STANDARD OPERATING PROCEDURES
ve
er
TABLE OF CONTENTS
es
R
Quality System SOP 2.2 Project License and Qualification Requirements................................................. 5
s
Project License and Qualifications .............................................................................................................. 7
ht
ig
Quality System SOP 2.3.1 Project Organization Chart .............................................................................. 8
lR
Project Organization Chart ......................................................................................................................... 9
Al
Quality System SOP 2.3.2 Appointment of Key Project Personnel .......................................................... 10
LC
Quality Manager Appointment Letter ...................................................................................................... 11
L
Project Manager Appointment Letter ...................................................................................................... 12
y,
Superintendent Appointment Letter ........................................................................................................ 13
lit
Design Manager Appointment Letter ....................................................................................................... 14
ua
Quality System SOP 2.3.3 Personnel Qualifications ................................................................................ 15
Q
Project Personnel Qualification Form....................................................................................................... 17
ira
Personnel Certifications and Licenses ...................................................................................................... 18
de
Quality System SOP 2.5 Identification of Quality Controlled .................................................................. 19
al
Quality System SOP 2.6 Project Quality Inspection and Test Plan ......................................................... 21
ht
ig
Quality System SOP 2.10 Project Records and Documentation Plan ...................................................... 32
Se
d
Quality System SOP 4.3 Project Design Quality Assurance/Quality Control Plan .................................... 40
ve
Project Design Process Plan ...................................................................................................................... 41
er
Quality System SOP 4.4 Design Progress Reviews .................................................................................. 42
es
R
Design Review Meeting Participant Form ................................................................................................ 43
Design Review Form ................................................................................................................................. 44
s
ht
Quality System SOP 5.2 Regulatory Codes ............................................................................................. 45
ig
lR
Project Regulatory Building Codes ........................................................................................................... 46
Al
Quality System SOP 5.6 Controlled Material Identification and Traceability .......................................... 47
LC
Controlled Materials Form ....................................................................................................................... 48
L
Quality System SOP 5.7 Measuring Device Control and Calibration ....................................................... 49
y,
Test Equipment Calibration Plan and Log................................................................................................. 50
lit
ua
Quality System SOP 6.2 Qualification of Suppliers, Subcontractors, and Departments .......................... 51
Q
Laboratory Qualification Form ................................................................................................................. 53
Subcontractor or Supplier Qualification Form.......................................................................................... 54
ira
Subcontractor and Supplier Certifications and Licenses .......................................................................... 55
de
Quality System SOP 6.7 Purchase Order Requirements.......................................................................... 57
al
C
Quality System SOP 7.2 Project Startup and Quality Control Coordination Meeting .............................. 61
ig
Quality System SOP 7.3.3 Work Task Preparatory Quality Planning Meeting ......................................... 67
ed
d
Initial Phase Checklist ............................................................................................................................... 77
ve
Work Task Inspection Form ...................................................................................................................... 79
er
Quality System SOP 8.13 Project Completion and Closeout Inspection .................................................. 80
es
Punch List.................................................................................................................................................. 81
R
Project Completion Inspection Form ........................................................................................................ 82
s
ht
Quality System SOP 9.2.3.1Recording of Nonconformances .................................................................. 83
ig
Nonconformance Report .......................................................................................................................... 84
lR
Nonconformance Report Control Log ...................................................................................................... 85
Al
Corrective Action Report .......................................................................................................................... 86
LC
Quality System SOP 10.3 Train Preventive Actions for Improvement ..................................................... 87
L
Training Record......................................................................................................................................... 88
y,
Quality System SOP 11.2 Project Quality System Audit .......................................................................... 89
lit
ua
Jobsite Quality Review Planning and Log Sheet ....................................................................................... 91
Q
Quality System SOP 11.3 Company-wide Quality System Audit ............................................................. 94
ira
Quality System Audit Form ....................................................................................................................... 95
de
Quality System SOP 12.3.1 Control of System Documents ..................................................................... 96
al
d
QUALITY SYSTEM SOP
ve
3.4.6 CHANGE ORDER
er
es
Version Approved by:
February 19, 2012 Quality Manager
R
s
Purpose:
ht
ig
To clearly communicate proposed project change orders and record customer acceptance.
