You are on page 1of 7
Techni nnel jalification & Experiens a a lQquatificatlexperid] Particulars of work reer rae ‘Any N. ion | nce done mee | ote O1.| U.K. SARAN B.TECH. | 45 | ELECTRICAL WORKS 02 (02. | ABHISHEK KUMAR DIPLOMA| 25 [MECHANICAL WORKS| 23 03.| AK. CHOUDHARY DIPLOMA| 18 CIVIL WORKS 03 04. | NEYAZ AHMED M.TECH | 3 [MECHANICAL WORKS| 01 05. | SUVESH KUMAR DIPLOMA| 05 | ELECTRICAL WORKS 05 (06.| BRAJENDRA KUMAR DIPLOMA| 05 |MECHANICALWORKS| 03 (07.| KUMAR SHASHI BHUSAN | DIPLOMA| 04 |MECHANICAL WORKS! 03 (08. | MD MUMTAZ DIPLOMA| 1.5 CIVIL WORKS o1 (09. | MD. AMANULLAH B.TECH | 45 CIVIL WORKS OL 10.| MD. GAFFAR ANSARI | DIPLOMA| 15 |REFRACTORYWORKS| 01 11.| MUKUND BCA 15 ADM. WORK 05 12. | AMAN KUMAR B.COM | 18 | FINANCIAL WORK 18 13, | SURENDRA SINGH DIPLOMA| 29 [SAFETY MANAGEMENT| 12 14. N.K. SHARMA GRADUATE| 28 |STORE MANAGEMENT| 15 15,| P.K. SAHU McA | 14 ‘ADM. WORK 03 16.| SANDEEP_KUMAR DIPLOMA| 12 | COMPUTER WORKS 10 17.| S.N. MALLICK GRADUATE] 40 _| OFFICIAL WORKS 5 18, | MD. ISRAR ALAM B.TECH | 45 | SITE INCHARGE o1 19.| MD. ZIAUL HAQUE B.TECH | 1.5 | SITE ENGINEER 01 20. | MD NASIR HUSSAIN B.TECH | 2.5 | SITE ENGINEER o1 21.| MD SARFARAZUDDIN | B.TECH | 1.5 | SITE ENGINEER OL 22. | MELVIN JOSHUA B.TECH | 3.5 | SITE ENGINEER OL 23, M.K. VERMA DIPLOMA| 1 | SITE SUPERVISION o1 24, | AJEET KUMAR SINGH B.com | 05 ACCOUNTANT 05: Proprietor Project mree =. Civil In-charge Structural In-charge ‘Accounts Documentation Supervisors Supervisors | | Workers Workers iE ments: SN. TYPE OF EQUIPMENT MAKE CAPACITY] QUANTITY O1. | CRANE PH - 955 ‘AMERICAN 507. i (02._ | CRANE HYDRAULIC TH 50T 1 (03._| CRANE HYDRA ACE 147 1 04. [CRANE SUKKU "ASHOK LEYLAND. 3T 3 05. [3CB CATERPILLAR 50 KW 1 06._| DIAMOND CUTTER (COMPLETE SET) HILT - i 07. | DEMOLITION HAMMERS & BREAKERS HILT - 2 08._[ TOTAL STATION SOKKIA : 2 09. | THEODOLITE SOKKIA - 2 10. | AUTO LEVEL - BW /20A SOKKIA - 5 11. | VERNIER CALIPER MITUTOYO - 5 12._[ TRUCK TATA i0T 3 13._[ DUMPER TATA 10T 2 14. [TRACTOR ‘SWARAJ/ SONILKA 457 2 15._| PICK - UP VAN TATA i: 1 16. | PICK - UP VAN MAHINDRA 2m 1 17. [AIR COMPRESSOR ‘ATLAS 6 KG 1 18, | WELDING MACHINE (GENERATOR) INDRAK/ KIRLOSKAR | 25 KW 6 19._| WELDING MACHINE (THYRESTOR) ESAB/ MEMCO 20 KW 6 20._| WELDING MACHINE (TRANSFORMER) SUN ARC 05 KW. 12 21. [ ELECTRIC WINCH ASHOKA [5-10 T, 3 22,_[ HAMMER DRILL MACHINE BOSCH/ HITACHI - 8 23._| DRILL MACHINE WITH STAND WOLF/ BOSCH 10-80 MM 8 24, | STRAIGHT GRINDER BOSCH/ HITACHI : 6 25._| ANGLE GRINDER BLACK DECKER/ BOSCH = G 26._| REVERSIBLE DRUM MIXER ‘JE PEE / PRIMEX 2 27._| CONCRETE MIXER MACHINE ‘ASHOKA MILLER 6 28, [REFRACTORY MIXER MACHINE ‘ASHOKA : 3 29. | POLYMER CUTTING MACHINE NEUTRON : 3 30._| POLYMER SHAPING