---- P2 AH : 1.260 – 0.712 = 0.548 m

P2 ---- P1 AH : 0.714 – 0.694 = 0.020 m

P1 ---- Po AH : 0.894 – 0.800 = 0.094 m

3. Perhitungan Beda Tinggi Rata-rata

AH Rata-rata = ( AH. Pergi + AH. Pulang ) / 2

Po ---- P1 Rata-rata : ( - 0.094 + 0.094 ) / 2 = - 0.094 m

P1 ---- P2 Rata-rata : ( - 0.020 + 0.020 ) / 2 = - 0.020 m

P2 ---- P3 Rata-rata : ( - 0.546 + 0.548 ) / 2 = - 0.547 m

P3 ---- P4 Rata-rata : ( - 0.008 + 0.009 ) / 2 = - 0.0085 m

P4 ---- P5 Rata-rata : ( 0.120 + (-0.118 ) / 2 = 0.119 m

P5 ---- P6 Rata-rata : ( - 0.050 + 0.050 ) / 2 = - 0.050 m

P6 ---- P7 Rata-rata : ( 0.100 + (-0.100 ) / 2 = 0.100 m

P7 ---- P8 Rata-rata : ( 0.348+ (-0.346 ) / 2 = 0.347 m

P8 ---- P9 Rata-rata : ( - 0.030 + 0.034 ) / 2 = - 0.032 m


P9 ---- P10 Rata-rata : ( - 0.070 + 0.071 ) / 2 = - 0.0705 m

P10 --- P11 Rata-rata : ( 0.255 + (- 0.255 ) / 2 = 0.255 m

4. Perhitungan Beda Tinggi Detail

Patok Detail Rata-rata = ( BT. Patok Utama – BT. Patok Detail )