R
Scope:
l
Al
All projects
C
Definitions:
LL
None:
y,
lit
Responsible Person(s):
ua
Project Manager has overall responsibility
Q
References:
Quality Manual Section 3.4.6 Change Order
i ra
de
Procedure:
ig
yr
1. Use the Contract Change Order Form contained in this procedure unless the customer contract
or Project Quality Assurance/Quality Control Plan specifies the use of a modified or customer
op
supplied form. In that case, the specified form replaces the standard form for that contract.
-C
2. The Responsible Person identifies contract changes as required by the Quality Manual.
s
3. The Responsible Person records the requested change on the Contract Change Order Form.
ge
4. The Responsible Person records the approved change order on the Contract Change Order Form.
Pa
5. The Responsible Person records the submitted change order on the Contract Submittals and
Schedule Form (see SOP 3.4.1 Contract Submittal Schedule)
ed
6. The Responsible Person stores the completed form in the field office as required by Quality
ct
d
ve
er
es
Change Order Form
R
Version February 19, 2012
s
ht
Change Order ID# Project ID Project Name Preparer and Date
ig
lR
[ProjectNumber] [ProjectName]
Al
Contract change requested by:
Requestor Name : ________________________
Caldeira Contracting
LC
Date: _________________________________ Client
L
Architect/Engineer
Request Reference Document: _____________
y,
Project Manager
lit
Code Enforcement Official
ua
Other:
Q
Change order description: Reason(s)s for change order:
ira
de
Time Extension Required: Yes No Cost Change Required? Yes No
yr
Reason: Reason:
-C
Name/Date ___________________________
Se
Name/Date ___________________________
e
pl
m
Sa
Questions? Call Ed Caldeira 410-451-8006
d
QUALITY SYSTEM SOP
ve
6.2 QUALIFICATION OF SUPPLIERS, SUBCONTRACTORS, AND DEPARTMENTS
er
es
Version Approved by:
February 19, 2012 Quality Manager
R
Purpose:
s
ht
To assess and record the qualification of suppliers, subcontractors, and company departments to meet
ig
the quality requirements of the company and/or project and to keep a record of their licenses and
R
certifications
l
Al
Scope:
C
All projects
LL
Definitions:
y,
lit
None:
ua
Responsible Person(s):
Q
Project Manager has overall responsibility
Quality Manager
i ra
de
References:
al
C
Procedure:
yr
op
1. Use the Subcontractor and Supplier Qualification Form and Project Subcontractor and Supplier
List Form contained in this procedure unless the customer contract or Project Quality
-C
Assurance/Quality Control Plan specifies the use of a modified or customer supplied form. In that
case, the specified form replaces the standard form for that contract.
s
ge
2. The Responsible Person identifies subcontractor and suppliers that require qualification as
required by the Quality Manual.
Pa
Qualification Form.
ct
4. When no qualifications are required “none required” is entered and then this procedure is
regarded as complete.
le
Se
5. The Responsible Person assesses the subcontractor or supplier and records the qualifications on
the Subcontractor and Supplier Qualification Form.
e
6. When all qualification requirements are met, the Project Manager signs the form.
pl
m
subcontract requirements, the Project Manager may approve a provisional subcontract. The
provisional subcontract lists requirements for actions that address correction of the
nonconformances. All nonconformances must be corrected and verification recorded on the
form before the company can commence work affected by the provisional requirements.
Questions? Call Ed Caldeira 410-451-8006
d
ve
Subcontractor or Supplier Qualification Form
er
Version February 19, 2012
es
Company Name: Scope of Work (specification sections):
R
s
Project ID Project Name Approval Approved By
ht
ig
Yes
lR
Conditional
No
Al
[ProjectNumber] [ProjectName]
LC
Subcontractor Quality System: Subcontractor or Supplier site quality inspection
Works under Quality System Site quality inspection required before approval
L
Approved to Work under subcontractor’s quality system Site quality inspection of product/material required before
y,
delivery
lit
Review Topics Project-Related Job Credentials
ua
Licenses required: License and expiration dates:
Q
Certification required: ira Certifications and expiration dates:
de
Personnel license, certification, and training required: List each person’s credentials on the Subcontractor and
yr
Qualifications
-C
Demonstrated capability to complete work to Access to codes, standards and product instructions
Company quality standards Equipment availability
Pa
Staffing availability
QUALIFICATION NOTES:
ct
le
Se
d
QUALITY SYSTEM SOP
ve
9.2.3.1RECORDING OF NONCONFORMANCES
er
es
Version Approved by:
February 19, 2012 Quality Manager
R
Purpose:
s
ht
To clearly document a nonconformance found by test or work task completion quality inspection, monitor
ig
the disposition status, and to record its disposition.