MACHINE NEUTRON = 3 31, | CONCRETE VIBRATOR CROMPTON = 5 32._| CONCRETE BREAKER GREAVES = 6 33,_| PUG MACHINE ESAB/ ASHA. : 5 34, | CUTTING SET ESAB/ ASHA - 25 35._| CHAIN PULLEY BLOCK INDEF i0MT 5 36. | CHAIN PULLEY BLOCK INDEF 05 MT 6 37._| CHAIN PULLEY BLOCK. INDEF 03 MT 8 38._| CHAIN PULLEY BLOCK ESAB. 02 MT 12 39. | MEGGER RUSSIAN 50 KV 2 40,_| MULTI-METER WITH TONG TESTER FUSION - 3 41, [TONG TESTER RUSSIAN = 2 42, | DIGITAL GENERATOR KIRLOSKAR 40 KW i DETAILS OF WORKS COMPLETED IN THE LAST THREE FINANCIAL YEARS Contract - Date of | Schedule [Actual date] Actual | Final Value of S| jon/agt No. & | Description of Work | Organizat} Origine! Contract | award of | Date of | of Start of | Date of Contract I Dated Work |Completion| Work _| Completion ‘Works/Spl/NPC/SSE | Extension of PF. shelters | South | 4,34,51,303.00|27.06,2013| 26.06.2014 | 27.09.2013 | 30.08.2015 | 4,99,43,265.00) (WYRNC/21/2014 |on balance portion of P.F.| Eastern 01} Dated 18.02.2014 | No.1,2&3and | Railway, renovation of existing | Ranchi PF. Surface on P.F. No. 1 e 02 | Works/CD/ENG/OTE | Cold Repair of Coke Oven] SAIL, 5,78,20,000.00|29.05.2012| 18 Months | 29.05.2012 | 16.09.2015 | 5,78,20,000.00 109/039 Battery#8 (Main | IISCO Steel Dated 29.05.2012 Package). Plant Burnpur 03| 4565017261 | Cold repair for Battery | SAIL, | 49,06,62,919.18]07.02.2014] 31.12.2015 | 10.02.2014 | 17.12.2015 | 19,06,62,919.18 Dated 07.02.2014 No.#3 Bokaro Steel Plant 04] 4565021285 | Removal of coal spilage | SAIL, 38, 28,005.85 | 10.03.2015] 07.04.2016 | 08.04.2015 | 07.04.2016 | _38,28,005.85 Dated 18.03.2015 | from different points of | Bokaro CHP & technological | steel Plant upkeep of blending & crusher are (Cat-A) 05] 4565023955 Upkeep of doors & | SAIL, 46 99,638.29 01.01.2016] 30.11.2016 | 01.01.2016 | 30.11.2016 | _46,99,638.29 Dated 01.01.2016 | changing of components | _ Bokaro and refractories (Cat-A) | Steel Plant z 06 | TRC{O\/ABORI/RKTS | Modification of Deformed | SAIL, 1,83,44,700.00|22.05.2015| 06 Months | 23.07.2015 | 10.02.2017 | 1,83,44,700.00 12/824/1050 |Supporting system of | Bokaro Dated 22.05.2015 existing K-10 Conveyor _ | Steel Plant gallery, CHSGP, BF#4 at Blast Furnace No. 4 of Bokaro Stee! Plant 07 | TRC(MY/AGO2A/S/SK| Coal Handling and Coke | SAIL, 5,30,01,760.00| 11.06.2015] 15 Months | 10.07.2015 | 06.01.2018 | 5,30,01,760.00 K/292/826/1186 | Sorting Plant (Pkg.- 5) of | Bokaro Dated 11.06.2015 | COB#8 of Bokaro Steel | Steel Plant Plant. M/s. P. Construction Swe Proprietor DETAILS OF WORKS PRESENTLY IN HAND s.