You are on page 1of 28

CV.

Wali Putra
Nama Proyek : Pembangunan Irigasi Ds.Lajer
Lokasi : Desa Lajer
Periode : 25 Agustus 2018 - 1 September 2018

Senin Selasa Rabu Kamis Jum'at Sabtu


No Nama Jab
Msk Lmb Msk Lmb Msk Lmb Msk Lmb Msk Lmb Msk
1 Pak Rustanto MN 1 1 1 1 1 1
2 Pak Pri MN 1 1 1 1
3 Pak Anton TK 1 1 1 1 1 1 1
4 Pak Sarmo TK 1 1 1 1
5 Pak Akrom TK 1 1 1 1 1 1
6 Mas Sis TK 1 1 1 1 1
7 Pak Wajio TK 1 1 1 1
8 Mbah Sujo KN 1 1 1 1 1 1
9 Mas Huda KN 1 1 1 1 1 1
10 Pak Abdul Rouf KN 1 1 1 1 1 1
11 Mas Aryo KN 1 1 1 1 1 1
12 Mbah Sarno KN 1 1 1 1 1 1
13 Mbah Warijan KN 1 1 1 1 1 1
14
15
16
17
Total

Diperiksa

Periode : 3 September 2018 - 8 September 2018

Senin Selasa Rabu Kamis Jum'at Sabtu


No Nama Jab
Msk Lmb Msk Lmb Msk Lmb Msk Lmb Msk Lmb Msk
1 Pak Rustanto MN 1 1 1 1 1 1
2 Pak Pri MN
3 Pak Anton TK 1 1 1 1 1 1
4 Pak Sarmo TK 1 1 1
5 Pak Akrom TK 1 1 1 1 1 1
6 Mas Sis TK 1 1 1 1 1 1
7 Pak Wajio TK 1 1 1 1 1 1
8 Mbah Sujo KN 1 1 1 1 1 1
9 Mas Huda KN 1 1 1 1 1
10 Pak Abdul Rouf KN 1 0.5 1 0.5 1 1
11 Mas Aryo KN 1 1 1 1 1
12 Mbah Sarno KN 1 1 1 1 1 1
13 Mbah Warijan KN 1 1 1 1 1 1
14 Mas Solihin KN 1 1 1 1
15
16
17
Total

Diperiksa

Periode : 10 September 2018 - 15 September 2018

Senin Selasa Rabu Kamis Jum'at Sabtu


No Nama Jab
Msk Lmb Msk Lmb Msk Lmb Msk Lmb Msk Lmb Msk
1 Pak Rustanto MN 2 1 1 1 1 1
2 Pak Anton TK 1 1 1 1 1 1
3 Pak Sarmo TK 1 1 1 1 1 1
4 Pak Akrom TK 1 1 1 1 1 1
5 Mas Sis TK 1 1 1 1 1 1
6 Pak Wajio TK 1 1 1 1 1 1
7 Mbah Sujo KN 1 1 1 1 1
8 Mas Huda KN 1 1 1 1 1 1
9 Pak Abdul Rouf KN 1 1 1 1 1 1
10 Mas Aryo KN 2 1 1 1 1 1
11 Mbah Sarno KN 1 1 1 1 1
12 Mbah Warijan KN 1 1 1 1 1
13 Mas Solihin KN 1 1 1 1 1 1
14 Karman KN 1 1 1 1 1 1
15 Tiyo KN 1 1 1 1 1 1
16 Pak Bagong TK 1 1 1 1 1 1
17 Pak Yatmo TK 1 1 1 1 1 1
18 Pak Isman TK 1 1 1 1 1 1
19 Pak Narto KN 1 1 1 1 1
Total

Diperiksa
Periode : 17 September 2018 - 22 September 2018

Senin Selasa Rabu Kamis Jum'at Sabtu


No Nama Jab
Msk Lmb Msk Lmb Msk Lmb Msk Lmb Msk Lmb Msk
1 Pak Rustanto MN 1 1 1 1 1 1
2 Pak Anton TK 1 1 1 1 1 1
3 Pak Sarmo TK 1 1 1 1 1 1
4 Pak Akrom TK 1 1 1 1 1 1
5 Mas Sis TK 1 1 1 1 1 1
6 Pak Wajio TK 1 1 1 1 1 1
7 Mbah Sujo KN 1 1 1 1 1 1
8 Mas Huda KN 1 1 1 1 1
9 Pak Abdul Rouf KN 1 1 1 1 1 1
10 Mas Aryo KN 1 1 1 1 1 1
11 Mbah Sarno KN 1 1 1 1 0.5 1
12 Mbah Warijan KN 1 1 1 1 1 1
13 Mas Solihin KN 1 1 1 1 1 1
14 Karman KN 0.5 1 1 1 1 1
15 Tiyo KN 1 1 1 1 1 1
16 Pak Bagong TK 1 1 1 1 1 1
17 Pak Yatmo TK 1 1 1 1 1 1
18 Pak Isman TK 1 1 1 1 1 1
19 Pak Narto KN 1 1 1 1 1 1
20 Pak Sakur TK 1 1 1 1 1 0.5
21 Pak Huri TK 1 1 1 1 1 1
22 Pak karnoto KN 1 1 1 1 1 1
Total

Diperiksa

Periode : 24 September 2018 - 29 September 2018

Senin Selasa Rabu Kamis Jum'at Sabtu


No Nama Jab
Msk Lmb Msk Lmb Msk Lmb Msk Lmb Msk Lmb Msk
1 Pak Rustanto MN 1 1 1 1 1 1
2 Pak Anton TK 1 1 1 1 1 1
3 Pak Sarmo TK 1 1 1 1 1 1
4 Pak Akrom TK 1 1 1 1 1 1
5 Mas Sis TK 1 1 1 1 1 1
6 Pak Wajio TK 1 1 1 1 1 1
7 Mbah Sujo KN 1 1 1 1 1 1
8 Mas Aryo KN 1 1 1 1 1 1
Total

