RAB Mekanikal
RAB Mekanikal
1 2 3
TOTAL
HARGA HARGA
SAT SATUAN PEKERJAAN
( Rp ) ( Rp )
4 5 6
bh 496,580.00 993,160.00
bh 4,700,120.00 4,700,120.00
bh 11,568,080.00 11,568,080.00
bh 5,445,480.00 10,890,960.00
bh 1,800,000.00 1,800,000.00
bh 711,960.00 7,119,600.00
bh 998,730.00 7,989,840.00
Unit 32,000,000.00 32,000,000.00
318,498,810.00
HARGA SATUAN PEKERJAAN
NO
I
1
2
3
4
5
6
7
8
9
10
11
12
3 - 25
HARGA SATUAN PEKERJAAN
URAIAN PEKERJAAN
PEKERJAAN PLUMBING
1 m' Pemasangan Pipa (PVC Class AW Dia 8" Putih)
1 m' Pemasangan Pipa (GIP Class Medium Dia 1/2")
1 m' Pemasangan Pipa (GIP Class Medium Dia 8")
1 bh' Pemasangan Single Wafer Chek Valve Dia 8 " Flanges
1 bh' Pemasangan Foot Valve Dia 8" Flanges
1 bh' Pemasangan Ball Valve Dia 1/2" Drat
1 bh' Pemasangan Rubber Flexible Joint Dia 8" Flanges
1 bh' Pemasangan Flanges Las Dia 8"
1 bh' Pemasangan Elbow Las Dia 8" GIP
1 unit' Pemasangan Panel Kontrol System
1 Unit' Pemasangan Pompa Diesel pengendali Banjir Kap.4m3/menit Head 10 meter Engine 16
1 Unit' Pemasangan Tanki Bahan Bakar Kap.200 Liter
4 - 25
HARGA SATUAN Rp.
501,180.00
71,630.00
1,081,980.00
4,700,120.00
11,568,080.00
496,580.00
5,445,480.00
711,960.00
998,730.00
9,817,980.00
193,996,390.00
6,655,480.00
5 - 25
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
NO.
A
I
ANALISA 001
ANALISA 002
ANALISA 003
6 - 25
NO.
ANALISA 004
ANALISA 005
ANALISA 006
7 - 25
NO.
ANALISA 007
8 - 25
NO.
ANALISA 008
ANALISA 009
ANALISA 010
ANALISA 011
9 - 25
NO.
ANALISA 012
10 - 25
ANALISA HARGA SATUAN PEKERJAAN
URAIAN KOEF
B C
PEKERJAAN PLUMBING
11 - 25
URAIAN KOEF
B C
Dibulatkan
12 - 25
URAIAN KOEF
B C
13 - 25
URAIAN KOEF
B C
1 Unit' Pemasangan Pompa Diesel pengendali Banjir Kap.4m3/menit Head 10 meter Engine 16 HP
14 - 25
URAIAN KOEF
B C
Bahan
Pompa Diesel pengendali Banjir Kap.4m3/menit Head 10 meter Engine 16 HP 1.0000
Perlengkapan & Alat bantu lainnya 10.0000
Tenaga kerja
Mandor 0.0010
Kepala tukang Pipa 0.0010
Tukang Pipa 0.0010
Pekerja 0.0010
Jumlah
Overhead + profit
Jumlah
Dibulatkan
15 - 25
SAT HARGA SAT (Rp.) JUMLAH (Rp.)
D E F = (C x E)
16 - 25
SAT HARGA SAT (Rp.) JUMLAH (Rp.)
D E F = (C x E)
1,081,980.00
bh 3,884,000.00 3,884,000.00
% 3,884,000.00 388,400.00
-
oh 135,000.00 135.00
oh 115,000.00 115.00
oh 102,500.00 102.50
oh 85,000.00 85.00
4,272,837.50
427,283.75
4,700,121.25
4,700,120.00
bh 9,560,000.00 9,560,000.00
% 9,560,000.00 956,000.00
-
oh 135,000.00 135.00
oh 115,000.00 115.00
oh 102,500.00 102.50
oh 85,000.00 85.00
10,516,437.50
1,051,643.75
11,568,081.25
11,568,080.00
bh 410,000.00 410,000.00
% 410,000.00 41,000.00
-
oh 135,000.00 135.00
oh 115,000.00 115.00
oh 102,500.00 102.50
oh 85,000.00 85.00
451,437.50
45,143.75
496,581.25
496,580.00
17 - 25
SAT HARGA SAT (Rp.) JUMLAH (Rp.)