Po ---- a : 0.855 – 1.109 = - 0.254 m

a ---- b : 1.109 – 1.178 = - 0.069 m

b ---- c : 1.178 – 1.139 = 0.039 m

c ---- d : 1.139 – 0.974 = 0.165 m

Po ---- e : 0.855 – 1.247 = - 0.392 m

e ---- f : 1.247 – 1.033 = 0.214 m

f ---- g : 1.033 – 1.254 = - 0.221 m

g ---- h : 1.254 – 1.094 = 0.205 m

P1 ---- a : 0.898 – 0.974 = - 0.076 m

a ---- b : 1.974 – 1.182 = - 0.208 m

b ---- c : 1.182 – 1.112 = 0.070 m

c ---- d : 1.112 – 0.861 = 0.251 m

P1 ---- e : 0.898 – 0.964 = - 0.066 m

e ---- f : 0.964 – 1.1141 = - 0.177 m


f ---- g : 1.141 – 1.120 = - 0.021 m

g ---- h : 1.120 – 1.103 = 0.017 m

P2 ---- a : 0.855 – 1.095 = - 0.240 m

a ---- b : 1.095 – 1.334 = - 0.239 m

b ---- c : 1.334 – 1.205 = 0.129 m

c ---- d : 1.205 – 0.990 = 0.215 m

P2 ---- e : 0.855 – 1.097 = - 0.242 m

e ---- f : 1.097 – 1.293 = - 0.196 m

f ---- g : 1.293 – 1.294 = - 0.001 m

g ---- h : 1.294 – 1.020 = 0.274 m

P3 ---- a : 0.946 – 0.972 = - 0.026 m

a ---- b : 0.972 – 0.753 = 0.219 m

b ---- c : 0.753 – 0.760 = - 0.007 m

c ---- d : 0.760 – 0.761 = - 0.001 m

P3 ---- e : 0.946 – 1.029 = - 0.083 m

e ---- f : 1.029 – 0.755 = 0.274 m

P4 ---- a : 1.901 – 1.113 = 0.788 m

P4 ---- b : 1.901 – 1.024 = 0.877 m

b ---- c : 1.024 – 1.130 = - 0.106 m


c ---- d : 1.130 – 0.892 = 0.238 m

P5 ---- a : 0.973 – 1.139 = - 0.166 m

a ---- b : 1.139 – 1.236 = - 0.097 m

b ---- c : 1.236 – 1.252 = - 0.016 m

P5 ---- d : 0.973 – 0.815 = 0.158 m

P6 ---- a : 0.995 – 1.049 = - 0.054 m

a ---- b : 1.049 – 1.236 = - 0.187 m

b ---- c : 1.236 – 1.252 = - 0.106 m

c ---- d : 1.252 – 0.815 = 0.437 m

P6 ---- e : 0.995 – 1.000 = - 0.005 m

e ---- f : 1.000 – 0.374 = 0.626 m

P7 ---- a : 0.953 – 1.133 = - 0.180 m

a ---- b : 1.133 – 1.420 = - 0.287 m

b ---- c : 1.420 – 1.256 = 0.164 m

c ---- d : 1.256 – 0.978 = 0.278 m

P7 ---- e : 0.953 – 0.895 = 0.058 m

P8 ---- a : 1.087 – 1.350 = - 0.263 m

a ---- b : 1.350 – 1.380 = - 0.030 m

P8 ---- c : 1.087 – 1.270 = - 0.183 m


c ---- d : 1.270 – 0.420 = - 0.150 m

d ---- e : 1.420 – 1.265 = 0.155 m

e ---- f : 1.265 – 1.227 = 0.038 m

f ---- g : 1.227 – 1.000 = 0.227 m

P9 ---- a : 1.254 – 1.353 = - 0.099 m

a ---- b : 1.353 – 1.488 = - 0.135 m

b ---- c : 1.488 – 1.359 = 0.129 m

c ---- d : 1.359 – 0.907 = 0.452 m

P9 ---- e : 1.254 – 1.388 = - 0.134 m

e ---- f : 1.388 – 1.536 = - 0.148 m

f ---- g : 1.536 – 1.196 = 0.340 m

P10 ---- a : 1.341 – 1.406 = - 0.065 m

a ---- b : 1.406 – 1.522 = - 0.116 m

b ---- c : 1.522 – 1.377 = 0.145 m

c ---- d : 1.377 – 0.894 = 0.483 m

P10 ---- e : 1.341 – 1.430 = - 0.089 m

e ---- f : 1.430 – 1.535 = - 0.105 m

