Professional Documents
Culture Documents
GEDA Hoist
GEDA Hoist
When repairing and maintaining silos, blast furnaces, co-generation plants and boilers etc, every minute and centimetre of space counts, since access is only possible
So this is precisely where the materials hoist, the GEDA 300 Z Boiler Hoist, should be deployed.
The platform of the pure materials hoist can be accessed for loading/unloading and personnel may also travel in the hoist for assembling/dismantling the device.
The GEDA 300 Z Boiler Hoist can be completely dismantled into its individual parts and is also popular with customers since it can be assembled and dismantled quickly by
two people in only about 40 minutes. In this regard its rack and pinion design has proven its worth as the GEDA 300 Z Boiler Hoist can be assembled significantly more
quickly than wire rope hoists. All connection cords are fitted with plug and socket devices to ensure that assembly is easy and fast.
Gear damage is avoided through the use of a wearing rack and pinion.
Safety devices such as the safety gear, safety stop with an acoustic warning sound and overload protection are included as standard.
Technical Data
Cargo Material
Aluminium mast 2 m Aluminium mast 1 m Mast tie Cable bin 100 m Trailing cable guide Uppermost mast
GEDA MINI 60 S GEDA MAXI 120 S GEDA MAXI 150 S GEDA 300 Z GEDA SH GEDA 850 ZM P