n Chapter 5 our catalog of project management decisions was de-
scribed at the top level. The entire catalog is reproduced here for your
reference.* The following tables appear in this appendix:
Problem Validation
s What is the acceptable level of consistency between
stakeholder needs and the mission requirement?
APPENDIX B Project Management Decisions 267
Concept Evaluation
s What is the methodology for determining concept and
technical feasibility?
s What are the evaluative tools, methods, and objectives for
evaluating concept design alternatives?
s What is the set of trade-off objectives required to satisfy the
problem definition and cost requirements?
Concept Validation
s What is the set of concept validation criteria?
s What is the concept validation methodology?
s What are the validation tools for concept designs, e.g.,
modeling and simulation?
268 The Project Manager’s Guide to Making Successful Decisions
Design Definition
s What are the additional design cycles (redesign, rebuild,
retest)?
s What is the concept/supplier selection?
Validation Definition
s What is the set of validation benchmarks?
s What is the set of design test criteria, e.g., stakeholder
perspective?
s What is the set of design validation mechanisms?
s What is the set of acceptable stakeholder risks?
Product Validation
What are the aspects of the product system to be validated?
What is the set of product system validation benchmarks?
What is the set of operational test conditions?
What are the stakeholder satisfaction criteria?
What validation tools and mechanisms are required?
Market Validation
What is the market validation strategy?
Manufacturing
s What is the set of manufacturing requirements?
s What is the manufacturing architecture?
Success Criteria
s What is the set of success criteria for the project, product,
processes, organization, and environment?
s What are the project risks?
s What is the project type?
s What is the project team structure?
s What are the project risks?
Stakeholder System
s What is the strategy for defining:
– Operational users?
– Elements influenced by product development?
– Elements impacted by product development?
– Stakeholders’ activities and roles?
s Who are the stakeholders?
Evaluation
s What is the strategy for evaluating organizational
competency factors?
Training
s What is the training plan?
272 The Project Manager’s Guide to Making Successful Decisions
Termination
s What are the project termination requirements?
274 The Project Manager’s Guide to Making Successful Decisions
Role Definition
s What is the organizational responsibility matrix (who does
what)?
Makeup
s What are the organizational team composition requirements as
defined by:
– Required degree of efficiency?
– Allocated personnel cost budget?
s What is the set of core skill competencies?
s What is the set of experience, skill requirements, and
interpersonal style requirements for organizational team
individuals?
s What is the time phasing of project personnel into the project?
s What is the process for team staffing?
s What is the set of external components, e.g., contractors,
subcontractors?
Resources
s What are the resource requirements necessary to perform
tasks?
s What are the infrastructure and tool requirements, e.g.,
software, computer support, building, office space?
s What are the resource constraints?
APPENDIX B Project Management Decisions 275
Validation
s What is the team composition validation methodology?
s What is the strategy for validating organizational processes?
Location
s What are the physical arrangement and location of the team as
influenced by:
– Communication objectives?
– Technological capabilities?
s What is the optimal project location and layout?
Training
s What is the required training?
s What is the timing of required training for organizational team
members?