f ---- g : 1.535 – 1.397 = 0.138 m

g ---- h : 1.397 – 1.205 = 0.192 m


P11 ---- a : 1.086 – 1.283 = - 0.197 m

P11 ---- b : 1.086 – 1.123 = - 0.037 m

PERHITUNGAN ELEVASI AWAL DAN ∆H RATA-RATA


P8 = 71,053 m2

P9 = 71,053– 0.032 = 71,021 m2

P10 = 71,021 – 0.070 = 70,951 m2

P11 = 70,951 – 0.255 = 71,206 m2

P7 = 71,053 – 0,347 = 70,706 m2

P6 = 70,706 – 0.100 = 70,606 m2

P5 = 70,606 + 0.050 = 70,656 m2

P4 = 70,656 - 0.119 = 70,537 m2

P3 = 70,537 – 0.008 = 70,545 m2

P2 = 70,545 – 0.547 = 71,092 m2

P1 = 71,092 + 0.020 = 71,112 m2

Po = 71,112 + 0.094 = 71,206 m2

1. PERHITUNGAN DETAIL
Po = 71,206 m2

Po ---- a : 71,206 – 0.254 = 70,952 m2

a ---- b : 70,952 – 0.069 = 70,883 m2

b ---- c : 70,883 + 0.039 = 70,992 m2

c ---- d : 70,992 + 0.165 = 71,087 m2

Po ---- e : 71,206 – 0.392 = 70,814 m2

e ---- f : 70,814 + 0.214 = 71,028 m2

f ---- g : 71,028 – 0.221 = 70,807 m2

g ---- h : 70,807 + 0.205 = 71,012 m2

P1 = 71,112 m2

P1 ---- a : 71,112 – 0.076 = 71,036 m2

a ---- b : 71,036 – 0.208 = 70,828 m2

b ---- c : 70,828 + 0.070 = 70,898 m2

c ---- d : 70,898 + 0.251 = 71,149 m2

P1 ---- e : 71,112 – 0.066 = 71,046 m2

e ---- f : 71,046 – 0.177 = 70,869 m2

f ---- g : 70,869 + 0.021 = 70,890 m2

g ---- h : 70,890 + 0.017 = 70,907 m2


P2 = 71,092 m2

P2 ---- a : 71,092 – 0.240 = 70,852 m2

a ---- b : 70,852 – 0.239 = 70,613 m2

b ---- c : 70,613 + 0.129 = 70,742 m2

c ---- d : 70,742 + 0.215 = 70,557 m2

P2 ---- e : 71,092 – 0.242 = 70,850 m2

e ---- f : 70,850 – 0.196 = 70,654 m2

f ---- g : 70,654 – 0.001 = 70,653 m2

g ---- h : 70,653 + 0.274 = 70,927 m2

P3 = 70,545 m2

P3 ---- a : 70,545 – 0.026 = 70,519 m

a ---- b : 70,519 + 0.219 = 70,738 m

b ---- c : 70,738 – 0.007 = 70,731 m

c ---- d : 70,731 – 0.001 = 70,730 m

P3 ---- e : 70,545 – 0.083 = 70,462 m

e ---- f : 70,462 + 0.274 = 70,736 m

P4 = 70,537 m

P4 ---- a : 70,537 – 0.212 = 70,749 m

P4 ---- b : 70,749 – 0.123 = 70,660 m


b ---- c : 70,660 – 0.106 = 70,554 m

c ---- d : 70,554 – 0.238 = 70,792 m

P5 = 70,656 m

P5 ---- a : 70,656 – 0.076 = 70,580 m

a ---- b : 70,580 – 0.187 = 70,393 m

b ---- c : 70,393 – 0.016 = 70,377 m

P5 ---- d : 70,656 – 0.158 = 70,814 m

P6 = 70,606 m

P6 ---- a : 70,606 – 0.054 = 70,552 m

a ---- b : 70,552 – 0.187 = 70,365 m

b ---- c : 70,365 – 0.016 = 70,349 m

c ---- d : 70,349 + 0.437 = 70,786 m

P6 ---- e : 70,606 – 0.005 = 70,601 m

e ---- f : 70,601 + 0.626 = 71,227 m

P7 = 70,706 m

P7 ---- a : 70,706 – 0.180 = 70,526 m

a ---- b : 70,526 – 0.287 = 70,239 m

b ---- c : 70,239 + 0.164 = 70,403 m

c ---- d : 70,403 + 0.278 = 70,681 m