Diperiksa

Periode : 01 Oktober 2018 - 06 Oktober 2018

Senin Selasa Rabu Kamis Jum'at Sabtu


No Nama Jab
Msk Lmb Msk Lmb Msk Lmb Msk Lmb Msk Lmb Msk
1 Pak Rustanto MN 2 1 1 1 1 1
2 Pak Anton TK 1 1 1 1 1 1
3 Pak Sarmo TK 1 1 1 1 1 1
4 Pak Akrom TK 1 1 1 1 1 1
5 Mas Sis TK 1 1 1 1 1 1
6 Pak Wajio TK 1 1 1 1 1 1
7 Mbah Sujo KN 1 1 1 1 1 1
10 Mas Aryo KN 1 1 1 1 1
Total

Diperiksa

Periode : 8 Oktober 2018 - 13 Oktober 2018

Senin Selasa Rabu Kamis Jum'at Sabtu


No Nama Jab
Msk Lmb Msk Lmb Msk Lmb Msk Lmb Msk Lmb Msk
1 Pak Rustanto MN 2 1 1 1 1 1
2 Pak Anton TK 1 1 1 1 1 1
3 Pak Sarmo TK 1 1 1 1 1 1
4 Pak Akrom TK 1 1 1 1 1 1
5 Mas Sis TK 1 1 1 1
6 Pak Wajio TK 1 1 1 1 1 1
7 Mbah Sujo KN 1 1 1 1 1 1
8 Mas Aryo KN 1 1 1 1 1
Total

Diperiksa
Periode : 15 Oktober 2018 - 20 Oktober 2018

Senin Selasa Rabu Kamis Jum'at Sabtu


No Nama Jab
Msk Lmb Msk Lmb Msk Lmb Msk Lmb Msk Lmb Msk
1 Pak Rustanto MN 1 1 1 1 1 1
2 Pak Anton TK 1 1 1 1 1 1
3 Pak Sarmo TK 1 1 1 1 1 1
4 Pak Akrom TK 1 1 1 1 1 1
5 Mas Sis TK 1 1 1 1 1 1
6 Pak Wajio TK 1 1 1 1 1 1
7 Mbah Sujo KN 1 1 1 1 1 1
8 Mas Aryo KN 1 1 1 1 1 1
Total

Diperiksa

Periode : 22 Oktober 2018 - 27 Oktober 2018

Senin Selasa Rabu Kamis Jum'at Sabtu


No Nama Jab
Msk Lmb Msk Lmb Msk Lmb Msk Lmb Msk Lmb Msk
1 Pak Rustanto MN
2 1 1 1 1 1
2
Pak Anton TK 1 1 1 1 1 1

3
Pak Sarmo TK 1 1 1 1 1 1

4
Pak Akrom TK 1 1 1 1 1 1

5
Mas Sis TK
6
Pak Wajio TK 1 1 1 1 1 1
7
Mbah Sujo KN 1 1 1 1 1 1

8
Mas Aryo KN 1 1 1 1 1 1

9
Pak Narto KN 1 1 1 1 1 1
Total
Diperiksa

Periode : 29 Oktober 2018 - 03 November 2018

Senin Selasa Rabu Kamis Jum'at Sabtu


No Nama Jab
Msk Lmb Msk Lmb Msk Lmb Msk Lmb Msk Lmb Msk
1 Pak Rustanto MN 1 1 1 1 1 1
2 Pak Anton TK 1 1 1 1 1 1
3 Pak Sarmo TK 1 1 1 1
4 Pak Akrom TK 1 1 1 1 1 1
5 Mas Sis TK 1 1 1 1 1 1
6 Pak Wajio TK 1 1 1 1 1 1
7 Mbah Sujo KN 1 1 1 1 1 1
8 Mas Aryo KN 1 1 1 1 1
9 Pak Narto KN 1 1 1 1 1 1
Total

Diperiksa

Periode : 05 November 2018 - 10 November 2018

Senin Selasa Rabu Kamis Jum'at Sabtu


No Nama Jab
Msk Lmb Msk Lmb Msk Lmb Msk Lmb Msk Lmb Msk
1 Pak Rustanto MN 1 1 1 1 1 1
2 Pak Anton TK 1 1 1 1 1 1
3 Pak Sarmo TK 1 1 1 1 0.5 1
4 Pak Akrom TK 1 1 1 1 1 1
5 Mas Sis TK 1 1 1 1 1
6 Pak Wajio TK 1 1 1 1 1 1
7 Mbah Sujo KN 1 1 1 1 1 1
8 Mas Aryo KN 1 1 1
9 Pak Nardi KN 1 1 1 1 1 1
Total

Diperiksa
Sabtu Jumlah Upah Jumlah
Total
Lmb Msk Lmb Hari Jam Upah Lmb
6 0 Rp 125,000.00 Rp 15,000.00 Rp 750,000.00 Rp - Rp 750,000.00
4 0 Rp 90,000.00 Rp 15,000.00 Rp 360,000.00 Rp - Rp 360,000.00
6 1 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp 15,000.00 Rp 555,000.00
4 0 Rp 90,000.00 Rp 15,000.00 Rp 360,000.00 Rp - Rp 360,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
4 1 Rp 90,000.00 Rp 15,000.00 Rp 360,000.00 Rp 15,000.00 Rp 375,000.00
3 1 Rp 90,000.00 Rp 15,000.00 Rp 270,000.00 Rp 15,000.00 Rp 285,000.00
6 0 Rp 80,000.00 Rp 15,000.00 Rp 480,000.00 Rp - Rp 480,000.00
6 0 Rp 80,000.00 Rp 15,000.00 Rp 480,000.00 Rp - Rp 480,000.00
6 0 Rp 80,000.00 Rp 15,000.00 Rp 480,000.00 Rp - Rp 480,000.00
6 0 Rp 80,000.00 Rp 15,000.00 Rp 480,000.00 Rp - Rp 480,000.00
6 0 Rp 80,000.00 Rp 15,000.00 Rp 480,000.00 Rp - Rp 480,000.00
6 0 Rp 80,000.00 Rp 15,000.00 Rp 480,000.00 Rp - Rp 480,000.00