R
Scope:
l
Al
All projects tests and work task completion quality inspections
C
LL
Definitions:
y,
None:
lit
Responsible Person(s):
ua
Superintendent reports nonconformance on a Nonconformance Report Form
Q
Quality Manager assigns disposition of the nonconformance
References:
C
Procedure:
op
1. Use the Nonconformance Report Form and Nonconformance Report Control Log contained in
-C
this procedure unless the customer contract or Project Quality Assurance/Quality Control Plan
specifies the use of a modified or customer supplied form. In that case, the specified form
replaces the standard form for that contract.
s
ge
2. The Responsible Person records nonconformances as required by the Quality Manual on the
Pa
Nonconformance Report Form and records the nonconformance report on the Nonconformance
Report Log.
ed
4. The Responsible Person records the disposition on the Nonconformance Report Log.
Se
5. When the corrective actions and/or preventive actions have been completed, the Responsible
Person records the action on the Nonconformance Report Form, updates the status on the
e
6. The Responsible Person stores the completed form in the field office as required by Quality
Sa
d
ve
Nonconformance Report
er
Version February 19, 2012
es
Nonconformance Report
R
Control ID Project ID Project Name
s
ht
[ProjectNumber] [ProjectName]
ig
Preparer Signature/ Submit Date Quality Manager Signature / Disposition Date
lR
Al
Description of the requirement or
specification
LC
Description of the nonconformance,
L
location, affected area, and marking
y,
Replace Repair Rework Use As-is
lit
ua
Disposition
Q
Approval of disposition required by customer representative? Yes No
ira
Customer approval signature /date: ___________________________________
de
al
C
ht
Corrective Actions
ig
Name/Date:_________________________
-C
s
ge
Preventive Actions
Pa
ed
d
Field Operations
ve
er
Compliance Verification FTQ 2TQ Heightened Awareness Checkpoints
es
o Compliance with initial job-ready
requirements o o Cuts for Conduits in structural members approved by
R
ENGINEER 1652
o Compliance with material inspection and tests
o Firestops installed at penetrations through fire partitions// fire
s
o Compliance with work in process first article o
ht
walls// smoke partitions// or floors 1653
inspection requirements
ig
o Compliance with work in process inspection o o Penetrations through floor// exterior wall and roof sealed and
made watertight 1654
lR
requirements
o Compliance with Task completion inspection
o o Excess wiring// insulation// ties// etc. removed from Conduits
Al
requirements 1655
o Compliance with inspection and test plan
LC
o Compliance with safety policies and procedures o o Conduits secured to prevent movement and chafe 1656
o o Remaining snake lines labeled at both ends 1657
L
Reported Nonconformances and incomplete items:
y,
o o Conduit bends do not exceed minimum for size of Conduit
used and are even 1658
lit
ua
o o Metal Conduits bonded and grounded 1659
Q
o o Conduits are mechanically continuous 1660
o ira
o Flexible connections to equipment subject to vibrations 1661
de
FTQ Scores and Completion Sign-off
al
Quality 5 4 3 2 1 Notes:
ht
ig
yr
On-Time 5 4 3 2 1 Notes:
op
-C
Safety 5 4 3 2 1 Notes:
s
ge
Pa
Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________
Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.
ed
Quality 5 4 3 2 1 Notes:
le
Se
e
Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________
pl
Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.