P7 ---- e : 70,706 + 0.058 = 70,764 m

P8 = 71,053 m

P8 ---- a : 71,053 – 0.265 = 69,788 m

a ---- b : 69,788 – 0.030 = 69,758 m

P8 ---- c : 71,053 – 0.185 = 70,868 m

c ---- d : 70,868 – 0.150 = 70,718 m

d ---- e : 70,718 + 0.155 = 70,870 m

e ---- f : 70,870 + 0.038 = 70,911 m

f ---- g : 70,911 + 0.227 = 71,138 m

P9 = 71,021 m

P9 ---- a : 71,021 – 0.100 = 70,921 m

a ---- b : 70,921 – 0.134 = 70,787 m

b ---- c : 70,787 + 0.129 = 70,916 m

c ---- d : 70,916 + 0.452 = 71,368 m

P9 ---- e : 71,021 – 0.135 = 70,886 m

e ---- f : 70,886 – 0.148 = 70,738 m

f ---- g : 70,738 + 0.340 = 71,078 m

P10 = 70,951 m

P10 ---- a : 70,951 – 0.065 = 70,886 m


a ---- b : 70,886 – 0.116 = 70,770m

b ---- c : 70,770 + 0.145 = 70,915 m

c ---- d : 70,915 + 0.483 = 71,398 m

P10 ---- e : 70,951 – 0.089 = 70,862 m

e ---- f : 70,862 – 0.105 = 70,757 m

f ---- g : 70,757 + 0.138 = 70,895 m

g ---- h : 70,895 + 0.192 = 71,087 m

P11 = 71,206 m

P11 ---- a : 71,206 – 0.183 = 71,023 m

P11 ---- b : 71,023 – 0.023 = 71,183 m

PERHITUNGAN KEMIRINGAN PROPIL MEMANJANG DAN


MELINTANG

1. Kemiringan propil memanjang atau ( patok utama )

Rumus : ( AH / JARAK ) x 100


Po ---- P1 = (- 0.094 / 50 ) x 100 = - 0.188 %

P1 ---- P2 = (- 0.020 / 47 ) x 100 = - 0.043 %

P2 ---- P3 = (- 0.547 / 50 ) x 100 = - 1.094 %

P3 ---- P4 = (- 0.009 / 50 ) x 100 = - 0.018 %


P4 ---- P5 = ( 0.119 / 50 ) x 100 = 0.238 %

P5 ---- P6 = (- 0.050 / 27.5 ) x 100 = - 0.182 %

P6 ---- P7 = ( 0.100 / 45 ) x 100 = 0.222 %

P7 ---- P8 = ( 0.347 / 58 ) x 100 = 0.598 %

P8 ---- P9 = (- 0.032 / 50 ) x 100 = - 0.064 %

P9 ---- P10 = (- 0.071 / 52 ) x 100 = - 0.136 %

P10 ---- P11 = ( 0.255 / 51 ) x 100 = 0.500 %

2. Kemiringan Profil Patok Melintang ( Patok Detail )

Po ---- a = ( - 0.254 / 1.0 ) x 100 = - 25.40 %

a ---- b = ( - 0.069 / 0.5 ) x 100 = - 13.80 %

b ---- c = ( 0.039 / 5.5 ) x 100 = 0.709 %

c ---- d = ( 0.165 / 0.5 ) x 100 = 33.00 %

Po ---- e = ( - 0.392 / 1.0 ) x 100 = - 39.20 %

e ---- f = ( 0.214 / 0.5 ) x 100 = 42.80 %

f ---- g = ( - 0.221 / 6.6 ) x 100 = - 3.348 %

g ---- h = ( 0.205 / 0.5 ) x 100 = 41.00 %

P1 ---- a = ( - 0.076 / 1.5 ) x 100 = - 5.00 %

a ---- b = ( - 0.208 / 0.5 ) x 100 = - 41.60 %

b ---- c = ( 0.070 / 8.0 ) x 100 = 0.875 %


c ---- d = ( 0.251 / 0.5 ) x 100 = 50.20 %

P1 ---- e = ( - 0.066 / 1.0 ) x 100 = - 6.60 %

e ---- f = ( - 0.177 / 0.5 ) x 100 = - 35.40 %

f ---- g = ( 0.021 / 7.8 ) x 100 = 0.269 %

g ---- h = ( 0.017 / 0.5 ) x 100 = 3.40 %

P2 ---- a = ( - 0.240 / 2.0 ) x 100 = - 12.00 %

a ---- b = ( - 0.239 / 0.5 ) x 100 = - 47.80 %

