STAINLESS WATER TANK CONCRETE PLATFORM DETAILS SCHEDULE OF CONCRETE BEAMS SCHEDULE OF GROUND SLAB 1.0 NOTES ON CONCRETE SLABS |A. AIL SLAB REINFORCEMENTS SHALL HAVE A CLEAR DISTANCE OF 20mm FROM THE BOTTOM AND FROM THE 000 TOP OF SLABS, TYPICAL BAR DETALS ARE SHOWN ON FIGURE 6 Fre-1 8. IF SLABS ARE REINFORCED BOTHWAYS, BARS ALONG THE SHORTER SPAN SHALL BE PLACED BELOW THOSE ALONG THE LONG SPAN AT THE CENTER AND QVER THE LONGER SPAN BARS NEAR THE SUPPORTS. . PROVIDE EXTRA REINFORCEMENT AT EXTERIOR CORNER OF TWO-WAY SLAB SYSTEMS AS PER AGURE 7. 0. UNLESS OTHERWISE NOTED IN PLANS OR SPECIMCATIONS, CAMBER ALL RIC. SLABS 3mm OF SHORTER SPAN, . PROFILE OF SLABS AND TS REINFORCING BARS IN CASES OF CHANGES IN ELEVATION SHALL BE AS fre- 3 Fret SHOWN IN FIGURE 8, 300 7 SLAB ON GRADE VERIFY DESIGN £, ‘50mm THICK GRANULAR BASE @ ~ | FBT (1 SLAB DETAILS (2 SLAB DIMENSION \eo] se ws (Ey SES OME SE 5