| Contract /LOA/Agt No. & Description of Work Cgeeteation | Comieeel Wibiar | PbcorS cece sel N. Dated eee Of | BTL/LOI/CCD-2423/12-13/1450 | Replacement of Ammonium Sulphate Plant- SAIL, Bokaro | BTLEPC Limited, | 10,45,26,649.00| 3 Crore Dated 03.09.2012 Stee! Plant Kolkata a HEC/PROM/CBS/ ‘Complete Civil and Structural works for installation of | HEC Limited, | 8,44,31,203.50| 2.5 Crore Meghahatuburu/2013-151 | Tertiary Crusher System Project at Meghahatuburu Iron Ranchi Dated 12.01.2013 Ore mines(MIOM) site Meghahatuburu 03 | _RMD/K/PROI/MIOM/CA/14- Extension of A’ Type Quarters at Township of SAIL, Raw | 3,03,77,900.41 90 Lac 15/052 Dated 30.07.2014 | Meghahatuburu Tron Ore Mine [Part-2, 30% job, (273.6 | Materials Division units) 04 W.564/DHN/2015- Gomoh (Electric Loco shed): Augmentation of loco holding | East Central | 7,06,49,004.77| 2.8 Crore 16/Open/38/01 Dated _| capacity from 120 to 175 under Assistant Engineer (1) €.C. | allway, Adra 27.01.2016 Railway, Gomoh 05 | RMD/K/PROJ/MIOM/CA/I6- | Construction of 60 Bedded Barrack at Meghahatuburu ron | SAIL, Raw | 4,53,05,200.00 30 Lac 17/081 Dated 30.08.2016 | ore mines, Meghahatauburu, Dist.- West Singhbhum, | Materials Division Sharkhand 06 | DGM/PCC/TK/2016/426 Dated | Enabling Works of Coke Oven Battery#7 (Pkg-5) under Re-| SAIL, Bhilai Steel | 9,86,46,499.00| 1.8 Crore 14.10.2016 building of Coke Oven Battery #788 in CORCCD of Bhila Plant Stee! Plant ee | 07 | _ BPSCL/CEO/PAC/12-13/C- | Supply, Erection, Testing & Commissioning of BF Gas Duct | Bokaro Power | _1,74,00,000.00 30 Lac 176/NIT-337/671 Dated from Battery limit of BSL (IP/13) to Battery limit of | Supply Company : 24.01.2017 Boller#9 (P) Ltd. 08 | 4565027789 Dated 28.01.2017 | Rate contract for "Mechanical jobs related to battery | SAIL, Bokaro Steel | 29,73,918.98 Zac machines (Group-2)" Plant (09 | 11.51,E24R/Erection of Mech. | Supply, unloading, storage, watch & ward, oading, | Mecon Limited, | 88,87,218.00 Blac P&E/SE-002/9219 Dated transportation, unpacking, inspection, checking, pre~ Ranchi 10.03.2017 erection testing, erection, alignment, painting, trial run, ‘commissioning, performance guarantee, and post commissioning services of Mechanical Plant & Equipment and Piping, Building / Technological Structures and ACVS ‘System (Pkg. SE-002) required for Installation of Quenching system (Package No.- 3) for rebuilding of (COB#8 at Bokaro Steel Plant, Bokaro 10 | 4565028665 Dated 01.05.2017 | Strengthening of Civil Structures of Silos in Coke Oven Area] SAIL, Bokaro Steel 36,45,752.86 25 Lac Plant ii | 11,51.E24T/Gvil works/SE- | Civil Works, Repair of Gas Nozzle Pipes in Deck Slab & |” Mecon Limited, | 2,74,27,958.00 1.5 Crore 821/9353 Dated 31.10.2017 construction Power (Pkg. No. SE-821) required for Ranchi Rebuilding of Coke Oven Battery # 8, SAIL, Bokaro Steel Plant, Bokaro, Jharkhand 12 | DGM I/e(PCC-NTKY/5(3103) Development of handling and storage facilities for SAIL, Bhilai Steel | 5,83,51,517.37_ 5 Crore 17/1434 Dated 11.12.2017 granulated slag at slag disposal area of BF#8. Plant. 