No Komponen Jlh Satuan

1 Kabel Power 3 x 6 mm, Serabut NYYHY Supreme 2 Rol


2 Kabel Elektroda 3 x 1,5 mm, Serabut NYYHY Supreme 2 Rol
3 Elektroda 3 bh
4 Panel Box Uk. 70 x 50 1 bh
5 PFR 1 bh
6 MCCB/MCCB 3 P C25 1 bh
7 MCB 1 P C6 1 bh
8 Kontaktor ST 25 1 bh
9 TOR 15 Ampere 1 bh
10 Selector Switch 3 Pole (A-O-M) 1 bh
11 Terminal Block 4 P STB 1 bh
12 Terminal Block 2 Row, 12 Position 1 bh
13 Timer Omron H3CR-A8 1 bh
14 Pilot Lamp "RED" 2 bh
15 Pilot Lamp "YELLOW" 1 bh
16 Pilot Lamp "GREEN" 2 bh
17 Fuse HY-F15 - 2 Ampere 3 bh
18 Kabel Duck 45x45 5 btg
19 Kabel Spirale 10 m
20 Kabel Ties 100 pcs
21 Pompa 25 Stage 1 unit
22 Motor Sumersible 7,5 Hp 1 unit
23 Water Level Control 1 bh
24 Pipa Galvaniz 2" btg
25 Socket bubutan 2" bh
26 Knee Drat Galvaniz 2" 1 bh
27 Selotip pipa 10 bh
28 Double Nipple 2" bh
29 Water mur 2"Galv bh
30 Plank Galvaniz 2" 2 bh
31 Check valve 2"
32 Shock drat luar galv 2"
33 Stop kran galv 2"
PEMASANGAN POMPA SUMERSIBLE 7,5 HP SUMUR 3
No Nama Barang Satuan Unit Jumlah
1 Pompa Sumersible Grondfos 7,5 HP Unit 1
2 Kabel Power 3 x 6 mm, Serabut NYYHY Supreme Meter 200
3 Kabel Elektroda 3 x 1,5 mm, Serabut NYYHY Supreme Meter 100
4 Elektroda Btg 6
5 Panel Box Kontrol Phase Set 1
6 Panel Pompa Double WLC Set 1
7 Pipa Galvaniz Medium A 2" Btg 15
8 Socket Besi Bubutan/Socket Besi Dratfull 2" Bh 15
9 Knee Drat Galvaniz 2" Bh 1
10 Selotip Pipa Bh 10
11 Plank/Boch Galvaniz 2" Bh 2
12 Check valve 2" Bh 1

PERALATAN PENDISTRIBUSIAN AIR DARI SUMUR KE TORRENT


No Nama Barang Satuan Unit Jumlah
1 Pipa PVC Rucika 2"
2 Socket PVC 2"
3 SDD PVC 2"
4 SDL PVC 2"
5 Elbow PVC 2"
6 Tee PVC 2"
7 Stop Kran / Ball Valve 2"
8 Lem Pipa PVC
9 Selotip Pipa
10 Filter Air