STAINLESS WATER TANK CONCRETE PLATFORM DETAILS
SCHEDULE OF CONCRETE BEAMS
SCHEDULE OF GROUND SLAB
1.0 NOTES ON CONCRETE SLABS
|A. AIL SLAB REINFORCEMENTS SHALL HAVE A CLEAR DISTANCE OF 20mm FROM THE BOTTOM AND FROM THE 000
TOP OF SLABS, TYPICAL BAR DETALS ARE SHOWN ON FIGURE 6 Fre-1
8. IF SLABS ARE REINFORCED BOTHWAYS, BARS ALONG THE SHORTER SPAN SHALL BE PLACED BELOW
THOSE ALONG THE LONG SPAN AT THE CENTER AND QVER THE LONGER SPAN BARS NEAR THE SUPPORTS.
. PROVIDE EXTRA REINFORCEMENT AT EXTERIOR CORNER OF TWO-WAY SLAB SYSTEMS AS PER AGURE 7.
0. UNLESS OTHERWISE NOTED IN PLANS OR SPECIMCATIONS, CAMBER ALL RIC. SLABS 3mm OF SHORTER SPAN,
. PROFILE OF SLABS AND TS REINFORCING BARS IN CASES OF CHANGES IN ELEVATION SHALL BE AS fre- 3 Fret
SHOWN IN FIGURE 8,
300
7 SLAB ON GRADE VERIFY DESIGN
£,
‘50mm THICK GRANULAR BASE @ ~ | FBT
(1 SLAB DETAILS (2 SLAB DIMENSION
\eo] se ws (Ey SES OME SE 5