Total Rp 6,105,000.00

Dibuat

Bismo Dimas P

Sabtu Jumlah Upah Jumlah


Total
Lmb Msk Lmb Hari Jam Upah Lmb
6 0 Rp 125,000.00 Rp 15,000.00 Rp 750,000.00 Rp - Rp 750,000.00
0 0 Rp 90,000.00 Rp 15,000.00 Rp - Rp - Rp -
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
3 0 Rp 90,000.00 Rp 15,000.00 Rp 270,000.00 Rp - Rp 270,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 80,000.00 Rp 15,000.00 Rp 480,000.00 Rp - Rp 480,000.00
5 0 Rp 80,000.00 Rp 15,000.00 Rp 400,000.00 Rp - Rp 400,000.00
5 0 Rp 80,000.00 Rp 15,000.00 Rp 400,000.00 Rp - Rp 400,000.00
5 0 Rp 80,000.00 Rp 15,000.00 Rp 400,000.00 Rp - Rp 400,000.00
6 0 Rp 80,000.00 Rp 15,000.00 Rp 480,000.00 Rp - Rp 480,000.00
6 0 Rp 80,000.00 Rp 15,000.00 Rp 480,000.00 Rp - Rp 480,000.00
4 0 Rp 80,000.00 Rp 15,000.00 Rp 320,000.00 Rp - Rp 320,000.00

Total Rp 5,820,000.00

Dibuat

Bismo Dimas P

Sabtu Jumlah Upah Jumlah


Total
Lmb Msk Lmb Hari Jam Upah Lmb
7 0 Rp 125,000.00 Rp 15,000.00 Rp 875,000.00 Rp - Rp 875,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
5 0 Rp 80,000.00 Rp 10,000.00 Rp 400,000.00 Rp - Rp 400,000.00
6 0 Rp 80,000.00 Rp 10,000.00 Rp 480,000.00 Rp - Rp 480,000.00
6 0 Rp 80,000.00 Rp 10,000.00 Rp 480,000.00 Rp - Rp 480,000.00
7 0 Rp 80,000.00 Rp 10,000.00 Rp 560,000.00 Rp - Rp 560,000.00
5 0 Rp 80,000.00 Rp 10,000.00 Rp 400,000.00 Rp - Rp 400,000.00
5 0 Rp 80,000.00 Rp 10,000.00 Rp 400,000.00 Rp - Rp 400,000.00
6 0 Rp 80,000.00 Rp 10,000.00 Rp 480,000.00 Rp - Rp 480,000.00
6 0 Rp 80,000.00 Rp 10,000.00 Rp 480,000.00 Rp - Rp 480,000.00
6 0 Rp 80,000.00 Rp 10,000.00 Rp 480,000.00 Rp - Rp 480,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
5 0 Rp 80,000.00 Rp 10,000.00 Rp 400,000.00 Rp - Rp 400,000.00
Total Rp 9,755,000.00

Dibuat

Bismo Dimas P
Sabtu Jumlah Upah Jumlah
Total
Lmb Msk Lmb Hari Jam Upah Lmb
6 0 Rp 125,000.00 Rp 15,000.00 Rp 750,000.00 Rp - Rp 750,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 80,000.00 Rp 10,000.00 Rp 480,000.00 Rp - Rp 480,000.00
5 0 Rp 80,000.00 Rp 10,000.00 Rp 400,000.00 Rp - Rp 400,000.00
6 0 Rp 80,000.00 Rp 10,000.00 Rp 480,000.00 Rp - Rp 480,000.00
6 0 Rp 80,000.00 Rp 10,000.00 Rp 480,000.00 Rp - Rp 480,000.00
5.5 0 Rp 80,000.00 Rp 10,000.00 Rp 440,000.00 Rp - Rp 440,000.00
6 0 Rp 80,000.00 Rp 10,000.00 Rp 480,000.00 Rp - Rp 480,000.00
6 0 Rp 80,000.00 Rp 10,000.00 Rp 480,000.00 Rp - Rp 480,000.00
5.5 0 Rp 80,000.00 Rp 10,000.00 Rp 440,000.00 Rp - Rp 440,000.00
6 0 Rp 80,000.00 Rp 10,000.00 Rp 480,000.00 Rp - Rp 480,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 80,000.00 Rp 10,000.00 Rp 480,000.00 Rp - Rp 480,000.00
5.5 0 Rp 90,000.00 Rp 15,000.00 Rp 495,000.00 Rp - Rp 495,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 80,000.00 Rp 10,000.00 Rp 480,000.00 Rp - Rp 480,000.00
Total Rp 11,225,000.00

Dibuat

Bismo Dimas P

Sabtu Jumlah Upah Jumlah


Total
Lmb Msk Lmb Hari Jam Upah Lmb
6 0 Rp 125,000.00 Rp 15,000.00 Rp 750,000.00 Rp - Rp 750,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 80,000.00 Rp 10,000.00 Rp 480,000.00 Rp - Rp 480,000.00
6 0 Rp 80,000.00 Rp 10,000.00 Rp 480,000.00 Rp - Rp 480,000.00
Total Rp 4,410,000.00

Dibuat

Bismo Dimas P

Sabtu Jumlah Upah Jumlah


Total
Lmb Msk Lmb Hari Jam Upah Lmb
7 0 Rp 125,000.00 Rp 15,000.00 Rp 875,000.00 Rp - Rp 875,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 80,000.00 Rp 10,000.00 Rp 480,000.00 Rp - Rp 480,000.00
5 0 Rp 80,000.00 Rp 10,000.00 Rp 400,000.00 Rp - Rp 400,000.00
Total Rp 4,455,000.00

Dibuat

Bismo Dimas P

Sabtu Jumlah Upah Jumlah


Total
Lmb Msk Lmb Hari Jam Upah Lmb
7 0 Rp 125,000.00 Rp 15,000.00 Rp 875,000.00 Rp - Rp 875,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
4 0 Rp 90,000.00 Rp 15,000.00 Rp 360,000.00 Rp - Rp 360,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 80,000.00 Rp 10,000.00 Rp 480,000.00 Rp - Rp 480,000.00
5 0 Rp 80,000.00 Rp 10,000.00 Rp 400,000.00 Rp - Rp 400,000.00
Total Rp 4,275,000.00