m
Quality Score 5 = 100% NO problems 4 = 1 minor problems 3 = Hotspot or 2-3 minor 2 = 6+ or major problems 1 = Excessive problems
Sa
On-Time Score 5 = On Time 4 = Late 3 = Late by 1 day 2 = Late by 2 days 1 = Late more than 2 days
Safety Score 5 = 100% NO problems 4 = 1 minor problem 3 = Hotspot or 2-3 minor 2= 4+ or major problem 1= Injury
d
Field Operations
ve
er
Compliance Verification FTQ 2TQ Heightened Awareness Checkpoints
es
o Compliance with initial job-ready
requirements o o Appearance of Air Outlets and Inlets approved by the
R
ARCHITECT prior to ordering and installation 1542
o Compliance with material inspection and tests
o Registers// grills// and diffusers are compatible with wall and
s
o Compliance with work in process first article o
ht
ceiling systems 1543
inspection requirements
ig
o Compliance with work in process inspection o o Air Outlets and Inlets clean of dirt// dust// rubbish// and debris
1544
lR
requirements
o Compliance with Task completion inspection
o o Air Outlet and Inlet connections to duct work is airtight 1545
Al
requirements
o Compliance with inspection and test plan o o Additional supports provided for registers// grills// and
LC
o Compliance with safety policies and procedures diffusers in drop-in ceiling tile systems 1546
L
Reported Nonconformances and incomplete items:
y,
o o Drive belts properly tensioned 1548
lit
o o Ventilators installed with clearance for inspection and
ua
maintenance 1549
Q
o o Gravity Ventilators installed level and plumb 1550
o ira
o Ventilator mountings weatherproof 1551
de
FTQ Scores and Completion Sign-off
al
Quality 5 4 3 2 1 Notes:
ht
ig
yr
On-Time 5 4 3 2 1 Notes:
op
-C
Safety 5 4 3 2 1 Notes:
s
ge
Pa
Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________
Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.
ed
Quality 5 4 3 2 1 Notes:
le
Se
e
Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________
pl
Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.
m
Quality Score 5 = 100% NO problems 4 = 1 minor problems 3 = Hotspot or 2-3 minor 2 = 6+ or major problems 1 = Excessive problems
Sa
On-Time Score 5 = On Time 4 = Late 3 = Late by 1 day 2 = Late by 2 days 1 = Late more than 2 days
Safety Score 5 = 100% NO problems 4 = 1 minor problem 3 = Hotspot or 2-3 minor 2= 4+ or major problem 1= Injury
d
Field Operations
ve
er
Compliance Verification FTQ 2TQ Heightened Awareness Checkpoints
es
o Compliance with initial job-ready
requirements o o Layout/ types/ sizes/ colors and dimensions: per plans 2479
R
o Compliance with material inspection and tests o o Drywall and plasters: type/ layers and taping per plans and
s
o Compliance with work in process first article specifications 2480
ht
inspection requirements
o o Thicknesses: per plans and specifications 2481
ig
o Compliance with work in process inspection
o Sprayed/troweled adheres to substrates/ continuous/ no
lR
requirements o
o Compliance with Task completion inspection voids 2482
Al
requirements
o o Board fireproofing: damage free/ fasteners per specifications
o Compliance with inspection and test plan 2483
LC
o Compliance with safety policies and procedures
o o Flexible/ pipes and flues: mfr and fasteners correct per
specifications 2484
L
Reported Nonconformances and incomplete items:
y,
o o Adhesives: correct types and ratings 2485
lit
o o Shipping/ Storage/ Preparation/ Application: per specifications
ua
2486
Q
o o Aesthetics: neat workmanship when finished application is
exposed 2487
o
ira
o Tests and Certifications: per specifications 2488
de
Quality 5 4 3 2 1 Notes:
ig
yr
On-Time 5 4 3 2 1 Notes:
op
-C
Safety 5 4 3 2 1 Notes:
s
ge
Pa
Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________
Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.
ed
Quality 5 4 3 2 1 Notes:
Se
e
pl
Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________
m
Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.