D E F = (C x E)
bh 4,500,000.00 4,500,000.00
% 4,500,000.00 450,000.00
-
oh 135,000.00 135.00
oh 115,000.00 115.00
oh 102,500.00 102.50
oh 85,000.00 85.00
4,950,437.50
495,043.75
5,445,481.25
5,445,480.00
18 - 25
SAT HARGA SAT (Rp.) JUMLAH (Rp.)
D E F = (C x E)
bh 588,000.00 588,000.00
% 588,000.00 58,800.00
-
oh 135,000.00 135.00
oh 115,000.00 115.00
oh 102,500.00 102.50
oh 85,000.00 85.00
647,237.50
64,723.75
711,961.25
711,960.00
bh 825,000.00 825,000.00
% 825,000.00 82,500.00
-
oh 135,000.00 135.00
oh 115,000.00 115.00
oh 102,500.00 102.50
oh 85,000.00 85.00
907,937.50
90,793.75
998,731.25
998,730.00
19 - 25
SAT HARGA SAT (Rp.) JUMLAH (Rp.)
D E F = (C x E)
bh 160,327,200.00 160,327,200.00
% 160,327,200.00 16,032,720.00
-
oh 135,000.00 135.00
oh 115,000.00 115.00
oh 102,500.00 102.50
oh 85,000.00 85.00
176,360,357.50
17,636,035.75
193,996,393.25
193,996,390.00
bh 5,500,000.00 5,500,000.00
% 5,500,000.00 550,000.00
-
oh 135,000.00 135.00
oh 115,000.00 115.00
oh 102,500.00 102.50
oh 85,000.00 85.00
6,050,437.50
605,043.75
6,655,481.25
6,655,480.00
20 - 25
DAFTAR HARGA UPAH
NO JENIS UPAH
1 Pekerja
2 Tukang gali
3 Kepala tukang
4 Kepala tukang batu
5 Tukang batu
6 Kepala tukang kayu
7 Tukang kayu
8 Kepala tukang besi
9 Tukang besi
10 Kepala tukang cat
11 Tukang Cat
12 Tukang las
13 Kepala tukang listrik
14 Tukang listrik
15 Kepala tukang Pipa
16 Tukang Pipa
17 Mandor
21 - 25
DAFTAR BAHAN BANGUNAN
NO JENIS BAHAN
1.1 PIPA-PIPA
1 PVC AW Dia 8" AW (Wavin) putih
2 GIP medium Dia 1/2" (Spindo)
3 Pipa Dia 8" ( GIP Medium Spindo)
1.2 ASESSORIES
4 Single Wafer Chek Valve Dia 8 " Flanges (Tozen) 10 K
5 Foot Valve Dia 8" Flanges (Mizu) 10 K
6 Ball Valve Dia 1/2" Drat (Kitz) 10 K
7 Rubber Flexible Joint Dia 8" Flanges (TwinFlex)
8 Flanges Las Dia 8" 10 K
9 Elbow GIP Las Dia 8" 10 K
10 Panel Kontrol System
22 - 25
HARGA (Rp.) SATUAN
Rp 85,000.00 Oh
Rp 115,000.00 Oh
Rp 120,000.00 Oh
Rp 120,000.00 Oh
Rp 115,000.00 Oh
Rp 115,000.00 Oh
Rp 102,500.00 Oh
Rp 130,000.00 Oh
Rp 112,500.00 Oh
Rp 115,000.00 Oh
Rp 102,500.00 Oh
Rp 120,000.00 Oh
Rp 115,000.00 Oh
Rp 102,500.00 Oh
Rp 115,000.00 Oh
Rp 102,500.00 Oh
Rp 135,000.00 Oh
23 - 25
HARGA (Rp.) SATUAN
Rp 410,000.00 m'
Rp 55,000.00 m'
Rp 890,000.00 m'
Rp -
Rp 3,884,000.00 bh
Rp 9,560,000.00 bh
Rp 410,000.00 bh
Rp 4,500,000.00 bh
Rp 588,000.00 bh
Rp 825,000.00 bh
Rp 8,500,000.00 bh
Rp 160,327,200.00 unit
Rp 5,500,000.00 unit
24 - 25
256 205 2400
2400 1600 2000
2400 1600 1800
600 1800