volume 28000 m3

dimensi 24.64 m3 2 5.6 2.2


feb mar april mei
jml hari 103 hari 24 26 26 27
Gembur Padat
SW 1 0.72 tanah biasa

15.32313
1544 27391.8
Senin Selasa Rabu Kamis Jumat Sabtu Minggu
1 2 3 4 5 6
0
7 8 9 10 11 12 13
0
JANUARI

14 15 16 17 18 19 20
13 2 3 8
21 22 23 24 25 26 27
76 12 13 12 13 13 13
28 29 30 31
48 12 11 13 12
1 2 3
23 11 12
4 5 6 7 8 9 10
55 12 10 8 0 12 13
FEBRUARI

11 12 13 14 15 16 17
69 10 12 10 12 12 13
18 19 20 21 22 23 24
83 14 13 12 14 12 18
25 26 27 28
51 13 12 14 12
1 2 3
25 12 13
4 5 6 7 8 9 10
77 13 12 12 14 14 12
MARET

11 12 13 14 15 16 17
80 12 14 14 14 12 14
18 19 20 21 22 23 24
81 13 14 14 13 13 14
25 26 27 28 29 30 31
76 12 13 14 12 13 12
1 2 3 4 5 6 7
62 8 8 8 8 15 15
8 9 10 11 12 13 14
78 11 11 15 16 15 10
15 16 17 18 19 20 21
APRIL

103 17 19 16 12 13 12 14
22 23 24 25 26 27 28
82 8 15 10 13 14 9 13
APRIL
29 30
30 14 16
1 2 3 4 5
69 15 15 13 13 13
6 7 8 9 10 11 12
105 16 15 15 15 14 15 15
13 14 15 16 17 18 19
MEI

78 15 16 0 0 16 16 15
20 21 22 23 24 25 26
105 15 15 15 15 15 15 15
27 28 29 30 31
75 15 15 15 15 15

februari maret april


1 1
2 8
3 8
4 8
5 10 15
6 6 15
7 0
8 8 11
9 8 11
10 15
11 8 8
12 8 8
13 8 8
14 0
15 0 8
16 5 5
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Kondisi Perubahan Kondisi Berikutnya
Jenis Material Kondisi Kondisi Kondisi
Awal
Asli Gembur Padat
(A) 1 1.11 0.9
Sand Tanah Berpasir (B) 0.9 1 0.8
(C) 1.05 1.17 1
(A) 1 1.25 0.9
Sand Clay / Tanah Biasa (B) 0.8 1 0.72
(C) 1.11 1.39 1
(A) 1 1.25 0.9
Clay / Tanah Liat (B) 0.7 1 0.63
(C) 1.11 1.59 1
(A) 1 1.18 1.08
Gravelly Soil / Tanah Berkerikil (B) 0.85 1 0.91
(C) 0.93 1.09 1
(A) 1 1.13 1.29
Gravels / Kerikil (B) 0.88 1 0.91
(C) 0.93 1.1 1
(A) 1 1.42 1.03
Kerikil Besar dan Padat (B) 0.7 1 0.91
(C) 0.77 1.1 1
(A) 1 1.65 1.22
Pecahan Batu Kapur, Batu Pasir,
(B) 0.61 1 0.74
Cadas Lunak, Sirtu
(C) 0.82 1.35 1
(A) 1 1.7 1.31
Pecahan Granit, Basalt, Cadas Keras,
(B) 0.59 1 0.77
dan lainnya
(C) 0.76 1.3 1
(A) 1 1.75 1.4
Pecahan Cadas, Broken Rock (B) 0.57 1 0.8
(C) 0.71 1.24 1
(A) 1 1.8 1.3
Lendakan Batu Cadas, Kapur Keras (B) 0.56 1 0.72
(C) 0.77 1.38 1
Nilai
Pengajuan ke-1
Pengajuan ke-2
Kontrak
Pengajuan Pengajuan
Kontrak ke-1 ke-2
Nilai 26,564 40,000 30,000
Perbedaan 51% 13%
dengan kontrak