PROJECT: PROPOSED THREE (3) - STOREY RESIDENTIAL BUILDING

LOCATION:
OWNER:
TOTAL FLOOR AREA:

ITEM DESCRIPTION QUANTITY

I MOBILIZATION
I.1 Transportation / Truck Rentals
I.2 Temporary Facilities
a. Temporary Fence
Coco Lumber 200 2 X 4 X 12 1600
Coco Lumber
Blue Sack
Hardwares
b. Bunkhouse/Toilet
c. Field Office/Warehouse
II REBAR WORKS
II.1 Footing F-1 2 3 X 2 X 4 48
F-2 2 1.5 X 3 X 3 27
F-3 3 2 X 2 X 2 24
F-4 2 2 X 1 X 4 16
UNIT UNIT COST MATERIAL COST LABOR COST EQUIPMENT COST

₱566.00 ₱241.00 ₱8.00 ₱8.00

bf
bf
roll
LS
OCM TOTAL COST

₱8.00 ₱8.00