Dibuat
Bismo Dimas P

Sabtu Jumlah Upah Jumlah


Total
Lmb Msk Lmb Hari Jam Upah Lmb
6 0 Rp 125,000.00 Rp 15,000.00 Rp 750,000.00 Rp - Rp 750,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 80,000.00 Rp 10,000.00 Rp 480,000.00 Rp - Rp 480,000.00
6 0 Rp 80,000.00 Rp 10,000.00 Rp 480,000.00 Rp - Rp 480,000.00
Total Rp 4,410,000.00

Dibuat

Bismo Dimas P

Sabtu Jumlah Upah Jumlah


Total
Lmb Msk Lmb Hari Jam Upah Lmb

7 0 Rp 125,000.00 Rp 15,000.00 Rp 875,000.00 Rp - Rp 875,000.00

6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00

6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00

6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00

0 0 Rp 90,000.00 Rp 15,000.00 Rp - Rp - Rp -

6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00

6 0 Rp 80,000.00 Rp 10,000.00 Rp 480,000.00 Rp - Rp 480,000.00

6 0 Rp 80,000.00 Rp 10,000.00 Rp 480,000.00 Rp - Rp 480,000.00

6 0 Rp 80,000.00 Rp 10,000.00 Rp 480,000.00 Rp - Rp 480,000.00


Total Rp 4,475,000.00
Dibuat

Bismo Dimas P

Sabtu Jumlah Upah Jumlah


Total
Lmb Msk Lmb Hari Jam Upah Lmb
6 0 Rp 125,000.00 Rp 15,000.00 Rp 750,000.00 Rp - Rp 750,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
4 0 Rp 90,000.00 Rp 15,000.00 Rp 360,000.00 Rp - Rp 360,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 80,000.00 Rp 10,000.00 Rp 480,000.00 Rp - Rp 480,000.00
5 0 Rp 80,000.00 Rp 10,000.00 Rp 400,000.00 Rp - Rp 400,000.00
6 0 Rp 80,000.00 Rp 10,000.00 Rp 480,000.00 Rp - Rp 480,000.00
Total Rp 4,630,000.00

Dibuat

Bismo Dimas P

Sabtu Jumlah Upah Jumlah


Total
Lmb Msk Lmb Hari Jam Upah Lmb
6 0 Rp 125,000.00 Rp 15,000.00 Rp 750,000.00 Rp - Rp 750,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
5.5 0 Rp 90,000.00 Rp 15,000.00 Rp 495,000.00 Rp - Rp 495,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
5 0 Rp 90,000.00 Rp 15,000.00 Rp 450,000.00 Rp - Rp 450,000.00
6 0 Rp 90,000.00 Rp 15,000.00 Rp 540,000.00 Rp - Rp 540,000.00
6 0 Rp 80,000.00 Rp 10,000.00 Rp 480,000.00 Rp - Rp 480,000.00
3 0 Rp 80,000.00 Rp 10,000.00 Rp 240,000.00 Rp - Rp 240,000.00
6 0 Rp 80,000.00 Rp 10,000.00 Rp 480,000.00 Rp - Rp 480,000.00
Total Rp 4,515,000.00

Dibuat

Bismo Dimas P
periode : 25 Agustus 2018 - 1 September 2018

No Nama Barang Banyak Satuan Harga Satuan Jumlah Harga Toko

1 Bendrat 1 Roll Rp360,000.00 Rp360,000.00 Bejo


2 Selang Timbang 29 m Rp5,000.00 Rp145,000.00 Bejo
Paku 2"/1000 1 kg Rp20,000.00 Rp20,000.00 Bejo
Paku 2"/500 1 kg Rp20,000.00 Rp20,000.00 Bejo
Paku 3"/1000 1 kg Rp16,000.00 Rp16,000.00 Bejo
Paku 3"/500 1 kg Rp16,000.00 Rp16,000.00 Bejo
3 Kayu 2x3 1 pack Rp240,000.00 Rp240,000.00 Hasil Alam
Kayu 3x5 5 pack Rp210,000.00 Rp1,050,000.00 Hasil Alam
4 Besi Ø10 KA 25 btng Rp45,000.00 Rp1,125,000.00 Bejo
Besi Ø12 full 22 btng Rp68,000.00 Rp1,496,000.00 Bejo
PC Holcim 40kg 20 sak Rp56,000.00 Rp1,120,000.00 Bejo
5 Selang Solar 3m Rp5,000.00 Rp15,000.00 Cahaya
Ban 8 bh Rp1,500.00 Rp12,000.00 Cahaya
6 Koral 1,2 1 engkel Rp950,000.00 Rp950,000.00 Ilham Abadi
Triplek 8 mm 10 lmbr Rp105,000.00 Rp1,050,000.00 Ilham Abadi
Paku 4" 1 kg Rp19,000.00 Rp19,000.00 Ilham Abadi
7 PC Holcim 40kg 50 sak Rp56,000.00 Rp2,800,000.00 Bejo
8 DP Pintu 1 kali Rp23,000,000.00 Rp23,000,000.00 Sukodono
9 Batu Putih 16 Rit Rp360,000.00 Rp5,760,000.00 Joko
10 Pasir Hitam 1 Rit Rp2,300,000.00 Rp2,300,000.00 P.Toni
Pasir Hitam 1 Rit Rp2,300,000.00 Rp2,300,000.00 P.Toni
11 Paku Papan 0.5 kg Rp20,000.00 Rp10,000.00 Raja Mulia
Paku 7 cm 1 kg Rp16,000.00 Rp16,000.00 Raja Mulia
12 Pertalite 12.82 ltr Rp7,800.00 Rp99,996.00 Pertamina
Pertalite 4.75 ltr Rp7,800.00 Rp37,050.00 Pertamina
Pertalite 12.82 ltr Rp7,800.00 Rp99,996.00 Pertamina
13 Koral 1,2 1 kol Rp480,000.00 Rp480,000.00 Mitra Tani
14 Besi Ø10 SNI 125 btg Rp68,100.00 Rp8,512,500.00 Semarang
Besi Ø8 SNI 50 btg Rp43,600.00 Rp2,180,000.00 Semarang
Bendrat 1 Roll Rp340,000.00 Rp340,000.00 Semarang

