You are on page 1of 8
CYZ MARA Bb th RK CYZ SERIES SELF-PRIMING CENTRIFUGAL OIL PUMP. bE Hae be WY 5 OPEATION & MAINTENANCE MANUAL ea ® Tif A Te Fae Mb MBE fed AT DR ZS] HEBEI HENGSHENG PUMPS CO., LTD. Ax CONTENTES 1.7 StRiBIGeneral 2.8!'51208/Model Explanations. 3.48#4134818/Construction and Features, 4.3802 Points of Pump's Installation. 5 JREV( Points of Pump’s Operation. 6.8 LANGE HERA 3#/Usual Trouble and the Ways of Remedy. 1.7* BE General CYZ BARR OR AT me Rh. i. MEAS. PARE BI4-20~80'C. BAM RAK A ER, PREAH ESAS, PAU ARMA, AKG. BRALL HK, FTAA A ALE SS CYZ series selt-piming centifugal oll pump is suitable for pumping petrol gasoine), kerosene diesel ol et. and the temperature should between-20 to +80°C.t's suitable pump under the conditions of ship, land oll depot and tank truck and so on also can pump the seawater freshwater etc If pumping chemical quid it should be assembled corrosive-proof mechanical swal WELRA AMS, ATLIEDIE. BIE (Ghistype pump asthe characteristic of simple strongly iE. ETF HEPES. BFE. (BAA seit-priming abiliy easy operation simple and convenient CHRSHiA. repair high efficiency wider@ppiications! 2.853340 Model Explannation 150 _CYZ - 65 LC ania in) Shows me pr ATROR A AMS A OR Shows te pump ede bls cetygal pump ARROBATE mp) Shomsne pump Plt serpin) 3.45410 491 Construction and Features RAMA RAT DERM, FR SER a OS MIE « EER MWR DARE MS. 185] RRR AA IOC+, FD ER REA, EX PADMA HN . FRI AL FR UAS AA FB PA MEHMMEM RBH, HEHRRER hE, REARREWMKAL, RAK MBLEAM SA — EAE. HSER MOMMA OTERERT, RAAF BIR. GHAR MN hie BARA EH RSA, RAB MAS. “THE Purp's bearing adopts single row angular contact ball Dearing with lubricating by albany grease or #10, machine ol ‘There's @ cooling room at the bearing body in some type pumps When bearing temperature rising exceeds TOU, could transtuse the cookant ito cooingroom by pipe joint an circle cooling The pump inner’ seal structure that prevent pumped liquid leak from high pressure room to low pressure room is font and back sel rng The front seal ring is assembled ‘on the pump body and the back seal ring is assembled on the bearing body When the seal rings fray too badly to operate normally should replace them. ‘The pump's shaft seal adopts mechanical sea. ‘The pump's connection with diving motor is clawed couple wth rubber. a4. SEXAMWEB The main structure parts: 8 “\ 1, RSE +. couple 6. Rt 2, RA a eae 7 Ho 3, ft 3. beating 8. ito 4, MBA 4 moctanealeeal “9, HEIR 5. ROR 5. beaing body (108 ESE 4 FRM Points of Pump's Installation 4.1 RS ALE NA BIE SS RARE / SRL RRO TERMS ROUTE. FRARGRNT, RGMREE. RRR SNES Bt RANE PART OH, BARN, Butts) BS SHE, 4.2 FARGO REL LE. IE RRL, EMA. AUBS eR TEACH HAIR 4.3 iB RA ARES RS — ENN RT, SHS FAY OR RE AAAS LE LB EH AE R, DAERORO GF RMP OR. 4.4 RASHMREMES a ERA, MADR A RARE ah Smith, FRERERASHKE, UREK, RHANTREARMA. b. RABE RA ARE, RATHER. BM RHABACMH2~ 3%, WIE RM EM e. 4.5 HWEMMAR CMR, RA SERLERZEROAG. i || Ne al 0 6. pumptedy 11, FE] 1h. bak searing 7 cuted 12 GHET _h0. citseat 8. et 13. 8 13. tracer 9. front ea sng 10. impotet, 4.4.When the pump is driven by motor directly, we should rake the pump's shaft and moto's shaft with the ‘same center When the pump is driven by motor with strap, We should make sure te pump’s shafis in parallel with the motors shat. and.make the two wheels which carying the strap oh the same level, the strap within measure degree Jf the pump's installation isn't suitable,pump's well-balanced operating and use lft is destroyed and Shortened. So the installation and debugging must be earnast ‘42 The purp's couple must be screwed down with nut Toeked in order to prevent the nut ftom looseness. Otherwise its easy to cause the impetlier vibration and mechanical troubles. 