Sa
Quality Score 5 = 100% NO problems 4 = 1 minor problems 3 = Hotspot or 2-3 minor 2 = 6+ or major problems 1 = Excessive problems
On-Time Score 5 = On Time 4 = Late 3 = Late by 1 day 2 = Late by 2 days 1 = Late more than 2 days
Safety Score 5 = 100% NO problems 4 = 1 minor problem 3 = Hotspot or 2-3 minor 2= 4+ or major problem 1= Injury
d
Field Operations
ve
er
Compliance Verification FTQ 2TQ Heightened Awareness Checkpoints
es
o Compliance with initial job-ready
requirements o o Subfloor area clean// sealed// and free of dust 1224
R
o Compliance with material inspection and tests o o Support pedestals secured plumb to structural flooring 1225
s
o Compliance with work in process first article
ht
inspection requirements o o Support stringers secured to pedestals and free of movement
1226
ig
o Compliance with work in process inspection
o Openings around ramps and stairs covered with fascia 1227
lR
requirements o
o Compliance with Task completion inspection
o o Access area free of scraps// debris// and other foreign
Al
requirements material 1228
o Compliance with inspection and test plan
LC
o Compliance with safety policies and procedures o o Flooring panel style and pattern approved by ARCHITECT
1229
L
Reported Nonconformances and incomplete items:
o o Floor elevated to proper level 1230
y,
o o Floor panels level and even 1231
lit
ua
o o Floor panels do not deflect under established load 1232
Q
o o Floor panels secure 1233
Quality 5 4 3 2 1 Notes:
C
ht
ig
On-Time 5 4 3 2 1 Notes:
yr
op
Safety 5 4 3 2 1 Notes:
-C
s
ge
Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________
Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.
Pa
Quality 5 4 3 2 1 Notes:
ct
le
Se
Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________
Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.
e
pl
Quality Score 5 = 100% NO problems 4 = 1 minor problems 3 = Hotspot or 2-3 minor 2 = 6+ or major problems 1 = Excessive problems
m
On-Time Score 5 = On Time 4 = Late 3 = Late by 1 day 2 = Late by 2 days 1 = Late more than 2 days
Safety Score 5 = 100% NO problems 4 = 1 minor problem 3 = Hotspot or 2-3 minor 2= 4+ or major problem 1= Injury
Sa
d
Field Operations
ve
er
Compliance Verification FTQ 2TQ Heightened Awareness Checkpoints
es
o Compliance with initial job-ready
requirements o o Course material source and gradation approved by
R
ENGINEER 1951
o Compliance with material inspection and tests
o Course materials from different sources and for different uses
s
o Compliance with work in process first article o
ht
stockpiles separately 1952
inspection requirements
ig
o Compliance with work in process inspection o o Drainage layer / piping outlets to surface or pervious area
1953
lR
requirements
o Compliance with Task completion inspection
o o Course material free of organic material// silt// clay// or other
Al
requirements objectionable material 1954
o Compliance with inspection and test plan
LC
o Compliance with safety policies and procedures o o Aggregate evenly graded and not segregated 1955
o o Base Course of even thickness and true to grade 1956
L
Reported Nonconformances and incomplete items:
y,
o o Bituminous Base Course joints offset from underlying course
joints 1957
lit
ua
o o Edge material compacted and brought even with finished
course surface 1958
Q
o o Sieve analysis// field density// and moisture content tests
ira
provided to ENGINEER 1959
Quality 5 4 3 2 1 Notes:
yr
op
On-Time 5 4 3 2 1 Notes:
-C
s
Safety 5 4 3 2 1 Notes:
ge
Pa
ed
Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________
Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.
ct
le
Quality 5 4 3 2 1 Notes:
e
pl
m
Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________
Sa
Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.
Quality Score 5 = 100% NO problems 4 = 1 minor problems 3 = Hotspot or 2-3 minor 2 = 6+ or major problems 1 = Excessive problems
On-Time Score 5 = On Time 4 = Late 3 = Late by 1 day 2 = Late by 2 days 1 = Late more than 2 days
Safety Score 5 = 100% NO problems 4 = 1 minor problem 3 = Hotspot or 2-3 minor 2= 4+ or major problem 1= Injury
For More Information:
Contact: Ed Caldeira
410‐451‐8006
www.firsttimequality.com
EdC@FirstTimeQuality.com
For More Information, contact: Ed Caldeira • Caldeira Quality, LLC • First Time Quality℠
410‐451‐8006 • www.firsttimequality.com • EdC@FirstTimeQuality.com