Total Rp55,589,542.00

periode : 3 September 2018 - 8 September 2018

No Nama Barang Banyak Satuan Harga Satuan Jumlah Harga Toko

1 Split 1,2 7,5 m3 1 kali Rp2,150,000.00 Rp2,150,000.00 Edi


2 Kayu 3x5 2 pack Rp210,000.00 Rp420,000.00 Hasil Alam
3 Pasir Hitam 1 Rit Rp2,300,000.00 Rp2,300,000.00 P.Joni
4 Paku 5 cm 1 kg Rp16,000.00 Rp16,000.00 Raja Mulia
5 Batu Puth 12 Rit Rp360,000.00 Rp4,320,000.00 Joko
6 Paku 1 1/4" 5 kg Rp0.00 Bejo
7 Paku 2" 1 doz Rp0.00 Bejo
8 Paku 3" 5 doz Rp0.00 Bejo
9 Paku 10 cm 2 kg Rp16,000.00 Rp32,000.00 Bumi Indah
10 Bendrat 2 kg Rp20,000.00 Rp40,000.00 Raja Mulia
11 Pertalite 12.82 ltr Rp7,800.00 Rp99,996.00 Pertamina
12 Kayu 3x5 2,5 m 3 pack Rp165,000.00 Rp495,000.00 Hasil Alam
13 WD Potong 1 bh Rp4,500.00 Rp4,500.00 Mitra Tani
14 Selang Dholpine 2 pack Rp195,000.00 Rp390,000.00 Ilham Abadi
15 Modern Potong 10 lmbr Rp3,500.00 Rp35,000.00 Ilham Abadi
16 Bambu 10 bh Rp15,000.00 Rp150,000.00 Ilham Abadi
17 Sewa Excavator 1 kali Rp7,950,000.00 Rp7,950,000.00 Mas Dian

Rp18,402,496.00
Total

periode :10 September 2018 - 15 September 2018

No Nama Barang Banyak Satuan Harga Satuan Jumlah Harga Toko

1 Pasir Hitam 2 Rit Rp2,300,000.00 Rp4,600,000.00 P.joni


2 Terpal 1 pack Rp262,500.00 Rp262,500.00 Pasar
3 Kayu 3x5 3 pack Rp210,000.00 Rp630,000.00 Hasil Alam
4 Triplek 9 mm 4 lmbr Rp110,000.00 Rp440,000.00 hasil alam
5 Bambu 5 bh Rp15,000.00 Rp75,000.00 M.Sujo
6 Pertalite 12.82 ltr Rp7,800.00 Rp99,996.00 Pertamina
7 Selang dolphine 3" 2 pack Rp280,000.00 Rp560,000.00 Mitra Teknik
8 Kayu 3x5 2 pack Rp210,000.00 Rp420,000.00 Hasil Alam
9 Toren 1050 l 1 bh Rp1,700,000.00 Rp1,700,000.00 Hasil Bumi
10 Triplek 9 mm 5 lmbr Rp110,000.00 Rp550,000.00 Hasil Alam
11 Kayu 3x5 3 pack Rp210,000.00 Rp630,000.00 Hasil Alam
12 Pertalite 4.08 ltr Rp7,800.00 Rp31,824.00 Pertamina
13 Pc Holcim 75 sak Rp56,000.00 Rp4,200,000.00 Bejo
14 Pasir Hitam 1 Rit Rp2,300,000.00 Rp2,300,000.00 Lana
15 Pasir Hitam 1 Rit Rp2,300,000.00 Rp2,300,000.00 Rukin
16 Pasir Hitam 1 Rit Rp2,300,000.00 Rp2,300,000.00 P.Toni
17 Terpal 5x7 1 pack 262500 Rp262,500.00 Pasar
18 Bambu 10 bh 15000 Rp150,000.00 M.Sujo

Total Rp21,511,820.00
periode :17 September 2018 - 22 September 2018

No Nama Barang Banyak Satuan Harga Satuan Jumlah Harga Toko

1 Batu putih 20 rit Rp360,000.00 Rp7,200,000.00 P.Yanto


2 Pasir Hitam 1 rit Rp2,300,000.00 Rp2,300,000.00 P.Yanto
3 Pertalite 2.56 ltr Rp7,800.00 Rp19,968.00 Pertamina
4 Benang 5 bh Rp7,000.00 Rp35,000.00 Mitra Tani
5 Terpal 5x7 1 bh Rp245,000.00 Rp245,000.00 Empat Tiga
6 Pc Holcim 50 sak Rp48,000.00 Rp2,400,000.00 Bejo
7 Ember 7 bh Rp8,000.00 Rp56,000.00 Bejo
8 Gear Set AHM 1 bh Rp290,000.00 Rp290,000.00 Bengkel
9 Pasir Hitam 1 rit Rp2,300,000.00 Rp2,300,000.00 Lana
10 Pertalite 5 ltr Rp7,800.00 Rp39,000.00 Pertamina
11 V.Bell B54 2 bh Rp32,000.00 Rp64,000.00 Mitra Teknik
12 V.Bell B35 2 bh Rp20,500.00 Rp41,000.00 Mitra Teknik
13 Pertalite 12.821 ltr Rp7,800.00 Rp100,003.80 Pertamina
14 PC Gresik 50 sak Rp48,000.00 Rp2,400,000.00 Bejo
15 Gembok HSG 1 bh Rp0.00 Bejo
16 Triplek 9 mm 5 lmbr Rp110,000.00 Rp550,000.00 Hasil Alam
17 Kayu 3x5 3m 3 pack Rp210,000.00 Rp630,000.00 Hasil Alam
18 Pasir Hitam 2 Rit Rp2,300,000.00 Rp4,600,000.00 P.Toni
19 Gerobak Farsala 3 bh Rp500,000.00 Rp1,500,000.00 Ilham Abadi
20 Selang hiprek 1/4 4m Rp5,000.00 Rp20,000.00 Mitra Teknik
21 Ember Tc.16 5 bh Rp8,000.00 Rp40,000.00 Bejo
22 Sreng Pt 2 bh Rp12,000.00 Rp24,000.00 Bejo
23 Ember 10 bh Rp8,000.00 Rp80,000.00 Ahlan Muliya
24 Pasir Hitam 1 rit Rp2,300,000.00 Rp2,300,000.00 P.Toni
25 Pasir Hitam 2 Rit Rp2,300,000.00 Rp4,600,000.00 P.Toni
26 Raja Muliya 5 bh Rp10,000.00 Rp50,000.00 Raja Muliya
27 Pc Holcim 15 sak Rp48,000.00 Rp720,000.00 Bejo
28 PC Gresik 50 sak Rp48,000.00 Rp2,400,000.00 Bejo
29 Ember 20 bh Rp9,000.00 Rp180,000.00 Ilham Abadi
30 Kayu 3x5 3m 3 pack Rp210,000.00 Rp630,000.00 Hasil Alam
31 Pasir Hitam 1 Rit Rp2,300,000.00 Rp2,300,000.00 P.Yanto
32 Batu putih 40 Rit Rp370,000.00 Rp14,800,000.00 P.Giyanto
33 Pasir Hitam 1 Rit Rp2,300,000.00 Rp2,300,000.00 P.Yanto
34 Kas Bon Borongan 1 kali Rp2,500,000.00 Rp2,500,000.00