43 The suction pie ine must be higher than the pump'sshaaft center and make some liquid deposited inthe pump body In order to reach the better sel-priming ability and protect the mechanical seal against dry attrition 44 Suction pipe line should be noticed when installing: alln possible conditon ,the pump's inlet should be as lower as possible than the pumped liquid level and cut the pipe line's length and reduce elbows so that shorten the selt-priming time. The suction pipe line must be gastight [The suction pipeline should mount strane and the vad fitting proportion shouldbe 2-3 tes of suction pipe line's section The strainer should be maintained regularly. 4.8 The stuction pipe line and outlet pipe line should bbe mounted individual brackets and the purnpealf is unal to support the pipe line's weight. -2- 4.6 RRR RAR Sie he KAR. KOSRD. 4.7 RRR LIRA AN AY ADI HK, RRABA 0 12HRARBNS. SBR AMZ 48 ERMOSMLMRA BO. TH ARTE PTE RAIA RT, BAER Mh MAHER. 5. 32M} Points of Pump’s Operation 5.1 RAMA. a EMAAR OS BAB! MEEK. HANA RBAMARA AAR, KELSERRE- b MERAARRES STH AY bid & MERE, TIAL MAORRA RUAN, RET ZAR TY Ame, SURTEESLE, BAR nes. c LERMNABTRA GEERT R d, AES OA BHD 2 MRE Fea MAR. cA LD ALS HH a FOE TE. ft MEROSRRSRA. ec TARASHMA, HI (FES FF) HOH. 5.2 RmRBtE. a. BRA, >. ERAMNAATE RMA MMR EARRASAEH, BURY BRERA AMARTH HTBER, WARACR LR, MRA EMME. 4. ERENT MELT, BD OR A) TEb, MHNERRAMBA SIA RW, MRETMBAK, RAR w FREAK RA. SRAM LEER. 48 When mounting shoul strict check having sundries or not ike stone block ron sand ete solid granules. 4,7 i eoolingroom mounted the matched joint serew spec. is M12 and cooling rubber or plastic pipe inner Giameteris D12mm 48 In the outlet pipe line should be mounted single direction valve. during the sel-priming period the pump couldn't get rid of gas successfully, should be appended pipe with drain tap near the pump's outlet 5.1 The inspection items before starting 2 Inspecting if the bearing body's lubricating ol reaches stated-leyel Lubricating ol should be between two scale thZad of machife a sulér and not too much or lack. ». Inspééting ifthe deposited liquid in the pump body ‘s higher than impellers upper edge .Itnot enough may transfuse pampes iqui rom pimp body once of transfusing liquid It shouldnt star befor ack of deposited quid thenvise the pump couldn't reguatly working and caused mechanical seal destroyed easly. ©. Inspesting ifthe pulmps rotating parts have locked phenomeha, "Inspecting ifthe feet of pump base and every joints screws are loosed. €. Inspecting ifthe pumps shaft and the motor’ shaft hhaué the same center. {Inspecting if the suction pipe line leaks gas, 9 Open absolutely the suton pipe line's valve and party outlet control valve 5.2 Starting and operating 2, Statoil pump and notice ifthe pumps shaft rotate iection is corect ». Notice if existing the abnormal noise and oscillation, Notice to observe pressure meter and vacuum meter ‘After started and pressure meter and vacuum meter finger steady point indicate pump has been into regular operation 4. During the pump from starting to regular operation, should specially notice the condition of oltemperature rising in the pump body. Ifthe course to regular operation is too long and temperature rise very high please stop the pump {and inspection the reason, 35 ee MRR ARR SA SAA A ME, BDRERL ARAL. FI AR ML A eh aN TT BRARXARALM MAO RARA ANTE, (ERA IAI. PARI AD a). FH OSH, ER AREA) REE, HRBRENE RAT TIRE A AL, AMAA RAMSAR AA WH, BMRA RBS. 6. RELAPSE on He BB RL A AMR A, AVRERRESAR. CREAT RAABM. —AAOSRBIA, —AR By ABIL AR Bad oe GS FP SEAREM. ERO SHSM BA HER, OB BURR RESE. h REL P AMER: BEAR ae, WORM, RHA AF AM TE PARAM OMEN, REPRE CEIEAIE AD AT BA. i FERS RADA RRMA, ERMAN AHEM. J. REPL AB 15> 207) Se et FB BT BHR AKIO SMH. 5.3 Be a. RANE aE A b. HERR ILS 6 RHSH, RAMS A MAAS. 5.4 