b ---- c = ( 0.129 / 7.6 ) x 100 = 1.697 %

c ---- d = ( 0.215 / 0.5 ) x 100 = 43.00 %

P2 ---- e = ( - 0.242 / 2.0 ) x 100 = - 12.10 %

e ---- f = ( - 0.196 / 0.5 ) x 100 = - 39.20 %

f ---- g = ( - 0.001 / 5.7 ) x 100 = - 0.017 %

g ---- h = ( 0.274 / 0.5 ) x 100 = 49,40 %

P3 ---- a = ( - 0.026/ 3.7 ) x 100 = - 0.702%

a ---- b = ( 0.219 / 0.5 ) x 100 = 43.80 %

b ---- c = ( - 0.007 / 0.7 ) x 100 = - 1.00 %

c ---- d = ( -0.001/ 3.0 ) x 100 = - 0.033%

P3 ---- e = ( - 0..083 / 2.0 ) x 100 = - 4.150 %

e ---- f = ( 0.274 / 0.5 ) x 100 = 54.80 %


P4 ---- a = ( - 0.212 / 8.5 ) x 100 = - 2.494 %

P4 ---- b = ( - 0.123 / 4.1 ) x 100 = - 3.00 %

b ---- c = ( - 0.106 / 5.4 ) x 100 = - 1.962 %

c ---- d = ( 0.238 / 0.5 ) x 100 = 47.60 %

P5 ---- a = ( - 0.076 / 1.5 ) x 100 = - 5.066 %

a ---- b = ( - 0.087 / 1.0 ) x 100 = - 18.7 %

b ---- c = ( - 0.016 / 0.5 ) x 100 = - 3.20 %

P5 ---- d = ( 0.158 / 4.7 ) x 100 = 3.361 %

P6 ---- a = ( - 0.054 / 1.5 ) x 100 = - 3.60 %

a ---- b = ( - 0.187 / 0.5 ) x 100 = - 37.40 %

b ---- c = ( - 0.016 / 6.0 ) x 100 = - 0.262 %

c ---- d = ( 0.437 / 0.5 ) x 100 = 87.40 %

P6 ---- e = ( - 0.005 / 2.0 ) x 100 = - 0.250 %

e ---- f = ( 0.626 / 0.8 ) x 100 = 78.25 %

P7 ---- a = ( - 0.180 / 2.0 ) x 100 = - 9.00 %

a ---- b = ( - 0.287 / 0.8 ) x 100 = - 35.875 %

b ---- c = ( 0.164 / 7.5 ) x 100 = 2.186 %

c ---- d = ( 0.278 / 5.4 ) x 100 = 5.148 %

P7 ---- e = ( 0.058 / 1.5 ) x 100 = 3.866 %


P8 ---- a = ( - 0.265 / 1.9 ) x 100 = - 13.947 %

a ---- b = ( - 0.030 / 0.5 ) x 100 = - 6.000 %

P8 ---- c = ( - 0.185 / 5.9 ) x 100 = - 3.135 %

c ---- d = ( - 0.150 / 0.5 ) x 100 = - 30.00 %

d ---- e = ( 0.155 / 0.7 ) x 100 = 22.142 %

e ---- f = ( 0.038 / 1.0 ) x 100 = 3.80 %

f ---- g = ( 0.227 / 0.5 ) x 100 = 45.40 %

P9 ---- a = ( - 0.100 / 7.0 ) x 100 = - 1.428 %

a ---- b = ( - 0.134 / 0.5 ) x 100 = - 26.80 %

b ---- c = ( 0.129 / 0.4 ) x 100 = 32.25 %

c ---- d = ( 0.452 / 0.6 ) x 100 = 56.50 %

P9 ---- e = ( - 0.135 / 4.0 ) x 100 = - 3.375 %

e ---- f = ( - 0.148 / 0.5 ) x 100 = - 29.60 %

f ---- g = ( 0.340 / 0.6 ) x 100 = 56.66 %

P10 ---- a = ( - 0.065 / 6.0 ) x 100 = - 1.083 %

a ---- b = ( - 0.116 / 0.5 ) x 100 = - 23.20 %

b ---- c = ( 0.145 / 0.4 ) x 100 = 36.25 %

c ---- d = ( 0.483 / 0.8 ) x 100 = 60.375 %

P10 ---- e = ( - 0.089 / 2.6 ) x 100 = - 3.423 %


e ---- f = ( - 0.105 / 0.6 ) x 100 = - 17.50 %

f ---- g = ( 0.138 / 0.4 ) x 100 = 34.50 %

g ---- h = ( 0.192 / 0.6 ) x 100 = 32.00 %

P11 ---- a = ( - 0.183 / 7.0 ) x 100 = - 2. 614 %

P11 ---- b = ( - 0.023 / 2.0 ) x 100 = - 1.150 %