Total Rp57,713,971.80

periode :24 September 2018 - 29 September 2018


No Nama Barang Banyak Satuan Harga Satuan Jumlah Harga Toko

1 Kayu 1x5 4m 10 bh Rp10,000.00 Rp100,000.00 Hasil Alam


2 Paku Triplek 1 kg Rp25,000.00 Rp25,000.00 Raja Muliya
3 Ram Ijo 1 cm 3m Rp20,000.00 Rp60,000.00 Ilham Abadi
4 Paku 3cm 5 kg Rp22,000.00 Rp110,000.00 Ilham Abadi
5 Pertalite 12.821 ltr Rp7,800.00 Rp100,003.80 Pertamina
6 Pc Holcim 75 sak Rp48,000.00 Rp3,600,000.00 Bejo
7 Papan 45 lmbr Rp6,500.00 Rp292,500.00 Hasil Alam
8 Pc Holcim 75 sak Rp48,000.00 Rp3,600,000.00 Bejo
9 oli Mesin 4 ltr Rp20,000.00 Rp80,000.00 Anugerah
10 Batu 50 Rit Rp370,000.00 Rp18,500,000.00 Pertamina
11 Pasir 7 Rit Rp2,300,000.00 Rp16,100,000.00 Yanto
12 Borongan Darjo 90 m Rp125,000.00 Rp8,750,000.00 Darjo
13 Kasbon Sakur 1 kali Rp2,500,000.00 Rp2,500,000.00 Sakur
14 Bambu 10 bh Rp150,000.00 Rp1,500,000.00 Mbah Sujo

Total Rp55,317,503.80

periode : 01 Oktober 2018 - 06 Oktober 2018

No Nama Barang Banyak Satuan Harga Satuan Jumlah Harga Toko

1 Ban + Pasang 1 kali Rp190,000.00 Rp190,000.00 Bengkel


2 Pasir 1 Rit Rp2,300,000.00 Rp2,300,000.00 Pak Toni
3 Batu Putih 50 Rit Rp370,000.00 Rp18,500,000.00 Giyanto
4 Pc Holcim 75 sak Rp46,000.00 Rp3,450,000.00 Bejo
5 Pasir 1 Rit Rp2,300,000.00 Rp2,300,000.00 Pak Yanto
6 Pasir 1 Rit Rp2,300,000.00 Rp2,300,000.00 Pak Yanto
7 Pasir 1 Rit Rp2,300,000.00 Rp2,300,000.00 Pak Toni
8 Pasir 1 Rit Rp2,300,000.00 Rp2,300,000.00 Pak Toni
9 Batu Putih 27 Rit Rp370,000.00 Rp9,990,000.00 Giyanto
10 Pasir 1 Rit Rp2,300,000.00 Rp2,300,000.00 Pak Yanto
11 Batu Bata 600 Bh Rp550.00 Rp330,000.00 Ilham Abadi
12 Pc Holcim 75 sak Rp46,000.00 Rp3,450,000.00 Bejo
13 Terpal 5x7 1 Bh Rp245,000.00 Rp245,000.00 Empat Tiga
14 PC Gresik 75 sak Rp48,000.00 Rp3,600,000.00 Bejo
15 Ember 10 bh Rp6,000.00 Rp60,000.00 Bejo
16 Pralon Wavin 8" 2 bh Rp625,000.00 Rp1,250,000.00 Hasil Bumi
17 Graji Besi 2 Bh Rp17,500.00 Rp35,000.00 Hasil Bumi
18 Gagang Graji Besi 1 Bh Rp25,000.00 Rp25,000.00 Hasil Bumi
19 Lem Kaleng 1 Bh Rp35,000.00 Rp35,000.00 Hasil Bumi
20 Bendrat 3 kg Rp20,000.00 Rp60,000.00 Hasil Bumi
21 Pertalite 12.821 ltr Rp7,800.00 Rp100,003.80 Pertamina
22 Bendrat 1 kg Rp20,000.00 Rp20,000.00 Ahlan Mulya
23 PAsir 1 Rit Rp2,300,000.00 Rp2,300,000.00 Lana

