You are on page 1of 3
CELADON PARK TOWER 3 Fetus St REQUEST FOR APPROVAL, Saat Dvtonant Coporaton srscesr me, Ghost iy reget From: tat Deviant carson sen: sty 24,2088 RespunseRequres: aay 3, 2013, suet EXCAVATION AND PILE HACKING METHODOLOGY ‘wansmital sv"2 Structural Consultant ys ‘abit a ST.oDO azo prewusno 1 ‘re sia cate f resol 123 ate wy a éesoiponFmanulasiver es Seelen, be an pag Gavin, dia reo B SETS MCAATIONANDPLE HACKING METHODOLOGY a eed ened 3 fromcontacir | __temenntaior* fiat f/Lycanas \ camer aa =| apace ‘Structural Consultant ‘iar above subniion For Ravaw & Approeal Sarl ita» = Makati Devel . Jom transmital io» Makati Development Corp. role an eeie oey z Aroioned 8 rovonad a corecednted © noted D cisanproved aie beste Te __fhd| i land ais pong ao aaned tae medion | : byconatrt conan" pa ESTRADIN! 3 ULF EE NRtE 26 20% It ng /oRDSSOOUTE —teedatiy, Makati Development Corp, ‘arena on abo iasion —— {eovies ‘ower Thee ‘uanty Sunejer Oia July 22, 2013, Ret No mi ADONT3.004 MAKATI DEVELOPMENT CORP. Felix Huertas St Sta. Cruz, Manila Attention ENGR. ARIEL P. LUCANAS Project Manager Thu ENGR. HAJIE J. SAC Projectin-charge Subject TRANSMITTAL, Dear Sirs, Transmitting herewith the following documents: Excavation & Pile Hacking layout (2 pages) fethod Statement including foundation pian Qui Project CELADON PARK TOWER 3 Location: Felix Huertas St,, Manila EXCAVATION & PILE HACKING METHOD STATEMENT Setting Out ‘The working drawings will be used for setting out work The Levels will be checked by Engineer before excavation, Methodolagy Fea Son Pilot Construction wil start the excavation at Area 1 as per setting Excavation shal! include removal of ali materials of whatever nature a! al depts coc Secarcance with fines, levels, grades and curves shown in the drawings or as direcied by iro Oumeriarchitects, The bottoms of excavation shall be leveled both longitudinal at vara OF sloped as directed by the Owner/Architects, Gace excavation werk for area 1, finished, Excavator will be shifted to area 2 and then pi breaking gang wil start pile breaking work in area 4 ‘The contractor shall report to the OwneriArchitects when the excavation and pile hacking is finished in area 1 and are ready to receive concrete, After the excavation is passed by contractor shal Ownerisrchitects, y the OwneriArchitects and before laying the get the depth and dimensions of excavation and leve le. thy i$ recorded by the ‘Simitar procedure will be continued to all the area 1, 2to area 7 At night time, excavated materials wil be disposed using designated dump trucks. ABI wil also provide wash bay area so that the clayey materials will not spread in the streets Safety All the site staff ang worker should where safety heimets and shoes ‘Workers must wear eye gogates, ear protectors and hand gloves where necessary Al the dangerous areas must be barricaded All the electrical wires and sockets such a way that musi be covered to sal regulations — All the site staff and workers must be algsb wen worn ame es he ‘Excavated area shail be illuminated dur fendi ne ety Kore , Tons NOTED Sub Rey) AMOC. Guinto Proje! Manager

You might also like