SIDSB will appoint 3rd party surveyor and back charge to contractor for as-built
drawing issuance.
ESB required by SIDSB to maintain the silt trap no. 2 after handing
over
ESB will maintain the existing earth drain since the water from silt
ESB required to check back the survey work outside Plot L4 since
SIDSB intended to cut the green area besides L4 area.