Total Rp57,440,003.80

periode : 8 Oktober 2018 - 13 Oktober 2018

No Nama Barang Banyak Satuan Harga Satuan Jumlah Harga Toko

1 Baut 5 bh Rp3,000.00 Rp15,000.00 Cahaya Diesel


2 PC Holcim 50 kg 50 sak Rp56,000.00 Rp2,800,000.00 Ilham Abadi
3 Pasir 1 Rit Rp2,300,000.00 Rp2,300,000.00 P.Yanto
4 Pertalite 12.821 ltr Rp7,800.00 Rp100,003.80 Pertamina
5 Pasir 1 Rit Rp2,300,000.00 Rp2,300,000.00 P.Yanto
6 Pasir 1 Rit Rp2,300,000.00 Rp2,300,000.00 P.Toni
7 Pasir 1 Rit Rp2,300,000.00 Rp2,300,000.00 Lana
8 Pasir 1 Rit Rp2,300,000.00 Rp2,300,000.00 P.Toni
9 Pasir 1 Rit Rp2,300,000.00 Rp2,300,000.00 Lana
10 Pasir 1 Rit Rp2,300,000.00 Rp2,300,000.00 P.Toni
11 PC Gresik 75 sak Rp48,000.00 Rp3,600,000.00 Bejo
12 PC Tiga Roda 75 sak Rp44,000.00 Rp3,300,000.00 Bejo
13 Ember 15 bh Rp6,000.00 Rp90,000.00 Bejo
14 Vanbell 2 bh Rp48,000.00 Rp96,000.00 Mitra Teknik

Total Rp26,101,003.80

periode : 15 Oktober 2018 - 20 Oktober 2018

No Nama Barang Banyak Satuan Harga Satuan Jumlah Harga Toko

1 Pertalite 12.821 ltr Rp7,800.00 Rp100,003.80 Pertamina


2 PC Tiga Roda 75 sak Rp44,000.00 Rp3,300,000.00 Bejo
3 ayakan 1/2 1.5 m Rp15,000.00 Rp22,500.00 Bejo
4 PC Holcim 60 sak Rp46,000.00 Rp2,760,000.00 Bejo
5 PC Gresik 15 sak Rp48,000.00 Rp720,000.00 Bejo
6 Kawat ijo 1.5 m Rp15,000.00 Rp22,500.00 Bejo
7 Batu Putih 18 Rit Rp370,000.00 Rp6,660,000.00 Giyanto
8 Pasir 1 Rit Rp2,300,000.00 Rp2,300,000.00 P.Toni
9 Pasir 1 Rit Rp2,300,000.00 Rp2,300,000.00 Lana

Total Rp18,185,003.80

periode : 22 Oktober 2018 - 27 Oktober 2018


No Nama Barang Banyak Satuan Harga Satuan Jumlah Harga Toko

1 Pertalite 12.821 ltr Rp7,800.00 Rp100,003.80 Pertamina


2 Aries Gold B 2 galon Rp75,000.00 Rp150,000.00 Alam Baru
3 Kuas 4" 2 bh Rp20,000.00 Rp40,000.00 Alam Baru
4 Roda Dalem Arco 2 bh Rp35,000.00 Rp70,000.00 Setia Kawan
5 Roda Luar Arco 2 bh Rp70,000.00 Rp140,000.00 Setia Kawan
6 Tali Tambang Kecil 1 bh Rp10,000.00 Rp10,000.00 Setia Kawan
7 Roda Luar Arco 1 bh Rp70,000.00 Rp70,000.00 Setia Kawan
8 Roda Dalem Arco 1 bh Rp35,000.00 Rp35,000.00 Setia Kawan
9 DL 8" 1 bh Rp177,500.00 Rp177,500.00 Toko T
10 PC Holcim 75 sak Rp46,000.00 Rp3,450,000.00 Bejo
11 Pasir 1 Rit Rp2,300,000.00 Rp2,300,000.00 Lana
12 Pasir 1 Rit Rp2,300,000.00 Rp2,300,000.00 Lana
13 Pasir 1 Rit Rp2,300,000.00 Rp2,300,000.00 Lana
14 Pasir 1 Rit Rp2,300,000.00 Rp2,300,000.00 Lana

Total Rp13,442,503.80

periode : 29 Oktober 2018 - 03 November 2018

No Nama Barang Banyak Satuan Harga Satuan Jumlah Harga Toko

1 Aries Gold B 1 galon Rp75,000.00 Rp75,000.00 Alam Baru


2 Pertalite 2.57 liter Rp7,800.00 Rp20,046.00 Pertamina
3 Dinabolt 8x40 26 bh Rp843.00 Rp21,918.00 Jaya Raya
4 PC Tiga Roda 50 sak Rp46,000.00 Rp2,300,000.00 Bejo
5 Pertalite 2.57 liter Rp7,800.00 Rp20,046.00 Pertamina
6 UNC 7/16 x 2 4 bh Rp2,100.00 Rp8,400.00 Jaya Raya
7 PC Tiga Roda 30 bh Rp46,000.00 Rp1,380,000.00 Bejo
8 Gembok 1 bh Rp35,000.00 Rp35,000.00 Bejo
9 PC Holcim 30 sak Rp44,000.00 Rp1,320,000.00 Bejo
10 Bendrat 2 kg Rp20,000.00 Rp40,000.00 Bejo
11 G joint 8" 1 bh Rp741,800.00 Rp741,800.00 Toko T
12 DL 8" 1 bh Rp135,000.00 Rp135,000.00 Toko T
13 Pertalite 2.57 liter Rp7,800.00 Rp20,046.00 Pertamina
14 Pertalite 12.821 liter Rp7,800.00 Rp100,003.80 Pertamina
15 Gorong 40 cm 4 bh Rp90,000.00 Rp360,000.00 UB
16 Gorong 80 cm 3 bh Rp225,000.00 Rp675,000.00 UB
17 Strup 1 bh Rp5,000.00 Rp5,000.00

Total Rp7,257,259.80

periode :05 November 2018 - 10 November 2018


No Nama Barang Banyak Satuan Harga Satuan Jumlah Harga Toko

1 Batu Putih 10 Rit Rp370,000.00 Rp3,700,000.00 Giyanto


2 Batu Putih 10 Rit Rp370,000.00 Rp3,700,000.00 Giyanto
3 PC Gresik 30 sak Rp48,000.00 Rp1,440,000.00 Bejo
4 Pilox 1 bh Rp16,000.00 Rp16,000.00 Mitra Tani
5 PC Holcim 30 sak Rp44,000.00 Rp1,320,000.00 Bejo
6 Pertalite 12.821 liter Rp7,800.00 Rp100,003.80 Pertamina
7 PC Holcim 50 sak Rp44,000.00 Rp2,200,000.00 Bejo
8 DinaBolt 8x40 4 bh Rp1,200.00 Rp4,800.00 Jaya Raya
9 Isolatip Onda 1 bh Rp4,500.00 Rp4,500.00 Mitra Tek
10 Isolatip 2 bh Rp2,500.00 Rp5,000.00 Raja Mulia
11 Solar 9.709 liter Rp5,150.00 Rp50,001.35 Pertamina
12 Vet Rotary 1 bh Rp20,000.00 Rp20,000.00 Anugerah