HPRALESLTER ME. a RW: SARKMITE. BK BHA-EREM, AHTHR. bl, RHHR: SHHABR- ER AER, SisiT BIR. co MMEH: MRE A TANT BK, ARR RFE. SHAT i RRR Pea ABE, MUL ALAA eS ET ih, RANMENMNLASMBM, EB RAHN, RPA PR ate. €. Ifthe qui temperature in the pump body isto high to.cause the pump’ settpriming well, you can transitory stop the pump ,make the outlet pipe retum to the pump body or direct transfuse pumped liquid rom pump body's orifice of ransfusng liquid for adding the qui inthe pump body and cooing the quid Then restart the pump {Adjust the contol va onthe outlet pipeline to make pressure meter points stated area for avoiding the pump ood urider stated area and infuencing the purp's normal operation 4. During the pump wofking, I herds smart vibration and poise the reason maybe is gl corade, There re two reasons 9 bring gas crade Inlet pipeline Now speed is too quik! 2nltiteoFigh When tow speed is too quick, yolléan adjust Ne conto valve on the outet pipeline and raise the bressure meter reading. Ihe inlets too high you can lowe the pump’ instalation height. bh. When festarttg the pump after removing roubles, the control ave on the Stet pipeine shouldbe opened! a Title in ofder to make thé gas discharge and ensure low to to start the pump, Noto ispectis hee are eak phenomena on he ppsine J/Notice to inspect the lubricating ol regula. 5.3 Stopping 4. Close the valve on the outet pipeline. b. Stopping the pump «6. When cold season empty the coalingroom '5.4 Several emphases when maintenance 2. Bearing After the pump working is long time, bearing would fray badly, the bearing should be replaced ». Front and back ring When seal ring fray to bad degree, should replace them for pumps normal working « Mechanica seatif there is not leak orifice below the bearing body, should cisassemble the mechanical seal to inspect Youhaveto be care of assembling and disassembing the mechanical seal, nots o make the oscultory facecean ‘and forbid knock and bump absolutely. 45 6.98 DXB HEIR 2& Usual Trouble and the Ways of Remedy aR eRe ere Tries Prose Reston ays tomy jas Riniwia AT 1 ine Thor's rogue oeckique mie pomp boy | Trae enough nus 2 ma serene 2B SENS “hare en akan ent pene Inspect an get i of ga kak pheraena RD a see swage punt, [toon swe. ‘ait sabe ot peed urea [4 BRERA aaReR A SERB 4 RfemAESRIR Em thats ng ret poe to ng. Uterine Rage ahonen a int pane. ees SE cee mechanical sat Jo mae REAL 6 abit Inala oa Fominiatppoine cnt dscarges |” Deshtge he male ae. 1. nesesicton A sree eer stu |" Thre amon ho net pps orielar Enon te avenge, PSE |e mtseatatsewssinsa a 2EeoR Bano cnt |? The petro moor alg tay bay epee Towel” Is sa eatieie kt Smee. Ae aE Foweriot enough seta spesaistolow” |” eth omer aoe end haps + Feo storia | Te foret 00 tx9e Rae heres cfotet ve fp seieaty 2 ences EA. | Theeedsto oh Fag esc acuesB Typeowe ly sean aaatot se Fa denen Sein, | Frabunps shat coxeaatts marl cto. Enendstn lacing Ome Ta sae maae a EEE 4 ae ‘Frac amet oda on ne pein pun en conan yt 1. sen { ma ‘Thafon ernectes wen gunn any Froth fot 4 BEL BERR Pee at ottireten 2 Rs Pa otig non sama 3. Binataa fume nag | Bera fy ad Feist new bear os (4 Faas BEER wetton | Fp cats tows Be emsnan ora >. ak ave arse ‘Theis unas n pump Bey or et pene lo. semana 5m 6 ween Feng shh on urs sis wove sane cone | Adele tr REGRARUA EER a At aE Me a RAS Res Mi. He RoMNIER. MO ro) Fal de tB B R W AR PR A B) HEBE! HENGSHENG PUMPS CO.,LTD. Sek: RYLe AST HOTS "iG: 0086-317-8223730 8223055 48H: 0086-317-8282746 62%: 062150 Falk: www.hengyuanpump.com ‘8F-(N#A: info@hengyuanpump.com ADD: NO.6i,hedongbei road,botou,hebei Tel: 0086-317-8223730 8223055 Fax: 0086-317-8282 748 PC.: 062150 Http: www.hengyuanpump.com E-mail: info@hengyuanpump.com PART T= RELY Bl Be AR PICCPROPERTY

You might also like