13 | CC-W/PO-4270006402/ Coke Cold Repair of Coke Oven Battery#10 SAIL, Bhilai Steel | 7,76,03,773.50 5 Crore ‘Oven-COB10CR/ 07/3718 Plant Dated 22.12.2017 14 | 11.51.£24T/Erection of Mech. | Supply, dismantling work & disposal of debris, construction | Mecon Limited, | 6,53,28,151.00 6 Crore PRE, Str./9366 Dated of stores, loading/unloading of materials, safe storage, Ranchi 23.01.2018 watch & ward, transportation of equipment/ material to site, placement, alingnment, erection, testing & ‘commissioning of mechanical Plant & Equipment, Building Structures, Technological Structures, Casting, Pipes & Fittings, , electrics, paints, CGS sheeting, providing services during heating up, commissioning and post commissioning period etc. required for Rebuilding of Coke Oven Battery # 8, SAIL, Bokaro Steel Plant, Bokaro, Jharkhand 15 | 4565030885 Dated 08.02.2018 ‘Operation of conveyors in CHP, CO&BPP ‘SAIL, Bokaro Steel | 35,35,999.20 Blac Plant. 16 | Works/CO/ENG/17-16/71/OTE/ Readjustment of Thermal, Hydraulic Regime & SAIL/ TISCO Steel | 15,66,428.00 Blac 48/178 Dated 12.02.2018 _ | Maintenance of Anchorage system in COB#8 and Misc. jobs| _ Plant, Burnpur 17 | E-TB/138/2017-OT Dated _| Construction of 20 Nos. OF BUS STAND’ type PF shed at 14” South Eastern | 1,36,32,576.30 30 Lac 16.02.2018 station of Adra Division Railway, Adra 18 | W-7/76]Misc/PNBEL(L)/ Open/ | Provision of 12'0” wide FOB on UP & DN PF at Jehanabad | East Central 1,66,33,436.10 75 Lac 2017-18 Dated 13.03.2018 Court station with end to end connection under Railway, Danapur ‘ADEN/L/PNBE. 19 | DCE/Con/IMP/WTOSE2 Dated | Construction of Foot Over Bridge at Pirpainti station, | Eastern Railway, | 8,29,58,342.05 5 Crore 28.03.2018 extension of platform wall of Shivnarainpur & Bikramshila, Jamalpur balance work between Pirpainti-Kahalgaon and other associated ancillary civil works in connection with proposed double line between Pirpaint-Bahgalpur. M/sN. P. Construction Page ne Proprietot 4565031556 Dated 18.04.2018 | Removal of coal spillage from different points of CHP & | SAIL, Bokaro Steel | _41,61,151.76| 4 Lac Technological upkeep of Blending and crusher area. Plant 21 | 4565032766 Dated 05.09.2018 Medium repair of saturators in BPP SAIL, Bokaro Steel | 14,85,094.17) 7Lac Plant 22 | W.584/275-DHN-2018-19 Dated | GMO- Provision of additional PF shed No.- 5&6 to meet | East Central 2,36,71,816.32| 2.36 Crore 07.02.2019 MEA and replacement of PF shed & FOB sheeting at GMO | Railway, Dhanbad Construction M/s.

You might also like