Total Rp12,560,305.15
Tanggal Total Semen Total Pasir Total Batu

10/8/2018 1280 44
23/8/2018
23/8/2018
23/8/2018
23/8/2018
23/8/2018
24/8/2018
24/8/2018
25/8/2018
25/8/2018
25/8/2018
26/8/2018
26/8/2018
27/8/2018
27/8/2018
27/8/2018
28/8/2018
29/8/2018
29/8/2018
30/8/2018
30/8/2018
30/8/2018
30/8/2018
31/08/2018
31/08/2018
31/08/2018
31/08/2018
31/08/2018 Rp55,589,542.00
31/08/2018
31/08/2018

89,542.00

Tanggal

1/9/2018
1/9/2018
1/9/2018
1/9/2018
2/9/2018
3/9/2018
3/9/2018
3/9/2018
3/9/2018
4/9/2018
6/9/2018
6/9/2018
6/9/2018
7/9/2018
7/9/2018
7/9/2018 Rp18,402,496.00

02,496.00

Tanggal

1/9/2018
1/9/2018
1/9/2018
1/9/2018
2/9/2018
3/9/2018
3/9/2018
3/9/2018
3/9/2018
4/9/2018
6/9/2018
6/9/2018 Rp153,217,829.80
6/9/2018 14670000
7/9/2018 Rp167,887,829.80
7/9/2018
7/9/2018

Rp21,511,820.00

11,820.00
Tanggal

15/9/2018
15/9/2018
15/9/2018
15/9/2018
15/9/2018
16/9/2018
16/9/2018
16/9/2018
17/9/2018
17/9/2018
17/9/2018
17/9/2018
18/9/2018
18/9/2018
18/9/2018
18/9/2018
18/9/2018
18/9/2018
19/9/2018
19/9/2018
19/9/2018
19/9/2018
19/9/2018
20/9/2018
20/9/2018
20/9/2018
21/9/2018
21/9/2018
21/9/2018
21/9/2018
21/9/2018
22/9/2018
22/9/2018
22/9/2018
Rp57,713,971.80
13,971.80
Tanggal

24/9/2018
24/9/2018
24/9/2018
24/9/2018
25/9/2018
25/9/2018
26/9/2018
27/9/2018
28/9/2018
17/9/2018
17/9/2018
17/9/2018
18/9/2018
18/9/2018 Rp55,317,503.80

17,503.80

Tanggal

24/9/2018
24/9/2018
24/9/2018
24/9/2018
25/9/2018
25/9/2018
26/9/2018
27/9/2018
28/9/2018
17/9/2018
17/9/2018
17/9/2018
17/9/2018
17/9/2018
17/9/2018
17/9/2018
17/9/2018
17/9/2018
17/9/2018
17/9/2018
17/9/2018
17/9/2018
17/9/2018 Rp57,440,003.80

40,003.80

Tanggal

24/9/2018
24/9/2018
24/9/2018
24/9/2018
25/9/2018
25/9/2018
26/9/2018
27/9/2018
28/9/2018
17/9/2018
17/9/2018
17/9/2018
18/9/2018
18/9/2018
Rp26,101,003.80
01,003.80

Tanggal

24/9/2018
24/9/2018
24/9/2018
24/9/2018
25/9/2018
25/9/2018
26/9/2018
27/9/2018
28/9/2018 Rp18,185,003.80

85,003.80
Tanggal

24/9/2018
24/9/2018
24/9/2018
24/9/2018
25/9/2018
25/9/2018
26/9/2018
27/9/2018
28/9/2018
28/9/2018 Rp13,442,503.80
28/9/2018
28/9/2018
28/9/2018
28/9/2018

42,503.80

Tanggal

24/9/2018
24/9/2018
24/9/2018
24/9/2018
25/9/2018
25/9/2018
26/9/2018
27/9/2018
28/9/2018
28/9/2018
28/9/2018
28/9/2018
28/9/2018
28/9/2018
28/9/2018
28/9/2018 Rp7,257,259.80
28/9/2018

7,259.80
Tanggal

24/9/2018
24/9/2018
24/9/2018
24/9/2018
25/9/2018
25/9/2018
26/9/2018
27/9/2018
28/9/2018
28/9/2018
28/9/2018 Rp12,560,305.15
28/9/2018

60,305.15
Pekan Upah Material Total
1 Rp 6,105,000.00 Rp 55,589,542.00 Rp 61,694,542.00
2 Rp 5,820,000.00 Rp 18,402,496.00 Rp 24,222,496.00
3 Rp 9,755,000.00 Rp 21,511,820.00 Rp 31,266,820.00
4 Rp 11,225,000.00 Rp 57,713,971.80 Rp 68,938,971.80
5 Rp 4,410,000.00 Rp 55,317,503.80 Rp 59,727,503.80
6 Rp 4,455,000.00 Rp 57,440,003.80 Rp 245,850,333.60
7 Rp 4,275,000.00 Rp 26,101,003.80 Rp 30,376,003.80
8 Rp 4,410,000.00 Rp 18,185,003.80 Rp 22,595,003.80 Nilai Proyek
9 Rp 4,475,000.00 Rp 13,442,503.80 Rp 17,917,503.80
10 Rp 4,630,000.00 Rp 7,257,259.80 Rp 11,887,259.80 PPN
11 Rp 4,515,000.00 Rp 12,560,305.15 Rp 17,075,305.15 Total
Total Rp 591,551,743.55
Rp 903,100,000.00
Rp 308,448,256.45
Rp 90,310,000.00
Rp 218,138,256.45